Urgent  ! Help in linking Work center to goods movement

hello,
i need help in finding the work center for the goods movement in AUFM.  The goods movement AUFM table shows all the goods movement entries but i want to tag it to the corresponding work center. i found out a way to tag it. by linking AFKO - RESB - AFVC - CHRD. But the problem is that if the material on the production order is the material that is finally produced, i cant find a work center for it. Because this material has no entry in the RESB table.
Any suggestion would be highly appreciated.
hey everyone
is there a way to have the VORNR field connected to the AUFM goods movement. this will solve the problem of linking the work center . So if someone knows how to link the AUFM entries with the respective VORNR activity ? Please give suggestions.
thanks
Laura.
Message was edited by: Laura. 3:20 PM
        laura s

Laura,
Goods issues are linked as you described because components consumed by a production order have reservations (RESB) and are assigned to an operation (AFVC).  Goods receipts, on the other hand, do not have reservations and therefore don't have this link to the work center.
If you are using automatic goods receipt, then one of the operations in the production order will have a control key set up for automated goods receipt (PP03 is the standard, and it's usually the last operation).  The business would likely see this work center as being logically tied to the goods receipt of the produced material.

Similar Messages

  • Urgent help!!  how to cal Good will in HFM?

    Hi Professionals,
    I need urgent help from you. I would like to know how to calculate Good will % from ownership.
    I dint work on tht before. And i posted this query before but dint not get any answer.
    Thanks in Advance
    Edited by: 897162 on Nov 27, 2011 1:56 AM

    Hi
    I found a thread in this forum on "Ownership calculation" which also talking about the good will calculation.
    Ultimate Ownership calculation in HFM
    This could give some idea.
    thank you
    Regards,
    Mahe

  • [HELP] - CM21 Rescheduling work center.

    Hello SAP Gurus,
    I have a problem with transaction CM21 when I try to change an operation from work center to another. The scenario is:
         - WC01 (Work center)
            - CC01 (Cost center)
               - Activity A
               - Activity B
         - WC02
            - CC02
               - Activity C
               - Activity D
    In my production order I have WC01 in the operation 0010, I release order and save. Then I go to CM21 and I schedule the operation 0010 to WC01 and save, until now everything is good.
    I change my mind and I go to CM21 and I change from WC01 to WC02 and I save.
    When I make the confirmation in CO11N for operation 0010 the system shows a message of wrong cost calculations because I have changed the original work center in the CM21, and the Cost Center and the Activities Types are not updated...
    Little help please...
    Thanks in advance,
    Adelmo Silva

    Dear,
    Check whether the Standard Values used in WC 1 &  WC 2 are alike, if there is any difference in the standard value unit of measure of WC1 & WC2 or any differences in the activity types UOM then it may cause some inconsistencies in the cost calculation leading to error.
    Thanks & Regards,
    Vijaya Bhaskar A

  • Urgent....work-center/cost center table...have ur point.s

    Hi all,
    I have work-center, I want to find the corresponding cost-center.
    But on screen i m getting structure CRKEYK.
    Please let me know the table...
    Urgent.
    <b>Help me ....n have ur points.</b>
    regards,

    Hi Pradeep,
    AFRV is the table which will have both work center & cost center.
    <b>Reward points if it helps,</b>
    Satish

  • Logical link / Work center for directly accessing "Business Activities"

    Hi All,
    We are upgrading from CRM 5.0 to CRM 2007. One unique challenge that I have encountered is the access to search, change or create - BUSINESS ACTIVITIES (Leading Transaction category: BUS2000126) in the CRM Web UI. We would like to directly access Business activities through a work center -> Logical link or a Logical link, in the SALESPRO business role.
    This is available in the IC_AGENT business role. But you need to create a preceding Interaction record and then create a followup activity -> Business activity. We do not want to do this. We want to be able to access the business activites directly. For example, Leads and Opportunities can be accessed directly through the work Center: "Sales Cycle".
    Does anyone know if there is a work center that I can use in SALESPRO business role that will give me direct access to Business Activities . I can use the transaction launcher to access the HTML version of the winclient transaction (T Code: (CRMD_BUS2000126) but I do not want to use the transaction launcher. Any ideas?

    Well I am pretty Serious?!!!
    The standard SAP delivered "ACTIVITIES" WORK CENTER has the following Logical links for CREATE:
    Activity
    Activity Scheduling
    Activity Template
    Appointment
    E-Mail
    Interaction Log
    Task
    Visit Plan
    And when you use the Activity create - you ONLY have the option to create:
    Interaction log - Channel report
    Interaction log - Partner report
    Task - Approve
    Task - Recurring Task
    I would expect to see more than this. There are other BUS2000126 Business Activity transaction types which are enable to be maintained online in SPRO. But they do not show up here. I can use the Search - Activity logical link and then use Activity Type to find the other Transaction types. But not in Create. I can control the transaction types that can be displayed for Leads and Opportunities. It doesn't seem to work for Activities!!!!
    Is this part of standard CRM 2007 SALESPRO delivered role functionality??? I have SAP_ALL and SAP_NEW and have access to the other Business activities in my security role. My Ophthamologist did confirm that my eyes are doing fine so far. So this has something to do with the way this 'Work Center' has been designed. Apart physiological/anatomical impediments what am I missing???
    Thanks,
    Ramesh

  • Urgent : Automatic Selection of  work center

    Dear All,
    Good Morning,
    please provide me valuable input to accomplish the business scenario,
    the scenario is
    1.There are 16 NC T-Bending Machine with different capacity.
    2. The Client wants to select the workcenter automatically if the 1st workcenter is overloaded i.e 2nd workcenter should be selected by the system
    Again,if 2nd workcenter is overloaded then system should select 3rd workcenter and so on..
    How I can make it possible.
    I am trying the Alternative sequence ,will it works to achive the requirement .
    please give ur valuable inputs.
    Thank in advance,
    Vijay Mankar

    In capacity leveling transaction, enable "date entry when dispatching".  Then, every time you dispatch operations, you will get a pop-up for date entry.  Luckily, this pop-up also has a field for work center - so you can change work center also (with or without date changing).
    We are using this method extensively.  Start transaction with all the work centers that you want to be considered.  Then, just select all the orders and dispatch.  In pop-up, change work center to the next in list.  So, some orders will get dispatched to that work center, and after its capacity is fully booked, the balance orders will fail to dispatch.  Once again, select all orders (left in the order pool) and dispatch, and change work center in pop-up.  You will have to do this as many times as the list of work centers OR till all orders are dispatched (whichever occurs first).  Takes just about a minute per work center and works perfectly.
    - Chetan

  • Urgent help required - linked subreport keeps asking for parameter value

    Greetings,
    I have developed a report in the Crystal Reports bundled with Visual Studio 2005. The data is obtained from a stored procedure. One of the fields in the result set is named "Id".
    I have embedded a subreport in the details row of the main report. The subreport also gets its information from a stored procedure. This stored procedure has one parameter named "OpportunityId". This field is linked to the field named "Id" above. the subreport has been set to supress blank subreports.
    In the development environment and running the executable of the application on the development machine the report works perfectly. The subreport displays as it should and all is well.
    When I deploy the report onto user machines where they have the crystal runtime installed, the report keeps asking for a parameter value for the subreport.
    I cannot get this to stop happening.
    This report is urgently required. PLEASE could someone help me out here.
    I am at my wits end.
    I have attached a zipe file containing the following:
    - the two stored procedure
    - the rpt file
    - a sample report
    - a screen showing the report having just been generated
    Thanks in advance,
    Robert Lancaster

    <p>Hi Robert,</p><p>I see your report template and stored procedures. All seems to be ok. <br /></p><p>The most important is to assign the report parameters for all linked subreports (only one in your case).</p><p> </p><p>Try this (in C#, in VB.NET the code are very similary): </p><p>ReportDocument report = new ReportDocument(@"TopFortyReport.rpt");</p><p>AssignParameters(report, paramCollection);</p><p>// and now assign parameters to all linked subreports </p><p>foreach( CrystalDecisions.CrystalReports.Engine.Section section in report.ReportDefinition.Sections)</p><p>{</p><p>    foreach (CrystalDecisions.CrystalReports.Engine.ReportObject reportObject in section.ReportObjects)<br />    {</p><p>        if (reportObject.Kind == ReportObjectKind.SubreportObject) </p><p>        {</p><p>            SubreportObject subReport = (SubreportObject)reportObject;</p><p>            ReportDocument subDocument = subReport.OpenSubreport(subReport.SubreportName);                                               AssignParameters(subDocument, paramsCollection);</p><p>        }</p><p>} </p><p> </p><p>void AssignParameters(ReportDocument report, object[] paramsCollection)</p><p>{</p><p>    int nParams = paramsCollection.Length;</p><p>    for (int iParamIndex = 0; iParamIndex < nParams; iParamIndex++)</p><p>    {</p><p>        if (report.DataDefinition.ParameterFields[iParamIndex].IsLinked())</p><p>            continue;</p><p>        report.SetParameterValue(iParamIndex, paramsCollection[iParamIndex]);</p><p>    }</p><p>}</p><p> </p><p> </p>

  • URGENT Help - navigation not working 1st time thru on deployed apps.

    Using update 6, and exporting a WAR file that, by hook&crook, I can actually get to deploy on Sun Application Server Platform Edition 8.1(the 2005Q1 version) on a Linux box... the app is running under an SSL-enabled http-listener on the app server.
    the app works fine on the dev machine.
    on the Production machine above, the user is faced with a form and an action link... almost everytime when the user clicks the link the browser goes off into the weeds, saying "Waiting for mysite.com..." and the little animation for page loading is going....
    and NOTHING happens, the app never sees the click, as in any log statements in the code don't get logged (even in the linkAction_action routine), the server is quiet, and nothing happens no matter how long you wait. It doesn't even run validation - it just hangs the browser....
    if you click the stop button and do it AGAIN, it's immediate!! you get the next page in the process. (and no, I can't tell my users to keep trying...)
    HELP? is this an app error or a SunAppServer issue??
    This is really UGLY.
    -Kristofer

    yes to all of the above. but when I moved the exact same app (*exact* same war file) to Tomcat 5.5.7, under a valid SSL cert (the same 'keystore' used above) the problem vanished.
    I have to "ship".
    SunAppServer 8.1 ain't ready for me. Sorry.
    cheers,
    Kristofer

  • Urgent help for linking file

    hi i am a noob in this area..can someone plz help me..
    well i have to do a link where it will open the latest file..
    how do i do tat......................
    String file = "C:/";
    File f = new File(file);
    String [] fileNames = f.list();
    File [] fileObjects= f.listFiles();
    %>
    <UL>
    <%
    for (int i = 0; i < fileObjects.length; i++) {
         if(!fileObjects.isDirectory()){
    %>
    <LI>
    <a href="<%= fileNames[i %">"><%= fileNames[i] %></A>
    (<%= Long.toString(fileObjects.length()) %> bytes long)
    <%
    tis code can loop for all the documents i have in my C drive..but i dont want it to loop .. i want it to search for me the latest file and just open it...
    thank you very much. </a>

    import java.io.File;
    public class LatestFileInDir {
         static long maxFileDate = 0;
         static String maxFilePath = "";
         static void getLatestFilePath(File fd) throws Exception {
            if (fd.isDirectory()) {
                 String[] children = fd.list();
                 for (int i=0; i<children.length; i++) getLatestFilePath(new File(fd, children));
    else {
         if(fd.lastModified() > maxFileDate) {
              maxFileDate = fd.lastModified();
              maxFilePath = fd.getCanonicalPath();
         public static void main(String args[]) throws Exception {
              getLatestFilePath(new File("C:\\TestDir"));
              System.out.println("Latest File : " + maxFilePath);
    }Cheers

  • Urgent help!! In 'export audio to movie' the final option to disable the original audio has disappeared. I am no longer allowed to deselect the audio tracks. Any ideas why Logic has stopped this?

    Greeting all
    I'm creating a movie with a new music track and follow the appropriate steps as in the manual:
    Choose format options for the bounced audio file, and click OK.
    In the dialog that appears, enter a name and target folder for the movie, and click Save.Another dialog opens, allowing you to choose which of the original movie’s audio tracks should be used in the new movie.
    Select the audio track that you want to retain in the new movie, and click OK.
    The QuickTime movie is exported to the selected folder; it contains all selected audio tracks, plus the part of your project that is encompassed by the start and end points of the QuickTime movie.
    However, this final dialog option 'select the audio tracks of movie to keep in new movie' has disappeared!!! For some reason Logic goes straight to bouncing without the offer to remove the original audio. My final movie ends up with both sets of audios. Any ideas please???
    Best
    Juan

    It is still there and Logic did not remove it.
    Did you do some trouble shooting.
    Try to load a different video (with different codec) to see if it is video file related
    Try a new (empty) project to see if it is project related
    Try to remove Logic preferences (move the original back if this wasn't the problem because the file contains other info you might not want to lose)
    Hope that helps
    Edgar Rothermich
    http://DingDingMusic.com/Manuals
    'I may receive some form of compensation, financial or otherwise, from my recommendation or link.'

  • Urgent Help.... deleted all my movies

    It's been one of those days and now tonight I go and delete my complete library
    Can anyone help. I have a Intel Mac Mini and a 500GB Iomega Mini Max hard drive.
    I had 186 movies on the hard drive in .avi format and somehow I have managed to select and delete them all and empty the trash.
    I haven't touched the Mac (except to write this)..... but can I recover the files??
    Merry Xmas

    There is no inherent 'undelete' in MacOS, so unfortunately file recovery relies on 3rd-party solutions. The best of these I know of (and use by choice) is Prosoft's Data Rescue II (http://www.prosofteng.com/products/data_rescue.php). Unfortunately, at $99 it is not inexpensive, but if you don't keep a backup for easy recovery, then you may find this software more useful than just this occasion!
    You can download a trial of the software for no cost, and see if it finds and lists all your files. Due to limitations in the trial version, it's not possible to use it for anything but cursory recovery, but at least it'll tell you whether your movies are intact.

  • Link between work center and G/L Account

    Hi All,
    I need to link work center to the G/L account in PM Module . I know the link between work center and cost center . But would like to know how MO cost hits which cost element/ G/l account and there assignment
    Thanks and Regards,
    Vivek

    Hi check the below definitions
    Cost centre : Organizational unit within a controlling area that represents a defined
    location of cost incurrence.
    Profit Centre: Organizational unit in Accounting that reflects a management-oriented
    structure of the organization for the purpose of internal control.
    Work Centre: An organizational unit that defines where and when an operation should
    be carried out.
    Regards
    Sreeni

  • Routing and Work Center

    My Friend,
    What tables and fields I can user to create a report with link ( Work center X Routing X machine times X labor times) I need of list with this information to analysis.
    I need comparete the times SAP information(Routing) verses Real Operation ( production line) by list.
    Thank you for any help.
    Best regards
    Armando

    Hi,
    You should have searched or posted your question in production planning forum.
    For example, check the link [Labour time and Machine time - production order table   |Labour time and Machine time - production order table]
    Regards

  • How to construct Work center Hirerchy in Production Planning.

    Hi Experts,
    How to construct Work center Hirerchy in Production Planning.
    Thanks in advance.

    Amit,
    I guess you must have overlooked the rules of engagement for this forum. It is customary for questioners to first perform basic research before posting any questions.
    First, search in the forums (search box in the upper right of this page). FYI The question you raised has been covered dozens of times.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com
    Work Center Hierarchy:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b1/c037ae439a11d189410000e829fbbd/frameset.htm
    Next, look for generic solutions solutions in Best Practices. Basic index at
    http://help.sap.com/saap/sap_bp/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these tasks, and studied all of the online help that is supplied for free by SAP, should you then consider posting a question to these forums.
    If you are unwilling or unable to perform such research, then you should probably engage a consultant to assist you. All consultants use searches to assist them in designing and executing solutions. If you intend to one day become a consultant, you would be wise to cultivate this skill.
    Best Regards & Good luck,
    DB49

  • Table with all versions of capacities (work center)

    Hi,
    I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
    I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
    Thanks
    Dede

    Dede,
    You will have to use a combination of tables, perhaps a SQVI to join tables
    CRHD - Work Center Header (link work center to capacity ID)
    KAZY - Capacity version
    KAPA - shifts and intervals
    In KAPA the times are displayed in seconds
    Hope that helps,
    ~Sunil

Maybe you are looking for

  • Errors an problems with InDesign CC 2014

    I am having "Out of Memory" error while using InDesign CC 2014. This has never happened before. I am working on a catalog and is constantly flickering the text or images, or freezes the screen or just wont start the program. I am in the final process

  • HT3939 how do i find out how many gb my iphone 4 has without a sim?

    how do i find out how many gb my iphone 4 has without a sim?

  • I need the report...

    Could you please tell me, is there report which contain the list of all programs with the empty field «Group authority» (field didn't fill)? thanks all!

  • How can we call creen of one program from some other dynpro Program

    Hi, Is it possible to call a screen of one program from some other program as pop up or full scree. please give you input if it is possible. Thanks in advance. Thanks and Regards, Praveen.

  • How to maintain battery life?

    i am using iPhone6, i want to know dos and donts to maintain a healthy battery. Healthy Charging pattern if needed. Also is all night charging harmful? And charging the phone to 100% or discharging it to 0% damages the battery? Pls help. Thank you.