TMS problem with ECC 6.0

Dear Global Support,
After hardware resizing we have successfully installed ECC 6.0 and
successfully performed DB restoration.
Now the problem lies with TMS as after installation performing necessary post installtion activity
we have configured TMS. As per all TMS check STMS configuration is fine. Even tp and domain
profile are generated.
But issues lies while releasing change request as after realease no data or cofile are populated in
trans/data or trans/cofile.
Even slog is not been generated. Kindly look into this and advice the needful.
Regards,
Partha

Hi Partha,
Is there only one system in the transport landscape at present?
If the transport has been built up in STMS properly, there should be no problem to export.
But you can create a virtual system and create the "transport route" accordingly. 
Then when you release a transport, the data and cofiles should be generated.
Is the transport a local transport?
Do you get a message "LOCAL REQUEST .......... released(objects no longer locked)   "
Local request can not be transported so releasing a local request does     
not export file to operating level.                                                                               
If you want to transport this released local change request, you           
can create a new reqeust of tranport type "Transport of Copies" from       
SE01 and include the objects in <local transport number>.                                                                               
Then you can transport the content of <local transport> by this newly created      
request.                                                                   
Hope this helps,
Paul

Similar Messages

  • Account integration problem with ECC 6.0

    Hi
    We have using PPM 5.0 system with ECC 6.0 system (No EHP). Problem we are facing is we are not able to created the PS project automatically.
    I have done already all the necessary settings and in manual case it working fine it seems. I eager to know any suggestions on this to resolve, to achieve automatic creation of project.
    Do you feel there is any issue with EHP?
    Regards,
    Pramod

    Hi Pramod,
    Refer to the note 1427365 for details. The pre-requisite for PS integration is as below:
    SAP Portfolio and Project Management 5.0 SP02
    and
    SAP ERP 6.0 SP 17
    or
    SAP ERP 6.0 EhP2 SP07
    or
    SAP ERP 6.0 EhP3 SP06
    or
    SAP ERP 6.0 EhP4 SP06
    or
    SAP ERP 6.0 EnhP5
    Regards
    Amit

  • Problem with ecc 6.0

    hi experts,
       I had installed ecc 6.0 ,
       while installation i had selected EP, ep core and Process      Integration component also.
    i want to configure the SAP XI , how can i do it
    plz help me
    Edited by: kavitha l on Jan 17, 2008 5:53 AM

    Hi,
    First you need to read the master guide for ERP2005 carefully,
    you need ECC and NW04s component toghether on a single server,
    The installation of the following product instances of product version SAP ERP 2005
    requires a large amount of memory and makes substantial demands on the host
    performance of the CPU:
    SAP NW - Adobe Document Service
    SAP NW - EP Core
    SAP NW - Process Integration
    look at sap Note 855534 - Embedded NetWeaver Components in ERP read it carefully,
    when you want to use XI/PI with ECC 6.0 ,SAP NW -Process Integration must be set up in a dedicated client
    now for configuring XI/PI
    login into
    service.sap.com -> Release & Upgrade Info -> Installation & Upgrade Guides ->SAP NetWeaver ->SAP NetWeaver PI 7.1
    here you can find instalation of SAP PI as well as the basic configuration document
    regards,
    kaushal

  • Problem with ECC 5.0 Upgrade in JOB_RASUVAR1 phase of PREPARE

    I am upgrading 4.6B system (copy of production to build QA system) on Tru64 with 3TB Oracle DB. The JOB_RASUVAR1 phase of PREPARE in running for about 115 hours. This phase saves existing variants for future conversion. There is a job running at the SAP level which using a lot of CPU, but no active Oracle session for this job. The same job took less than an hour on development system (200GB DB). So far the response from SAP has been like "Unfortunatly there is no possibility to improve the performance of the reports RASUVAR1 and RASUVAR2 during the upgrade" because this phase does not happen during production downtime.
    Did anyone else face similar problem?

    Hi Kausik,
                  we recently upgrade our client systems from 4.6c to ECC 5.0, on unix environment. we too faced similar kind of problem, our job_rasuvar1 in prepare phase took almost 70hrs. after raising a msg with SAP, we were asked some correction in function module.."FASU_RS_VARIANT_CONTENTS"..check whether the following changes are already available..or not
    <b>the necessary change:</b>
    replace the line
    PERFORM fill_tables_ps TABLES objects
    with the line
    PERFORM fill_tables_ps(saplsvar) TABLES objects "CHANGE
    in function module FASU_RS_VARIANT_CONTENTS
    2) To fix this issue I would recomment, that you stop the JOB_RASUVAR1.
    Then please implement the corrections of note 712297. After this please
    clear out all the entries in DB tables TASUVCAT, TASUVSVO and TASUVSVD.
    You can do thie for example via transaction SE14.
    Then implement the following modification to ABAP RASUVAR1:
    FORM return_content USING taskname.
    RECEIVE RESULTS FROM FUNCTION 'FASU_V_VARIANT_CONTENTS'
    TABLES
    valutab = gt_params
    OBJECTS = gt_objects
    EXCEPTIONS
    syst_except = 1
    communication_failure = 2
    system_failure = 3
    variant_non_existent = 4
    variant_obsolete = 5
    error = 6.
    g_error = sy-subrc.
    g_returned = 'X'.
    data: l_count type i. "INSERT MOD
    describe table gt_params lines l_count. "INSERT MOD
    if l_count gt 20000. "INSERT MOD
    g_error = 7. "INSERT MOD
    endif. "INSERT MOD
    ENDFORM. " return_content
    After this you can restart the JOB_RASUVAR1 by just call report
    please try with this & let me know. and 1 more thing, this phase again depends on database size (in our case, for 1.8TB it took 6hrs).
    with regards,
    Raj

  • Problem with ECC 6.0 upgrade iseries

    Hello,
    We are upgradering our SAP 4.6c to ECC.6.0 on OS/400. This are the steps which i used to start the upgrade as shown in the Upgrade guide - SAP ERP Central Component 6.0 ABAP Support Release 3
    Operating System and Database IBM i5/OS/IBM DB2 for i5/OS
    *1. Login with QSECOFR.*
    *2 .MKDIR u2019/usr/sap/putu2019*
    *3. CHGPGP OBJ(u2019/usr/sap/putu2019) NEWPGP(R3GROUP) DTAAUT(RWX) OBJAUT(ALL)*
    *4. LODRUN DEV(OPT) DIR(u2019UMN_OS400_PPC64/UPGRADEu2019)**
    *5. Login with the <SID>OFR*
    *6. ADDLIBLE SAPUP*
    *7. GO SAPUP
    8. Here i choose PREPARE but received the following error message: Function check. CEE9901 unmonitored by PREPAREOS4 at statement 0000046300..
    When i checked the /usr/sap/put/bin content, i don't see the PREPARE file and also many files are missing. Maybe the LODRUN....didn't worked properly. We used the same CD for the our sandbox and it worked well.
    Regards
    Niclas
    Edited by: Niclas Glenneholm on Dec 15, 2008 12:54 PM

    Hi,
    Firstly, please ensure you are using the latest SAPup version. You can download it at  http://service.sap.com/patches.
    Any errors when you call qp2term:
      call qp2term
    Cheers.

  • Problem with TMS setup in HA systems

    Dear colleagues,
    Our team have installed a new production environmnent to ECC in HA. We have a ASCS in cluster and two dialog instance in each server(local instance).
    A virtual host GPPR3CIB and two instances in local, node GPPR301 and node GPPR302. This is an ECC 6.0 on Windows 2003 Server and SQL server 2005.
    The architecture is as follows:
    - GPPR301 node:
       - Virtual ASCS ASCS_0 (message server)
       - ABAP Primary Instance PPR301_1 (disp+work)
       - ERS (Enqueue replication server) instace ERS_10
    - GPPR302 node:
       -ABAP Additional Instance PPR302_2 (disp+work)
       -Virtual Database Instance GPPR3DB
       -ERS (Enqueue replication server) Instance ERS_10
    Once the installation is complete you need to apply SAP Note No. 943334 - "TMS setup in high availability systems" to set up high availability STMS. The problem is to distribute the configuration after running
    the report " 'TMS_MGR_LOADBALANCING" described in SAP note.
    The message indicates problems trying to run the command tp.exe. It has followed the note No. 1010990 and we have checked the folder permissions of the kernel but the problem persists.
    Any information or help regarding this type of setup would be welcome.
    Thanks.

    Hi,
    We have solved the problem with STMS. After several tests, the problem was in the parameter SAPLOCALHOSTFULL. This parameter must be assigned the hostname of the local system for each profile instance. If you've assigned the virtual host in the cluster generates the error in the distribution of the STMS.
    Regards.

  • Error while posting GR from EWM in ECC. "Problem with receiver finding"

    Hi
    I have completed putaway of inbound delivery in EWM. This has triggered PPF to ECC for GR posting. This is stuck in ECC SMQ2 with error "Problem with receiver finding".
    I have checked ECC>EWM interface configuration. Handling unit management setup in ECC and EWM. Do not see any issues there. Also tested GR account postings with IM storage location for Po in ECC. This is also working fine...so no issue with account determination.
    Unable to figure out what is causing issue. Please help. Thank you.
    Best Regards
    phani sai MN

    Hi All
    Thanks for your responses. Issue was with distrubution model fiter parameters. for message type InboundDelivery.Deliverychange there was additional filter parameter for logical system. Removed values for logical system and only retained warehouse number.
    With this issue is resolved. GR is posted succesfully in ECC.
    Best Regards
    Phani sai MN

  • URGENT :   EP 7.0 /ECC 5.0  -   Problem with Business Package : ESS/MSS

    Dear Portal Gurus,
    We are facing a problem with business package for ESS/MSS
    Our system Info is as under :
    Portal:- NW 2004s
    ERP2004: - (R3 ECC 5.0)
    ESS:- BP for Employee Self-Service (mySAP ERP 2004) 60.2
    MSS:- BP for Manager Self-Service (mySAP ERP 2004) 60.1.1
    SAP XSS  à (SAP ESS 100, SAP MSS 100 and SAP PCUI_GP 100 , all upto SP 12)
    After the Business Packages were installed,found that some  ess apps where not deployed...so manually deployed it.
    The JCO connections are OK.
    Do we need to set up the backend Homepage Framework for the same......even for preview.....was thinking not.
    Also, here is the error and exception that we get when we preview any ESS iview.
    A critical error has occured. Processing of the service had to be terminated. Unsaved data has been lost.
    Please contact your system administrator.
    You dont have the authorization to start service sap.com/pcui_gp~xssutils/XssMenuArea.
    com.sap.pcuigp.xssfpm.java.FPMRuntimeException: You dont have the authorization to start service sap.com/pcui_gp~xssutils/XssMenuArea.
    at com.sap.pcuigp.xssfpm.java.MessageManager.raiseException(MessageManager.java:111)
    at com.sap.pcuigp.xssfpm.java.MessageManager.raiseException(MessageManager.java:121)
    at com.sap.pcuigp.xssfpm.wd.BackendConnections.initBackend(BackendConnections.java:234)
    at com.sap.pcuigp.xssfpm.wd.BackendConnections.connectModel(BackendConnections.java:159)
    at com.sap.pcuigp.xssfpm.wd.wdp.InternalBackendConnections.connectModel(InternalBackendConnections.java:183)
    Thanks.
    Message was edited by: Ashutosh Rana

    I got the same problem :/
    not the authorization, but the fields in working time is displaying wrong.. (too big)
    Any solution to this?
    Best Regards
    Kristoffer Engh

  • Problem with TMS config

    Hi all,
            I have a problem with my TMS config.
    When I adjust the transport queue, the "No system found in another group for import queue QAS" message appears.
    My landscape includes a DEV-QAS and a PRD systems.
    can somebody help me?
    thanks in advance.

    Hello,
    I have the same problem.  I just forund the alert from RZ20.  When we are doing transport and checking RFC connections from SM59, seems to be all working fine.  So I am not sure where this alert is coming from. 
    Command  TMS_MGR_READ_TRANSPORT_QUEUE
    Service  Transport Service
    Start    Online
    Function TMS_MGR_TRANSMIT_TR_QUEUE
    Message  TRANSMIT_QUEUE_FAILED
    No system found in another group for import queue <SID>
    I run into this thread but there is no information on how the problem got resolved.  Please let me know if you have any ideas. 
    Regards,
    Tony

  • Problem with ITS after ECC 6.0 upgrade

    Hi All,
    I am facing problems with customized ITS application created based on CATW. It does not work properly after an upgrade to ECC 6.0 from 4.7. Some of the screens user interface is different when i compared that of with 4.7. I came to know that ECC 6.0 uses the Integrated ITS where as 4.7 uses the Stand-alone ITS. What is the difference between them? Is there any way to deactivate the Integrated ITS and run the application on ECC 6.0 as it was before on 4.7?
    Any help much appreciated.
    Thanks,
    Naga Bokkisam

    Hello Naga,
    can you be more specific about the differences between 4.7 and ECC 6.0? Are you using the SAP GUI for HTML (~webgui 1)?
    With best regards,
      T. J. Domsalla

  • ECC 6.0 Problems with transaction TRIP

    Hi all, we are working with ECC 6.0 and in the travel management when using the transaction TRIP we saved a travel, we got the error message
    "1 PTRV_WEB_ADVANCES_INT , PTRV_UTIL_VSCH"
    Following the sap note 871580 as we had enhanced the old structure PRTV_UTIL_VSCH, we now enhance the structure PTRV_WEB_ADVANCES_INT.
    But we got the same message.
    Can anybody help us?.
    Thanks,
    Alfonso

    The problem was a duplicate data element in one enhancement strucutre

  • With ECC 5 & BI7 system - Unicode problem

    Hi All,
    I am facing problem with unicode and Remodiling in BI7.
    R/3 - ECC 5
    BI - 7
    please help me regarding this.
    thanks in advance
    krish

    Hi Premkishan
    the following parameter should following value.
    login/accept_sso2_ticket---> 1  
    login/create_sso2_ticket---->1
    check in R3 Using RZ10 tcode. if not add it or change ti.
    restart the R3 ECC 5.0 server
    regards,
    kaushal

  • Problem with UE ZXKKEU11 in ECC 6.0

    Hi Guys,
    I have a problem with UE ZXKKEU11.
    When it was called from VA01 during material insert, the structure i_copa_item is empty and I don't know why.
    Have you got any suggestion???
    Thank you in advance for any useful answer
    If you could I need help urgently. thanks.
    Edited by: Salvatore Bruno on Jan 15, 2009 6:59 PM

    Hi Salvatore,
    Could you help me?  I face the same problem you posted some moths ago.  In your last message of the thread you said, "The problem was in KEDR configuration".
    What was wrong in your configuration?
    Thanks in advance 4 ur answer.
    llr

  • Problem with PRD upgrade from 4.6C to ECC 6.0

    Hello,
    I'm experiencing a problem with our live Productive system, and hoping for some ideas on how to resolve.  First, we have successfully upgraded our DEV and QA environment, and are now upgrading PRD.  I was successful in getting through the uptime SAPup of our downtime minimized upgrade.  Note that I did not need to log into the Shadow instance at all, because all modifications will be transported from DEV during downtime.
    However, I did want to log into the Shadow instance to take a look at it.  I first had to start the instance in the SAP Management console, and then when I attempted to access via the SAPGUI, I recieved error "Internal TSKH error.  Session terminated".  Also, I noticed that as soon as I started up the Shadow instance, I am now getting "SYSTEM_CANT_CLEAR" short dumps every minute.  Error says:  Error when initializing the work area "SYST".
    Since I don't need to log into the Shadow instance to complete the upgrade, I'm not sure if this is going to be an issue for me or not while I complete the upgrade.
    Any assistance would be greatly appreciated.
    Thank you,
    Leeanna Travis

    Hello,
    I'm experiencing a problem with our live Productive system, and hoping for some ideas on how to resolve.  First, we have successfully upgraded our DEV and QA environment, and are now upgrading PRD.  I was successful in getting through the uptime SAPup of our downtime minimized upgrade.  Note that I did not need to log into the Shadow instance at all, because all modifications will be transported from DEV during downtime.
    However, I did want to log into the Shadow instance to take a look at it.  I first had to start the instance in the SAP Management console, and then when I attempted to access via the SAPGUI, I recieved error "Internal TSKH error.  Session terminated".  Also, I noticed that as soon as I started up the Shadow instance, I am now getting "SYSTEM_CANT_CLEAR" short dumps every minute.  Error says:  Error when initializing the work area "SYST".
    Since I don't need to log into the Shadow instance to complete the upgrade, I'm not sure if this is going to be an issue for me or not while I complete the upgrade.
    Any assistance would be greatly appreciated.
    Thank you,
    Leeanna Travis

  • A problem with return order with free goods

    Hello
    I am working on ECC 6.0
    I am facing a problem with the return order the case is I created an order of 1000 pc with inclusive free goods (w/o item generation) condition record that for every 10 pc over the 100 the customer will take  1 free pc
    1 pc = 10 $
    100 pcs = 900 $
    120 = 1080 $
    the problem when I am creating a return order with 30 pcs the system  calculate the price as if there are free goods the system returns the 30 pcs with 270 $ instead of 180 $ and it should not calculate the free goods because the remaining items are 90 pcs that should not take a free goods discount
    Regards
    Jacopo Francios

    hi ,
    Such scenerios can be tackled by different pricing procedure in return scenerio.
    See Pricing procedure Depends on sales area + customer pricing procedure + Document pricing procedure .
    So for Return document type please maintain different pricing than the normal scenerio this will solve ur problem.
    This is generally done also for tackling such scenerios.
    Thanks & Regards

Maybe you are looking for

  • Should we share itunes store account if we use home sharing?

    Right now, my children and I share an itunes store account, but it is getting hard to manage their itunes gift cards this way. Should I just bite the bullet and have them each get their own account? How will this affect home sharing? Do we just have

  • Is there any way to create a system-wide variable?

    Hello IDM gurus. Is there any way to create rarely changing system wide variables that can be loaded at system startup that will be available to all users? For example, at IDM system startup, the variables would be read from configuration or generic

  • Transfer between iPod and iTunes - mission impossible !

    I recently got iPod Touch (latest model with latest iOS) - just to use it in my car. I simply wanted to add and remove few songs. In a normal world, there would be just 2 columns (ipod/computer and simple managing both parts within files and folders

  • Restoring itunes songs kep on external hard drive

    hi all - some time ago on my power pc mac I put my entire itunes songs on an external drive, whilst keeping the song details on the computer. My power pc gave up the ghost and I transferred the contents of the old power pc mac to my new intel imac. T

  • Lion OS on Mac Mini Server?

    I recieved a Mac mini server from my brother with Snow leapord server installed.  I have a copy of regular Lion that I would like to install as I dont need the server capabilities.  Every time I try it tells me that I need to buy the lion server part