Transport planning book from Production to Dev/ Test system

Hi APO Gurus,
I need clarity for below mentioned point u2013
I have a correct planning book in production system. I have a different structure in testing as well as in quality system. I want to transport planning book with all data views and macrou2019s associated with it to development system (or in test system).
How to do this? Please elaborate with details
Thanks in advance.

I did the transport from Production to Dev client using TSOBJ last week. Basis team helped in connecting Prod and Dev clients.
Everyting went ok except selection IDs. When I check 'with selection transport' in TSOBJ, it ends up in short dump saying Timed Out in reading SQL table /sapapo/sdpsetde. We increased the system profile parameter "rdisp/max_wprun_time" from 1800 seconds to 3600 seconds. It still timed out with same message. So, I created the transport without selection IDs and it worked.
Next, I downloaded the only required selection IDs (total 498) from the DP Planning Area in Production client to excel spreadsheet using table /sapapo/TS_SELKO. Then created another transport using TSOBJ.....this time I used the 'Transport of Selections' section for Selection IDs and used single value selection from drop down, uploaded the IDs from clipboard option. That worked.
Although my problem is solved....but by any chance, has anyone encountered that TSOBJ Timed out? Is there any OSS note for this?
-Sachin

Similar Messages

  • Is it possible to transport an object from Production to DEV?

    I have some queries and workbooks in Production that I would like to archive.  I have not been able to find a method to archive, so I am wondering if I can transport the queries and workbooks from Production to DEV?  I realize the queries may not execute, but so long as I can open them up and see their definitions in DEV, I will be satisfied.
    I know this sounds a little bizarre, but is it possible to transport anything from Production to DEV?
    Thanks!

    hi
    Yes. its possible but its not recom
    you can set in production system to allow changes to obj rsa1->transport connection->click 'object changeability', and look for object type , and set to changeable.
    pls refer these below posts
    transport a query backwards, from production to development
    Re: Transporting Process Chains from Production DOWN to QA and Dev
    assign points if useful.....
    Shreya

  • Transport planning Book to Q

    Hi Gurus,
             I wanted to know how we transport all the planning area and planning book from Development system to Quality system?
    Do we need to rebuild all of them in quantity or anyother way?
    Thanks for your answers and please let me know
    Regards,
    RAJ

    Hi Raj,
    You can do this using transaction /sapapo/tsobj (you may need to place /n/sapapo/tsobj in the t-code box). In this transaction, you will be able to create a transport object for planning areas, books, macros, selection id, forecast profiles etc. Depending on your transport strategy, you can create seperate transport #s for  different objects (i.e. 1 TP for PAs, 1 TP for Planning books). I usually create multiple TP #s so that if there are errors in the TP i can just recreate transport for those parts with errors.
    Please take in mind the dependencies. Planning Books are dependenent on Planning Areas (obviously). So you will need to tranport the Planning Areas first.
    Hope this helps. Please post again if you have more questions.

  • Moving Planning areas and Planning books from SCM 4.0 to SCM 5.1

    Hello Experts,
    Can anyone have idea of how to transport planning areas and Planning book from SCM 4.0 to SCM 5.1.
    Do we need any prerequisite to Transport Planning area and Planning book from Lower version (SCM 4.0) to higher version SCM 5.1.
    Any suggestion could be very helpful for me.
    Thanks!
    Best Regards,

    I have never done this, but I suspect it might be tad easier to just recreate them in 5.1 There are scores of tables that Planning Book configuration lies in. I would not rely on a transport mechanism working across versions to migrate every bit of the configuration accurately.

  • Transport Table K9RPEF1000006  from Production Server to Quality Server

    Dear Friends,
         I am performing client export/import activity and I have exported the Production Client with SAP Profile SAP_CUSX but when we checked log then It shows the table K9RPEF1000006 is available on production server but not available in quality server.So I have two queries ,( i) how can we create tranport request for this sap standard table (ii) How can we transport/move table from production client to quality client.
    Regards,
    Adya

    Hi Adya,
    You will need to create a transport manually using SE03 or SE09 ...
    R3TR TABL will transport technical settings for the table.
    R3TR TABU will transport table contents.
    Best regards,
    Derrick Hurley
    Development Workbench

  • Planning Proposal -  Transport.plan.pnt from data profile not considered!

    Dear Gurus,
    When clicking on the Planning Proposal to manage my deliveries I have the following 2 messages of error:
    1-  Transport.plan.pnt from data profile not considered!
    2-   Shipment type from data profile not considered!
    What does that mean and how can I modify this situation
    Many thanks in advance for your help
    Chris

    Closed

  • Unable to release transport request for modified Planning book from Dev Sys

    Hi All
    can someone advice on this:
    We have included a new key figure to our existing Planning book, which is already defined in Planning Area. This key figure is just getting shipping data for comparison and is not having any impact on macros also. We inserted key figure and set the attributes as output only and all looks good in Development system. But when we created transportation request and trying to release request it is giving error "Test Call of transport control program (tp) ended with return code 0208" Message no: TK094
    can any one advice on this
    KV

    Hello,
    Please check with Basis team. I think this is not related to planning book that you are trying to export. A look in the message text gives the following:
    Check the following points:
    Feasibility of the transport control program tp
    Parameter settings in the transport profile
    Availability of the transport directory and the subdirectories (cofiles, data, log, sapnames, bin)
    Write authorization for the subdirectories
    Write authorization for the files of the subdirectories cofiles, data, log, sapnames
    Release the request again when the error has been removed.
    Hope this helps.
    Warm regds,
    Ashutosh

  • APO SNP Planning Book Show Product View alternative UoM

    Hi,
    I have a base UoM of BTL and an alternative UoM of CAS.
    I can change/save in my users settings the in transactions /SAPAPO/RRP3 (Product View) and /SAPAPO/SDP94 (Planning Book) to show the alternative UoM CAS as default.
    The problem I have is when I enter the Planning Book, load a product, right click on the product (in Selected Objects), select Show Product View and then look at the stock tab, this always shows as the base UoM BTL.  Can this be saved to show the alternative UoM CAS?

    Hi Linda,
    Try changing you user settings for a product in RRP3 Screen.
    Page Menu --> Settings -->General Tab -->General Panel -->enter AUOM value (CAS in your case).
    Note - The conversion only takes place for the products, for which the alternative unit of measure entered is also entered as the alternative unit of measure in the product master, or for the products, for which the base unit of measure has the same dimension as the alternative unit of measure.
    Caution: Test it , how its affecting for other products which doesnt have CAS as AUOM.
    All products which have BUOM as BTL will be changed to CAS when AUOM is maintained for them in product master.
    Thanks
    Vinoth

  • Purchase requisition date in SNP planning book and product view not in sync

    Hello Experts,
    We have an issue with display of purchase requisition date in SNP planning book.
    We are manually entering the PR's for a perticular week from Monday - Sunday(01.09.2014- 07.09.2014), when the last PR is entered on 07.09.2014, it does not appear on the same day in planning book(cell becomes empty) and moves to 06.09.2014, thus quantity on 06.09.2014 is the summation of the quantities present on 06th and 07th.
    The PR dates are appearing correct when we click on display details in planning book and they are correct in product view, MD04 as well.
    Additionally, this is the same date on which daylight saving time comes  into effect.
    Kindly advise if anyone has faced similar situation earlier.
    Many thanks,
    Aditi

    Hi Aditi,
    Check the time zone that you have in your location in ECC and APO.
    Also note it is recommended that you maintain the same system time zone in APO and in ECC. (check tcode STZAC in both systems).
    Different time zones should generate this kind of inconsistencies.
    Kind Regards,
    Mariano

  • Transport of queries from production to developement

    Hello BI Community,
    We allow ad-hoc query development in our production system. Yet certain queries are critical and must be "certified" so that they cannot be overwritten in an ad-hoc manner.
    The method for certifying a query is to transport it from the development system, and once done the only way to change this query is to move another transport.
    As more and more sophisticated queries need to be certified, it is becoming difficult to re-create those queries in the development system for the certification process.
    Does anybody have experience or recommendations around moving a query that was originally created in the production system BACKWARDS to the development system ? Then it would be easy to move forward again via transport for certification.
    Thank you !
    Kiran

    Hi Kiran,
    1. Open production system
    2. Create transport (1) in Prod, add queries, process chains, etc.
    3. Create new transport (2) in Prod (in SE01) of type "Transport of Copies"
    4. Enter your target system on this screen (choose your Dev system here!)
    5. Include objects from transport 1 into transport 2
    6. Release transport 2 to go to Dev
    7. Delete transport 1 from Prod. This release locks on the objects.
    8. Close Prod
    8. Import transport 2 into Dev system
    OR
    The reverse transport is usually not setup , what you could do is :
    1. As BASIS to set up the connection
    2. Copy the transport object into file and then import it manually into Development
    Check this thread.............also.....
    Re: Reg : Transport  req
    Regards,
    Vijay.

  • Planning Migration from Development Server to Testing Server

    Hi All,
    I am doing migration from development env to testing env. I am stuck in the middle of the migration. Anyone please guide me in this situation. Its very urgent for me. I am following below steps for the planning migration
    1. Create a new database on Production RDBMS Server for your planning application.
    I created the new database for my planning application.
    2. Configure a data source on Production Planning Server.
         I configured the new datasource on planning.
    3. Create fresh planning application on Production Server and Ensure the admin is the same as your planning application on Development Server.
         I created the new planning application on production server. Its working fine with admin login.
    4. Go into the database tables for the planning app on Production Server and look at table HSP_USERS; store the SID value against user 50001.
         I save the SID value against 50001 in a notepad
    5. Go into the database planning system tables on Production Server and HSPSYS_APPLICATION, clear out the version field for the application you have created.
         I removed the version for the application i created
    6. Stop Planning.
         I stopped the planning services
    7. Restore the planning application database on Development over the one created in the first step (to the Production Server Database).
         In this steps only, i am facing diffculities.
         How to take the backup of development database? (Here, i want to the take the database backup of planning application schema  or entire oracle databat in development server)
         How to restore to testing env database
    Please anyone guide me in this situtation. Please......
    8. Go into the HSP_USERS table and update the SID for user id 50001
    9. Start planning
    10. Go to planning web and you should see your application when you try and log in it should take you to a migrate screen.
    11. If you are requiring to migrate users as well, you will have to make sure you create them in Shared Services and then use the updateusers utility in the planning bin directory.
    Thanks,
    Lakshmi

    Hi Mars,
    Thanks for your reply. I did the same as you specified. I used Imp instead of import, exp instead of export.
    7. Restore the planning application database on Development over the one created in the first step (to the Production Server Database).
    I restored the Planning dmp here
    8. Go into the HSP_USERS table and update the SID for user id 50001
    Here, SID remains the same after restore the backup from the development server(SID same for Development and testing Server)
    9. Start planning
    I started the Planning Services.
    10. Go to planning web and you should see your application when you try and log in it should take you to a migrate screen
    I am facing problem here.
    While login into planning application, its not redirect to migrate screen. Its normally login to the application
    Thanks,
    Lakshmi

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Error  while import XML file from Production to Dev., But has GREEN status

    Hi,
    I tried to export/import bex queries through XML transportation. Transportation is being done from Production system to Development. In transport connection I selected required query and then I exported to Development. export of file is done successfully.
    Now in development system I imported that XML file. It is imported. Giving GREEN symbol and also with GREEN check. But in Log view I found ERRORS. in errors it is mentioned "SAP object 46N3K1OCT22PSBN46O95MQLTJ () cannot be imported". along with long message text "Install the specified objects from Business Content. Only import the metadata afterwards.".
    What should I do now as of next step... import of file is stuck..
    How can I search object 46N3K1OCT22PSBN46O95MQLTJ (), if I have to install from BC.
    I am also unable to find the query in Development Bex analyser.
    Thanks for help....
    [email protected]

    Hi Babloo,
    According to the error message, the package may have failed are as follows:
    The user account that is used to run the package under SQL Server Agent in PRODUCTION server differs from the original package author.
    The user account does not have the required permissions to make connections or to access resources outside the SSIS package.
    The package may not run in the following scenarios:
    The current user cannot decrypt secrets from the package. This scenario can occur if the current account or the execution account differs from the original package author, and the package's ProtectionLevel property setting does not let the current user
    decrypt secrets in the package. In this scenario, we can change the SSIS Package ProtectionLevel property to EncryptSensitiveWithPassword, then modify the SQL Server Agent job step command line to include this password.
    File access fails because the current user does not have the required permissions to write to the file share that the connection manager accesses. In this scenario, we can create a SQL Server Agent proxy account. This proxy account must use a credential
    that lets SQL Server Agent run the job as the account that created the package or as an account that has the required permissions.
    References:
    SSIS package does not run when called from a SQL Server Agent job step
    Run an SSIS Package Under a Different Account
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • Using ALE to synchronize Variant Configuration data from Production to Dev

    SAP Gurus,
    We are trying to move away from opening our production environment every time with need to add new Variant configuration for products.
    In order to do so, we need to ensure that our development and staging systems are in line with production LO-VC data. We have been looking at a possible ALE solution but I would like to get other suggestions.
    Any thoughts you may have with regards to either pros and cons of ALE, or another solution we may have overlooked.  If your clients are transporting Variant Configuration to production, what method are they currently using to ensure data consistency between environments.
    Our landscape currently has two production environments for two separate business lines but both use LO-VC therefore we would like to standardize the process.
    Thanks and Regards,
    Kevin Webb
    SAP SD Senior Consultant

    Hi Webb,
    General its a complex process to transport VC but for system consistency you can:
    1. do the changes Manually in each system
    2. Use ALE idoc process to transport.
    But ALE transport generally used for fresh VC transport, if the VC already present in transporting system, it may cause inconsistency. Hence if you want to transport some changes then I can suggest you to do MANUALLY.
    But if you are transporting VC freshly in each system, go for ALE.
    try and revert

  • Watermark in ALL printouts from the dev/test system

    Hi guys,
    A way back I was responding and was one of the top contributors here, now I see myself in the situation to humbly ask for your oppinion.
    We have this situation: we have a lot of SAPscripts and Smartforms in the dev/QA systems. The client is using the same printers for both test printing and productive ones. We want that all the spools that come out of dev and QA to have a watermark on them, text, picture, what have you.
    I wonder if you know which standard program should be enhanced/modified to achieve this and how it should be modified.
    Best regards and thanks in advance,
    George

    Hi George,
    Well, I must say thats a very good idea and I will be curious to see the solution.
    I wonder if that is possible without modifying the sap standard code as I doubt there will be any customer exit/BADI to modify the spool just before it is sent to printer.
    Pawan.
    PS: I think FM RSPO_RPRINT_SPOOLREQ is sending the spool to printer.
    Edited by: Pawan Kesari on Aug 5, 2009 6:00 PM

Maybe you are looking for

  • Is there a way to prevent Firefox from checking "work offline"?

    If I open Firefox before I am connected to the internet or if I try to do something when I have been dropped from the internet "work offline" is automatically checked. It is easy to fix but annoying. Is there a way to turn off this function?

  • I downloaded iTunes but it won't open

    Where can I get help?  I need to update an old 4.3.3 iPad to new ios.  So, I need to do it through iTunes.  Well, new laptop since i last used iTunes - several years ago. I tried to download iTunes to this laptop but it will not open. I want to do th

  • My Photoshop Elements 7.0 Editor module

    Photoshop Elements Editor stopped working and reports a problem area as fiel Mscrv80.dll. Is my problem with Elements or with Windows Vista and what do I do?

  • Trip has no postable amount when PR05 is used to create advances

    Hi Experts, Whenever a Trip Advance/ Cash Advance in PR05 is created, settled and ran for posting, the system provides an error message: 'Trip has no possible amount'. But when I created a cash advance using PR03, the amount is read and detected afte

  • Can time machine restore in new HDD?

    if i backup my mac os in an external hdd with time machine and then ill change my mac hdd, can time machine restore my os in new hdd?(for example by Recovery Disk Assistant)