Subcontracting work handling in CO

Hi ,
For my client , we need to configure and handle  subcontracting business both for subcontractor & subcontractee . Both under the same corporate group but separate leagal entity . For example , A is giving a subcontracting owrk to B .   In the books of A  subcontarcting configuration and the corresponding steps  are clear to me . But not sure how to handle , in the books of B in SAP from CO perspective . .
Any inputs how to handle the same in books of B from CO perspective  ?
Thanks in advance for help .
Regards ,
Arnob

Hi Deve.,
Thanks for your reply . but our senario is bit complicated . We are raising Subcontracting order in the books of A  and the subcontracting vendor is B . Doing 541 & 542 mvt type for giving the subcontracting material to B and reciving back the same from B .  So far B is concerned ,  he is doing some small services . So as per the subcontracting procedure , neither input materials from A  , nor the final product after subcontracting work will hit the books of B , for the entire cycle it will remain in the books of A --. Consumption as well inventorisation .  In the books of B , we have some small expense items for doing the subcontracting work.
Now , in my clients scenario B will pay the Exicsie duty and thats  why they are looking for production order in the books of B . Since , neither we have the input materials nor the final products in the books of B , I am unable to create production order .
One  possibility , is to create a service order in the books of B to capture this activity in the books of B along with Excise duty .Unfortunately , we do not have CS module in place .  Excise liability on the part of  B is confirmed one  and quite unique considering the business model .
Any thoughts based on the above inputs.
Regards ,
Arnob

Similar Messages

  • Subcontracting PO help!

    Hi Gurus,
    I have the following scenario here.
    Company send 10 components out for subcontracting work. 10 finished products were received. 3 out of 10 products were spoilt. Vendor invoice is received for the 7 finished products.
    How can we handle this scenario in the system?
    Thinking of doing the following steps. Please advise if it is correct.
    - Goods receipt for the 10 products
    - Scrap the 3 spoilt products
    - Not sure how to post the invoice. Post the invoice for 10 qty instead of 7. How do i resolve the open invoice qty?
    Points will be awarded for helpful answers. THANKS!

    As Vendor is invoiced for only 7 you have to make GR for 7 only.  If u have already made GR for 10 nos you have the following options
    1) REject the 3 nos in quality inspection and send them back to vendor as return delivery.  Here you ensure that components required for end-product are also reversed i.e. are not consumed with 543 movement.
    2) if you want to scrap the 3 nos received, u have to do invoice verification for 7 numbers only and clear the GR/IR manually
    Hope this helps u

  • Work on IMOVIE08 import

    Hi,
    I imported work from imovie08 via xml. At first editing worked fine. Than, because of the fact that audio was imported as two mono tracks I began to create stereo pairs (btw, is there no other way as to do that with every dammed single clip?).
    Also I shifted some scenes to other places in my sequence. Suddenly I got that annoying situation that no efffects could be insertet. (not enough material...). Indeed there was no overlapping at the editing points.
    Next I tried the described procedure to get overlapping. This results in 'clip collision at...' No I am somewhat desperate and do not know what to do
    Probably all my negative expiriences are typacal for a newbee but perhaps somebody has a hint for me how to avoid a situation as described above
    applemanni

    Tom,
    thanks for the quick answer! But if it would have been so easy, I would not have made this remark. When I select all, I cannot use the command in the 'modify' pull down, to bulid stereo pairs, it is grey shaded! Unfortunately it worked in undoing stereo pairs, so now I have mono again )-:.
    Now to transitions. At first, after having imported the sequence from IM08, it was possible to insert transitions at every point I wanted.
    Than I did some editing (moving around scenes, building stereo pairs (by single clip!) trimming shots etc.
    After doing so I wanted to insert a transition at a point where after shifting new scenes where put together and - I failed. I realized that it was not possible to insert transition at any place in that sequence.
    How is it possible that all this 'working handles' necessary for transitions simply disappear?? Can I get them back without this time consuming procedure with the ripple tool discribed by you?
    Greetings
    Applemanni

  • Problem using Handler chain with JAXWS

    Hi, I want to use handler chain on a web service and I'm not sure if I understood correctly how it works. In every example I found on the web the handler chain is applied on the client side (the binding is made on the generated client side). So, when I send a request the handler catch an outbound message and when the web service respond, it receive an inbound message. The problem is that I would like to link the handler on the server side, i.e. when the web service receive a request, the handler receives an inbound message and when the WS respond it receives an outbound message.
    Is it possible to do so?? I mean, it makes no sense to link the handler on the client side, since I don't have control on the client side, I produce web services and I want to apply some handlers at this level.
    Any idea??? Or is there something that I didn't understand about handler chains??
    Thanks,
    Korg

    Hello again, I finally found how to do what I wanted to do. The problem came from different examples I found on the web. In my handler.xml file, the structure must be something like:
    <jws:handler-chains xmlns:jws="http://java.sun.com/xml/ns/javaee">
    <jws:handler-chain>
    <jws:handler>
    <jws:handler-class>........</jws:handler-class>
    </jws:handler>
    </jws:handler-chain>
    </jws:handler-chains>
    In many examples, there is an element at the root that is "handler-config" and it doesn't work if I use it this way. Here's an example of a handler.xml file that doesn't work:
    <handler-config>
    <handler-chains>
    <handler-chain>
    <handler>
    <handler-class>............</handler-class>
    </handler>
    </handler-chain>
    </handler-chains>
    </handler-config>
    Korg

  • Subcontracting and atp check

    hi
    has anyone out there found an error or questionable conduct by ATP in a Subcontractor PO, ie partial deliveries with the change of BOM afterwards and a new ATP ????
    Does SAP SubContracting work 100%?

    Refer note 323991.

  • Subcontracting process in PS

    Dear All
    In my client requirement they are giving material  to do Subcontracting work for vender Through project how to map in sap by which activity i want do this please help me sir
    Regards
    Raj

    Hello Raj,
    1. Make a proper WBS structure, by which you want to control cost and budget. based on the WBS structure you can assign certain WBS to subcontractor. This is done through raising PO to a vendor and account assignment to WBS element.
    The same way services also can be sub contracted, but in services we have to use service activity, service entry sheet and billing can be done through the amount of time spent or time booking.
    2. In subcontracting, vendor (the subcontractor) receives components from the company from which he produces a product. The product is then ordered by company through a purchase order. The components required by the vendor to manufacture the ordered product are listed in the purchase order and provided to the subcontractor. The components can be determined by the system via a bill of material.
    2. If the assembly is inhouse manufacturing, components are manufactured at vendor, then
    purchase of components
    Goods receipt for purchase order
    Goods issues to productin order
    Production
    Delivery production order
    Goods issue to network activity or consumption.
    Hope this helps
    Thanks,
    Srihari.G

  • BOM mandatory for Subcontract PO .

    Dear All ,
               My client wants to make BOM mandatory for subcontract PO .Like whenever I create a Subcontract PO with item category L and BOM is not maintained for the material , the system should give error message .
              We have 2 links for this .One is item category L and other is purchasing group 005 which they have maintained for subcontracting work .Please let me know how to maintain error message for this .
    Regards
    Abhijit Das

    Hi
    For Scheduling agreements, the system do not  issue any error message while creation.
    But when you maintain Delivery schedules in transaction ME38 , they system will ask for component and schedule lines cannot be saved without entering the components.
    Gobinathan G

  • Old Photoshop 4 serial number won't work

    I've made headway with trying to reinstall my Photoshop 4 CD on VISTA (P4 with P5 upgrade gave me 4 glorious years on this computer. I originally got P4 bundled with a scanner in the 90s). To review, for some reason several months back it stopped working and reinstallation wouldn't start.
    Now suddenly using the copy of the CD I placed on my hard drive has gotten as far as the serial number. Except the serial number keeps getting rejected. I cleared all instances of Adobe and Photoshop and Photoshp from the registry when I tried to troubleshoot the first time and before I tried the CS6 trial (didn't care for it. The CS5 at work handles much nicer without the overkill). I don't THINK it's the number itself.
    The fact that I got as far as entering a code is great. The fact that a correct code is not working - not so great.

    Photoshop 4?! Wow. I think I still have a copy of that around, but that's an ancient version. Heck, I even still have 5.5 on a Macbook 5300 in my home office museum. 
    For me PS 5.5 was a sweet spot in functionality, before the CS name change. Personally I still use CS2, which is also getting long in the tooth ... but added some RAW and other improvements over CS(1).  If you could get a licensed copy of CS2, I think you'll find it comparable in interface and workflow to 4 or 5.5 with minimal re-learning. (And there are some great "get up to speed with new version" books on CS2 you could get cheap on the used book market.)
    I wouldn't even want to use 4 due to improvements in memory use, speed, and some updates to librarys and plug-ins since that release.

  • Subcontracting Account Postings

    Hi,
    Can any body explain me what are the posting happen during Subcontracting cycle, After GI and after GR (101 and 543).
    What might be the difference if we used price control V or S.

    Accounting Entries for a Subcontract Order
    You check an invoice for a subcontract order in the same way as for a standard purchase order.
    Additional account postings do, however, occur if a price variance has occurred. These postings are shown in the following example :-
    Postings for a Subcontract Order 
    In this example, a subcontract order was created for the end product "ASSEM-1". The components COMP-1 and COMP-2 were provided to the subcontractor. 
    Purchase Order 
    50 pieces of material ASSEM-1 were ordered. The subcontract price is $10/piece (total value = $500). 
    The following components were provided to the subcontractor: 
    15 kg   of the component COMP-1 
       5 pcs of the component COMP-2 
    Good Receipt 
    The subcontractor delivers 50 pieces of material ASSEM-1. 
    At goods receipt a consumption posting for the components provided to the subcontractor is automatically made. It is valuated at the price from the material master record, for example: 
    15 kg  of the component COMP-1 at $20/kg = $300 
       5 pcs of the component COMP-2 at $30/pc = $150 
    The goods receipt is valuated with $950. This is calculated as follows: 
    the subcontract price      (50 pcs * $10/pc = $500) and 
    value of the components ($300 + $150). 
    Invoice Receipt 
    The vendor (subcontractor) sends you an invoice for the subcontract work. However, the price is $10.50/pc. The invoice is, therefore, 50 pieces ASSEM-1 * $10.50/pc = $525. 
    Posting Schema for Moving Average Price Control 
    In this example, the following postings are made at goods receipt and invoice receipt, if the material (end product) is valuated at moving average price: 
    Postings 
          At goods receipt 
          At invoice receipt 
          Vendor account 
                  525 - 
          GR/IR clearing account 
                  500 - 
                  500 + 
          External service account 
                 500 + 
                   25 + 
          Stock account: end product 
                 950 + 
                   25 + 
          Stock change 
                 950 - 
                   25 - 
          Stock account: comp. 
                  450 - 
          Consumption account 
                 450 + 
    Posting Schema for Standard Price Control Without Price Differences 
    For materials (end products) with standard price control also note that no price differences are posted if the total of the external service value (for example, $500) plus the "material to be provided" value (for example, $450) varies from the value at standard price (for example, $1000). Posting of a price difference is not required because each posting line has its own
    offsetting entry. 
    No posting lines are created on the stock account or on the stock change account when an invoice is received. 
    In the above example, the following postings are made for a material with a standard price of $20: 
    Postings 
         At goods receipt 
         At invoice receipt 
         Vendor account 
              525 - 
          GR/IR clearing account 
              500 - 
              500 + 
    External service account 
             500 + 
               25 + 
    Stock account: end product 
           1000 + 
    Stock change 
           1000 - 
    Stock account: comp. 
             450 - 
    Consumption account 
            450 + 
    Posting Schema for Standard Price Control With Price Differences.
    However, if you wish to generate a price difference posting in those cases where the manufactured material is managed at standard price and the standard price varies from the receipt value (externally performed service + value of components + delivery costs), you can configure this in the Customizing system of Inventory Management. 
    In the above example, the following postings (including price differences) are made for a material with a standard price of $20: 
    Postings 
           At goods receipt 
           At invoice receipt 
    Vendor account 
           525 - 
    GR/IR clearing account 
           500 - 
           500 + 
    External service account 
           500 + 
             25 + 
    Stock account: end product 
         1000 + 
    Stock change 
           950 - 
    Price difference 
            50 + 
    Stock account: comp. 
            450 - 
    Consumption account 
           450 + 
    Regards,
    Ashok

  • Subcontracting PPMs for two subcontractors

    Hi all,
    We have an issue using subcontracting in SNP.
    The demand from the customer is to have two subcontracting options available for a material/locations, and the planning to be split by a quota.
    In ECC we have in the material master a prod. version (X001), using a dummy subcontracting work-center.
    Also we have two info-records, both having the production version (X001) attached.
    In APO 4.1 we have two external procurement relationships (as expected from two PIRs) and two PP/DS PPMs (for both subcontractors).
    But both PP/DS PPMs have the same Plan name, they differ only by the source of supply. And as the mode generation combination is created by the PP/DS Plan name, it creates only one, therefore we get only one SNP PPM - using one (the older) of the subcontractors. If a planned order is created in the second one, the order has no source of supply.
    What is wrong in our scenario? Is there a way to use two subcontractors at the same time (for the moment the only problem seems to be the missing SNP PPMs)

    Does your vendor's supply more than 1 plant?  If so, you should use location type subcontractor vs vendor.
    You will need to modify the naming convention for SNP PPM's.
    Most of the clients I have been at, modified the naming convention for both PP/DS and SNP PPM's to match a more simplified and logical naming convention.
    Ken Snyder

  • Subcontracting Component  Issue Error

    HI,
    i am creating Sub contracting Purchase order.component qty is issued for unlimited, accepted for PO.
    my option is Po Parent qty against Component issued Excess qty not Allowed.
    Purchase Order Qty A: 100Pc
    Child Qty               B : 100PC
    Issued qty             B :150 Pc is Allowed.
    this Child qty are maintained for BOM.
    Plz, Explain and Advise the Issue.
    By,
    Jeevan

    Dear,
    You can not issue the quanity more than the BOM component quantity with respective to the PO.
    Transaction ME2O uses the component quantities from the individual purchase order items. However, it does not set up a stock based on purchase orders (POs). The system therefore does not assign POs directly to quantities either. The evaluation of the SC stock is therefore always a cumulative analysis of all the requirements of a material over time. The "Closing Stock" for each material displays whether there is excess stock or a stock undercoverage at that time, or whether requirements and stock are balanced.
    You can set up the SC stock with larger quantities than component requirements exist at that time. This option is often used if, for example, you want to set up buffer stocks for the subcontractor for subcontracting works that frequently recur.
    Hop clear to you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on May 19, 2009 12:26 PM

  • Project stock material for subcontracting

    Hi,
    I want to send project stock material (special stock with 'Q') for subcontracting vendor. Pl elaborate the procedure.
    Subcontracting PO is with account assignment category 'Q'.
    Pl revert.

    Hello Sachin
    We had similar requirement but in a different way. i.e sending material for subcontracting work for materials returned by customers getting it reworked bringing the reworked material back to plant stock and then sending to customer.
    We had used alltogether different transactions ADSUBCON is the transaction code. Prerequsite is you will have to implement BADI BADI_ADSUB_MVT_TYPES of enhancement specefe ES_BADI_ADSUB_MVT_TYPES.
    Regards

  • Subcontracting for Non valuated material.

    Hai all MM gurus,
    The client is doing Jobwork - From fabric to Trousers for the customers. This material is not his own material, so he treat this material as a Non valuated material.The part of work say pocketting or lining has to be done by his vendor, it should be a subcontracting work. While doing Subcontracting PO for this non valuated material, system is throwing the error " acct assignment mandatory ". Is there any other way to map this scenario in SAP.

    hello u r scenario is littlle confusing...
    u r supplying the compent material to SC vendor so u have to attach the same in component over view.. but any how u r goin to give him the conversion or job work chargs for doing the job work.. so u need to create the valuated material(fineshed material which u r going to receive from Sc vendor and sell the same to ur customer)...and attach the same in PO with item category L....

  • Sub-contracting job work

    Hi all
      Customer (X) sending raw material to my client (ABC) for subcontracting work, after completing job work that is delivered to customer(X).But that raw material delivered directly from some vendor of customer (X).So Excise gate pass for ED credit comes along with raw material. In this case my client avail credit of ED and charge ED on the customer when delivering the material. How to configure this process? We know the material price when inward the material.
    How to in ward the material by using MM? What movement type to be used and how to keep the stock as customer stock? How to issue it to production and get it back as sales order stock? When delivering the material the stock should be reduced with 8% process loss ( Evaporation while melting)

    Hi Ramesh,
    Please confirm,who is having owership of stock and why does management want Product costing to be implementated?
    Product costing will not too much extensively advisable for industries who is exclusive in subcontracting.
    If business is expecting comparision between expenses and absorbed on service provided then go with internal order or cost center.
    Hope this helps you.
    Ashok

  • Internal Subcontracting

    Hi All,
    I need kind help in mapping the following scenario..
    My client does the subcontracting work for the customer. The input materials are provided by the customer and after doing the production process the produced material is sold to the customer. I am using PP-PI and that too without MRP.
    Please let me know the complete cycle right from procurement of the customer supplied material to production and than to sales to the customer.
    Thanks and Regards,
    Anup Dubey

    Hi
    http://sap-img.com/sap-sd/consignment-sales-process-in-sap.htm
    Hope this will be help full
    Thanks
    Prashanth
    Reward point if this info was usefull

Maybe you are looking for

  • No music on iPod after sync

    I've been having a problem with syncing music to iPod gen4 and and iPod gen3 for some time now.  There are similar issues reported in a variety of questions on this forum:  after syncing, apparently successfully via iTunes, you disconnect the iPod an

  • Lost ability to download PDF documents with upgrade to 4.0

    Before upgrading to 4.0 could go to a website and click on a document, then pick a specific page to download to Adobe Reader 8 and get a clean PDF document. After upgrading could go to the same site, download a document and the site would show that i

  • Ipod disappears from itunes source list after installing update 1.0.2

    i plugged in nano to install more music. itunes asked if i wanted to install update 1.0.2 on my ipod, i clicked ok, and it installed. But the ipod never restarted or reappeared in source list or windows device manager (except briefly in devices when

  • How to disable adobe flash in chrome and use windows adobe X

    I keep getting "shockwave flash has crashed" and was told to disable flash player in chrome, but when I do that, videos won't play. I DO have Adobe X installed but chrome won't use it. However, just having it seems to cause a conflict. I have Windows

  • HELP- UNABLE TO INSTALL BUILT-IN ISIGHT

    WINDOWS VISTA ULTIMATE IS NOT RECOGNIZING MY BUILT-IN ISIGHT AFTER INSTALLING THE MAC WINDOWS DRIVERS USING THE BOOTCAMP DISK CREATION PROGRAM.