Transporting SolMan project with Aris integration to new SolMan system

We have a sandbox SolMan that was installed for temporary use, and some people on the team have done some process modeling with Aris.  We need to move this to a new SolMan development system that we're about to install.  I haven't really found good documentation on doing this, but in SOLAR_PROJECT_ADMIN, I do have the option to transport a complete project.  Can I do this, and then manually import that transport request into the new Dev system?  What has to be done on the Aris side to insure consistency?

Hi David,
There is not a lot of information about this topic. Just finished a project migration at the customer site. I used the solar_migration transaction, worked very good. But has some downsites, test plans are not migrated anc change documents. Be carefully with content repository this really painful. Even the Aris synchronisation worked because the SAP ids are not replaced.
regards,
Ralph

Similar Messages

  • Can we transport BW templates present in  SRM to New BW system

    Hello All,
    We have activated all the web templates related to SRM in our BW system.
    Our requirement is to run customised  BW templates which are present in SRM system in  BW system.
    Can we transport all the BW templates present in SRM system to BW system.
    BW templates are pressent in
    SPRO - SRM - SRM Server - Cross Application Basic settings - Define logical system and template names for BW reports.
    1. Bidder History
    2. Vendor evaluation
    3. price comparison
    4. detailed bid comparison with attributes
    Is there any possibility of activating or  transporting the above reports in the separate BW system.
    Thanks in advance.
    Cheers!
    Ravi

    Solved

  • Ressource Problem: Export with graphical reports from projects with integrated sub-projects

    Hi all,
    i have the following problem with the exported data of the graphical reports possibility.
    Expected output:
    OLAP Cube with processes and ressources
    Setup:
    Project Server 2010 with Enterprise ressource pool
    One main project with 6 integrated sub-projects
    Every ressource is assigned to just one sub-project or the main project
    Problem:
    The data (work and cost) in the OLAP Cube exported from the main project is 7 times (some reports 49 times) higher than the data in the main project
    Tested scenarios:
    Export just processes -> data is correct
    Export just ressources -> data is 7 times higher
    Generate another main project with 2 sub-projects and no ressources in the main project - Export of processes and ressources -> data is 2 times higher
    Because of the tested scenarios I expect that this is a problem caused by ressources and integrated sub-projects.
    I hope that this community is able to help me to solve this problem.
    Thanks & all the bests,
    Holger

    Using the "Baseline work report", I can't reproduce your issue:
    I have 1 task in each project (2 projects) with a resource assigned on each task (80hrs). The report correctly shows me 160 hrs.
    Which Project 2010 SP and CU do you have? I'd suggest you to install the
    latest version and see if it helps.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Activation of CRM RDS with ERP integration impact on existing ERP configuration

    Hi,
    I'm doing automatic content activation (via Solution Builder) of the CRM RDS solution with ERP integration. The CRM system is a new installation which will linked to an existing ERP system.
    Will the activation of RDS Solution content overwrite the existing configuration in ERP? What is impact of on existing configuration and existing process on ERP?
    Regards,
    SK

    1. The add-on seems to support all new versions of ECC, does this include ECC on HANA ? --> The add-on supports all release of ECC above the base release mentioned in the Integration guide, including ECC on HANA
    2. Is it necessary to backup the environment before installing the add-on ? --> The Add-On does not contain any DB tables. It should not interfere with the ECC environment, so you can install these without any disruption or downtime. As part of general hygiene, you may want to make sure that there is a recent enough backup for the ECC system.
    3. The component seems to be isolated from impacting any ECC functionality and its just for the purpose of integrating C4C with ECC. Would this mean that no regression testing is required in ECC ?
    No regression testing is required for ECC standard functionality. It will not affect existing distribution models. You will have to set up new ones for Cloud for Customer Integration scenarios.
    4. The component doesn't seems to have an uninstall option which would meant that any reverts could only be done through system backup only. Is this accurate ? --> There is no uninstall option.

  • Difference between using new Date() and new Date(System.currentTimeMillis()

    Hi All,
    I have seen many open source api's where they are updating dates with the following code
    new Date(System.currentTimeMillis())
    when i print the new Date() it prints the same
    what is the difference between using new Date() and new Date(System.currentTimeMillis()) ??
    Thanks,
    J.Kathir

    when i print the new Date() it prints the same
    It does because of backward compatability. This constructor exists in version 1.3.1 but not in newer versions.Really ? Please point me to where you read that.
    API doc 1.5 : new Date() (still there, not even deprecated)
    A quick look at the code for this constructor:    /**
         * Allocates a <code>Date</code> object and initializes it so that
         * it represents the time at which it was allocated, measured to the
         * nearest millisecond.
         * @see     java.lang.System#currentTimeMillis()
        public Date() {
            this(System.currentTimeMillis());
        }

  • ARIS Integration with SAP ERP 6.0

    Hi,
    For integrating ARIS with Solution manager, we will import a transport request into Solution manager.
    What has to be done for ARIS integration with ERP 6.0?
    Will there be a transport request as well, Where can we get that from?
    Has anyone done this before.
    Regards,
    Siv

    Hi Markus,
    I have Installation and Administration guide for ARIS 7.1 (December 2008) version and it has only 3 chapters.
    Could you just let me know what steps i need to do.
    Thank you very much.
    Regards,
    Siv

  • I look for integrated in the legend bloc of diaporama, a widget such as "Accordion" for, with a click, or passing with mouse, open a new legend for each photo. I tried with "Accordion" of Muse, it does not work. I tried copy/paste, mais no result. The wid

    Question.
    I look for integrated in the legend bloc of diaporama, a widget such as "Accordion" for, with a click, or passing with mouse, open a new legend for each photo. I tried with "Accordion" of Muse, it does not work. I tried copy/paste, mais no result. The widget disappear in bloc legend. disparaître. Have you one solution?
    Thank you,
    Loïc

    Accordion or Tabbed panel should to it, with click and open container.
    Please provide site url where this does not work, also if you can provide an example where we can see the exact action then it would help us.
    Thanks,
    Sanjit

  • How to re-classify a project with a new Bucket

    Hi.
    Does anyone know how to reclassify Projects with new Buckets? we want to change how the Portfolio are divided and delete some bucktes. The problem is with projects that belongs to this buckets, they should be reclassified again.
    Thanks a lot for your help,
    CAMILO URIBE

    Hi Thorsten,
    Thanks for you answer.
    I do not find where can i move in my dashboard the buckets. In fact, the field where bucket is listed in the item is non-editable.
    Do you know how can i change this or is there any function to do it?
    Best regards
    CAMILO URIBE

  • Integration Methods - Oracle Projects with Primavera using API

    Hi,
    We are trying to do manual integration in between Oracle Projects with Primavera using API, if some one can able to help us on the process and procedure that would be really helpful....
    Thanks
    Rgds,
    Vijay
    [email protected]

    Hi,
    The Primavera intergration works with the "Standard Intergration" of Oracle 11i & R12.1 with the version of P6, this is the statement was in by the market experts. Even I have not worked on this intergration part of primavera with Oracle. still, I can provide you some search engine links, which could help you in http://www.projectp.com/products/op3.php ; http://www.projectedconsulting.com/index.php/community/blog/2010/04/primavera-and-oracle-projects-integration/
    Lavanya

  • Transporting SolMan Project

    Hi Gurus,
    Does anybody have the success story of transporting SolMan projects from one SolMan system to the other?
    I have read that it is possible. Also have heared that lot of people are facing lot of issues while transporting. So, looking forward for some expert advise.
    best regds,
    Alagammai.

    Hi Raja,
    Thank you for the reply.
    But as I told you, I have heared people saying that it is possible. But I also have heared people saying that they are facing one or the other problem like:
    Structure got transported, but not documents
    (ii) Only released docs can be transported, etc.
    In the link specified by you, again the issue has not got resolved. The user has got the error of "specify transport target". But as said in the forum it looks more like a Basis issue.
    Thats why, I am looking for somebody to confirm me, "Yes it is possible. And these are all the prerequisites for successful transport".
    But many thanks for your efforts to help me out.
    Thanks & best regds,
    Alagammai.

  • Can I open a new project with 5 or 10 bins already in the browser?

    Hi,
    I'm wondering if I have to create and name five to ten bins every time I open a new project. Or is there a way to set FCP preferences to have a certain amount of bins and their names open every new project?
    Thanks

    You could however, create a "template" project. If you new the bins were going to be named the exact same thing for every project.
    Just create a project, set up your bins and save as "template.fcp" (or whatever the fcp extension is, I can't remember right off hand.) Keep that somewhere you can find it, and then open it up and save it as a new project name anytime you need a project with that set up.
    I do this for my projects because there is another editor that I work with that doesn't keep his browser very organized, so it was hard for me to figure out where he put everything when it was my turn to come in and finish the edit. So I created a template that had bins called "Graphics" "Animations" "Music" "Sound efx" "Sequences" etc.
    Helps keeps things orderly.
    Hope that helps
    Chris

  • Cannot Start a new project with a mapped network drive

    When I try to start a new project with Encore and save the file to our network cluster (An Isilon Server), I get a file not found error message. When I try to do this to a local drive, it works just fine. None of the other Adobe products (Photoshop, Illustrator, After Effects) have this problem with this network drive.
    Greg Glaser

    Yes, it worked on the local drive, and also to a Windows Networked Server that was not the Isilon. Even after creating the project and moving it to the Isilon, it was generating error messages after a few minutes of use. The Isilon is using a BSD variant of Linux and Samba. The really strange part is the all other Adobe products from the Production Suite work with this server without any problems at all.

  • Can't open project saved in iDVD4 on new Mac with iDVD 7.02

    I used iDVD 4 (in OS 10.4) a great deal but recently upgraded my Mac to Leopard on a Mac Pro. I have now iLife08 installed with iDVD 7.02.
    When I try to open an old iDVD project file I get the following error message:
    "Changing the TV standard will require iDVD to encode all previously encoded assets again."
    I checked and made sure that iDVD is set to PAL (by opening it on a blank project) and I know for a fact that the old projects were also PAL so there is NO change of TV standard. When I click OK on the dialogue box, iDVD quits.
    Am I doing something wrong here? I cannot go back to the old version as iDVD4 and 5 report that they will not run on OS 10.5.6. (iMovie 4 will run). This seems an almost Microsoft like lack of file compatibility.
    Any suggestions are very welcome.
    Dave

    After further investigation, I think it is a bug with iDVD7.
    It will open an NTSC iDVD4 project with no problems. It is a PAL version that it chokes on. I suspect this is an example of the "NTSC default" mentality in the software where things are not tested enough for other standards. My default if iDVD7 is set to PAL but something is not working.
    I went back to my old iDVD4 projects and then saved them as an archive, ie with all files and themes included. These files, even if PAL, would open in iDVD7.
    Very strange.

  • Is it possible to link data across different/multiple PWA sites leveraging Master Project with the Subprojects feature?

    A couple different questions /similar scenarios
    1) Is it possible with Project Server 2010 to have several sites (http://server/pwa1 and
    http://server/pwa2 for example) communicate and build a Master Project at a third (or X) site (http://server/pwa3)
    2) Is it possible with Project Server 2010 to have several sites (http://server/pwa1 and
    http://server/pwa2 for example) communicate and build a Master Project at one of the original sites (http://server/pwa1 (for example))
    OR is there a better way to do this/more preferred way to do this. 
    We found this (http://social.technet.microsoft.com/Forums/projectserver/en-US/2379c3f2-6c80-46d7-8eac-3bc2ccb2d908/master-projectsubproject-with-sites-in-pwa-2010?forum=projectserver2010general)
    but its not what we're looking for
    3a) Issue/Example -
    We want to set up a site (http://server/pwa100) for just the president of the company - all the schedules of the subsites (/pwa99 + /pwa98) create a feed into an integrated master schedule/master project with subprojects(located
    in /pwa100). 
    3b-1) We also want to set up sub sites (http://server/pwa99 and
    http://server/pwa98) for each division VPs (and specific other people). These two sites would only allow specific user's project files to be viewed by each other...
    Can their project files have linkages between the two project sites (/pwa99 and /pwa98)? Meaning if user1 logs in to /pwa99 can he see a project file (given that they have permission) from /pwa98 in the same instance?
    3b-2) Can they see the project file in ProjPro and/or PWA ???
    3c) is it possible to have:
    + /pwa100 (pres)
    ++/pwa99 & /pwa98 (two vps)
    +++/pwa97 & /pwa96 & /pwa95 & /pwa-etc (minions)
    each rolling up to the next level (level 3 rolls up to level 2 which can roll up to level 1)

    kbwrecker,
    I agree with Dale. Having multiple sites will make this difficult to set up. 
    Not knowing how your Custom Groups/Categories have been set up, have you looked into using the "Project Permissions" feature to share projects. These permissions are 'additive' to the category permissions, so you could start out with people looking at the
    projects they are authorized to via categories, and then let them share/add people as needed basis. This will also satisfy the requirement of not-loading the projects with resources..
    And finally, the department and categories need not align, except that when projects from one dept are shared t another dept resource, the visibility of custom fieds will be affected.
    Hope I did not go off on a tangent there :)
    Prasanna Adavi,PMP,MCTS,MCITP,MCT TWitter: @prasannaadavi Blog: http://www.prasannaadavi.com
    Meant to get back to this earlier - your answer is close (because its what we currently do..sort-of)
    From my understanding of this issue the users are separated by department and can only see specific projects; however, when they try to share departments between users (so they can see their projects (dept a sees dept b projects)) this works - but there
    is a bigger issue/main issue.  
    main issue: when dept B adds a new project dept. A cannot see the new project in dept B.
    This can be eliviated by removing the user/s and re-adding them to the permission structure of the deptment but overall doing this several times based on user/s and projects being added it gets to be cumbersome and just plain annoying.
    Any help/additional thoughts would be great

  • Updating projects with activities linked to other projects.

    Im kind of new at this. I am working on a project with several contracts. i am thinking of setting up each contract as a separate project in an EPS and linking the milestones in all the projects to create a master schedule. On a weekly basis i recieve schedule updates from the contractors. What im wondering is if there is a way i can copy the new schedule in with all the updates without having to re-link all the activities everytime I get an updated schedule? also is this the best way to create a master schedule?

    *794503,*
    It sounds like your sub projects (contracts) are in sort of a design on the go mode?
    To make things a little more manageable I would suggest that you establish a set of standard start and finish milestones for each project in order for you to be able to ensure that your master project major milestones (hopefully integrated with your cost or earned value milestones) remain logically tied to those designated sub project milestones.
    With that said, I would just paste the new edition of each contract's schedule into their respective projects. I would make an export (.XER) backup before pasting any new data. It's better to be safe than sorry!
    Be mindful of the fact that you probably need to make sure that the logic ties gets pasted by not clicking the box (Relationships / Only between copied activities) on the "Copy Act. Options" dialog box. Otherwise, you'll have to manually tie all of the logic again. A royal pain in the "A" double "S"!!
    **Use a copy of the latest project/contract schedule update and as a baseline. Format your bars to also display that baseline schedule on row #2. Also insert a schedule variance column to display date changes between your original vs. newly updated schedule. For analysis of changes.....maybe build a new layout and filter to only display those act's that have major date changes (sched. variances)?
    **Another tool to use after the fact would be *"Claim Digger"* in order to analyze the details of what changes were made with each new schedule update.
    There is no way to eliminate all of the manual work. :(    Some manual verification will always have to be performed.
    It would be very smart to get a good grip on how you'll handle these changes early in the project before the situation gets out of hand.
    For every "schedule change" made to your schedule the chance of a scheduling error increases. So there you go.
    Good luck and let me know how it turns out.

Maybe you are looking for

  • PrE-10 Will not start in Win7(x64)

    I sincerely hope this is not redundant, but I have spent days on this forum looking for answers, but with no luck. I have seen many similar questions, but none of the 'fixes' proposed are relevant, or do not work for me. History: I have been running

  • MacBook pro powers on but with no display. What do I do?

    Somebody please help! I press the power button and it dings but then nothing comes on the screen. I need to figure this out!

  • Exchange Server 2010 - Message Tracking Logs - Log file creation

    Hi, I would like to find out on the behavior of the exchange server in the way that it logs the message tracking. Currently the parameter used is  MessageTrackingLogMaxDirectorySize - 10GBMessageTrackingLogMaxAge - 30daysI would like to check when th

  • Speech Recognition Not responding

    Hi, im running snow leopard 10.6.6 on a iMac 27inch intel. I want to use the Speech commands on the computer. The internal microphone is calibrated in speech. It is also selected in the audio prefs. But on my speakable items little circle thing im ge

  • AE Organizer 13 Mac how do I change all the subcategory keyword tags and colors

    I have a long list of categories and subcategories. I need to assign different colors to the category and subcategory tags (matching subcategory colors to the respective category). I can change the category tag and color but not the subcategory?? Wha