Switcover production to DR and DR to production in SAP server

Dear All,
How I switch over production to DR and DR to production in SAP server R3 server?
thanks
manas

Hello Manas,
Are the PRD and DR in a cluster?
If the DR has a different hostname you may need to check the following notes:
[757692 Changing the hostname for J2EE Engine 6.40/7.0 installation|http://service.sap.com/sap/support/notes/757692]
[8307 Changing host name on R/3 host: What do you do?|http://service.sap.com/sap/support/notes/8307]
Regards,
Eduardo Rezende

Similar Messages

  • Products(Page 3) and Add/Modify Products(Page 6) of Sample Application

    I would like to create Products(Page 3) and Add/Modify Products(Page 6) of Sample Application .
    I would like to get manual/ instruction/ with complete documents.
    Thanks in advance.

    hope this will help:
    http://www.oracle.com/technology/products/database/application_express/pdf/2.2.1_advanced_tutorials.pdf

  • Create number range and assign new product id

    hi,
    can anyone tell me the steps to create the number range and assign it to the product id..
    and replace existing product id to the new one through program or.. is there any standard program is available to change the product id
    thanks
    dinesh

    Hi Dinesh,
    Agree with Arden, I think there is no number range feature for product IDs. You can have your own number range object and intervals with custom solution on UI to create product IDs sequentially.
    I am not sure but have a look at the TCode: COMC_MATERIALID_ALL which may be doing what you need.
    You cannot change the product ID once created I think.
    You can change the category assignment of the products through the report : COM_PRODUCT_RECATEGORISATION
    Check enhancement spot : CRM_PRODIL_EXIT which has got some methods for CREATE and MODIFY Products.
    Hope this will be useful.
    Regards,
    Naresh

  • Difference between Production Supply Area and a Storage Location

    Hello Experts,
    Basic question but wanted to get more clarity on the concept as i never worked on the PSA
    Can someone tell me the exact difference between PSA and a SL. I understand PSA is a Kanban, WM and SL is an IM concept. Can a work center have a storage location assigned or just a PSA? Can a GI be done from PSA or just from a storage location.

    Hello
    The production supply area is a master data used by WM, while the storage location is used by MM-IM.
    Check this link for details:
    Production Supply Area - Warehouse Management System (WMS) - SAP Library
    The goods issue is done with reference to the storage location
    It is possible to assigne a storage location to a production supply area and assign the production supply area to the work center.
    BR
    Caetano

  • Product Revenue Bookings and Backlog Dashboard does not display any data

    Product Revenue Bookings and Backlog Dashboard does not display any data even though the load completed successfully.
    They are able to see just the parameters.
    Not sure if the upgrade of the database from 9.2.0.6 to 10.2.0.3 is a factor.
    What can I check?
    Is there some table to verify that the data exists for display in the Product Revenue Bookings and Backlog Dashboard?
    Screenshot is at:
    https://gtcr.oracle.com/gtcr-dir/gtcr_5637/6415786.993/Product_Revenue_Bookings_Backlog_Dashboard.doc
    Support suggested to create a new request set and run the initial load with load all summaries option; but there was no change in the Product Revenue Bookings and Backlog Dashboard.
    Any ideas?

    hi
    We have faced the similar problem after the upgrade to 10G
    What we did was
    Ran the initial load of time dimension, Item setup request set, and the request set of all the dash board in the clear and initial load mode..
    we were able to get the data once the clear and load is completed successfully
    Regards
    Ramesh Kumar S

  • Adobe Creative Cloud oder Adobe Creative Suite 6 Production Premium Student and Teacher Edition

    Hallo.
    Ich bin im Moment ein Student. Mein Studium geht noch 10 Monate lang.
    Jetzt weis ich nicht so recht was sich für mich daheim mehr lohnt.
    Die
    Adobe Creative Suite 6 Production Premium Student and Teacher Edition für 575€
    oder die Adobe Creative Cloud.
    Ich könnte wärend meines Studiums das Angebot für 20€ im Monat nutzen, allerdings kann ich ja nach meinem Studium nicht einfach auf dem Studenten abo bleiben? Wie ist das geregelt? Denn sonst hänge ich ja wieder auf den 60€ im Monat......als privat Kunde....für meine eigenen Projekte.
    Im Grunde wär die Creative Suite 6 bei dem Preis auf dauer bestimmt besser geeignet, aber ich habe Angst das die CS6 Versionen zu veraltet sind/zu schnell veralten.

    Nun ja, "veraltet" ist keine Aussage. Das hängt ja wohl in erster Linie davon ab, was du für ein System verwendest und wie lange du es behalten willst. CS6 läuft prima auf Windows und wird es noch ein paar Jährchen, nur auf Mac wird's langsam finster, weil sich Apple nicht drum schert...
    Mylenium

  • My computor won't let me download apple products like safari and itunes. Why? What can i do to fix this?

    I'm running windows vista home premium and my computor won't let me download apple products like safari and itunes. why? what can i do to fix this? i belive this happened when i tryed to update itunes 10.whatever it tells me "There is a problem with windows installer package. A program required for this install to complete could not be run. Contact a support personnel or vendor." So im contacting apple as i think you guys might be able to halp me. can you help please? Thanks

    I apoligise i didn't relise that since i have seen apple support people post on questions here i misunderstood.
    Yes i am 100% i downloaded the setup for safrai and itunes for windows from the apple website.
    P.S. I apoligise for my bad spelling it's not my strong suite

  • I have had  adobe creative suit 6 design standard for 2 years and all of the sudden it would not open. I do not have the windows disc anymore however i still have the product code, number and serial number. is there anyway to get my photoshop back?

    I have had  adobe creative suit 6 design standard for 2 years and all of the sudden it would not open. I do not have the windows disc anymore however i still have the product code, number and serial number. is there anyway to get my photoshop back?

    uninstall, clean and reinstall per Use the CC Cleaner Tool to solve installation problems | CC, CS3-CS6
    for the installation file(s):
    Downloads available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4 | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  12 | 11, 10 | 9, 8, 7
    Photoshop Elements:  12 | 11, 10 | 9,8,7
    Lightroom:  5.5 (win), 5.5 (mac) | 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5
    Contribute:  CS5 | CS4, CS3
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.

  • Regarding production order closing and demand closing

    Hi Gurus,
    I am new to pp module..
    I have the requirement on production order closing and demand order closing.
    The requirement needs plant,reuirement plan no ,basic finish date and percentage in selection screen.
    In the output display plant,requirement plan no,PIR No,order,order finish dat ,***.order qty,***.delivered qty,qty difference,percentage%,order status as in alv grid display.
    And in the output it has 2 buttons named technically complete and demend close .whener user click on first button system should take all the orders which r selected to the program with the same reuirement plan as for the selected order and then technically close all the orders with the same reuirement plan number.
    when user clicks on demand close button,system should take the respetcive requirement plan number,order finish date and material and it has to take the pir no which match the above and deactivate the pir and save.
    I need the help about this.
    Thankx in advance.

    Dear Chandu,
    First settle the production order using the T Code CO88,and then close the production order.
    Prerequisites
    Prerequisites for setting the CLSD status are:
    The order must have the status Released (REL) or Technically completed (TECO)
    The order balance must be 0
    There can be no open purchase requisitions, purchase orders or commitments
    There can be no future change records from confirmation processes
    Regards
    Mangalraj.S

  • Report on production order status and shortage report

    I want to know standard report on production order status and shortage report. Kindly suggest.

    COOIS - Production order information system . In this report you can give system status in selection screen  and in report you can get complete status details (both system and user status) .
    shortage report - CO24

  • When i try to open photoshop this shows up Please uninstall and reinstall the product.  If this problem still occurs, please contact Adobe technical support for help, and mention the error code shown at the bottom of this screen.  Error: 16

    i had to take my photoshop file into a hardrive because my dad was going to give me a new Mac and when things didn't work out and went back to my old one i use the time capsule thing to save everything before but didn't give me photoshop so i physically moved the file and tried to open it but then this error shows up
    Please uninstall and reinstall the product.
    If this problem still occurs, please contact Adobe technical support for help, and mention the error code shown at the bottom of this screen.
    Error: 16
    and when i click the uninstall app on the file it tells me this
    The alias “Uninstall Adobe Photoshop CS6 2” can’t be opened because the original item can’t be found
    and when i click fix alias i click on photoshop and the app just turns into photoshop and i just run in circles
    please help thank you

    Run the cleaner tool and reinstall.
    Use the CC Cleaner Tool to solve installation problems | CC, CS3-CS6
    Download CS6 products
    Mylenium

  • I just got my first Apple product (ipod touch) and am needing to know how to transfer music from another itunes list. Can music that is currently on another ipod and/or computer be transferred to my new touch and my new itunes account? Thank you!

      
    Recently purchased my first Apple product (ipod touch) and am needing to know how to transfer music from other ipods and other itunes accounts. Can this be done? I have plugged in another ipod into my new itunes account and it will not let me transfer the music that it contains into my new account. Any/all help is much appreciated. Thank you!

    I have no music in my itunes account yet. I am trying to transfer music from friends' accounts and their ipods/playlists.

  • HT1386 How do I create one Apple ID and iTunes user name and password for all of my Apple products: iPad, iPhone, and iPod plus iTunes on my PC?

    How do I create one Apple ID and iTunes user name and password for all of my Apple products: iPad, iPhone, and iPod plus iTunes on my PC?

    Yes, I do have multiple devices and it appeared to me that every time I tried to sync or log onto iTunes, the password was incorrect.  Consequently, I was and am constantly changing it.  Wouldn't it be nice if Apple would simply say that you only need one Apple ID and one password regardless of the number of Apple devices you intend to sync via iTunes. 
    Barring the above, how about a way to merge all of the Apple IDs and passwords into one.

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • Allocating Standard and Variances of Production Costs into CO-PA

    Hi Experts,
    I would like to ask you about the process of allocating eg. humal labour into CO-PA.
    Lets have an example:
    We have planned to spend 10 hours on some action. But actually we have spent 20 hours.
    When we allocate our time from some PC, we have to allocate actuals, that means 20 hours, which will come into CO-PA online.
    At the end of the period we run Production Order Settlement and find the variance.
    What will now happen do distinquish between the planned costs and variances?
    Thanks in advance for your answers!
    Kindly Regards,
    Radek

    Hi,
    I am not really sure about your question
    We have planned to spend 10 hours on some action. But actually we have spent 20 hours.
    When we allocate our time from some PC, we have to allocate actuals, that means 20 hours, which will come into CO-PA online.
    At the end of the period we run Production Order Settlement and find the variance
    The 20 hours will only flow to Production order and not to COPA online. 
    Whatever the difference between the planned actual vlaues in the cost centers, they will come a cost center variance report. It does not effect any where else.
    But if there are any balances left out (difference between the total cost collect to the cost centers and the cost obsorbed to production orders etc), this values need to be assessed to COPA using COPA Assessment cycles
    I hope i touched your question.
    Please do let me know if your question is different. If it is different, please rephrase your question
    best regards
    Surya

Maybe you are looking for

  • Using new Apple ID on an old iPad

    Hi, I have a question. I recently had my iPhone stolen. On that Apple ID I also had my iPad. I now have a new phone and decided to create a new Apple ID (I feel safer this way). My question is, can I simply change Apple ID info on my iPad to the new

  • Log file in project online

    Hallo, I Need crate a log file which will contain all transactions made by project online users. how can i do that.

  • NEED HELP ( sound doesn't work )

    Hello, i such a problem: i've bought a new computer P4 MSI motherboard whith OB sound card. After installing windows,my speakers doesn't work.In hardware devices there are 3 quastion signs : ? other divices ? Ethernet controller ? multimedia controll

  • When I plug my iPad into my laptop it doesn't pick it up on iTunes?

    When I plug my iPad into my laptop it doesn't pick it up on iTunes?

  • Android "L"

    I realize this is breaking development on Android and won't be out for some time officially but I downloaded the developer preview and found all my AIR apps just display a grey screen.  The native extensions like ads and dialogs still come up but not