In BOM, we have couple of alternatives.  Each alternative includes valid date (valid from and valid to).  We want to change value for valid date (valid from and valid to).  Unfortunately, those fields are blocked for changes.  Therefore, can anyone tell me how can I change value for those fields.  Thank you very much.  Reward will be given.

Hi,
I'm afraid that this is not possible in the standard. See also explanatation for the parameter settings in transaction OICB.
The validity period ( well actually better to say the 'valid-from' ) is linked to activating BOM validity maintenance ( as a prerequisite for activating engineering change management )
As such the periods are handled internally ( hence the appearance on screen 'Administration' ).
THe only standard option I see is to create a copy of the BOM alternative using the new required valid-from date ( and then delete the old alternative ). More work but the end result should be the same,
regards
Dirk

Similar Messages

  • Display overlap of period for each record.

    Hi All,
    I have a report in which I have 2 date columns(start date say 'a' and end date say 'b'). In my prompts i have selected a time range. My start date and end date will fall in this time range.
    Time range is 1/5/2009 to 3/16/2009
    Start Date     End Date          1/5/2009     1/12/2009     1/19/2009     1/26/2009     2/2/2009     2/9/2009     2/16/2009     2/23/2009     3/2/2009     3/9/2009     3/16/2009
    1/19/2009     6/8/2009          0     0     1     1     1     1     1     1     1     1     1
    4/20/2009     5/25/2009          0     0     0     0     0     0     0     0     0     0     0
    3/16/2009     5/18/2009          0     0     0     0     0     0     0     0     0     0     1
    1/19/2009     6/8/2009          0     0     1     1     1     1     1     1     1     1     1
    1/5/2009     3/8/2009          1     1     1     1     1     1     1     1     1     0     0
    3/16/2009     5/18/2009          0     0     0     0     0     0     0     0     0     0     1
    As shown above I need to stamp '0' if the week(horizontal row) doesn't fall in the a-b time range and '1' if it falls.
    How can I achieve this .
    Thanks and regards,

    Very tricky but it can be done.
    1- create view which returns all the week start date between the prompts (if you are on oracle play around with a select againts the ALL_OBJECTS).
    2 Bring this view as a dimension in your RPD and create a dummy join againts your fact table.
    3. In your report use a case when to determine if your period is valid or not.
    4. put it in a pivot table.
    regards
    John
    http://obiee101.blogspot.com/
    Edited by: John Minkjan on Jun 26, 2009 6:03 AM

  • Issues with Shared Variables in Systems Running for Extended Periods of Time

    I am designing a large SCADA system using LabVIEW DSC and cRIOs. My plan is to use shared variables to communicate the majority of the information across my network (much like "tags" in a normal SCADA system).
    I'm wondering if anyone has experienced issues (connection failures, etc...) with shared variables running on systems for months (both real-time and windows based PCs) without the cRIO or PC being restarted/redeploying the variables. What is the stability of the Shared Variable Engine over extended periods of time?
    Thank you for the input.
    --CLD--
    LV 6.1, 8.6.1, 2011 SP1, 2012 SP1

    I have a system with 2 cRIO's each with Ethercat extension chassis.  Each cRIO hosts ~100 NSV's and is running the scan engine at 40 Hz.
    Each cRIO is coupled to a HMI that has front panel control bindings to NSV's hosted on the cRIO as well as a windows hosted mirror library (used for citadel db logging) that is also bound to the cRIO NSV library.  The cRIO's have monay months of contiguous run time without reboot and I closely monitor cpu and memory usage and also rt performance metrics and will log faults if there are any such events.  I also use NSV's for messaging from the HMI to the cRIO for such things as setting zero offset values and deploying configuration parameters.  My overall findings are that the SV engine and the PSP are stable and efficient (especially NSV<->NSV and NSV<->HMI binding)

  • Different BOM for each month

    Hi,
    The BOM is different for each month. If i make different alternatives for each month and run the LTP will it help to get the raw material requirement as per the BOM for that month. Example BOM for NOV/DEC will be not same but we want to estimate the raw material req for next year.
    Kindly advise what i need to do?
    Regards
    ShankarR

    Dear Shankar,
    1.What is the business contraint in using change number functionality to address this requirement without creating any
    additional alternative BOM?
    2.Say you create the first alternative BOM using a change number and save all the BOM components.
    3.The default valid from date will be the valid from date of the change number and valid to date will be 31.12.9999.
    4.Whenever there is a BOM change use a different change number with valid from date say 25.10.2010,so using this in the
    same BOM delete the components and add the new component's or make any BOM change and save.
    5.For the deleted components the valid from date will be say (you have created using today's date for BOM creation)
    05.10.2010 and the valid to date will be 25.10.2010.
    6.What is the advantage of creating new alternative BOM?
    6.How are you using the LTP results for inventory purpose,say how are you planning the raw material's requirement for the
    next year based on this year's BOM?
    7.LTP is not only the feasibility of material procurement,but also production that can be produced with available resource.
    Check and revert
    Regards
    S Mangalraj

  • Capacity Utilization by network activity for each period

    Hi all,
    How do i find out the capacity utilization at the network activity level. My requirement is to findout the remaining requirement/capacity of a workcenter for each period, which will be the cumulative value of the non utilized resources/hours for the previous months, based on distribution key.
    The same functionality is there in CM07, but what is the exact functionality and how it can be reimplemented in a report?

    Hi,
    Check if table KAKO helps. You may have to calculate the remaining capacity from available and utilised.
    Regards

  • Closing Stock For Each Period in Inventory Infocube

    Hello Guru's,
    Can we have closing stock of each material  for entire period in Invnetory Infocube ? or through any logic or transformation routine can we create this keyfigure  at infocube level ?
    I know that to get Closing Stock  ( Opening Stock + Goods Receipt - Goods Issue), we have to have Opening Stock as well for each month. in 0IC_C03 infocube, we only have Goods Receipt Qty and Goods Issue Qty keyfigures. We don't have Opening Stock and Closing Stock keyfigures as those are calculation which works during run time of query but still we want to have this information at Infocube Level.
    Do please let me know your thought as i appreciate your help in advance.
    Regards,
    Komik Shah

    hi,
    I will check that t code.
    thanks and regards,
    Devina

  • MDX to dynamically create period to date for each month of current year

    I need some help with MDX. I am not even sure if this is possible to do but here is what I need.  Any help is greatly appreciated.
    I have a Date dimension with a hierarchy defined as Year-Qtr-Month-Date
    I have a measure called Rentals
    Assume the current date is 10/24/2014.  I want to display by month for the year 2014, the sum of rentals equivalent to the current MTD.  So January would sum 1/1 thru 1/24.  February would sum 2/1 thru 2/24.  March would sum 3/1 thru
    3/24, etc.
    On the end of the current month, all months would display the sum of the whole month. I am not concerned if a month ends on the 30th or 31st.  The end is end.
    It needs to be dynamic enough so that if the current date is the 27th, each month would sum from the 1st to the 27th.

    Hi Rocko,
    According to your description, you want to compare the sum amount of rentals for each month, right?
    In MDX, we can use
    PARALLELPERIOD function returns a member from a prior period in the same relative position as a specified member. So you can use the query like
    with set Period as {[Arrival Date].[Date].[Month].&[2014]&[1]:[Arrival Date].[Date].[Month].&[2014]&[27]}
    member [Arrival Date].[Date].[0] as sum({Period})
    member [Total Amount N-1] as (PARALLELPERIOD([Arrival Date].[Date].[Month], 1, [Arrival Date].[Date].[Year].&[11]), [Measures].[Total Amount])
    Here is a sample query on AdventureWorks cube.
    SELECT ParallelPeriod ([Date].[Calendar].[Calendar Semester]
    , 3
    , [Date].[Calendar].[Month].[October 2003])
    ON 0
    FROM [Adventure Works]
    Regads,
    Charlie Liao
    TechNet Community Support

  • How to apply Date condition for each month in 12 month period to my SQL query

    I am trying to retrieve all Outstanding Problem tickets in my Trendline SSRS report.
    I need to pull the OpenDate <= Last day of last month And CloseDate >= 1st day of current month
    for each month in the Last 12 months. How do I accomplish this in my query?
    I must also need to pull the oustanding tickets for the next 11 months in the same query
    where it will automatically pull the outstanding tickets for when a new month comes
    in out of the 12 month period?
    Here's a sample of my query to pull July 2013 Outstanding Problem tickets:
    Select OpenDate, CloseDate, Ref_Num, Type, status
    From Call_Req
    Where OpenDate <= '2013-07-31 00:00:00' And CloseDate >= '2013-08-01 00:00:00'
    And Type = 'P'
    My Results:
    OpenDate
    CloseDate
    Ref_Num
    Type
    status
    6/13/2013 7:41
    8/26/2013 12:41
    P1726456FY13
    P
    CL
    6/13/2013 8:17
    8/23/2013 12:31
    P1726612FY13
    P
    CL
    6/13/2013 10:17
    9/6/2013 16:54
    P1727352FY13
    P
    CL
    7/12/2013 10:46
    9/6/2013 10:23
    P1812568FY13
    P
    CL
    7/18/2013 10:17
    9/6/2013 8:53
    P1830452FY13
    P
    CL
    7/29/2013 15:54
    9/6/2013 16:16
    P1862906FY13
    P
    CL
    5/17/2013 20:51
    8/22/2013 9:09
    P1653380FY13
    P
    CL
    5/30/2013 13:29
    8/26/2013 7:33
    P1685693FY13
    P
    CL
    7/15/2013 14:14
    9/7/2013 9:42
    P1818874FY13
    P
    CL
    6/7/2013 15:49
    9/6/2013 16:46
    P1712265FY13
    P
    CL
    7/18/2013 10:25
    9/7/2013 9:18
    P1830516FY13
    P
    CL
    7/24/2013 16:30
    8/12/2013 18:26
    P1849909FY13
    P
    CL
    Talitha Davis

    Would this Work?
    DECLARE @now DATE = GETDATE();
    WITH months(lvl, daydate)
    AS (
    SELECT
    1,
    @now
    UNION ALL
    SELECT
    lvl + 1,
    DATEADD(MONTH, -1, daydate)
    FROM months
    WHERE lvl < 12
    ), dateranges(period, opendate, closedate)
    AS (
    SELECT
    CAST(YEAR(daydate) AS CHAR(4))
    + '-'
    + RIGHT('0' + CAST(MONTH(daydate) AS varCHAR(2)), 2),
    DATEADD(DAY, 0-DAY(daydate), daydate),
    DATEADD(DAY, 1-DAY(daydate), daydate)
    FROM months
    SELECT
    b.period,
    a.OpenDate,
    a.CloseDate,
    a.Ref_Num,
    a.Type,
    a.status
    From Call_Req a
    INNER JOIN dateranges b
    ON
    a.OpenDate <= b.opendate
    AND
    a.CloseDate >= b.closedate
    WHERE Type = 'P';
    Microsoft Certified Trainer & MVP on SQL Server
    Please "Propose as Answer" if you got an answer on your question, and vote for it as helpful to help other user's find a solution on a similar question quicker.

  • May I have an extended trial period for adobe photoshop cs6?

    I had already a 30 days free trial period for adobel photoshop and I would like to know if I could get an extended free trial period as unfortunately I had no time left in my work  schedule to properly try the photoshop cs6 downloaded.
    Thank you for your understanding.
    Best,
    Jacques Olivar

    I am sorry Tyrone41 there is no way to extend the trial period.  If you wish to continue evaluating the software then please install the trial on another computer.

  • Using MBP in closed mode for extended periods

    I use my MBP mostly in closed lid mode as a desktop computer and only use it as a notebook when I'm on the move. I was wondering, is this a bad setup considering that when the lid is closed it's covering up vents and holding heat in?

    Hi,
    I just installed Leopard on to my Macbook Pro (which is attached to a 19" Samsung monitor) and cannot get Spaces to work.
    I was told it is possible to have Spaces work in closed mode though. I just have some concerns about keeping the MBP closed for extended periods of time, particularly when running programs that place a heavy demand on the processors (i.e. Second Life, Photoshop etc).
    Is it not possible for the computer to overheat or for the screen to somehow get damaged with the top closed ?
    I really want to use Spaces but it does not appear to work with dual screen set ups.
    Hannah

  • Do we document BOM information for each item in BR100 for BOM?

    Hi,
    I'm working on BR100 for BOM. I noticed that in BR100 BOM template there is not a section for the documentation of BOMs for each item. I wonder if the standard is not documenting any of that information in this document?
    Thanks a lot,
    Robert

    Hello Robert,
    BR100 explain all setups steps for modules.
    BOM for each item is not 'setup' but 'Data Management'.

  • Extending recording time/length for each track?

    Hello Any and Everyone!
    I would like to know if someone can help me out with what I am to do about extending the recording time for each track? I have found nothing as of yet that explains to me how to do it in the manual or in the application itself. It is standard 15 minutes and that's it. It may be and probably is a simple thing but can someone help me? Thanks.
    Wazzmatic

    Hi,
    If I'm not mistaken, you should check the preferences.
    Click 'Audio' or 'Recording'. There you should find a field where you can setup the desired recording time for all your projects....
    As far as I know, you cannot setup independent rec. time for each chammel/track.
    Hamm.Nrd

  • "The evaluation period for some of your software can be extended..​."

    Installed LabVIEW 2012 for which we have a license. Apparently it installed Application Builder without my knowledge or consent. Now, -everytime- I try to launch LabVIEW I get an annoying dialog, "The evaluation period for some of your software can be extended.  Would you like to extend the evaluation periods now?" Only if you will let me get my work done and quit bothering me with advertisements...
    How do I get rid of this "evaluation" software that I did not install and do not want?

    add/remove programs or hit that little check box on the Eval advertisment window that says do not show me the ad aagain.
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Sql query - Selecting last recorded values for each date in specified period

    Hello,
    Can someone please help me with my problem.
    I'm trying to get last recorded balance for each day for specific box (1 or 2) in specified period of days from ms access database using ADOTool.
    I'm trying to get that information with SQL query but so far unsuccessfully...  
    My table looks like this:
    Table name: TestTable
    Date Time Location Box Balance
    20.10.2014. 06:00:00 1 1 345
    20.10.2014. 12:00:00 1 1 7356
    20.10.2014. 18:45:00 1 1 5678
    20.10.2014. 23:54:00 1 1 9845
    20.10.2014. 06:00:02 1 2 35
    20.10.2014. 12:00:04 1 2 756
    20.10.2014. 18:45:06 1 2 578
    20.10.2014. 23:54:10 1 2 845
    21.10.2014. 06:00:00 1 1 34
    21.10.2014. 12:05:03 1 1 5789
    21.10.2014. 15:00:34 1 1 1237
    21.10.2014. 06:00:00 1 2 374
    21.10.2014. 12:05:03 1 2 54789
    21.10.2014. 15:00:34 1 2 13237
    22.10.2014. 06:00:00 1 1 8562
    22.10.2014. 10:00:00 1 1 1234
    22.10.2014. 17:03:45 1 1 3415
    22.10.2014. 22:00:00 1 1 6742
    22.10.2014. 06:00:05 1 2 562
    22.10.2014. 10:00:16 1 2 123
    22.10.2014. 17:03:50 1 2 415
    22.10.2014. 22:00:10 1 2 642
    23.10.2014. 06:00:00 1 1 9876
    23.10.2014. 09:13:00 1 1 223
    23.10.2014. 13:50:17 1 1 7768
    23.10.2014. 19:47:40 1 1 3456
    23.10.2014. 21:30:00 1 1 789
    23.10.2014. 23:57:12 1 1 25
    23.10.2014. 06:00:07 1 2 976
    23.10.2014. 09:13:45 1 2 223
    23.10.2014. 13:50:40 1 2 78
    23.10.2014. 19:47:55 1 2 346
    23.10.2014. 21:30:03 1 2 89
    23.10.2014. 23:57:18 1 2 25
    24.10.2014. 06:00:55 1 1 346
    24.10.2014. 12:30:22 1 1 8329
    24.10.2014. 23:50:19 1 1 2225
    24.10.2014. 06:01:00 1 2 3546
    24.10.2014. 12:30:26 1 2 89
    24.10.2014. 23:51:10 1 2 25
    Let's say the period is 21.10.2014. - 23.10.2014. and I want to get last recorded balance for box 1. for each day. The result should look like this:
    Date Time Location Box Balance
    21.10.2014. 15:00:34 1 1 1237
    22.10.2014. 22:00:00 1 1 6742
    23.10.2014. 23:57:12 1 1 25
    So far I've managed to write a query that gives me balance for ONLY ONE date (date with highest time in whole table), but I need balance for EVERY date in specific period.
    My incorrect code (didn't manage to implement "BETWEEN" for dates...):
    SELECT TestTable.[Date], TestTable.[Time], TestTable.[Location], TestTable.[Box], TestTable.[Balance]
    FROM TestTable
    WHERE Time=(SELECT MAX(Time)
    FROM TestTable
    WHERE Location=1 AND Box=1 );
    Tnx!
    Solved!
    Go to Solution.

    For loop
    following query keep day (here 24 in below query) Variable from ( 1 to 28-29/30/31 as per month)
    SELECT TOP 1 TestTable.[Date], TestTable.[Time], TestTable.[Location], TestTable.[Box], TestTable.[Balance]
    FROM Test Table.
    WHERE  Time=(SELECT MAX(Time) FROM TestTable WHERE Location=1 AND Box=1 )
    AND DATE = "2014-10-24";
    PBP (CLAD)
    Labview 6.1 - 2014
    KUDOS ARE WELCOMED.
    If your problem get solved then mark as solution.

  • Problem in getting Norms for each BOM

    Hi Experts,
    I am doing a report for stock with subcontractors and I am facing a problem in getting the accurate
    Norms (STPO~MENGE) against the BOM (STPO~STLNR)  for each EBELN.
    My requirement is :
    1. Finished Goods - ( MSEG~MATNR)  or (EKPO~MATNR) but mseg-matnr is more prefered as  my output  is  based on the  mkpf-budat , WHERE BWART IN ('101','102')  then
    MSEG~EBELN.
    IF EKPO-PSTYP  ne  ' 3 '   delete Finished goods.
    Then I take raw materials for finished goods and BOM for each rawmaterials.
    2. Raw materials -  select (RESBMATNR, RESBSTLNR, RESBSTLKN, RESBSTPOZ)  where resb-baugr = mseg-matnr and ebeln = mseg-ebeln.
    Now I am facing problem in getting NORMS against each BOM.
    3. Norms - * select STPOMENGE where STLNR = RESBSTLNR , IDNRK = RESB~MATNR,
                        STPOZ = RESB~STPOZ.
    But I am not getting the correct Norms for each EBELN, please advice if my logic is wrong or if my
    tables are wrong.
    Thanks
    Karthik.
    Edited by: Karthik R on Mar 13, 2009 10:32 AM
    Edited by: Karthik R on Mar 13, 2009 10:32 AM
    Edited by: Karthik R on Mar 13, 2009 10:33 AM

    Hi Karthik,
    You try this one, which I already tried and working fine for me when i developed a custom's enquiry report,
    here is a peice of code,
      SELECT  ABUDAT AXBLNR BMBLNR BZEILE
              BBWART BEBELN BMENGE BDMBTR B~KUNNR
              INTO CORRESPONDING FIELDS OF TABLE IT_FINAL
              FROM MKPF AS A INNER JOIN MSEG AS B ON AMBLNR = BMBLNR AND
                                                     AMJAHR = BMJAHR
              WHERE A~BUDAT IN S_BUDAT AND
                    B~MATNR = WA_IMAT-MATNR AND
                    B~WERKS IN S_WERKS .
      IF NOT IT_FINAL IS INITIAL.
        SELECT MATNR WERKS STLAN STLNR STLAL
               FROM MAST INTO TABLE IT_MAST
               WHERE MATNR = WA_IMAT-MATNR AND
                     WERKS IN S_WERKS AND
                     STLAN = '1'.
      ENDIF.
      IF NOT IT_MAST IS INITIAL.
        SELECT STLTY STLNR STLAL DATUV BMEIN BMENG
               FROM STKO INTO TABLE IT_STKO
               FOR ALL ENTRIES IN IT_MAST
               WHERE STLNR = IT_MAST-STLNR AND
                     STLAL = IT_MAST-STLAL AND ( STLTY = 'D' OR STLTY = 'E' OR STLTY = 'K' OR
                                                 STLTY = 'M' OR STLTY = 'S' OR STLTY = 'T' OR STLTY = 'P' ).
      ENDIF.
      IF NOT IT_STKO IS INITIAL.
        SELECT STLNR DATUV IDNRK POSNR MEINS MENGE
               FROM STPO INTO TABLE IT_STPO
               FOR ALL ENTRIES IN IT_STKO
               WHERE STLNR = IT_STKO-STLNR AND STLTY = IT_STKO-STLTY.
      ENDIF.
      IF NOT IT_STPO IS INITIAL.
        SELECT MATNR MAKTX
               FROM MAKT INTO TABLE IT_MAKT
               FOR ALL ENTRIES IN IT_STPO
               WHERE MATNR = IT_STPO-IDNRK AND
                     SPRAS = 'EN'.
      ENDIF.
      LOOP AT IT_STKO INTO WA_STKO.
        " Own Custom Logic, If Item Quantity is 500 KG, how to calculate per KG, Simple divide by the same Qty.
        IF WA_STKO-BMEIN = 'KG'.
          LOOP AT IT_STPO INTO WA_STPO.
            WA_STPO-RATIO = WA_STPO-MENGE / WA_STKO-BMENG.
            MODIFY IT_STPO FROM WA_STPO.
            CLEAR : WA_STPO.
          ENDLOOP.
        ENDIF.
        CLEAR : WA_STKO.
      ENDLOOP.
      LOOP AT IT_STPO INTO WA_STPO.
        LOOP AT IT_MAKT INTO WA_MAKT.
          MOVE-CORRESPONDING WA_MAKT TO WA_STPO.
          DELETE TABLE IT_MAKT FROM WA_MAKT.
          CLEAR : WA_MAKT.
          EXIT.
        ENDLOOP.
        MODIFY IT_STPO FROM WA_STPO.
        CLEAR : WA_STPO.
      ENDLOOP.
      LOOP AT IT_FINAL1 INTO WA_FINAL1 WHERE BWART = '101' OR BWART = '102'.
        MOVE WA_FINAL1-BUDAT TO WA_FINAL2-BUDAT.
        MOVE WA_FINAL1-EBELN TO WA_FINAL2-EBELN.
        MOVE WA_FINAL1-MENGE TO WA_FINAL2-MENGE.
        MOVE WA_FINAL1-DMBTR TO WA_FINAL2-DMBTR.
        APPEND WA_FINAL2 TO IT_FINAL2.
        CLEAR : WA_FINAL1.
      ENDLOOP.
    Thanks & Regards,
    Dileep .C

Maybe you are looking for

  • Is there a practical size limit on JPEG format image files?

    I have noticed when working with Photoshop v7.0 on Windows XP that, when creating a JPEG format image file from a very large scanned image (more than 800 Mb, maybe), the .jpg file will usually be saved on disk at any of the possible compression ratio

  • Appending data in receiver file adapter

    Hi EveryBody, I have an IDOC to File Scenario.I need to create a flat file in the receiver file adapter directory and want to append the data in the same file every time the IDOC is trigged.I have File Construction Mode as Append but still i am not a

  • Employee not able to view the Leave/Absence Types

    Hi experts, I have done the settings of Workflow with leave types in table V_T544S_WEB with grouping 40 against the leave type. Workflow task iD is TS21500004. The User Grp is set to 40. But when the empolyee checks system shows no data available . C

  • From title screen to Stage01

    I've been having an issue in Flash CS4 trying to make a game. From the title screen you click on the start button it does go to the next stage, which right now is currently set to Stage03 for testing purposes. However when it moves from the title scr

  • Report painter:- How to add new characteristics.

    We are creating the new report through report painter by copy from report : 1aip-001 , We require additional Characteristics i.e. not available in the available characteristics, So how we can add the require new characteristics. Please suggest Regard