TS3938 How do I run PowerPC applicationson OS X10.9.1

How do I run PowerPC applicationson on OS X 10.9.1? I have some old apps that I would still like to run without paying for an upgrade.

BobHarris wrote:
Run Snow Leopard Server in a virtual machine (VMware Fusion, Parallels, VirtualBox).  The "Server" part is important as that is licenced to run in a virtual machine
It is a common Urban Myth that the Snow Leopard EULA prohibits is virtualization in Lion, Mt. Lion, etc.  That myth has been debunked in the last two years.
The issue became substantially moot when Apple dropped its price for Snow Leopard Server by 95% to the same price for Snow Leopard: $19.95.

Similar Messages

  • TS3938 How can I run PowerPC to my mac air. Need it to run wow

    Recently buy Mac air. Then i download wow, but it won't install because it's asking me or PowerPC butdoesn't run in my Mac air.  Please help me. Ty

    Quoted from this link: http://us.battle.net/support/en/article/issues-installing-the-game-21059
    "You can't open the application Installer because PowerPC applications are no longer supported"
    This happens due to using older installation discs that have a PowerPC application code to install World of Warcraft on Mac OS X Lion (10.7). To resolve this issue, simply log into Battle.net and Download the Full Game Client.

  • How do you use powerpc programs

    How can I run powerpc programs on my mac?

    From inside Mac OS X 10.6.8 or earlier, either as a native boot(if the Mac's compatible) or through Mac OS X Server running in emulation.
    (96751)

  • How would leopard run

    I recentely got a eMac
    and I was thinking about upgrading from tiger to leopard,
    but... I don't know how it will run, my eMac does meet the system requirements, but only just
    I have this:
    processor: 1; 1GHz PowerPC G4 (with 512KB L2-cache)
    memory: 512MB DDR SDRAM
    busspeed: 167MHz
    model: PowerMac6,4
    modelname: eMac
    Leopard will run, but how can I find out +how fast+ it will run?
    though leopard has lots of new features, I don't feel like using a OS that will make my mac run slower then my PC (witch has a celeron processor, to give you an idea...)

    Hi,
    I have a 1Ghz Dual PCC Tower (Mirrored Doors) (Circa Jan 2002)
    It came with only 256Mb of RAM and I did run Leopard on it with that RAM.
    I have since given it a birthday present of another 1Gb of RAM and this did give it a speed boost.
    On the Tiger versus Leopard overall speed I see no real difference once I have passed the applications Install point to have what I use everyday or at least now and the.
    Photoshop Eelements 6
    Taco HTML Editor
    iTunes
    iChat (As I have PCI Slots I have USB 2.0 and Extra Firewire ports card for a UVC Compliant Cam)
    Firefox as Browser (although testing Safari 4 with this post).
    Dreamweaver (CS3)
    Little Snitch.
    Word (somewhat older version Office: Mac X)
    Dabble in Pages now and then.
    Once in a while iMovie 6 (Not HD)
    Hope this helps
    9:54 PM Thursday; June 11, 2009

  • Will mountain lion run powerpc (rosetta)

    hi
    im a student who needs powerpc to run on my mac is there any chance that mountain lion will run powerpc?
    thanks in advance

    medorrhinum wrote:
    Hello
    How about Rosetta?
    I have used 2 sophisticated specialist medical software applications since 1987, my whole practice is there, but I cannot use Lion as Lion rejects Rosetta. How about Mountain Lion?
    Thanks, Fran
    As above. I don't believe you will ever see Rosetta again. They began phasing PPC programs out seven years ago and Rosetta in Snow Leopard was pretty much a last chance courtesy for people to finish updating their programs to Intel ones. I keep a seperate Snow Leopard partition in case I run into something I have not yet converted over. Snow Leopard will be best for you until the makers of the specialist software you use update their software.
    Pete

  • I recently upgraded to Mavericks from Snow Leopard. Does Snow Leopard still exist on my Mac? If so, is it possible to restart under Snow Leopard in order to run PowerPC apps? If not, is there an OS available in 64 bit that supports PowerPC apps? Mav ***.

    I recently upgraded to Mavericks from Snow Leopard. Does Snow Leopard still exist on my Mac? If so, is it possible to restart under Snow Leopard in order to run PowerPC apps? If not, is there an OS available in 64 bit that supports PowerPC apps? Mav ***.

    The only reason I upgraded to Mavericks was because my Snow Leopard OS was 32 bit, which I was told would support only 4GB of RAM.
    That wasn't quite right. You can put in as much RAM as your Mac's hardware supports. The division is in the apps themselves. A 32 bit app can't use more than 4 GB or RAM. A 64 bit app can use much more.
    For example, as a 32 bit only version, Photoshop CS3 can't use more 4GB of RAM, no matter how much you actually have installed. CS4 or later can use all the RAM you want to throw at it.

  • Run powerPC software on intel macbook

    Does anyone know how to run powerPC software on a intel macbook

    Most Mac OS X PowerPC software will run on an Intel Mac transparently thanks to the built-in Rosetta environment. Rosetta functions completely transparently, and does not need a boot like the Classic environment. That said, there is no Classic environment supported by Apple available for Intel Macs. While hacks exist, they require possibly illegal actions. Those software titles that depend on drivers or plugins that are PowerPC only will have difficulty on Intel Macs and need updating for use with Intel Macs. See my FAQ*:
    http://www.macmaps.com/macosxnative.html#INTEL
    for more details.
    - * Links to my pages may give me compensation.

  • How do i install powerpc ms office which ran on snow leopard?

    How do I install powerpc ms office on lion?  It ran on snow leopard

    Niel wrote:
    Office 2008 will run on Lion but can't be installed when booted from it.
    (59650)
    You can indeed install Office 2008. Just did it today.
    (6396028340)

  • Can't run PowerPC apps under Snow Leopard. Why?

    I just upgraded to Mountain Lion on my main hard drive. I also installed Snow Leopard on an external drive to run some older PowerPC apps I have that Lion and Mountain Lion don't support. Snow Leopard is supposed to run PowerPC applications just fine. So I installed those apps on the same drive as SL, but when I start up from that drive, the apps won't open? The system starts up just fine from the external drive, but when I try to open the apps, they just bounce in the dock at the bottom of the screen for a few seconds (like they're starting up). Then they go away and don't start up. No error warnings, no crashes. Nothing. I've restarted after the installs, checked to make sure folders weren't locked, etc. I can think of no reason why the apps won't run under SL on an external drive. Anyone have a guess?

    Obviously you are unaware of the advice I give on this forum: You're preaching to the choir!
    Try this patch for Freehand MX use in Snow Leopard:
    http://helpx.adobe.com/freehand/kb/cant-launch-freehand-mx-mac.html
    Let me know how this works out for you.
    Here is how I run Freehand MX on my Lion Macs:
                                  [click on image to enlarge]

  • How Can I Run A SQLJ Normal Project In SAP NWDS

    I have a question about SQLJ in SAP NWDS.
    1.I created a java dictionary project,and then create the table , then depoly it.it's ok.
    2.I created a java normal project including the above java dictionary project.
    3.I used the SQLJ tech in the java normal project,exporting the opensqllib.jar,sqljapi.jar,sqljc.jar,sqljimpl.jar.
    4.I coded the normal project,and export the project .jar,everything is ok.
    <b>5.But when i runed the project in NWDS,the error appeared:java.lang.NoClassDefFoundError: com/sap/sql/log/OpenSQLException
         at com.ezkj.deom.sqlj.MainApp.main(MainApp.java:21)
    Exception in thread "main"</b>
    How Can I Run A SQLJ Normal Project In SAP NWDS?
    PLS Help me and don't let me alone!

    Tony,
    Why not try to import your SQLJ project in SAP NWDS. Add all the jars mentioned to the project path both for compile time as well as runtime. Now try running he project. Once you are able to bypass java.lang.NoClassDefFoundError, you will get other errors related to SQL statements. These Oracle SQL statements needs to be converted to OpenSQL format.
    Chill out!!!
    Sukanta Rudra
    Note: If helpful, plz donate some points.

  • How do I run query per report page?

    I have a report with two subreports which both need queries to run on the fly per supplier(per report page).  All the other subreports on the page as well as the main report queries are loaded in advance before the report and includes all records needed for all suppliers.  However, these two querys that I'm trying to have run per report though can only be loaded one at a time because of the way these queries are formated (it allows a bar graph to show a label for only the current supplier on the x-axis and all other suppliers will display a "" for x-axis label, effectively only showing one legend label per report).  I already have the necessary parameter needed for the report(Pm-Supplier) so how can I run an oracle query on the fly per report page? 
    Eric
    Query 1:
    select vendor,supplierloc,commodity,ip from (select c.Vendor, q.supplierloc, c.commodity,SUM (q.indexpoints+q.lateindexpoints) AS ip
    FROM qa_occ q, glovia_prod.c_vencom@GL7TEST c
    where q.occdate BETWEEN TO_DATE ('4/1/2006', 'mm/dd/yyyy')
    AND TO_DATE ('3/9/2007', 'mm/dd/yyyy')
    and c.vendor=q.supplier
    and (upper(trim(foundby)) not like '%MARKET%' or foundby is null)
    and (upper(trim(foundby)) not like '%TRIAL%' or foundby is null)
    and (upper(trim(rank)) not like '%MARKET%' or rank is null)
    and (upper(trim(rank)) not like '%TRIAL%' or rank is null)
    and nvl(void,'N') = 'N'
    and q.supplier= @SUPPLIER
    GROUP BY C.vendor,q.supplierloc,c.commodity) qa
    union
    select '' as vendor,supplierloc,commodity,ip from (select c.Vendor, q.supplierloc, c.commodity,SUM (q.indexpoints+q.lateindexpoints) AS ip
    FROM qa_occ q, glovia_prod.c_vencom@GL7TEST c
    where q.occdate BETWEEN TO_DATE (@BegDate, 'mm/dd/yyyy')
    AND TO_DATE (@EndDate, 'mm/dd/yyyy')
    and c.vendor=q.supplier
    and (upper(trim(foundby)) not like '%MARKET%' or foundby is null)
    and (upper(trim(foundby)) not like '%TRIAL%' or foundby is null)
    and (upper(trim(rank)) not like '%MARKET%' or rank is null)
    and (upper(trim(rank)) not like '%TRIAL%' or rank is null)
    and nvl(void,'N') = 'N'
    and q.supplier<> @SUPPLIER
    GROUP BY C.vendor,q.supplierloc,c.commodity) qa
    order by commodity,ip desc
    Query 2:
    select c.name as name,c.vendor,c.ven_loc, SUM(q.indexpoints+q.lateindexpoints) as ip
    from qa_occ q,glovia_prod.ven_loc c
    WHERE q.occdate BETWEEN TO_DATE (@BegDate, 'mm/dd/yyyy')
    AND TO_DATE (@EndDate, 'mm/dd/yyyy')
    and (upper(trim(q.foundby)) not like '%MARKET%' or q.foundby is null)
    and (upper(trim(q.foundby)) not like '%TRIAL%' or q.foundby is null)
    and (upper(trim(q.rank)) not like '%MARKET%' or q.rank is null)
    and (upper(trim(q.rank)) not like '%TRIAL%' or q.rank is null)
    and q.supplier is not null
    and nvl(q.void,'N') = 'N'
    and q.supplier=@SUPPLIER
    and q.supplier=c.vendor
    and q.supplierloc=c.ven_loc
    GROUP BY c.name,c.vendor,c.ven_loc
    union
    select '' as name,c.vendor,c.ven_loc, SUM(q.indexpoints+q.lateindexpoints) as ip
    from qa_occ q,glovia_prod.ven_loc c
    WHERE q.occdate BETWEEN TO_DATE (@BegDate, 'mm/dd/yyyy')
    AND TO_DATE (@EndDate, 'mm/dd/yyyy')
    and (upper(trim(q.foundby)) not like '%MARKET%' or q.foundby is null)
    and (upper(trim(q.foundby)) not like '%TRIAL%' or q.foundby is null)
    and (upper(trim(q.rank)) not like '%MARKET%' or q.rank is null)
    and (upper(trim(q.rank)) not like '%TRIAL%' or q.rank is null)
    --and q.supplier is not null
    and nvl(q.void,'N') = 'N'
    and q.supplier=c.vendor
    and q.supplierloc=c.ven_loc
    and q.supplier <> @SUPPLIER
    GROUP BY c.name,c.vendor,c.ven_loc
    ORDER BY ip DESC

    You can't, CR considers each subreport as a separate report and therefore it makes a new connection and runs the SQL for the subreport.

  • How do i run an external monitor with my macbook and change settings so that when i close the lid the signal to the monitor is not lost and i can continue using the mac with a mouse and a wireless keyboard?

    How do i run an external monitor with my macbook and change settings so that when i close the lid the signal to the monitor is not lost and i can continue using the mac with a mouse and a wireless keyboard?

    No, nothing will prevent the computer from going to sleep when you close its display except third-party hacks that are designed to do exactly that. I strongly advise against using any of those, as they may interfere with successful entry into clamshell mode (and they carry other downside risks as well). Just wait until the computer is asleep (with its sleep light pulsing), then press any key on the keyboard. It sounds as though your setup is working as it's designed to do.

  • HT3986 How do I run an external monitor on a macbook pro running windows 7

    How do I run an external monitor on a Macbook Pro running Windows 7

    on my imac connecting a TB to dvi converter to my imac and to my 24" dell monitor was all it took
    windows like osx saw the external monitor and let me clone to it or extend my desktop to it

  • How can I run the report for different input values at the same time?

    Reports version: Report Builder 6.0.8.13.1
    Oracle version: Oracle8i Enterprise Edition Release 8.1.7.0.0
    I want to run the same report for different input parameter values and spool each o/p to different file and ftp to a server. For this, as a first step, I am spooling different input values in to a file, reading those values through a loop and calling the report for that input values. Each report run/execution is taking 15 minutes. Total report execution is taking approximately 4 hours (assuming 16 different input values) to complete. So I have to wait 4 hours to see ALL outputs.
    I would like to run the report parallel for ALL the input values and I should be able to see the ALL outputs with in 15 or 16 minutes.
    In my shell script, I added & symbol at the end of the report call to start/run the job in the background. Due to this the control passed to the next step after the report call. At this place I have an ftp command to send the output file to a different server and it is giving error some thing like “o/p file is not available/created yet". This is due to the fact that report writer is NOT yet completely started/initiated or it is NOT completed the spooling.
    How can I run the report at the same time for all the input values and save the time?
    Thanks in advance.
    Kishore.

    Increase the number of server engines running right now it seems there is only one engine running ,increase it to 4 or 6
    and then atleast 4 or 6 reports will run simultaneously.
    For FTPing the output add to your sript to check whether it is locked and if not then only try to ftp .
    Also for more better functionality read the document (chapter 15 ) for 10g reports for its new fuinctionality.
    http://download.oracle.com/docs/cd/B14099_17/bi.1012/b14048/toc.htm
    Thanks
    Subodh

  • How SAP standard run the interest calculation in AR module

    Dear expert,
    would like to seek for your advise, how SAP standard run the interest calculation in AR module ?
    Also advise,does the interest calculation generate the interest base on the dunning run?What are relationship between interest calculation generate ?
    What are the T-code for running the interest so that able to generate the interest posting according to baseline due date?
    On top of that, does SAP have standard AR interest calculation report and what are the T-code ?
    Between, do you have any ideal the Interest Indicator ZB stand and reminder date it is the last reminder date,waive,KIV and charge Interest and also noted item amount mean for in the AR Interest Calculation report?
    Please help.
    Regards,
    Karen

    Hi,
    Thank you for the promtp reply.
    I still have query would like to seek for your advise.
    1.Does the interest calculation generate the interest base on the dunning run?For example, the interest is only can be post/generated when there is dunning run and vise versa.
    2.What are relationship between interest calculation generate ?Does interest generation depand on the dunning run?
    On top of that, does SAP have standard AR interest calculation report and what are the T-code ?
    3.Between, do you have any ideal the reminder date it is the last reminder date,waive,KIV and charge Interest and also noted item amount mean for in the AR Interest Calculation report?
    4.For posting use F.2B and that will calculate interest on open items of customers. Does this posting is post as noted item or posting document? Beside, do we every day need to run this posting  F.2B in order to update the AR interest calculation report and post the interest for the overdue invoice?
    5.Do you have any reference link/document /SAP notes on calculate interest on arres F.2B?
    a)How the program calculate those overdue invoice for example: does sap calculate the interest  base on interest + due amount until the customer made the payment?
    b) If customer made payment on the due amount and not the interest and vise versa? How theF.2B program logic work on the calculation ?
    Please help.
    Regards,
    KH

Maybe you are looking for

  • Search Help "PREM"  Restriction on Company Code

    Dear Friends, I have modified the screen SAPLKACB 0002. I HAVE APPLIED SEARCH HELP "PREM" ON COBL-PERNR(Personnel No).Now if u go to F-02 Transaction.We have a Company Code entered Say : 2200. Now if we fill in the mandatory fields we go 2 next scree

  • Question on design of new layer comps feature

    The new layer comp feature in Photoshop CC 2014 is great. It allows you to access the layer comps within smart objects from another file. One very important aspect seem to have gone missing though: Imagine you have 1 master document (e.g. website moc

  • Export fonts used in PSD

    I'm trying to concieve of a way to copy the fonts used in a psd file from the 'C:\WINDOWS\Fonts' folder to a 'Fonts' folder in the same location as the PSD. Essentially, I want to be able to "package" a psd file like you would in InDesign (minus the

  • Change mandatory attribute in Entity Service

    I have an Entity Service E with attributes A and B as mandatory attributes. I changed attribute B and made it non-mandatory and deployed. But the backend table in the database doesn't change and it still has B as NOT NULL attribute. Any attempt to cr

  • Need Help! Flash to HTML5

    I have a bunch of flash interactions that I need to publish out to an HTML5 format to play on iPad. I'm currently using CS4 Professional. Is there anything I can do to be able to avoid having to redo these in another tool?  I need to be able to publi