In travel management, when i give cash advance to employee(these postings are automatic postings)
Cash Advance a/c DR
To Vendor a/c CR
Vendor a/c DR
To Bank a/c CR
(when he gets the cash )
Now my client wants to dun the vendor if he doesnt reimburse the cash advance. So how can i dun the vendor in this case since while getting the cash itself the vendor a/c gets knocked off. How can i do this?
2. These postings are utomatic postings lyk we have thru OBYC. Is there a possiblity to use Spl. G/L in automatic postings? say for example can we use spl g/l indicator for OBYC auto postings?
This is my scenario, plz help me by giving suggestions on how to do this?
Its very very Urgent
I hope u all will help me.
Regards
Rajaram

Hi Rajaram
The Employee Salaries JV has to be uploaded into FI.  Other than Salaries like Employee Travel Advances, Employee Reimbursement Expenses, if u need to track the individual employee advances, expenses in Cost center wise.  Treat each Employee as a Vendor, for this u need to create the separate Vendor A/c Group for Employee's.  If u Treat each Employee as a Vendor, its possible to track the Advances, Expenses at Cost Center level for each Employee Vendor A/C.  (If HR Module is not implemented)
Thanks & Regards
Babitha

Similar Messages

  • Issue in Positive Time Mgmt

    Dear SAP - HR Experts .
    In My Client side , they want to shift for Positive Time Mgmt (want to capture actual times).
    They Usually run payroll on 25th day of every month .
    if they implement Positive Time in Company then they will have Time Evaluation up to 25th of the month .
    Suppose if a employee took two days absences from durring the period of 26th to 31st Jan . but we have Time Evaluation up to 25th day only and we run payroll for Jan upto 1st to 31st .
    in that case Employee will recieve complete salary , while in actaul scenrio he was absent for 2 days .
    so client have some quries about this situation ...
    Q 1 : How his salary will deduct and recover the absence of 2 days  ?
    Q 2 : How we have to run  Time Evaluation from 26th  to 31th day of Jan .
    Q 3 : what changes are required in PA03 and PU03 ?
    Regards : rajneesh
    Edited by: Rajneesh Kumar on Feb 13, 2009 8:53 AM

    Hi Rajneesh,
    Time evaluation period can vary from the payroll periods. You can run the payroll from first of the month till last day and Time evaluation from 26th of previous month till 25th of current month. In this situation employee will be paid for the whole month by the payroll and it will not take into account the absences/sick etc that took place after 25th of the month till the month end.
    Later when you do Time evaluation during the following month system will capture those 2 days (as you mentioned) sick/absence took place after 25th of current month and it will deduct the amounts from the Payroll of the following month. But it will not deduct from the current month as the Time evaluation was only done till 25th of the month.
    It doenst need any changes in PA03 / PU03
    Hope this clarifies your query.
    Thanks,
    Tara

  • Setting up ESS for Training and Event Mgmt

    Hello to all SAP HR experts,
    i am now doing a project on SAP ERP HCM and would like to learn more about the things and steps i need to do to come up with a ESS for Training and Event Management. I have an account for SAP Netweaver and able to access Enterprise Portal (EP). Do i require to navigate in EP to use the items there or do i need to set up an adobe interactive form using SAP Netweaver Developer Studio, design the flow at Visual Studio(VC), then link all the VC at Guided Procedure? If that's the case how am going to extract the data which i have configured in the IMG path under Training and event mgmt (TEM) and also SAP Learning Solution(LSO)?
    For an example: I have created Training Event Groups, Training Event Types and Courses. If i want to so a paperless ESS, how can i extract all this into the fields which i have designed in my adobe interactive form.
    Please help me and guide me along
    Thank you in advance:)
    Regards,
    Jenny

    Hi
    There are 2 end user possibilities for Learning
    One is PV7I and PV8I ITS services which are part of an old ESS role and can be used as integrated ITS versions
    any ESS role via HpF or called directly via URL (without a Portal) - this will allow users to book course and events and view/change bookings etc
    The other is Business Package for Learning 1.0 which requires a Portal (and other LSO dependancies to run)
    this provides a wider range of Learning based activities including booking etc
    Best wishes
    Stuart

  • Can no longer import from VHS to iMovie HD via Sony TRV-340E

    For the last few weeks I have been successfully importing alot of my old home videos into iMovie 4.01.
    The set up is a typical AV pass-through arrangement:
    VHS (via component cables) to:
    Sony TRV-340E (no tape inserted) (via 6-4 pin Firewire) to:
    iMac G5
    Then yesterday I upgraded to iMovie HD and updated straight away to 5.02.
    Now when I play the tape in the VHS, it will show up on my cameras LCD screen but not on the G5.
    I know this is an iMovie problem because:
    If I play the VHS, and then put a tape in to the camera, then click import in iMovie, I can see that iMovie grabs a split second of video from the VHS before starting to import from the DV tape.
    I hope Apple can fix this soon because I have to return both the camera and iMac soon!

    Yes, some analog to DV converters don't work in iMovie HD 5.0.2 like they do in iMovie 4.0.1.
    I'm not holding my breath for a fix since this has been a known issue for eight months:
    http://www.sjoki.uta.fi/~shmhav/iMovieHD_bugs.html#analogDV
    You can send feedback to Apple at:
    http://www.apple.com/feedback/imovie.html

  • I upgraded to imovie 9 and now it wont recognize my sony dcr trv 25 movie camera.  I have a conopus coverter that works to inport my video with an s cable but no audio.  How do I get imovie 9 to recognize my camera?

    I've been to the apple store and they thought my camera was defective but I can input video with my canopus con verter with the s cable .  But it has no audio.  Imovie 6 recognized my sony movie trv 25 camera and I imported without a problem.  I can't find an rca to dv cable for this sony camera which would
    let me use my converter box.  Can I find and download Imovie 6 , import my movies and then import them to imovie 9???
    thanks,
    carol

    I do not know that camera, but with many, there is a set scheme for the connections, to get things to work. It seems to differ by make/model, but many have found that just by changing the order of turning things on, and invoking the Capture module, things will usually work.
    The connections are camera to computer via FW cable, then turn ON camera in proper mode, then launch PrE, then go to Capture. Users have found that their camera will require, say, plug-in, launch PrE, THEN turn ON camera, then launch the Capture module. As you can see, there can be variations in when one does each part of that chain, and it can make a difference. I would sit down with a pad and pencil, and test each possibility. If one works, that would be the scheme that I would then use.
    Good luck,
    Hunt
    PS - the only thing that I would NOT do would be to turn ON the camera, prior to connecting via the FW cable. That can cause big issues.

  • Question to the Power Users RE: Time Capsule Disk Mgmt and Security

    I was real excited to get the Time Capsule, but now since I have it I have to say its lack of security and disk management features are disappointing.
    I am thinking of giving up on Time Machine backups completely (I have never been thrilled with TM) and using the Backup 3.0 that is available to .Mac users. If I backup one machine using TM to the TC, I can login from a different machine and modify/delete the backups, this is not secure from accidental or malicious access.
    What I am hoping to do is to create logical partitions on the drive and use a program like PGP to encrypt the disk. This so far has been a real pain in the @$$ because of the lack of disk mgmt with the TC.
    I have used the OS X disk utility to create a disk image (takes forever) and it does not automagically mount itself, so PGP will not recognize it is a disk. I then decided to start over and use the Airport Utility to erase the disk (this has been running for about 12 hours now, and is still flashing amber). I am not sure if this TC is DOA or just slow as cr@p.
    If anyone has any ideas on how to make an out of the box TC more secure, please share.

    darndawg wrote:
    Have you been able to get all of your applications to recognize the disk image as a place to save/create/modify files?
    All applications? Only tried some - but since I was able to copy 56GB of iTunes content to the drive and access it with TuneRanger - I am fairly certain it is universally available.
    With the encrypted disk image, can you decrypt that image from another machine with a passphrase? I believe the answer is no, which is why I want to use PGP to encrypt the disk image.
    I believe the image is not machine restricted. The only encrypted image I have is on a USB memory stick. I will have to try and open it on my other mac.
    I did create a 50GB disk image successfully, however I changed my mind and decided I wanted to create an image using the entire TC disk.
    I deleted the disk image I had created, as well as the TM backups on the disk. I then used the Airport Utility to do a "quick" erase of the disk, and now 36 hours later it is still erasing the disk.
    That sounds wrong.

  • Sony TRV-350 8mm will not import correctly into iMovie 8.0.4 (Any ideas?)

    I purchased a Sony TRV-350 because it is supposed to play all 8mm tapes, and has a bridge function that converts analog signal to DV. The camcorder also has inputs to connect a VCR to the camcorder and convert the signal to DV. I am trying to import hundreds of VHS and 8mm tapes to iMovie. I connect the camcorder via firewire to the computer. The computer recognizes the camcorder and has control of the camcorder. When I try to import the video everything seems fine. I can import a five second clip or twenty min. clip. The problem starts after you click "Done" on the importing screen. The importing screen closes, and the clip appears in iMovie. The problem is when viewing the clip in iMovie it is only half the length of the import. (I import a 10 min clip, only 5 min shows in iMovie) It seems like every other second is missing. So far I have tried these trouble shooting tips.
    1. Made sure the camera DV feature is turned on
    2. Made sure the camera is set to ilink
    3. The camera is set to NTSC with 30 FPS
    4. Opened played a note and close Garageband
    Someone suggested I should try find a copy of iMovieHD (6.0.3) and try importing the videos. If you think this will work let me know.
    Any suggestions, idea or help would be greatly appreciated. I am a new mac user, so please give detailed instructions.
    Thanks for your time.
    Tyrel

    I believe the new 8 core mac pro only has firewire 800 connecters. So you would need a converter cable to connect your camera. Is that how you system is setup? If so, what kind of converter are you using? That could be the cause of your problem. A blue screen usually means you have some sort of connection issue.

  • Features in Patch 6.4 missing from ZCM Patch MGMT 11.2.1.0

    We are migrating from Novell ZENworks Patch Mgmt v. 6.4.2.1592 to the ZCM v. 11.2.1.0 patching service. I've noticed that there are are few features in the Patch mgmt 6.4 that I don't see in ZCM 11.2.1.0 and want to see if I'm just missing them somehow. I've looked throught the zen11_pm_administration manual and could not find any info on the following:
    1) In Patch 6.4 when looking at the vulnerabilities/patches, you could filter by a specific OS in that it would only show patches (for example) for Windows 7 32bit workstations...and those patch results would only display "patched" or "not patched" numbers for that specific OS. In ZCM 11.2 patch mgmt...it appears that it can only filter by Platform: Windows, Vendor: Microsoft. With this filtering it mixes all the XP, Windows 7 32bit, Windows 7 64 bit, and Windows server patches all together. In the patch name field I can put "Windows 7" but it display 32 and 64 bit as well as patches for servers and includes servers in the numbers for "patched vs not patched". I would like to be able to filter the patches to show for example only patches for Windows 7 64bit workstations and have it reflect the workstations with only Windows 7 64 bit as it does in Patch 6.4. We have ZCM servers in our system but are using a different method to patch them. Basically, I currently have to wade throught the patches for Windows 7 (for example)..select the ones I want..and if that patch also is for Server 2008...I have to make sure that after the deployment creation is completed to remove the servers from the deployment. It would be much easier and efficient to be able to filter out the patches for a specific OS and apply those patches to only that specific OS workstations. Any ideas if this is possible under ZCM 11.2.1.0 patching?
    2) In Patch 6.4 you could configure a policy for snooze and reboot options. Then when completing the deployment wizard...you could select "Use policies" for these options. Is there a place to configure these presets in ZCM 11.2.1.0 or does one have to manually change them every time a deployment is created?
    3)Once a deployment is set to a group of test workstations, in Patch 6.4 I could export the list of worksations in the test deployment to send to the helpdesk in case they received any calls. Is there an option to do this in ZCM? There doesnt seem to be one.
    Any info or feedback would be greatly appreciated.
    Thank you,

    Michaelstump,
    is there a reason you posted in the ZCM *10* patch management forum? At
    this time, I agree, some things are better with ZCM patch management,
    some things are not...
    Shaun Pond

  • I have used SAP doc mgmt for years. We copied a client and now when I configure a Class to my DMS DIR and go to CV01n Additional Data NONE of the characteristic entry boxes show up. Additional Data is blank.

    I have used SAP doc mgmt for years. We copied a client and now when I configure a Class to my DMS DIR and go to CV01n Additional Data NONE of the characteristic entry boxes show up. Additional Data is blank.
    It appears there must be some high level setting missing in the client. I have checked all authorizations and cannot find a difference between this client and all of the other clients we have. Only this one client does not show the class characteristics in the Additional Data tab.
    Any ideas of why this standard function is not working). It does not matter which DIR I config the 017 class to, nothing shows on Additional Data.

    Hi,
    The issue is resolved. We are working in a sandbox with Class configuration on a DMS issue related to standard class 017. There are no standard settings in SPRO - Cross-Application Components | Maintain Object Types and Class Types | for the object type DRAW that will allow "auto-populating" characteristic values as we do with VC class 300.
    For whatever reason DRAW and class 017 are not configured by SAP in the same manner as class 300 for example.
    We made a config entry for DRAW Class 017 VBAP. Let's just say the system did not like that.
    We are exploring other options.

  • Cost Element Category and Commitment Item Cat. for PS Cash Mgmt

    Dear All,
    We are activating PS Cash Mgmt.
    I want to know the difference between:
    1. Maintaining the Cost Element Category as 1 and 11. Is it necessary to maintain 11 (Revenues) or maintaining 1 (Primary costs/cost-reducing revenues) will have same result.
    2. In Comm. Item Financial Tran. maintained is 30. But for Commitment Item Cat. as 3 (Expenditures) or 2 (Revenues) only to be assigned for revenue.
    Our Client is asking to maintain everything as 3 (Expenditures) to all the commitment items. What will be the effect on PS Cash Management if I use Cost Element Category as 1 & Commitment Item Cat. as 3 ?
    Regards
    Shubham

    Hi,
    Cost element category as 1 and commint Item caterory 3 holds good for all expenses, so you can use this, with this when you process Invoice In MIRO a Project cash management document will get generated and this will update the report against the payments in CJIA as well in S_ALR_87013574 reports etc.
    Combination for creating commitment items is
    Cost element category 1 --> Commitment item category as 3 and Financial Transaction as 30
    Cost element category 11--> Commitme nt Item category as 2 and Financial Trns as 30.
    Note : what ever the G/L accounts created wrt Chart of accounts, whether it is Expenses or Inventory or Revenues, you have to assign commitment item in the G/L Master in Create/bank/interest tab in field commitment item. If it is not assigned in all modules you will get error as commitment item not assigned.
    Thanks
    Regards
    kishore

  • What is the difference between Category Mgmt and Spend Analysis?

    Hi Friends
    What is the difference between Category Mgmt and Spend Analysis?
    Regards
    Chinna Krishna

    Hi Chinna
    Here are my two cents on this questions
    1. Catagory Management : It pertains to all sourcing activities that a purchasing group does for a specific catagory of items ( say tyres, bearings, etc. in automobile industry scenario OR steel sheets, electric motor, etc. in consumer durables industry scenario) in order to meet companies strategic goals like cost, quality, delivery and new product introduction. It also involves the strategic sourcing piece for that category. Typically it can include following activities for a category which is being managed
    - Identifying current and future business & technical requirements
    - Constant vigilence and analysis of supply market for that category ( and also identifying new sources)
    - Lauching various projects within category focussed on cost reduction, quality improvement, delivery improvement. This may include some of activities like supplier analysis. RFx, Reverse auctions, contract negotiation, etc.
    - Monitoring the category specific supplier performance
    Category Management team typically consists of cross functional team and it is iterative process (continuous improvement).
    Category Management in covered to some extent in E-Sourcing application and its analysis is covered in Spend Analytics application. Fully blown category management is on road map of SAP but none of the current functionalities addresses it fully.
    2. Spend Analysis: This involves analysis of the spend at highest level of organization. To improve the data quality, it typically involves spend data standardization & enrichment, supplier normalization and spend categorization. Once you have clean data, one can slice and dice the data to gain insight into the spend and identify opportunities for launching the various initiatives focussed on cost, quality and delivery.
    SAP Spend Analytics application covers this spend analysis capability.
    Its a long answer and hope it helps you.
    Bhushan

  • SAP LSO - Time Mgmt integration

    Hello Gurus
    Iu2019m working in a SAP environment where are managed companies in more countries and all companies are using SAP Learning Solution (ECC6.00 EhP4).
    We are introducing a new country A, in which is managed company X, having 3 personnel subarea (PS1, PS2, PS3). In country A we are introducing SAP Time Management module too, to be integrated with SAP Learning Solution.
    Since PS3 has a different mgmt in Time, we have defined 2 PS groupings, one for PS1 and PS2, and the other for PS3.
    For the 2 PS groupings, we customized 2 attendance reasons for training:
    0110 u2013 Training as attendee
    0111 u2013 Training as instructor
    Even if we have 2 different PS grouping, we need to maintain the same coding for absence and attendance reasons.
    The integration SAP LSO and Time Mgmt has been activated and itu2019s perfectly working.
    Unluckily, the requirement of the company X is to receive automatically attendance records from SAP LSO for the employees belonging to PS1 and PS2, but not to PS3, because all attendances and absences of employees in PS3 are coming via interface from an external system.
    We canu2019t filter the 2 attendance reasons coming from this interface, because not all type of training is managed in SAP.
    My questions are:
    1. Do you know if it is possible to disable the SAP LSO integration for PS3? How can I do that?
    2. There will be technical problem for countries not managing Time solution? Will SAP LSO try to send attendance records to Time also for these countries? How can I avoid that?
    Many thanks for your help
    Regards
    Katia
    Edited by: Katia Gabrielli on Jan 13, 2010 1:25 PM

    Hi Katia,
    You can manage all your business scenarios using BADI (SE18) HRTEM_INT_ZW "HR-TEM: Badi for Integration TEM - Time Management".
    Cheers

  • Workflow Approval Notification in Sales Aggrement of Order Mgmt R12

    Hi All,
    In Sales Aggrement form in Order Mgmt(R12), after submitting the draft, Approval Notification is not firing.
    When checked in the workflow status, it is being directed as 'Not Eligible' and ending the process. I have checked in the package 'OE_APPROVALS_WF.Initiate_Approval' the varibale Role is getting null value.
    Can anyone let me know what exactly does this mean. how can i see/fire the notifications.
    Regards,
    RR

    Hi All,
    The issue is resolved. I have changed the Approval in Transaction Types from Fullfilment to Negotiation.
    Regards,
    RR

  • Upgrade/Migrate AS 10.1.2.2 Identity Mgmt, Forms, Disco to Fusion MW 11g

    Hello All,
    Need info/steps how to upgrade/migrate AS 10.1.2.2 Identity Mgmt, Forms/Report, Disco and Portals to Fusion MW 11g to new servers.
    We're currently running AS 10.1.2.2 Identity Mgmt, Forms/Report, Disco and Portals on Suse SLES-9 64-bit OS.
    We're currently running AS 10.1.2.2 Portals on Sun Solaris 8 64-bit OS.
    Fusion MW 11g does NOT support Suse SLES-9 or Sun Solaris 8 64-bit OS.
    Our Sys Admin said it's complicated to upgrade Suse SLES-9 to Suse SLES-10 OS on the same box.
    We'd like to install Suse SLES-10 OS on a NEW SERVER and upgrade/migrate AS 10.1.2.2 Identity Mgmt, Forms/Report, Disco and Portals to Fusion MW 11.1.2.
    We'd like to instal Sun Solaris-10 OS on a NEW SERVER and upgrade/migrate AS 10.1.2.2 Portals to Fusion MW 11.1.2.
    Have anyone done this upgrade/migrate at the same time?.
    We opened an SR with Oracle Support but the answers are not quite clear so If someone had done this upgrade/migrate before then it's very helpful.
    Any helps?.
    Thanks,
    Tom

    Both Infra and portal database is going to be in the database. You need to get the database copied over to new server and select upgrade option

  • LMS 4.2.5 Syslog/Automated Action/Config mgmt issue

    LMS 4.2.5 on Windows
    We use the server as it's own Syslog server. The Syslog collector status is fine. I see syslogs coming into the server. However, I just made some changes on a router so ran a syslog report on it, but nothing was returned. I Tested the Collector Subscription and everything was fine.
    We also have Automated Actions configured on certain syslog messages (duplex mismatch for example). There is an AA configured to send my team e-mails when this event occurs. There was a device that had two days worth of syslog messages complaining about this issue. Yet, we only received about 10 e-mails from the LMS system on it.
    Another issue is with Configuration Mgmt. I fixed the duplex mismatch listed above and went to check the config tree to see if or when something changed. The last config archive was pretty old and I know changes were made on the device since then. This tells me that the LMS server didn't get notified of the config change or it would have gone out and checked it.
    The one thing in common on all of the above is Syslog messages. LMS will take actions based on receiving these messages and those actions don't seem to be firing.
    Any ideas would be greatly appreciated.
    Thanks,
    Mike S.

    To confirm if the device is sending the syslogs and they are being received by LMS server properly, check the $NMSROOT/log/syslog.log and see it has the syslog from the device.
    Unless syslog is there on syslog.log, we don't expect LMS to react on any AA. 
    For configuration backup, try to sync the device config by initiating a manual job to update the latest configuration from device. Even if there is no Automated Action working, you should still have a reoccurring/scheduled job configured to archive configuration backup periodically.
    Following is a document I created for Syslog troubleshooting :
    Ciscoworks LMS : Syslog in a Nutshell!
    -Thanks
    Vinod
    **Encourage Contributors. RATE Them.**