Transfer of Costs in Product Cost Collector to COPA

Dear Experts,
Please can you advise me on this current issue I'm having. Below is a description of problem:
Customer is currently using report designed in COPA (KE30) to derive P&L report for using Plant as a characteristic.
This was being done at a time when Product Costing functionality was not being used
All costs (administrative, sales and production costs) were being collected in cost centers
At end of month assessment of cost center values to COPA is executed (KEU5)
Customer is then able to derive P&L report per Plant characteristic
However with implementation of Product Costing, all Production related costs are captured in Product Cost Collectors and not Cost Center
Hence we have no way of assessing or transferring total production costs from Product Cost Collector to CO-PA
We have tried to configure FI/MM PA transfer structure (KEI1) and default account assignment (OKB9) for automatic transfer of costs on goods receipt/issue, however this is not working because the product cost collector is used as the default account assignment for the transactions
So far only material cost valuation of sales/billed materials are possible (which does not address concern)
As a result we have a gap and customer is unable to derive P&L by Plant from CO-PA.
Can you advise if there is a way out, in order to have all Production Cost transferred to CO-PA.
Thanks,
Ola.

Hi Ola
Your Cost centers would be categorized as below
1. MFG Cost Centers (In Plant)
2. Service Cost Centers (In Plant)
3. Few Cost centers (outside plant) Eg: Sales, Marketing, Sales offices etc
At period end
1. Allocate the Costs from SER CC to MFG CC using Distribution / Assessment cycle.
This will make SER CC as zero
2. Calculate actual activity price in MFG CC (KSS2 / KSII)
3. After this, do revaluation of PCC using CON2.. This will make balance in MFG CC as zero
4. Allow the Variances to be updated to COPA by ticking the "Variances to Costing based COPA" in your settlement profile
5. In short, what remains for you to allocate to COPA is the 3rd category of CC.. i.e. you should allocate those CC to COPA whose cost is not included in the cost of product using COPC module
Br. Ajay M

Similar Messages

  • Target costs on Product cost collectors

    Hi,
    we have a problem with target costs on product cost collector.
    For the product cost collectors which are existing from long time, it is not updating target costs as soon as backflushing(Goods issue and goods receipt at same time) is done.
    For the product cost collectors which are created newly it is updating target costs as soon as backflushing is done.
    so we would like to know exactly at what point of time target costs will be updated on product cost collector.
    Thanks,
    Santosh Malisetti.

    Hi Rich,
    After researching little bit we found that its a standard functionality for product collector's not to update target costs until we do the variance caluculation. But there is one special case. When a new product collector is created it will update the target costs when backflushing(GI and GR ) is done, but this will happen during first month only. once this product cost collector has participated in variance calculation process, it will not update the target costs when backflushing is done,
    until it participates in  variance calculation again.
    Thanks,
    Santosh

  • Difference Aetween Overhead Cost and Product Cost

    Sir,
    What is the difference between Overhead Cost and Product Cost
    Thanking You
    Juhi

    Product cost indicates the cost of making a product which includes
    1) materials (contained in the BOM)
    2) labour  (specified in the routing)
    3) Overheads (charged via costing sheet).
    1) and 2) are directly identifiable to the product made.
    3) is not possible to directly associate to a making of product. This is more a common cost. Eg. Material handling charges. The material handling department, say, employs a few workers to do material transfer from warehouse, their cost is hard to associate to a particular production order.  Hence, usually a percentage is applied , where in the order is charged proportionate to use of materials in that order. The corresponding credit is given to the Material handling departmnet/cost center.

  • Difference between sale order Costing & Standard Product Costing

    Hi experts
    I wanted to know Importance of Sales Order Costing & standard Product Costing.what are the benefits of these.
    Regards
    Sandeep patil

    Dear Sir,
    we are implementing SAP in packing industry. In packing industry in PP Bill of material is frequently change, for this we are implementing sales order costing.
    We are doing the following things,
    1. we are doing the inquiry at that time we are doing unit costing.
    2. On the basis of inquiry we are preparing the quotation. the unit costing done in inquiry flow to the Quotation because we r preparing the quotation with reference to inquiry.
    3. Similarly we are preparing the sales order based on quoation and unit costing data flows.
    4. Now when we run the MRP it doesnot explode the unit costing material requirement.
    Please tell us how the unit costing material data will flow to MRP run.
    Please reply.
    Regards,
    Bhadresh

  • When it is update target cost in product costing ?

    What is standard cost  ? when it is update target cost cost  in product costing ?

    hi
    target cost normally update when you calculate variance. Target cost is the plan cost on actual quantities confirmed
    u can check the following threads
    Target Cost Update in Production Order
    Target cost update on Production Order
    Target Cost in Production Orders
    You will get to know more about target costs
    krishna

  • Target costs for product cost collector

    hi,
    can anyone tell me when are the target costs updated for product cost collector. it is after we post actual costs or after we calculate variance.
    Thanks

    Hi Elaine,
    Thankyou very much for the Information. In our case when we create new product cost collector and cost it and post actual costs to it, system is showing target costs on the product cost collector even before variance calculation but for product cost collectors which are existing from long time system is not showing target costs after we post actual costs. we have created new cost component structure recently and its active from april 1. does this have any impact on the target costs. Please let me know if you have any idea on this.
    Thanks,

  • Standar cost and product cost collector not updating the new price

    Hi,
    Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
    Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
    govind.

    Hi
    1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
    If the cost estimate was of previous months - then you can definetely release it again
    2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
    br, Ajay M

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Cost sheets--PRODUCT COSTING

    Hi Friends,
    In Product costing i have two scenarios-- MAKE TO STOCK AND MAKE TO SALE ORDER.
    For make to stock the costing variant will be PPC1
    AND for make to sale order the costing variant will be PPC4
    we can give different cost sheets for PPC1 AND PPC4
    But in in cost object controlling for the costing variants PPP1 (Planing) AND PPP2 (Actual) we can give only one cost sheet which is used while creating production order.
    How to provide different cost sheets(Mak to stock and Make to sale order) here in cost object controlling also?
    Any ideas ? Full points will be awarded.
    Regards
    siva

    You are unable to attach separate costing sheets to PPC1 and PPC4 because the valuation variant in the two costing variants is the same. (based on the standard config that I can see)
    SAP does not allow the valuation variant for a costing variant to be changed after creation.  To get a different cost sheet requires a different valuation variant, which would require building a new costing variant - we did do that and named it ZPC4.
    If you want the valuation different BY PLANT, go to the valuation variant tab of your costing variant and look for a selection "Valuation Variant/Plant" (in 5.0 this is a button in the upper left corner of the screen). Here you can make plant specific valuation variant configuration.  We use this for manufacturing plants - all plants use ZPC2 costing variant for standard cost to be released, but each plant has their own costing sheet as defined in "Valuation Variant/Plant"
    Just remember to test, test, test.
    As to this question:  In such case make to stock and make to order can not be done in the same Plant--Right?  our make to order is for non-valuated stock, so all costs move to the sales at the standard value of the actual quantities used.  Depending on what is added to make Cost of good sold, I don't know how you would get the "Actual" on to the manufacturing order so that it would settle to the sales order. - it is after all a manufacturing order.   have you tried doing the COGS on the sales order instead of the mfg order?   
    Obviously this question is a bit out of my usual practice. Someone else may have experience with this.  But one other thought to keep in mind with your costing variants - which costing/valuation variant is used to release standard cost for inventory purposes? To me that is the value that you want associated with production orders because mfg variances will generate from that cost.
    Hope some of this is helpful
    Althea

  • Packing cost in production cost

    Hi Gurus,
    My client is producing metal coated coil and from coil the produce roofing sheets. Products produce in every intermediate stage are saleable. They want to include the packing in production cost but they do packing only if that product go for sales otherwise same product they send for the next process without packing. They want packing cost in the production cost if the product goes for sale otherwise(if it is go for next process) production cost exclude packing cost. Can you please tell me how it can be done? How BOM and routing can be used in production order?
    Regards
    Rajib pathak

    Hello .
    First solution is,
    Create separate material code for Packed material and Unpacked material . Here you can define the BOM & Routing for each material.
    Second solution  is , if you donot want to create seriate material code ,
    Create two production  version for intermediate material. Define  BOM & Routing  with packing for 1st  PV and Define BOM & routing with out packing for  2nd PV.
    Now create production order and select the PV manually based on your requirement. Now packing cost will be added to production order for first PV.
    For that you need to do following setting .
    1.BOm selection   by production  version at MRP view
    2. Production version selection = manual  at for order type at OPL8.
    Note:But if run the MRP, may be this will not work.
    Please try  and come back
    Regards
    Pradeep  Kumar

  • Report for settled costs of product cost collectors

    Friends,
    Is there any report where i can see all the settled costs for cost collector for previous period. I can see individual costs through KKBC_PKO but i need one for all the cost collectors in one report.

    Sridhar,
    As always you got a answer. Thanks. i tried this before but missed running KKRV before this. Now this is good.

  • Quarterly Cost estimation - Production Costing - Costing Run

    Dear Experts,
    is it possible to run CK40N on quarterly basis - at presrnt we are using this function on monthly basis, but my client is asking to run this on quarterly basis.
    if yes please help me
    Regards

    Costing run will update standard costs and there will be any change in std costs only when say the quantity structure changes, BOM changes or overhead rates changes. If none of the above is changing, running CK40N will have no impact
    Which means that you can choose to run in quarterly as well.
    Regds
    Pooja

  • Doubt-product costing

    Experts:- plz clarrify this one:-
    2. what is the difference between:-
    a.product cost planning,
    b.cost object controlling
    c.sales order costing.

    Hi,
    Product cost planning is used to calculate the standard costs of the Materials. For which we need to prepare one cost sheet which calculates the overheads used in Production and cost component structure which includes all the cost elements with which the product is costed(materials,activities etc). In planning we create a Costing variant to capture / calculate the standard cost of the product. Costing variant is again a combination of valuation variant(which includes the strategy to calculate ur materials i.e. whether standard price or mov avg price,costing sheet etc.), date control, qty structure control etc. Planning can be done in 2 ways. 1 with qty structure and 2 without qty structure. with qty structure uses a bom and routing selection  and without qty structure does not. When we run a standard cost estimate the system calculates the cost of the material based on the settings we make in planning.
    After making settings for the planning we need to make settings for costing the object i.e order, Cost collector etc. Cost object controlling settings are different for Order, Period(repetitive) and Sales order Production types.
    In cost object controlling we need 2 more costing variants.one for calculating and capturing planned costs as per ur BOM and another for calcualting the actuals which we confirm during production(sap standard ones will be used generally for both). Once the production is confirmed, the system calculates the variance i.e. the difference between ur standard cost and the actuals. Apart from order settings we also need to make settings for calculating WIP, Variance and Settlement of Order or Cost Collector in Cost object controlling.
    Sales order costing is one type of production like make to stock, make to order, repetitive. unlike others, in sales order costing production is done based on the sales order of the customer. Generally FMCG and other consumer goods are produced with make to stock and order.
    Hope this would help u.
    Pls assign points if useful.
    Regards,
    Vishnu.

  • KKF6N - Cost estimate on cost collector

    When I cost a product cost collector with MF30 or KKF6N, the BOM of the finished product is not exploded as if all the components were raw material or the BOM was monolevel - despite the BOM is multilevel. I don't understand why...
    Thanks for your help

    In the same time i found OSS note 717592
    The system response in the preliminary costing of a product cost collector
    is different from the previous behavior in releases as of Release 40B . Up
    to and including Release 40B, assemblies were broken down and costed
    further. The cost estimate was created in multiple levels. In the following
    releases, the system does no longer break down the incoming components and
    carries out a material valuation.
    This system response is correct. However, you can check whether you can set
    up again the prior behavior with a modification. In this case, contact the
    Remote Consulting.
    Christophe Le Bail

  • How to add depreciation and interest in product costing?

    how to add depreciation and interest in standard cost estimate and actual costing in product costing ?

    Hi,
    WHy the admin and sales overhead will be deited to cost of product. The cost of product should include only the factory related direct cost and overhead cost .. not the sales and admin ovehead. exp. for those treat them as period expense and pass on the same to COPa and there those can be analysed there..
    I hope i am clear..
    Regards
    Prabhat

Maybe you are looking for

  • Safari only opening in a shrunken size?

    I haven't changed anything that I'm aware of but now safari doesn't open at full size (I don't mean full screen). It's like a 1/4 of it's full size and I have to hit the green button. Any ideas how I can get to open full? Thanks

  • Is it possible to change the user status of a TECO Order

    Hello Folks Is it possible to changes the user status of a TECO Order? I have tried to change it using the FM 'STATUS_CHANGE_EXTERN'. Its working fine for NON TECO Orders but not for TECO Orders. On the other hand I was able to manually change the us

  • Stored Proc to create .csv file from table

    Hi all, I have a table with 4 columns and 10 rows. Now I need a stored proc to create a .csv file from the table data. Here the scripts to create a table and insert the row's. Create table emp(emp_id number(10), emp_name varchar2(20), department varc

  • How to control material in PO type

    There are two material type in our company.One type is normal material,it has information record. other type is test material. it has not information record. but it can be created the information record by company approval. Normal material can be ord

  • Jumpy and Blurry Animation in Google Chrome

    Hi! I seem to have problems getting my animation to run smoothly in Google Chrome... seems to work ok in Internet Explorer. Am I doing something wrong? Untitled thank you so much any help is appreciated! Christina