Target cost for co-products which can be substitute

Hi,
Is there somebody who is working with co-products which can be different each time you consume raw material?
Here is the situation when we want to analyse variance Actual vs Preliminary cost.
We use Production Order with Co-Products.
When we create a Plan Order, the order costs and qty are calculated for the order header.
Actual costs and qty are charged to the order header as they are incurred.
PLAN: 
Main co-product   900 PC
Co-Product A         50 PC
Co-Product B         50 PC
                           1,000 PC
Consumption:
Raw material         250 PC
ACTUAL:
Main co-product    800 PC
Co-Product A        100 PC
Co-Product B        100 PC
                           1,000 PC
Consumption:
Raw material         260 PC
An apportionment structure is used to apportion the costs and qty to the primary products and co-products.
PLAN
                                                          Raw Material
Main Co-Product   90% * 250 PC = 225   PC  
Co-Product A          5% * 250 PC =   12.5 PC
Co-Product B          5%  * 205 PC =  12.5 PC
                                                            250 PC
ACTUAL
                                                          Raw Material
Main Co-Product   80% * 260 PC =   208   PC  
Co-Product A         10% * 260 PC =    26   PC
Co-Product B         10%  * 260 PC =   26   PC
                                                            260 PC
Variance calculation and settlement are then performed at the level of the order item, not at the header level of the order.
Here is the target qty calculation made by the system.
Main Co-Product  250 PC * 800/900 * 80% = 177.78 PC
Co-Product A        250 PC * 100/ 50 * 10% =    50.00 PC
Co-Product B        250 PC * 100/ 50 * 10% =    50.00 PC
                                                                           277.78 PC of raw material
Since variance calculation is performed at the order item level, that means you can not substitute one Co-Product by another one. 
In our business, we can substitute Co-Product by another one.  In this example we planned to make a total of 1,000 PC finished products and we produced a total of 1,000 PC finished products.  So the target quantity for the consumption of raw material should be 250 PC, not 277.78 PC as calculated by the system.
Any idea?
Regards,

Hello Ajay,
I think  i am missing some thing here. For Configurable product or VC materials there is no standard cost. Costing tab 2 standard cost is zero.
When a make to order sales order is created with this VC materials, based on system settings and quantities system picks up the correct BOM and routings. Through costing funtionality with in sales order , the sales order need to be costed and marked.
This sales order cost is used for  valuation of material movements including 101 from corresponding productuon order and 601 for delivery.
As far as i know for VC material target cost has nothing to do with Standard cost, because there is no standard cost at all for the material.
Please clarifty
thanks
sapfreek

Similar Messages

  • Target cost for a Production order

    Hi
       How to get Target Cost for a production order?
    Thanks
    Naga

    Well Naga, Right now I’m on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
    I also notice “cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
    Here I am talking about 4.5b system.
    You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
    Here are the steps I followed .
    1- I read the material which you can see in material component on production order in Co03.
    After that I take the qty and also multiply by the cost at which machine is posted .
    I have that programs, as I need to find out . I’ll post you later .
    But you have to read the tables afko,afpo,afru,caufv,cost ..etc
    Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . This’ll also help you.
    Hope this’ll give you idea!!
    <b>P.S award the points.!!! DOn`t forget :)!!!!</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"
    "Some are wise and some are otherwise"

  • Target costs for product cost collector

    hi,
    can anyone tell me when are the target costs updated for product cost collector. it is after we post actual costs or after we calculate variance.
    Thanks

    Hi Elaine,
    Thankyou very much for the Information. In our case when we create new product cost collector and cost it and post actual costs to it, system is showing target costs on the product cost collector even before variance calculation but for product cost collectors which are existing from long time system is not showing target costs after we post actual costs. we have created new cost component structure recently and its active from april 1. does this have any impact on the target costs. Please let me know if you have any idea on this.
    Thanks,

  • Excel 2007 throws "this action is valid for the products which are currently installed" while i try to open .txt file format.

    Hello,
    We have Windows 2008 r2 TS, on which we have MS office 2007 Standard installed. There are almost 50 users on this particular machine.
    The problem is we get an error message when we try to open a .txt file in Excel (Right click on .txt file--> Open with --> Excel). Error message is as follows  "this action is valid for the products which are currently installed".
    Previously this was faced by all users so we completely reinstalled it, which worked, except for 1 user.  Currently i have recreated the profile for that particular user but that also didn't helped.
    A drag-drop approach works but user don't want it that way.  
    Now am clueless in terms of where should i look into. Any help would really be helpful.
    Thanks,
    Amol S

    Hi Amol S,
    As per the description, I understand that you are trying to register .dll files in your computer now.
    I suggest you to go through the following article to know more about registering .dll file.
    Refer to the Link:
    https://support2.microsoft.com/kb/844592?wa=wsignin1.0
    Unregister or Register DLL or OCX files:
    The Regsvr32 tool is a command-line utility that can be used for registering and un-registering OLE controls like DLL and ActiveX (OCX) controls in the Windows operating system. If you find
    that some of your Windows functions are note working properly, you may need to register your
    dll files.
    Register dll file
    To register a dll or
    ocx file, open a command prompt windows as an administrator, type the following and hit Enter:
    regsvr32 “path & filename of dllor
    ocx
    Unregister dll file
    To un-register a dll or
    ocx file, open a command prompt windows as an administrator, type the following and hit Enter:
    regsvr32 /u “path & filename of dllor
    ocx“
    Note: This will register or unregister the
    dll file.
    Hope this information is helpful. Please do let us know if you need further assistance, I’ll be glad to assist you.
    Regard,

  • Transfer to PA the target costs of a production order

    Hi everyone,
    How can I transfer to PA the target costs of a production order?
    Thanks
    Cátia Pereira

    Hi
    1. Check your settings in KE4U - Strategy 001 must be assigned to PV=01 and Rec Type F
    Tick the "Mat Cstng" indicator and assign COPA Qty Field ABSMG
    2. Assign costing key to Mat Type in KE4J or KEPC
    3. assign Cost Comp Str to VF in KE4R
    4. Assign Value Fields to your variance categories in PA Transfer Structure....
    Tick "Variances to Costing Bsed COPA" in your settlement profile
    Br, Ajay M

  • Creating a template in Pages is straight-forward as answered here previously. Is there and equivalent for iBooks Author which can start with a blank page and build up the template as required? or can one only adapt a ready made template?

    Creating a template in Pages is straight-forward as answered here previously. Is there an equivalent for iBooks Author which can start with a blank page and build up the template as required? or can one only adapt a ready made template? This has proved unsatisfactory to me so far. Lines are left in etc.

    There are two basic menus for fonts - one from the main menu bar and one from the toolbar. You can also bring up the font manage dialog.
    I don't recommend trying to hard to force an otherwise foreign font, as it inevitably needs to be usable/supported on iOS as well, and that can get tricky w/3rd party fonts, as an example, even with the expanded font support in the latest iBA.
    If you need to discuss fonts more, I suggest starting a new thread....preferably with a slightly more brief title, thanks.

  • Only Remaining var. in version 0 - no target cost for order

    Hi,
    I am getting the error message "Only remaining var. in version 0 - no target costs for 000060003328" while performing the Variance Calculation in KKS2 transaaction.
    The order is having status DLV and TECO.
    Kidny give your suggestions
    Thanks and regards
    Murugesan

    Got answer from Financials forum

  • Hi..someone there?i am looking for an app, which can show and calculate. fully excel data from windows.until now i only found apps, which just show, but not calculate

    Hi..someone there?i am looking for an app, which can show and calculate fully excel data from windows.until now i only found apps, which just show, but not calculate.anybody who know an app???

    Look at the Rccharles answer on this post.
    https://discussions.apple.com/thread/6033082?tstart=0
    Also, you can download these free MS Office apps (Word, Excel, PowerPoint) to view (but not create or edit) these files.
    https://itunes.apple.com/us/app/microsoft-word-for-ipad/id586447913?mt=8
    https://itunes.apple.com/us/app/microsoft-excel-for-ipad/id586683407?mt=8
    https://itunes.apple.com/us/app/microsoft-powerpoint-for-ipad/id586449534?mt=8
    Microsoft Office for iPad:Early Reviews of Word, PowerPoint & Excel Apps
    http://ipadacademy.com/2014/03/microsoft-office-for-ipad-early-reviews-of-the-wo rd-powerpoint-excel-apps
     Cheers, Tom

  • I want to find out how to retrieve the serial number for my product. i can't find it in my email

    i want to find out how to retrieve the serial number for my product. i can't find it in my email

    Find your serial number quickly

  • Report for production order with actual and target cost for each

    Hi
    Is there any report that gives me the list of all production orders in a month with its respective actual and target costs?
    I can use COOIS to get a list of production orders, then double click on the prod order, then click on goto and then to cost analyis.. but can i avoid going through all this and get a report with the details i need?
    thanks in advance

    Thanks a lot for that.
    I'm a little confused with the columns in the report.
    Which columns should I keep for my requirement? -
    Production Order
    Total Target Cost
    Total Actual Cost
    Total Actual Qty
    Total Target Qty
    Thanks

  • Percentage based overhead based on target cost of actual production

    Hello,
    I'm trying to calculate percentage overhead (overhead as a % of total cost of production) using the usual overhead group, overhead key ,costing sheet, etc.
    Also put the overhead group in the material master.
    Although I am getting it correctly as part of product cost planning, when it comes to calculating this overhead on a production order, it does it based on 'total actual costs' posted to the order. I want it to calculate the % overhead based on the standard cost of actual production (the target cost).
    I would really appreciate some help on this.

    Hi
    If that's the requirement, you can achieve through template allocation. Refer the doc contributed by arturo senosain
    I use a workaround for such cases. Add an activity type in routing with activity quantity same as base qty of routing.. Say, 1 PC
    Maintain the activity price as .15. And you are done
    Br. Ajay M

  • How to calculate fixed cost for by-product in costing run?

    Dear,
    We want to have some fixed cost calculated for by-product B in costing run.
    Our current practise,  we only calculate the delivery cost as variable cost for this by-product B in the costing run for B. The by-product B is a component in the BOM of finish product A.
    However, we need some fixed cost to be countered in for by-product B, which can be by controlled by us.
    Any thought?
    Thank you all in advance.
    Christina.

    Dear,
    You have to maintain  BOM Usage-Costing-6 i.e., Costing BOM with all your required  Fixed Cost related Material components and assign it  in the by-product Material Master to include the Fixed Cost in by-product Standard Cost Estimate.  Based on this setting, system will calculate Standard Cost Estimate with this Fixed Cost and display in the related reports.
    Regards
    appalas

  • GR Cost not updating as Target Cost for process orders

    Dear SAPians,
    We are facing an issue in Target Vs Actual cost reporting for process orders. We are creating a process order after cost estimate of that material and doing the confirmations for activity cost. After that, GR has been done for the finished goods of that process order. That GR entry is updating the Actuals values but not updating the Target cost. When I am checking the standard report KKBC_ORD, I am getting the following figures.
    Cost Elemnt Text     |     Target Cost     |     Actual Cost     |     Target Vs Act
    Inventory Chnge FG     |     0     |     1,472,205.60-     |     1,472,205.60-
    Packing Matrl Cons.     |     1,148,142.37     |     1,252,752.68     |     104,610.31
    Raw Material Cons.     |     60,463.91     |     50,688.29     |     224.38
    Semi-Fin Matrl Cns.     |     181,934.68     |     367,959.56     |     186,024.88
    Labour Cost Activity     |     39,735.36     |     39,862.80     |     127.44
    Machine Cst Activty     |     41,611.75     |     43,153.01     |     1,541.26
    That 'Inventory Change FG' entry is showing the GR posting updating actuals and not target cost. This is causing huge difference in target vs actual cost that will affect the profit and loss figures ultimately.
    What am I missing here? What should I do to update the GR amount in Target cost as well.
    Shirazi

    Dear,
    Target Cost on Production Order or Process Order is shown only when Variance is Calculated.
    So please calculate the Variance, system will show the Total Target Cost.
    Br,Vivek

  • Target Cost Verion in Product Cost

    Hi,
    I'm not able to create Target Cost Version (1,2,3.....) in variance Calculation pertaining to Product Costing.
    I'm getting this message:
    Version 1000 1 not intended to be used as the target cost version
    Message no. KQ243
    Diagnosis
    The specified target cost version has not been flagged in central version maintenance as suitable for variance calculation.
    Procedure
    1. Check the entries in the central version table.
    2. If appropriate, flag the version as suitable for variance calculation.
    Please help & guide urgently.
    Regards,
    Viki
    [email protected]

    Try running a variance analysis, and see if it civd you an error message. typically this occurs when a SCE estimate was created after the process/production order was created. So check the dates of the two orders that you have, and compare with the date of the SCE CREATION.

  • I am looking for a software which can recognize grain boundaries on a wafer. have you solutions?

    i am working on a wafer tracing project in Scancell which is making solar cells in Norway. the appearance of wafers are changing in every step in produt line. but only the grain boundaries on the wafer is the same. we want to identify wafers through recognize the grain boundaries. i want to find a software which can do this. i attach 2 pictures: one is the raw wafer in the beginning, the other is the wafer at last. you can see grain boundaries.
    Attachments:
    P1010014.JPG ‏411 KB
    P1010009.JPG ‏451 KB

    That�s a custom application. I am sure you have matlab http://www.mathworks.com/ . You could build your own. Labview does have some things you may won�t to ask there application support engineers. If I had the version of matlab needed for this type of application I would try to write a small program. But I don�t sorry

Maybe you are looking for