Systems not checking in

Hi,
I'm having a problem with one of my systems not checking in to Update Connection. I have registered the system using sconadm. Registration completes fine and the system shows up as being available for updates. After two hours however the system then appears to fail to check in again and displays as "Not checked in" in the web interface. The last check-in date is displayed as the time that the system was originally registered.
Any ideas as to how I can go about fixing this? I've tried deleting the system, waiting 24 hours and then re-registering but this doesn't seem to help.
Thanks in advance for any suggestions.
Message was edited by:
kjdavidson
Fixed typo

OK, I think I've found the problem. I noticed I had a lot of these entries in /var/adm/messages
CNS Transport[1691]: [ID 617356 daemon.error] Could not send message from queue: /var/tmp/cc-transport/
CCTQueueStore/store/queues/REGISTRATION/registrationA quick search turned up the following thread
http://forum.sun.com/jive/thread.jspa?threadID=92320&tstart=15
which seemed to give the solution
1. Apply patch 122231-01
2. Run /usr/lib/cc-cfw/platform/transport/bin/cctrunner -p to verifiy the connection.
After doing these all the temporary registration files in /var/tmp/cc-transport/CCTQueueStore/store/queues/REGISTRATION/registration disappeared and the system now seems to be checking in and selecting updates.

Similar Messages

  • System Not Checking Release Budget

    Hi
    Exports
    My cliant using ecc 6 Bcs budget.
    When i enter intial budget system automatically treated As availability amt.Here Release not Effected.
    I done Budget Release Customization settings.why Release not effect.
    For Ex.
    Intial budget enter-Rs. 10000 For Commitment budget,Payment budget (FMBBC)Vlaue type-BI Budget,Process- Enter,Bud cat-CB,PB Document type-Budget enter,Budget type-BI(Budget intial)
    Execute-FMAVCR01-Consumable budget-10000,Consumed Amt-0,Available Amt-10000.
    Now i Release Rs.5000/- Through (FMBBC) for commitment budget and payment budge Value type-R1 Release,Process-Enter,Bud cat-CB,PB,Document type-Budget release,Budget type-Budget Type Release .
    System Showing Document posted for budget release but not update in FMAVCR01.
    Now i posted F-02 For Expencess jv For 10000/- Document posted.
    And also i am using for budget intial and release documents same no ranges.(Maintain Number Range Interval for Entry Documents-01)Same no ranges i assigned in(Define Document Types)
    Please any body can help me.
    Regards.
    Devi.

    Dear Devi
    you should make it like below
    FM Area              ( your FM area )
    Control Ledger       ( control ledger )
    From Fiscal Year     2011
    Version                    Active version
    Value Type Selection       Budget or releases according to fund dependent settings ( Choose Blank )
    WF Status for AVC    P     Posted budget only
    then system will check for the released budget only
    you can use the t code FMMPRELE - Release Budget Data  to release the budget monthly
    i hope this help you
    Esam abd elfattah

  • System not checking the source list while creating Scheduling Aggrement

    Dear Gurus,
    when i create a PO for a material(XYZ) which is not having a vendor(100) in the source list the system throws me a error message sayin that the vendor(100) is not maintained i the Source list.
    but the same is not happenin when i create a Scheduling aggrement.
    Can you please advice me which setting i am missin here?
    Thanks...
    Kumar

    Hi,
    Are you trying to create the Scheduimg agreement for the same plant as that of the Purchase order?
    As "Source list mandatoty" check box is in the plant specific view of Material master,it is possible that it is not ticked in case both the plants are different.
    Please check & advise.
    Thanks & regards,
    Kaveri

  • F110 Automatic payment checks printed system not updated

    Hello Gurus!
    Original Invoice is entered using FB60.
    When Automatic payment run (F110) is run, every thing looked normal except for the check numbers for that rundate/id combo the check numbers started at 1 (through 11, not in the range allowed).
    And the status screen has only two lines:
    Parameters have been entered
    Payment proposal has been created
    Missing are:
    Payment proposal has been edited
    Payment run has been carried out
    Posting orders: xx generated, xx completed
    However checks have been printed and most of them are cashed as well. Bank highlighted the exceptions to the positive pay when the check numbers are not on the positive pay file.
    There is no check informaton to be found on the system, in F-58 no open items were found. FBL1N for the vendor shows the line as open and overdue.
    How can I correct this? What are the options.
    Thanks in advance.
    Swami

    After reading variuos notes related to AP payables, note number 444989 is identified
    as the one that came close to a solution to this problem. That note explains how to reuse the payment proposal.
    "Check whether or not the payment run generated any payment documents.To do this, create, for example, a document list and restrict to the document type for payment documents and the posting date of the payment run.
    If no payment documents were generated, then delete the outputs via the menu option: 'Edit > Payments > Delete output'.Afterwards, you can plan the payment run again."
    So after the output is deleted, payment proposal is run again and system generated checks with new good numbers.

  • My mac mini is running slow.  Bought it in 2009.  Activity monitor shows nothing running that should not be.  Someone suggested it might be my operating system?  Check for software updates, and I am current.  Suggestions?

    My mac mini is running slow.  Bought it in 2009.  Activity monitor shows nothing running that should not be.  Someone suggested it might be my operating system?  Check for software updates, and I am current.  Suggestions?

    Open Activity Monitor, Show:>All Processes, sort on CPU%, see if anything using too much CPU% when this happens, click on Memory tab, do you have many Pageouts?
    Open Console in Utilities & see if there are any clues or repeating messages when this happens.
    Check the S.M.A.R.T. status of the drive in Disk Utilty by highlighting the Drive & looking at the bottom of the window.

  • OSX 10.6 .8 -- Firefox automatically starts when I boot up (MacBook Pro Intel). It is not in the Startup Items in System Preferences, and automatic startup is not checked in Firefox Options. Don't know where else to look.

    How do I keep Firefox automatically starts when I boot up (OSX 10.6 .8 -- MacBook Pro Intel). It is not in the Startup Items in System Preferences, and automatic startup is not checked in Firefox Options.

    Hi fullrun-
    Once Firefox is open, you should be able to open the Right click context menu on the icon. From there you select 'Options' and then de-select 'Open at Login'. Hope that helps.

  • HT201412 My iPhone will not respond even once it is hooked to iTunes nor will it respond when I hit the power (reset) button. The screen mentions that the system is checking for "borrowed blocks" (small writing in the top right corner).

    My iPhone will not respond even once it is hooked to iTunes nor will it respond when I hit the power (reset) button. The screen mentions that the system is checking for "borrowed blocks" (small writing in the top right corner).

    Are you using the charger and cable that came with the phone?
    Are you using an unauthorized third party charger?

  • Not aware of system readiness check - SAP Note 817920.

    Hi,
    I am not aware of system readiness check SAP Note 817920.
    Can you please let me know the procedure do it?
    And also I am not able to log on http://server:port/rwb in XI server.
    please suggest me.

    hi
    1. if you want to look this sap note SAP Note 817920 for this you must have market place user id password
    To check SAP Notes go to http://www.service.sap.com/notes
    2. And also I am not able to log on http://server:port/rwb in XI server.
    r u able to login into xi server if yes then u r entering wrong id adn password..if no then check for user id and password is it valid ?
    Thanks
    Kunaal

  • Do Not Check Uniqueness of Data in Write Optimised DSO

    Hello,
    I am working with write optimised DSO with already billion records in it. I have flag 'Do Not Check Uniqueness of Data' in Settings as checked(means it will surely not check for uniqueness of data). I am thinking of removing this flag off and activate the DSO again. I am willing to remove this flag as it will provide option of Req ID input in listcube on DSO and without this list cube will never return back with results.(I have to analyze aggregations)
    I tried removing this flag and then activate DSO in production system with 17 million records which took 5 mins for activation (index creation). So maths says for a billion records activation transport will take around 6 hrs for moving to Production.
    I am willing to remove this flag as it will provide option of Req ID input in listcube and without this list cube will never return back with results.
    Questions:
    How does this flag checks the uniqueness of record? WIll it check Active table or from the Index?
    To what extent DTP will slow down the process of subsequent data load?
    Any other factors/risks/precautions to be taken?
    Let me know if questions are not clea or further inputs are required from my side.
    Thanks.
    Agasti

    Hi,
    Please go through the site :
    /people/martin.mouilpadeti/blog/2007/08/24/sap-netweaver-70-bi-new-datastore-write-optimized-dso
    As far as your ques are concerned... i hope above blog will answer most of it , and if it does'nt please read below mentioned thread.
    Use of setting "Do Not Check Uniqueness of Data" for Write Optimized DSO
    Regards
    Raj

  • In FBL1N system not showing W/tax exempt amount.

    Hi,
    In FBL1N system not showing W/tax exempt amount.
    Regards,
    Nilesh Surve.

    Hi,
    we are doing implementation for country India.
    I have checked report out-put & it is not giving correct figures. Also our client require with holding exempt amount in vendor ledger so that they can immediately extract vendor report with TDS details.
    Regards,
    Nilesh Surve.

  • While updating my iphone, I am receiving a notice that itunes is not available.  Is system not avaialbe and should I just try later?

    while updating my iphone, i recevied a message that iTunes was not availabel and to try later.  Is the system not available or is there something wrong with my computer

    Hey csumner1,
    Thanks for the question. I understand you are receiving a "Not enough free space" alert when attempting to sync your new iPhone 4s. The following article may help to resolve your issue:
    iOS: "Not enough free space" alert when trying to sync
    http://support.apple.com/kb/TS1503
    Resolution
    Try disconnecting and reconnecting your device, then syncing again to solve this issue.
    Orphaned files may remain on your iOS device if it is physically disconnected while syncing music, podcasts, videos, or photos. This can prevent iTunes from syncing the iOS device on subsequent sync sessions. When this happens, the Capacity indicator in iTunes may report a large amount of "Other" disk usage for the iOS device. To resolve this issue:
    1. Turn off the music or photo sync option in iTunes for the device.
    2. Click Apply to sync the changes to the device.
    3. Turn the music and photo sync options for the device on again.
    4. Click Apply again to try to sync the device to iTunes.
              - If the 'Not enough free space' alert appears, continue to step 5.
    5. Turn off the automatic syncing functions for the iOS device. To do this:
              - Select the iOS device from the iTunes window and click the Summary tab.
              - Deselect "Automatically sync when this device is connected" and select the "Sync only checked songs and videos" checkbox.
              - Click Apply to sync the changes to the device.
              - Reduce the amount of data that is being synced to the device and resync the device. For example, if syncing your Music library exceeds the memory capacity of the device, choose "Selected playlists" to transfer rather than "All songs and playlists" under the Music tab in iTunes.
    If the 'Not enough free space' alert appears, continue to step 6.
    6. Restore using iTunes.
    Thanks,
    Matt M.

  • System not giving Forward date when Material will be available

    Dear All,
    I have a problem of system not giving me the forward date when material will be available in the schedule line. I will give you an example - say material - A01 , stock of same is - 500 qty available. Availability check - 02(Individual reqt), all other MRP controllers also set properly.
    Now i create Sales order for the same material  for 650qty, system confirming 500qty but not giving me the confirmed date when rest 150qty will be available in the schedule line.
    Kindly tell me which config setting needs to be enabled to get this in sales order.
    Thanks in advance...

    Is there a MRP element which could cover the remaining 150? Like a purchase or production order, for example?
    If there's none, and you still want to have a confirmation after the replenishment lead time, maintain the RLT in material master, and use/define an ATP check that is taking in consideration RLT.
    If there's such an element, use/define/review ATP checking logic, to include such elements in the check.

  • PO creation-ME21n-Why SAP does not check company code and Plant relation

    Hi All,
    Does someone know, why SAP does not check Plant and company code relation at the time of PO creation or how can we put validation between plant and company code at the time of PO creation.
    <b>Example:</b> Suppose i have a company 0001 which is assinged to Plant 0001. when i am creating a PO with another company code 0002(Entering at header level-Org, data) and using Plant 0001 at line item level. SAP does not do this validation.
    How can we put this check in place?
    Thanks in advance.
    Deepak

    Hello Deepak,
    There are three types of purchasing
    - Company code specific :You need to assign company code to Pur organization
    - Plant specific : You must assign plant to pur organization
    - Cross company purchasing: No assignment between company code and pur organization.
    In the case 3, the system will not check company code and plant relationship, but it will check plant and pur organization specific.
    The following is the copy of sap help text:
    You can assign a purchasing organization to one company code. This is company-specific purchasing.
    You can assign a purchasing organization to no company code. This purchasing organization can then procure for all plants assigned to it, irrespective of the company code to which the plant belongs.
    Since each plant must be assigned to a company code, the company code can be determined via the plant in each procurement transaction, even if the procuring purchasing organization is not assigned to a company code.
    A purchasing organization must be assigned to one or more plants. This is plant-specific purchasing.
    Now, check your company-code and purchase organization assignment.
    Hope this helps.
    Regards
    Arif Mansuri

  • Logical system not defined in table SMOF_ERPSH!

    Hello,
    In the inbound queue of CRM, the queues are in 'SYSFAIL' status. The error message is ' logical system not defined in table SMOF_ERPSH!' .
    the table has an entry for relevant ERP system.
    I dont know where else to check.
    I have checked the logical destinations on CRM and it is defined correctly.
    can anyone help me here.
    Regards,
    Pratima

    Hi Pratima,
    I am also facing the same issue. I checked all the entries and Entries are there in the respective tables but still the same issue.
    But if I delete the queue, the changes are replicated for that time but after some time again the queues are getting blocked with the same issue.
    Pratima, can you please tell you whether your issue got fixed on this.
    Thanks,
    Sharath.

  • IDOC Scenario: System not configured as XI integarton engine

    Hello Experts,
    I have beeen trying to solve this since a few days.
    I have created an IDOC scenario  from SAP ECC s/m to PI 7.0.
    The IDOC is being sent successfully fron SAPECC with status 03 in Transaction WE05.
    But in PI 7.0 I am not able to view these messages anywhere in WE05.
    SXMB_MONI of PI 7.0 shows an error record for previous trials and shows error status (red) as "System not configured as XI integration engine"
    I have already set configuration parameters on PI7.0 in SXMB_adm.
    Your suggestions will be appreciated.
    Thanks in advance,
    Elizabeth.

    Hi,
    you can check in PI:
    - TCODE - SXMB_ADM
    - integration server
    - edit - change global config - check if you have: integration server set
    Regards,
    Divya

Maybe you are looking for