Upgrade Project Case Study

Dear Friends:
I have to do a case study regarding an upgrade project from 4.7 to Ecc 6.0. Please guide me with suggestion,notes.If you any case study material,Please forward to my e-mail ID:[email protected]
Thanks&Regards
MSReddy

Hello
I do not have any ready made material on the topic, but could give my views:
- Presentation to be in PPT format.
- Features of 4.7 version
- Features of ECC version
- Comparitive features / replaced by new functionality
- Advantages of new version
- Disadvantages of old version
- Challenges in new version
Give all the comparisons, module wise.
- Options in new versions
- How the client benefits from the new versions
- List of decisions to be taken.
Q &A
Reg
*assign points if useful

Similar Messages

  • Re: SAP BW Case study

    Hi eveyone,
    Can anyone please provide me with a SAP BW project case study, with details in it like right from blue printing till go-alive. I am looking something which states what business content used, why custome design done....
    I will really appreciate help
    chintan,

    hi,
    Before going to do BW project , you should consider the following things.
    1)You must understand the Business requirements of the project.(project preparation)
    2)Design the specification.(Here you should consider, if SAP supported pre-built in objects available).let's say, sap has preconfigured cube, ods,roles,queries, and infosource etc.. in Business content.
    you should search if any of SAP Business content object suitable for your Business requirements.
    If your Business requirement is to overview the Sales of particular company in a year, sap has provider Sales Overiveiw cube already, you can use them, instead of creating by own). Business blueprint.
    3)Create a object according to the specification you created in the previous step(realization).
    4)Create a Documents for your projects(final preparation)
    5) Test your bw project in QA/PRD system..(go-live)
    thanks,
    senthil kumar

  • BW Self learning project or case study

    Hi All, Does anyone can help me to get BW Self learning project or case study, as due to my location and work nature I can't join BW project in class, as it demands access only from inside the college, can't access from remote location, but I do have BI7 and R3 access, thanks.

    Hi Frank,
                  If you know already Bw then In IDES system work on demo cubes & itz reports...........
    Hope it will help you.....

  • Organization structure for Case study .... need yr advice

    Hi …I am in process of preparing an org structure for one of the company.
    The company operations is like ….
    The company has four factories in different locations and have 3 Regional distribution centers (RDC) across india. Each distribution center has 5 branches (Sales Offices), in this way they 15 Sales offices across India.
    Most of the materials are procured by factories independently while some materials are centrally procured. Factories produce Finish goods and they are either sale to customer directly ( big regular customers) , or transferred to RDC to cater the requirements of other MID size customers and the other possibility to transfer it to Branches for Retail customers. RDCs also transfer FG to Branches.
    All factories , RDC and branches have warehouse facility , however branches have limited warehouse facility as the customers supported by them are very few and generally deliveries are made directly from RDC / Factory.
    They also have one R&D department in another location to develop new products and material is generally transferred from factories to R&D department.They also have one project division at the same (R&D) location which handles commissioning of new plants and procurement of capital goods.
    Raw Material , Semi finish and FG are transferred between factories and FG material is also transferred between RDCs.
    The group also has another Company which produces another line of products. RDCs and Branches of first company also work for second company (which means same RDC can store FG produced by both companies) and also Branches can also have FG material of both companies. Second company doesn’t have any specific R&D or capital division and R&D and capital of first company also work for second company.
    Inter company transfer between both companies is a regular practice.
    > Proposed Org structure
    Company – Group Company
    Company Code – First company and Second company
    Factory Configurations
    For first company
    4 Factories will be 4 plants
    Factories Structure (Storage locations / warehouses and storage type)
    Since factories have different type of material ( like FG , Raw material , WIP ) therefore I am confused what option I should select 
    1) 3 storage location ( for each plant) and one warehouse, 1 storage type
    2) 1 storage  location and three warehouses (I think this is not possible in SAP , not sure ?? )
    3) 1 storage location , 1 warehouse and 3 storage types
    RDC structure
    RDCs have full fledged warehouse facility and therefore thinking of making them also as Plant. Every RDC will have 6 Storage locations , 1 for First company RDC itself, 5 for associated branches and I feel each “RDC storage locations” should be a associated to a separate warehouse also.
    ( Since both companies produce different set of products therefore they will have different material and hence thinking of handling products of both companies in same plant and same storage location and warehouse , may be two storage type/area can be defined to differentiate material of both companies.)
    Branches: Will be storage locations under RDC …..
    While making branches as Storage location …. I have another question about valuation , since material from Plant and RDC is being transferred to Branches and  from there it is distributed to customers therefore the valuation of FG at BRANCH and RDC should be different as transportation cost , packing , unpacking etc cost should get added at Branch level.
    Therefore in case I make branch as Storage location , I will miss the valuation part while if I make them as Plant then there will be lot of documents get generated for each movement. Hence not sure for what option I should go.
    R&D:
    Since R& D department is involved in testing in New Product development and generally material is required to be scrapped after testing therefore thinking of making it as Plant with one storage location and may be here I don’t need any warehouse (WM) here.
    Project Division
    Project division may also be a separate plant with one storage location and NO WAREHOUSE is required to linked with it.
    Purchase Organizations
    4 purchase organizations for each plant respectively and 1 centralized purchase Org for central procurement.
    Your all valuable inputs are welcome .... looking foward to have a best possible configuration for above mentioned case study.
    Regards

    Phew... long long question
    The rule I generally follow is that the org structure should map reality.
    Company code - where Balance Sheet and Profit and Loss are prepared at the end of the year. If an entity does not do this, it is not a company code.
    Plant
    1) Each manufacturing facility is a plant (could be in 1 location or separate).
    2) Each separate location is a plant (even if it only stores goods). May be an overkill, but helps when legal requirements change or the location is upgraded.
    So in your case, RDC will be a plant (may be more than 1 if necessary). R&D should be a separate plant without warehouse management
    Storage location
    The only rule I follow is that there should not be any overlap of storage locations. So physically, any area of say 1 square foot should belong to one and only one storage location. Otherwise there is a lot of confusion during physical inventory. So logical locations are a no-no.
    I usually use a lot of storage locations.
    Don't have a warehouse spanning multiple plants (even though it is allowed).
    Purchasing organizations
    Have one for each location of purchase. If there is a team sitting in each plant procuring for only that plant, have it as a separate purchasing org (not strictly necessary, but makes authorization simple). For central purchasing, a central purchasing org should do nicely...
    Hope this helps,
    Lakshman

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • Gridworld Case Study - how to use a .jar file with textpad

    Hello,
    I am a student currently working on a project involving the Gridworld case study. While trying to work on my project at home, I discovered that I would get new "cannot find symbol" compiler errors that I had not previously gotten while compiling the same code at school. I am assuming this has something to do with the .jar file included in the gridworld code. How do I get textpad and/or the java compiler to find and use the .jar file and reccognise the classes which i am importing and extending in my project?
    Thanks,
    -Alex

    Thanks, It works for compiler now.
    Now, I write a html to run the applet. appletviewer
    says "
    java.lang.NoClassDefFoundError: ij/process/ImageProcessor
    at java.lang.Class.getDeclaredConstructors0(Native Method)
    at java.lang.Class.privateGetDeclaredConstructors(Class.java:1590)
    at java.lang.Class.getConstructor0(Class.java:1762)
    at java.lang.Class.newInstance0(Class.java:276)
    at java.lang.Class.newInstance(Class.java:259)
    at sun.applet.AppletPanel.createApplet(AppletPanel.java:566)
    at sun.applet.AppletPanel.runLoader(AppletPanel.java:495)
    at sun.applet.AppletPanel.run(AppletPanel.java:292)
    at java.lang.Thread.run(Thread.java:536)
    It seems the appletviewer can not find the right path for the package. How can I fix this?
    Thank again,
    Hillxy

  • BW Upgradation Project from BW 3.5 t o BI 7.0

    Dear SDNS,
                             We got an requirement to do an upgradation project for BW 3.5 to BI 7.0... This is the first time am involving for Upgradation..Am An BW Technical Consultant.. Can anyone one sugggest at scratch level wat are the roles should play by BW Technical consultant.. And Wat are the activities whould done by BW technical consultant.. An can anyone tell me.. How many SAP Consultants should involve in this Project.. i.e like how many Basis Consultants and how many ABAP Consultants should involve.. Who plays the Vital Role for Upgradation...
    Can anyone send me the Documents Related for BIW Upgradation for BW 3.5 to BI 7.0.. If anyone send me screen shots related to BW Tehcnical Consultant work it would be helpful.....
    My E-Mail - [email protected]
    Answering Getz Appreciated,
    Thanks & Regards,
    Aluri

    Hi
    I have some checklist ,do not exactly remember from where i got it but its really usefull
    There is no standard SAP checklist as it used to exist in 3.x for nw2004s upgrade and trust the master data guide available on market place is not upto the mark and expectations
    So Heads up..
    /message/2979584#2979584 [original link is broken]
    /message/2765713#2765713 [original link is broken]
    /message/2979576#2979576 [original link is broken]
    /message/3214476#3214476 [original link is broken]
    /message/3024448#3024448 [original link is broken]
    You may wish to have a look at draft portrayed below,rest you learn when you drive
    Lessons Learnt - Upgrade
    1)Convert Data Classes of InfoCubes. Set up a new data class as described in SAP OSS Note 46272.
    2)Pay attention to the naming convention. Execute the RSDG_DATCLS_ASSIGN report.
    3)Run the report RSUPGRCHECK to activate objects.
    4)Upgrading ABAP and JAVA in parallel may cause issues. If there is no custom development on J2EE instance, it is recommended to drop the J2EE instance and re-install the latest J2EE instance after the upgrade.
    5)Apply SAP OSS Note 917999 if you include the Support Patch 6 with the upgrade or you will get the error at PARCONV_UPG phase. When you upgrade to a product containing Basis 700, the phase PARCONV_UPG terminates. You included Basis Support Packages up to package level 6 (SAPKB70006) in the upgrade. The job RDDGENBB_n terminates with the error RAISE_EXCEPTION. In addition to this, the syslog contains the short dump TSV_TNEW_PAGE_ALLOC_FAILED. The program SDB2FORA terminates in the statement "LOOP AT stmt_tab". An endless loop occurs when the system creates the database table QCM8TATOPGA.
    6)Apply the OSS note 917999 if you get the following error during PARCONV_UPG phase: PARCONV_UPG terminates with TSV_TNEW_PAGE_ALLOG_FAILED
    Critical OSS Notes:
    819655 – Add. Info: Upgrade to SAP NW 2004s ABAP Oracle
    820062 - Oracle Database 10g: Patchsets/Patches for 10.1.0
    839574 – Oracle database 10g: Stopping the CSS services ocssd.bin
    830576 – Parameter recommendations for Oracle 10g
    868681 – Oracle Database 10g: Database Release Check
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    853507 – Usage Type BI for SAP Netwaevers 2004s
    847019 - BI_CONT 7.02: Installation and Upgrade Information
    818322 – Add. Info: Upgrade to SAP NW 2004s ABAP
    813658 - Repairs for upgrades to products based on SAP NW 2004s AS
    855382 – Upgrade to SAP SEM 6.0
    852008 – Release restrictions for SAP Netweaver 2004s
    884678 - System info shows older release than the deployed one
    558197 – Upgrade hangs in PARCONV_UPG
    632429 – The upgrade strategy for the add-on BI_CONT
    632429 - The upgrade strategy for the add-on FINBASIS
    570810 - The upgrade strategy for the add-on PI_BASIS
    632429 - The upgrade strategy for the add-on SEM-BW
    069455 - The upgrade strategy for the add-on ST-A/PI
    606041 - The upgrade strategy for the add-on ST-PI
    632429 - The upgrade strategy for the add-on WP-PI
    Post upgrade Steps :-
    1. Read the Post Installation Steps documented in BW Component Upgrade Guide
    2. Apply the following SAP OSS Notes
    47019 - BI_CONT 7.02: Installation and Upgrade
    558197 - upgrade hangs in PARCONV_UPG, XPRAS_UPG, SHADOW_IMPORT_UPG2
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    3. Install the J2EE instance as Add-in to ABAP for BI 7.0 and apply the Support Patch that equivalent to ABAP Support Patch.
    4. Run SGEN to recompile programs.
    5. Install the Kernel Patch.
    6. Missing Variants - (also part of test script)
    look at the RSRVARIANT table in SE16. If it is empty, then you will definitely need to run RSR_VARIANT_XPRA
    program - RSR_VARINT_XPRA
    OSS -953346 and 960206 1003481
    7. Trouble Shootauthorizations
    820183 - New authorization concept in BI
    I think the above material is sufficient but in case you face any issues feel free to revert back
    Reward suiatble points

  • ABAPer role in upgrade project

    Hi,
    Please let me know the ABAPer role with upgrade project. When Std programs updated by support packs what are the responsibility of ABAPers?
    Thanks,
    Praneeth

    Hi,
    Automatic- It means that there will be a green icon. You will have to just click it and it is done.
    This is because the changes to the SAP Object have been done either via SNOTE for some note application or you have used the modification assistant. So SAP does not have any problem in determining the changes. So the adjustment is automatic.
    Semi-Automatic - In this case there will be a yellow icon. This means that you have to make some manual adjustments. This is because SAP considers that the adjustments are proper but still there is some discrepancy.Probably this is because you have made some note changes and additionally inserted some comments like begin of changes by xxxx on yyyyy for note zzzzz.
    So in this case SAP will give you a split screen editor in whihc your existing code and the one coming from support pack will come. So you have to adjust accordingly.
    Manual Adjustment - In this case there will be a red icon. This means that you have to make the chnages manually. This is because SAP finds a lot of discrepancy in your program and the one coming via support pack. The reason can be either the earlier note was incorrectly applied or you have added your own code for some custom requirment. So again SAP gives you the split screen editor to make the adjustments.
    Your assumptions about Reset to Original and Adopt Modifications are correct.
    I hope it solves your queries.
    Regards,
    Ankur Parab

  • Abaper role in Upgradation project

    Pls let me know the Role and Responsibilities of  ABAPER in Upgradation project.

    Murugesh,
    are we people here for only replying your qns?
    we all have own work at our desk also.it is not nesseccery for us to ans your qns.please dont say like this as you are saying.it is community you have to understand how can servive in community.please dont xpect here from anyone to spoon feeding to you.please support SDN.
    Go through this info.
    SAP Implementation:
    SAP Implementation is the whole of processes that defines a complete method to
    implement SAP software in an organization. It is based on best practices and case studies from various literature sources and presents a collection of processes and products that make up a complete implementation method to allow any organization to plan and execute the implementation of SAP (ERP) software. The SAP implementation process is made up out of four main phases, i.e. the project preparation where a vision of the future-state of the SAP solution is being created, a sizing and blueprinting phase where the solution stack is created and training is being performed, a functional development phase and finally a final preparation phase, when the last tests are being performed before the actual go live.
    ABAP Developer Role is to prepare the Technical Specification (based on a Functional Specification given by a Functional Consultant), build the code, Review the code and finally to prepare the Unit Test Cases. Sometimes ABAPer may be asked to do a technical research for an optimal solution.
    SAP Support:
    After a go live, the application needs a maintenance/support to resolve the issues/tickets raised by the users when using the application. Ticket is like a request for changes/bug fixing or a request for a new ABAP Developer Role includes bug fixing/change the existing code due to new requirements/build a new code etc.
    SAP Upgrade:
    SAP Upgrade is nothing but upgrading the software with a superior version which has got more advantages when compared to the earlier version.
    ABAP Developer Role is to go through transactions SPAU/SPDD to compare the old and new version of the change and finally need to activate the relevant one. Some times might need to work on SAP notes too.
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d163a7-0301-0010-d9b0-98f692ea3c60
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    Go through this link.I think you don't need any other doc.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/index.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881
    https://websmp102.sap-ag.de/upgrade-bw
    please close this thread after giving mark.
    Rgds,
    Amit

  • Role of MM consultant in Upgrade Project

    HI,
    i am in ot my First Upgrade Project.what will be the role of MM consultant when upgrade is happened from 4.6 c to ECC 6.0 from configuration point of view.
    can any one guide me regarding this.we are going for Technical Upgrade
    regards
    subhash

    hi subhash,
    first you have to see what kind of modified business processes are followed in ECC6 as compared to version 4.6.sure you will get to know which fields are new in MM cycle. then prepare document for technical guys about the same so that they can provide same funcationality by modifing code of  4.6
    second some time technical guys not able to under stand which kind of information is requred in perticular case(report) then MM consultant can help them for understand the business requirement.
    they can also tell from which table a technical person can fetch the data.
    if useful then plz provide points
    BR
    Rajeev

  • Upgrade Project: CRM Function Groups

    Hi All,
    The Function groups like "CRM_ISALES_SOLDTO" which was present in SRM 3.0 is replaced in SRM 5.0.
    I am currently on an upgrade project anr there are several Z FM's which gives a call to the FM's under this function group. Since they are unavailable in new system, all these Z FM's are showing syntax error.
    Please let me know if there is any replacement made by SAP for the above Function Group or FM's under it?
    Thanks
    Sangharsh

    Hi
    Incase nothing suits you, then you need to go for Custom Z function modules in this case.
    Take help of ABAP resources and create Z function modules, referring to the Standard Function modules in your old SRM 3.0 Version.
    Also, raise an OSS message with SAP on this at the earliest.
    Regards
    - Atul

  • SAP PS Case Study

    Hi,
    Can anyone provide me a SAP PS case study or a small project description ? Need to Prepare a small presentation.
    Thanks
    Ankur

    The below link mentions "PSAP<SID>ES<rel>[X] or PSAP<SID>EL<rel>[X] " when in a recent SAP/Oracle book mentions PSAP<SID><REL> which was where my confusion came in as to which was correct.
    http://help.sap.com/saphelp_nw70/helpdata/en/9f/4a56b2185851468b39b719daa2d3aa/content.htm
    The book I have says PSAPEL<REL>D is tablespace for release-dependant compiled abap code
    and PSAPES<REL>D is for release-dependant abab source code
    But the link describes them Exchange tablespaces.
    Sorry if this has wasted time..... I will just go with PSAPQAS700 as you've all said.
    Regards.
    Edited by: Jason Bryan on Dec 2, 2008 8:48 PM

  • Upgradation project in sap xi

    hi expects ,
         i want to know about what would the problem or process in upgradation project.please help me.
                                                                                    thank u

    Hi,
    As an XI Developer one has the following responsibilities
    SLD developement is depends upon the Organization.
    1)  Developing Interface Objects
    2) Developing maping objects
    3) Developing Config objects like Creation of Communication channels , Sender and Receiver agreemnets, Interface data and    Receiver  data.
    In Addition to this he has to check whether the files are correctly picking and the files are correctly placing in the Target.
    Any Mapping related error means he has to look into those
    what are the responsibilities of an XI Developer?
    A) Steps are as follows.
    1) Receives functional specs.
    2) Understand the business requirements.
    3) Check whether are the required information is provided in Functional specs or not information like, source sturucutre,target strucutre,Transformation rule, test files, validation rules, error handling, data size etc.
    4) Raise issue log if there are issues and resolve it with functional team.
    5) Start building or designing the tech specs with all the required details like IR and ID part.
    6) Develop the object as per the design.
    7) Follow the naming convention as per the doc.
    8) Test the developed object with test cases and prepare UTC.
    9) Then review will happen with other team members.
    Regards
    Mohammed

  • Importance of OCM in an Upgrade Project

    Many times when upgrade projects are commissioned, the need to involve the business community is often overlooked.  However, upgrade projects can be defined in different ways, all of which require more or less change management activity.  The idea is to get IT and the business to recognize the differences (i.e.upgrade entails switching out hardware behind the scenes with no new functionality for end user to learn v. upgrade that introduces a new user interface or new module).  Once the difference in definition of "technical upgrade" is acknowledged, IT and the business can start appropriate converstations as to how they will work together to make the upgrade a success.
    What was your experience in applying OCM to an upgrade project? 
    Also, for those interested in continuing this conversation in a live forum, I will be hosting such a discussion at TechEd.  See you at the BPX roundtable at 11:00 on October 3rd!
    Rebecca Potts

    More and more businesses are waking upto the fact that even an Upgrade project needs Change Management to make it a complete success. I have led CM in 2 upgrade projects (technical upgrade) and agree with you on the fact it is essential to understand the differences b/w the two systems.
    There are certain essentials which pertain to an upgrade:
    Identifying the objectives and the benefits envisaged from the Upgrade
    Communication to key stakeholders
    Business Impact Analysis (This is where a large portion of the business users get involved)
    Training on delta changes
    My personal experience has been that the sponsors of the Upgrade are always keen on having CM but they lack the drive and the support that is essential to any CM success. The inherent resistance also lies in the fact that it is ingrained in peoples mind that a technical upgrade hardly requires any CM.
    I refer to Upgrade as CM keeping in mind the scope, the criticality and the magnitude of change which is quite limited in this case. (CM being a subset of OCM)
    Roshik Shenoy

  • Add BAPI to SAP case study flights - need access key

    Hi,
    i try to implement a BAPI which should be part of the business object "SFLIGHT" of the default case study of SAP.
    If i try to change the business object "SFLIGHT", i receive a message window which asks for an access key to modify the business object.
    I don't understand why SAP disables the change of the business object...this is not a productive environment, the case study should be for training purposes etc.
    Can anybody tell me the access key or help me to change the business object?
    Thank you in advance.
    Kind regards

    Ok, now i know that it is not possible to change SAP-objects without beeing a registered developer. The registration process at the service marketplace is not possible with a trial version, so only customer-projects can be used in the trial version.
    In my opinion, this makes no sense at all... but i found a workaround... i created a customer business object as a subtype of the SAP business object.
    Thread closed.

Maybe you are looking for

  • Passing integer value in prompt

    Hi Everyone, I am trying to pass a smallint datatype value (ex: 2000) from a page prompt to a filter. When I try to view the result, I am getting an error; Error getting drill information: SELECT C1, C2, FROM SH WHERE C1 = variable1 Odbc driver retur

  • Problems with DSLR Footage in CS 5.5

    I am using Premiere CS 5.5.  I have no trouble editing AVCHD footage, but a new client is giving me footage shot with various DSLR cameras and this is causing me problems. First, my specs. Windows 7 i7-2600 processor GTX 460 card (1 GB memory, 336 CU

  • Safari keeps quiting on iOS 6

    When ever I type in something on safari it quits the app

  • Create a Formatted report for a single record

    I am trying to create a report for a single record in a document format instead of row and column format For example to list a custome information with list of orders. CustomerID ---------------------        Name ------------------------------------

  • Help Viewer Font Size Way Too Small

    Hello, The font size of the adobe help viewer content is way too small (it looks like a 4 pt or something). I can hardly read it at all. Can someone please tell me how to enlarge it? Thanks a lot! Mike