Taxonmoy with date "valid until" - "valid from"

Hi,
We have a repository with xml documents. We would like to make a taxonomy, which displays documents where the value of the property "valid from" is later then the current date  and the property "valid until" is earlier then the current date.
In the current taxonomy builder you can only select a fixed date.
Can we enter a variable like TODAY() or something else?
Best regards
Luc

Hi,
Hendri is absolutely correct. To have the valid until field appear on IT0016, the contract types have to be marked as fixed-term contracts in table V_T547V.
Second part can be handled via dynamic actions. A routine will calculate the date equal to 2 months after contract start date. Then, dynamic action would call this routine and default the valid until date with the calculated date. A sample code:
F ZCONTRACT (ZDYNAMIC_ACTIONS)
W P0016-CTEDT=RP50D-DATE1
Here, ZCONTRACT is the routine in program ZDYNAMIC_ACTIONS which would calculate the date and store it in RP50D-DATE1. The next step defaults the valid until date to the calculated date. Your technical team should be able to create the routine.
Feature CONTR is used to default contract types and other fields like probationary period, notice period etc.
Hope this helps.
Donnie

Similar Messages

  • Issue with Data download to excel from ALV

    Hi,
    I am trying to download data to excel from ALV.
    The number of records are 26000.
    When I am trying to download I am getting an error displaying a pop up saying that
    problems came up in the following areas during the load
    TABLE
    The log displayed is not clear.
    I need to know the limitations while downloading to excel... I tried in SDN but of no use. I am using office 2007.
    What is the max downloading limit(MB)
    What must be the Length of line that can be downloaded.
    Regards

    Hi ,
    First check whether your ALV grid OUTPUT   is Consistent or Not   .
    if there are any inconsistency  then you need to rectify that  .
    for Checking COnsistency / Inconsistency  .do following steps
    1) execute ALV report 
    2) Press Shift+Mouse Right Button (Twice)  in blank area of report 
    3) you will get result   whether ALV is good or not .
    regards
    Deepak.

  • Problem with data format when getting from a database

    I'm trying to get a date from the database but the problem is that it also return the time. I have tried to change the format of the date when retrived from my database but it still returns the time.
    Any solutions?
    String theDBDate = rset.getString("date_of_call");
    SimpleDateFormat formatterdate = new SimpleDateFormat ("EEE, MMM d, ''yy");
    String date = formatterdate.format(theDBDate);
    theCalls.setDateofCall(date);// callin my Call Class to store the date which is a string

    Hi could any help me? I have this problem for the last few day. I gave up on it for a while but today I'm trying to get to the botton of this problem.
    I connecting to an oracle database but it return back the date & time but I want only the date.
    Here my code.
    Locale currentLocale= new Locale("en","GB");
    Date today = new Date();
    DateFormat formatter = DateFormat.getDateInstance(DateFormat.DATE_FIELD,currentLocale);
    String theSQL = (" Select * From Call ") ;
    Statement stmt;
    stmt = conn.createStatement();
    ArrayList CallsList = new ArrayList();
    ResultSet rset;
    rset = stmt.executeQuery(theSQL);
    while(rset.next() == true)
    Call theCalls = new Call();
    theCalls.setCallNo(rset.getInt("call_no"));
    theCalls.setUsername(rset.getString("username"));
    theCalls.setCompID(rset.getString("comp_id"));
    theCalls.setTimeofCall(rset.getString("time_of_call"));
    Date todaydate = rset.getDate("date_of_call");
    Timestamp theDBDate = rset.getTimestamp("date_of_call");
    SimpleDateFormat formatterdate = new SimpleDateFormat ("EEE, MMM d, ''yy");
    String date = formatterdate.format(theDBDate);
    theCalls.setDateofCall(date);
    theCalls.setPriorty(rset.getString("priorty"));
    theCalls.setProbCat(rset.getString("problem_cat"));
    theCalls.setProbDesc(rset.getString("problem_desc"));
    theCalls.setCloseDate(rset.getString("close_date"));
    theCalls.setProbSol(rset.getString("problem_sol"));
    theCalls.setStatus(rset.getString("status"));
    theCalls.setAssign(rset.getString("assign"));
    CallsList.add(theCalls);
    conn.close();
    return CallsList;

  • Issue with Date Datatype while importing from SQL Server to OBIEE

    Hi,
    We have a column in SQL Server Database with datatype as Date. When we imported this column into the Physical layer of OBIEE rpd,
    the datatype of this column is getting converted to VarChar automatically. Has anyone faced this issue before?
    Please let me know if you have a solution for this.
    Thanks in advance.

    Hi,
    How are you passing this date parameter ?
    Instead of passing this parameter in date format, you can pass this as string and then in PL/SQL package, you can convert this string to date.
    --Sushant                                                                                                                                                                                                                                                                                                                                                                                                                           

  • How to pass internal table with data in ABAP OO

    Hi experts ,
    Here is the problem...
    I create a screen 100 and use the internal table to get data from database, and then press the button on screen 100 , it will call screen 200.
    I use ABAP OO code in screen 200, and i want to keep the internal table with data that i get from the sceen 100 parts, but it seems that it just supports to create a new internal table and get data from database in ABAP OO. That means i need to create a new table to save the data in internal table ? Or there is any other solution something like exporting or memory id ...
    ps . the internal table in screen 100 is declared in global area, the beginning of the code.
    Please give me some advice, thanks a lot!
    Regards ,
    Claire

    I have already know how to do, here is my code:
    METHODS fill_tree importing itab2 like itab1.
    CALL METHOD: me->fill_tree exporting itab2 = itab1.
    In METHOD fill_tree,
    declare
    data: itab3 TYPE STANDARD TABLE OF itab,
    itab3[] = itab1[].
    It is useful to me, thanks a lot.

  • Copying valid until date from sales quotation to sales order

    Dear all,
    is it possible to copy the Valid Until Date of a sales quotation to the Delivery Date of a Sales Order, when I use the "Copy To Sales Order" button of a sales quotation?
    Is there a way to do this?
    Can someone help me, please?
    Regards
       Emanuele
    Edited by: Emanuele Croci on Oct 19, 2009 11:49 AM

    The problem is that the FS will not fire using the Copy To button without any data changing.
    (I would consider it an error, but it works that way.)
    If you use the next FS, connected to the Remarks field, you can use it on the order with the Copy From button, or manually activated after a Copy To.
    declare @c nvarchar(254)
    declare @p int
    set @c=$[$16.1]
    set @p=charindex('Quotations',@c)
    set @c=substring(@c,@p+10,20)
    set @p=charindex('.',@c)
    Select OQUT.DocDueDate
    From OQUT
    Where OQUT.DocNum=cast(substring(@c,1,@p-1) as int)

  • Conversion from string "20041023 " to type 'Date' is not valid.

    Hi ,
       I have a table with one of the column(EmpHiredate) datatype is char(10). It has value like "20141023". I need to display this value as date format(dd/mm/yyyy) in report. 
    Following methods i tried in textbox expression but no luck.
    =Format(Fields!EmpHireDate.Value,"dd/MM/yyyy")
    =Cdate(Fields!EmpHireDate.Value)
    Error:
    [rsRuntimeErrorInExpression] The Value expression for the textrun ‘EmpHireDate.Paragraphs[0].TextRuns[0]’ contains an error: Conversion from string "20041023  " to type 'Date' is not valid.
    Is it possible to convert string to date using SSRS textbox expression ? Can anyone help me with the solution.
    Thanks,
    Kittu

    Hi Jmcmullen,
         Found one more issue on the same. I have one value like "00000000" for the column(EmpHiredate)
    , when i use above expression values(ex:"20141023")
    are displaying in dd/MM/yyyy format in report except value like "00000000" and giving following error:
    [rsRuntimeErrorInExpression] The Value expression for the textrun ‘EmpHireDate.Paragraphs[0].TextRuns[0]’ contains an error: Conversion from string "0000/00/00" to type 'Date' is not valid.
    Even i tried to pass its original value("00000000") as below but no luck.
    =IIF(Fields!EmpHireDate.Value = "00000000","00000000",Format(CDATE(MID(Fields!EmpHireDate.Value,1,4) + "/" + MID(Fields!EmpHireDate.Value,5,2) + "/" + MID(Fields!EmpHireDate.Value,7,2)),"dd/MM/yyyy"))
    Also tried this:
    =IIF(Fields!EmpHireDate.Value = "00000000","2000/10/21",Format(CDATE(MID(Fields!EmpHireDate.Value,1,4) + "/" + MID(Fields!EmpHireDate.Value,5,2) + "/" + MID(Fields!EmpHireDate.Value,7,2)),"dd/MM/yyyy"))
    Please Suggest. 
    Thanks ,
    Kittu

  • Validation with data file failed

    Hello All
    I have loaded the Currency Exchange Rates from BW cube into Rate Model in BPC upto March 2014 and then our BW cube get updated the Exchange Rates for April 2014.
    Now I am trying to load the Exchange Rates for April 2014 only into Rate model and for that I am validating the Transformation File but it was failed. It shows 'VALIDATION WITH DATA FILE FAILED'.
    Rejected list option showing blank screen.
    With the same Transformation file I have loaded the data upto March 2014 successfully.
    I have compressed the source cube, reactivate the source cube after all am unable to validate the Transformation file. Below is my transformation file screen shot.
    Please let me know if you need any more details from my side.
    Thanku you all in advance.
    Please help
    Regards
    Srikant

    Hi Shaik
    Thanks for your reply.
    I have validate the Transformaiton file by given vlaue in MAXREJECTCOUNT= 10000 but there is no chage same error is coming. 'Validation with data file failed' without any errors.
    Thanks
    Srikant

  • View data in client B from client A in the same SID without a valid logon?

    Hi Folks
    We are planning on upgrading our 4.6C system to ERP 6.0, and are initialy considering having two clients in the same sandbox SID.  One would be for the developers to perform code remediation checks (client A), and one would contain a copy of production data for performing testing of functionality over live data (client B).
    Would it be possible to view data in client B from client A in the same system without a valid logon to client B or RFC connection to client B from client A?   For example via the use on an ABAP program to SQL the database?
    I know one can use transactions like SM30/SM31 to view, compare, and adjust data between clients, but this requires an RFC connection and valid logon to the target client.
    Regards
    Kevin.

    Hi Kevin.
    >
    Kevin McLatchie wrote:
    > Would it be possible to view data in client B from client A in the same system without a valid logon to client B or RFC connection to client B from client A?   For example via the use on an ABAP program to
    Short answer: yes.
    If someone has the right to write and execute ABAP reports on the system he is able to access the data of all clients. So I don't think that this setup is advisable. Don't mix development and production data in one system.
    Best regards,
    Jan

  • The timesheet creation failed, because of problems with the project I server or with data validation

    Hi,
    One of my user is facing issue in creating new time sheet,
    "The time sheet creation failed, because of problems with the project server or with data validations".
    This issue is coming to only few members out of 10000 members.
    Note: For the same user, can able to do in other machines. only the problem in his machine. Have ran the office diagnostics, but still the problem persists.
    Is any add-on's/any settings need to update in IE. Could any one please help me on how to fix this issue?
    Many thanks in advance.

    I would check the compatibility settings in IE etc, or try another browser (chrome, safari etc.)
    Ben Howard [MVP] | web |
    blog | book

  • Upgrade from CS 5.5 design premium to CS 6 design standard with purchased DVD and valid serial #s

    Why can't I upgrade from CS 5.5 design premium to CS 6 design standard with purchased DVD and valid serial nos?

    Kkofron please make sure the CS5.5 serial number you are using is also able to be registered under your account at http://www.adobe.com/.  You can find additional details on how to register your Creative Suite 5.5 serial number at Find your serial number quickly - http://helpx.adobe.com/x-productkb/global/find-serial-number.html.

  • Error: Validity of Certificate from list with PSE type PSE ends in 3 da

    Hello,
    our system is reporting the followin warning
    Error: Validity of Certificate from list with PSE type > PSE < ends in 1 days, more notes on system log (SM21)
    We check the transaction STRUST and STRUSTSSO2, the certificate between ERP and EP expires today. The ERP system is SAP R/3 Enterprise and EP release is 6.20
    Please how can we create the certificate in that releases of SAP ERP and EP, we only found information about this procedure in the newest releases.
    Thanks

    Hi
    Is the SAP Logon certifiacte goiogn to expire??From Portal to ERP??
    If this is PSE then follow this [Link.|http://help.sap.com/saphelp_nw2004s/helpdata/EN/a6/f19a3dc0d82453e10000000a114084/frameset.htm]
    Regards
    Ajay

  • Help with date validation on input boxes.

    I need some help with date validation on input boxes.
    What I�m trying to create is a form where a user inputs dates and then the rest of the form calculates the other dates for them.
    i.e. � A user inputs 2 dates (A & B) and then a 3rd date which is 11 weeks before date B is calculated automatically.
    Is this possible and if so how do I do it ???
    Thanks

    Hi,
    to get third date try this:
    java.util.Date bDate = ...;
    Calendar yourCalendar = new GregorianCalendar();
    yourCalendar.setTime(bDate);
    yourCalendar.roll(Calendar.WEEK_OF_YEAR, -11);
    java.util.Date cDate = yourCalendar.getTime();Regards
    Ldinka

  • Problems with date validation pattern DD.MM.YYYY in Form Builder

    (I am using LiveCycle Designer 8.0.)
    My form uses an input date field which consistst of DD.MM.YYYY.
    Display pattern, edit pattern, validation pattern and date pattern has been set to DD.MM.YYYY.
    "Validation Pattern Message"-box has been set to checked.
    "Validation Script Message"-box is not checked.
    1. When I type:      313101
    the system converts the digits to the date 01.01.3131
    2. When I type:      3131
    the system converts the digits to the date 01.01.3131
    3. When I type:       31   
    I get an error message "Date is not valid."
    I need a form to throw an error message if the user doesn`t type the correct input
    DD.MM.YYYY.  (01.03.2009)
    Thanks in advance.
    Tor

    Does anyone have any input on this matter?
    Thanks in advance.
    Regards,
    Tor

  • I have an itouch that will not let me sign in to my itunes account. The email address that it is associated with is no longer valid. I keep entering the correct password but it says that it is incorrect. I cant get a reset all of my credentials dont work.

    I have an itouch that will not let me sign in to my itunes account. The email address that it is associated with is no longer valid. I keep entering the correct password but it says that it is incorrect. I can’t get a reset all of my credentials don’t work. Now all my apps won’t work. it looks like they load for half a second then disappear. What can I do?

    - Try contacting iTunes for the password problem:
    Apple - Support - iTunes - Contact Us
    - For the other problem you can try a reset. Nothing will be lost
    Reset iPod touch:  Hold down the On/Off button and the Home button at the same time for at
    least ten seconds, until the Apple logo appears.
    - The next standard thing to do is to download/install a new app but you cant 'do that.
    - Instead, try restoring from backup.

Maybe you are looking for

  • DVI problems

    Hi, I have this DVI monitor which was able to work when using DVI interface However i do not know what happen. I had a power failure in my home, and the computer was shut off. When the power was back, I turn on my computer, there was an error message

  • Oracle 9i for Linux, disk 2, download fails

    Dear Oracle, can you please split up 9i to smaller pieces say 200 Meg each. This should reduce the failure rate. Just take the cpio.gz file and use the split(1) command like this split -b 200m Linux9i_Disk2.cpio.gz My several attempts to download dis

  • Windows 7, had to change user profile, lost all my Thunderbird info. please help.

    Worm or virus caused me to have to change my user profile in Windows 7. I have everything back looking more or less like it did before this disaster on my computer and I am once again able to get into Internet Explorer but when I go to my Thunderbird

  • How can I make an image appear partially in front and partially behind another layer?

    I have a drawn vector image that is behind a layer with a stroked ellipse like this: However I need just one part of the image to appaer in front of the stroke.  In this image I need the paw on the right to be in front of the stroke but I need the ot

  • Plant Replication CRM Service Contracts & Orders - ECC Debit Memo Requests

    Dear experts we are struggling with the assignment of a plant in SAP ECC Debit Memo Request Line Items created from SAP CRM documents - the Plant field on the Shipping tab stays empty. This refers to Service Products. We use CRM 7.0 (however, same pr