Update termination error at the time of order creation

Dear gurus,
Facing an error at the time of creation of order.
system is giving update termination error & when we are going in change mode of that order system is giving an error message " SD document XXXX is not in the database or has been achieved"
please treat on priority
regards,
krai

Hello ,
"Update terminated " error has two reasongs.
First is system update  was not active and hence terminated
For this to check Goto the transaction code SM13  and  check whether the SYSTEM UPDATE is active or not.
If it is active ,
Then click on the Option TOBE updated in the status  and execute, then in the next screen you can find some list of documents that are not updated and causing error .
Click on MODULES in the screen and find the erro which causing this error.
Most this kind of error will happen if something in the Funcion Module or USER EXIT is missing.
Please check and revert back if you need further details
Also check the link
http://help.sap.com/saphelp_nw04/helpdata/en/e5/de870535cd11d3acb00000e83539c3/frameset.htm
regards,
santosh

Similar Messages

  • Update termination error at the time of order creation and chamge?

    Dear gurus,
    Facing an error at the time of creation of order.
    system is giving update termination error & when we are going in change mode of that order system is giving an error message " SD document XXXX is not in the database or has been achieved"
    please treat on priority
    regards,
    krai

    Hi,
    Goto ST22 T.Code and analyse the error.The error message why it is terminated will be displayed here.
    Or go to SBWP T.Code in the user where you got this error and check the inbox.
    It will display why the error is appearing.
    Show the same to the ABAPer and ask them to work on it.
    I think your server may be slow and it will take some time to update the order created by you.But I am not sure.Check the error message.
    Regards,
    Krishna.

  • Process Order Batch number generation at the time of order creation

    Dear All,
    I m facing some issue at the time process order creation:
    Current Settings:
    1. Batch Number Creation at the time of order create.
    Reason for this setting: Release of order is done  by releasing operations one by one, therfore batch number will be generated on the final operation release, thats why we set up batch creation at the time of order create.
    2. For FG batch number generation there is a program that copy the SFG(in Order BOM) Batch number to FG. ITs a industry requirement.
    Problem:
    when we create FG order system generate the error message at the time of order creation tht No batch could be determine.
    Please suggest the solution
    Thanks,

    Hi
    Hope you have cretaed Batch serch strategy in COB1
    U need to maintain it as per your strategy type.

  • Create warning message at the time of order creation

    I am looking for a  solution :- "Create warning message at the time of order creation/save if a cc is assigned in the settlement rule that crosses the company code of the order or where the company code of the plant for the order is different from the company code assigned to the cc"

    The txn code : IW32 (maintenance order) , this warning message for settlement rule creation using Cost center as a settlement receiver.  If the used cost center is belongs to some other company code, said warning message should occure.
    I tried user exit, field exit, also used std message control (KO-458).  Nothing is working.

  • Manual BOM selection at the time of order creation

    Dear Experts,
    Could you help me to understand if there is any provision to select BOM by user at the time of order creation without the help of production version.Is there any configuration required to make BOM selected manually.
    Regards,
    Krishna Mohan

    Hi karishna,
    Please go to T-code OPL8 and in production version use( 1 )Manual selection of production version. Then user can select manually instead of automatic selection.
    Regards
    Muhammad Umar

  • Error at the time of PR creation

    I am facing a Error at the time of PR creation:-
    Status "Material Inactive" of material 30001668 does not allow external procurement
    Message no. ME053
    how to active the material.

    you have a material status in your material master, either at plant level or at general level.
    Just remove the status.
    Plant level status can be found in almost any plant view,
    general level in general data view

  • Want to change item category at the time of order creation

    Hi Gurus,
    Client require to implement individual PO scenario.
    I was configured the same and working fine.
    I am facing problem at the time of item category determination.
    User using same material and order type and they are not ready to accept to create new order type.
    Now My order type is OR and item category group is NORM and right now system determine item category TAN.
    User not want to change manually at the time of order creation.
    I have specific condition on which i want to apply this logic.
    Now i want to determine TAB item category through some user exits or enhancement.
    Can anyone suggest exact in which user exit or enhancement i have to change.
    Thanks & Regards,
    Chirag

    1. Use TCode 0VVW for creating a Z Item Usage, say, ZPO1
    2. Do an item Cat determination in VOV4, as
    Sales Doc type
    Item Cat Group
    Usage
    Item Category
    OR -
    NORM -
    ZPO1 -
    TAB
    3. Maintain Customer Materials Info Record by using VD51.
    In item screen for Cust-Mat combination maintain Item usage
    Regards
    JP

  • Error at the time of PO creation - Asset is investment measure, transaction

    Hi all,
    When am assigning the Investment Order (order for AUC) against Asset at the time of creation of Asset PO, the system throws the following error:
    Asset is investment measure, transaction type not allowed
    Message no. AK005
    Diagnosis
    Asset 1700000 0 that is to be posted is an investment measure. You are not allowed to post transactions that affect acquisition value using the current transaction.
    Procedure
    Check the asset and transaction type 120.

    System expects you to enter the Investment Order rather than the asset as account assignment object in the PO.
    Regards
    Sreenivas

  • Error at the time of repository creation

    Hi exprts
    I am creating one rep_owner repository on my onsite server from offsheore machine and the time of creation i am getting the below error.
    ERROR : The warehouse builder repository installtion failed on user REP_OWNER. INS0017 Installation of the seeded data failed.Oracle.wh.utill parser Parse exception
    Please suggest me how i can overcome this error.
    Thanks in advance
    Regards
    frnd

    Try the following options :
    1.dropping user OWBRT_SYS and all it's objects. Then create a new repository user with no problem. Insert records for previous repositories in OWB in OWBRT_SYS tables and try.
    Alternate solution
    ===========
    This problem has been reported in <Bug:3692835 >. This problem has been reported in <Bug:3692835>.
    Fix :
    [http://translate.google.co.uk/translate?hl=en&sl=zh-CN&u=http://www.oracle.com.cn/viewthread.php%3Ftid%3D53488%26extra%3Dpage%253D15&sa=X&oi=translate&resnum=5&ct=result&prev=/search%3Fq%3DINS0017%2BInstallation%2Bof%2Bthe%2Bseeded%2Bdata%2Bfailed.%26hl%3Den%26sa%3DG]

  • EBSTax calculation error at the time of PO creation

    At the time of any purchasing document creation, like PO or any type of requisition, system is showing error telling, an error occured during tax calculation.
    Now, here we are not using EBSTax, so no setup related to tax has benn touched upon. I am currently configuring the Test instance R12. Can anybody suggest
    me the solution?

    Posting the exact error message is a lot more helpful.
    Check Unexpected Error Occured During Tax Calculation [ID 472911.1]
    Sandeep Gandhi

  • Batch creation at the time of order creation & confirmation on the batch.

    Hi all,
    My client's requirement is while creation of the production order of say 100 pcs, system should create 4 batches, each of 25 (this might be different every time) of that order & also the confirmation (CO11) should be done on those batches.
    Also if the order contains 10 operations then confirmation of operation no. 0020 should not be possible before confirmation of 10, whether it is for partial & whole quantity.
    You can say these batches will reprsent the lots.
    Regards
    SmanS
    Edited by: SAP PP Consultant on Mar 9, 2009 8:05 AM

    Hi SAP PP
    You can use this function to automatically create a batch for the material to be produced.
    You can make the following settings in Customizing (production scheduling profile):
    No automatic creation of batches in production orders
    Automatic creation of batches during order creation
    Automatic creation of batches during order release
    To carry out automatic batch splitting via batch determination, proceed as follows:
    Select the component that you wish to split and choose Component ® Batch management ® Trigger batch det.
    The system lists all batches that meet the selection criteria and that have available stock on the requirements date.
    Distribute the required quantity as required over the existing batches.
    Choose .
    The system copies each batch as a separate component into the component overview screen.
    For more information refer to Batch Determination.
    To carry out manual batch splitting with manual batch assignment, proceed as follows:
    Select the component for which you want to carry out batch splitting. Choose Edit ® Insert ® Batch split.
    Enter the batch number and the required quantity manually in the component.
    Save your entry.
    Regards
    Sachin

  • Alt BOM Selection at the time of order creation

    Hi Friends,
    For one of our FERT We Have 4 Alt BOMS and Fore Production Lines
    My requirement here is while creating The Production Order In co01 I Need to select The Required Alt BOM. How to configure this spro
    However the System Is asking for The Production Lines(as Pop UP Massage)
    Suggestu2026u2026
    Hari

    Hi,
    For that you need to maintain the production Version in material master MRP4 view in that maintain all your BOM and routing.
    Then MRP4 view of material master there is option selection method here you need to select 3-Selection only by production version.
    After that in OPL8 for your order type and plant maintain
    Production version-1     Manual selection of production version
    Please try and come back.
    Regards,
    R.Brahmankar

  • Batch determination at time of order creation

    Dear All,
    When i am creating process order at the time system not allowing me to execute batch determaination after release only it is allowing me to do.
    My requirement is At the time of order creation i want assign batches ( Execute Batch Detrmination)for the material.
    how to do this one, kindly hel me
    Regards,
    s.sakthivel

    Craig- you are correct. That setting is about how to create a batch for the Material produced , does not have any impact on the batch determination for the raw materials consumed.
    I dont think there is a way to do the batch determination before releasing the order. The other option isto go for the automatic release of the order at creation - this option will carry out the batch determination automatically once an oder is created and order will be released. check with PP consultant on this.
    Hope it helps.
    Thanks,
    Ram

  • HT1725 I am unable to download app updates.  Error windows said I must order from the Canadian iTines Store.  How do I switch from the US Store to the Canadian Store?

    I am unable to download app updates.  Error windows said I must order from the Canadian iTines Store.  How do I switch from the US Store to the Canadian Store? Using iPad2.

    Settings > iTunes & App Stores > tap your Apple ID: > View Apple ID > Country/Region
    Regards.
    Forum Tip: Since you're new here, you've probably not discovered the Search feature available on every Communities page, but next time, it might save you time (and everyone else from having to answer the same question multiple times) if you search a couple of ways for a topic, both in the relevant forums and in the Apple Knowledge Base, before you post a question.

  • Budget Error at the time of Release of Purchase order

    Hi,
    We are using former budgeting and getting budget payment budget exceeding error at the time of releasing a carry forward PO.
    PO has been successfully carried forward to next year and we are not making any changes in the PO. While releasing the same via ME28, system is giving budget exceeding error.
    Screens shot is attached herewith for reference.
    Thanks in advance.

    Hi Mar,
    The root cause of the issue is incorrect updation of taxes value in EKPO table for that PO, which causes the system to consume less budget at the time of saving of PO.
    Now while releasing the PO, system is checking for whole tax amount and sufficient budget is not available in the budget address.
    Hope you able to connect the issue.....:P
    Regards
    Rohit Chopra

Maybe you are looking for

  • Working on 2 Posting Periods at a time

    Hi, Is it possible to work on different posting periods at a time.My client closes his month in 10th of every month but the posting date will be in previous month In this case he wants to work on existing month as well as previous month. i have set t

  • Need OneStep DVD Help

    I just used a firewire plug to connect my digital camcorder (set to VCR) to my MacBook, inserted a blank DVD, clicked on "OneStep DVD". Nada. What gives?

  • My ipod has "hold" in place permanently for some reason

    This started happening last night where my ipod has "hold" lock on, almost permanently, even if it's not switched on. Nothing happens if I actually move the switch over to "hold," it just stays on "hold." The only way I can get it off is when I jiggl

  • RDF_1 passes last page number to RDF_2

    Hi, Scenario ======= User runs Report 1 which is immediately followed by Report 2 (but this appears to the user as only one report). Requirement ========== We need to continue page numbering on Report 2 so that it appears to be one Report. Environmen

  • Overclocking 2.4 800FSB - Start to Finish

    I've notice that the cheapest way to go for speed appears to be the following combo which i hear is getting quite popular with this MB. So i was hoping that everyone or anyone could help out with a guide for the beginner from scratch. I will be buili