Value field in cost element

Dear Experts,
I am facing an error after running copa cycle (cost allocation) through keu5.It is showing ''value field is not assigned to cost element this this.How to get the details of warning message showing in red ?
Regards
Partha

Dear,
Identify the PA settlement structure assigned to Assessment cycle using transaction KEU2 and then check this PA settlement structure in transaction KEI2. Here assign the cost element to the value field for valid assignment.
Regards,
Chintan Joshi.

Similar Messages

  • Difference between value category and cost element

    Hi I am new to SAP Pm.can anyone explain me the difference between value category and cost element and how are they linked with examples

    HI Pallavi,
    Value Category are use to devide your total cost in to diffrent elements for example Material, External Services, Internal Services etc. If you dont have any value category configured then all cost will show together.
    Cost Element are the cost collector where your cost will be booked means different cost under different Elements.
    So What you need to do You need to create one Value category Like material or any thing then you need to assign all Cost Elements which will be used to book cost related to Material or that perticular category. You can assign Cost Element directly, range or as a group to these category under SPRO.
    Regards,
    SS

  • How to Add new fields in Cost element Master data transaction: KA01/02/03?

    New fields ZORGUNIT(CHAR 4) is needed to be added in a separate tab. The data should be updated in cost element master data trx.

    >
    Sr!^^ wrote:
    > Hi
    >
    > try with PM01
    Is there any relevancy in your answer?
    Have you read the question?

  • Cost Elements and COPA Value Fields

    Hi All,
    Should all the cost elements created in CO be assigned to value fields in Costing Based COPA?
    I am a bit confused . . .
    Regards,
    Ravi Kumar

    Hi ravi,
    Basically fist you understood, how the values are flowing into the CO-PA. ie When ever billing document generated co-pa document generates automatically. based on your condition type and account keys.
    While defining pricing procedure, they mapped the conditon type against releavant account key.
    Based on the releavant account key they assigned releavant cost element under VKOA.
    Against these condtion types they assgined value filed under KE4I in co-pa.
    This is the way system will capture cost elemetns under copa. KIndly revert in case any issue.
    Regards
    Maruthi.

  • Manual/Autometic creation of cost elements in chart of accounts field

    Dear Friends,
    While creation of Chart of accounts (OB13) under  Controlling Integratiion tab
    thers is two options are there.
    1 manual creation of cost elements
    2 autometic creation of cost elements.
    While creation of cost elements if we select
    (MANUAL CREATION OF COST ELEMENTS) what will happen???
    (AUTOMETIC CREATION OF COST ELEMENTS) what will happen?
    What is the main difference between about two fields?
    Thanks in advance,
       Mallika

    Hi,
    MANUAL CREATION OF COST ELEMENTS -  Cost elements maintained manually. A push button is available for
    this purpose, with which you can go directly to the related cost
    element.
    AUTOMETIC CREATION OF COST ELEMENTS - Cost elements maintained automatically. When you save a new G/L
    account, the related cost element is automatically created. A prerequisite is that a default value for the cost element category
    has been set up for this cost element. If no default value is found, the system will not create a cost element.
    You can make default settings via :
    Cost Element accounting --> master data --> cost element --> automatic creation of primary and secondaru cost element --> make default settings
    Dhara.

  • There are values for cost element 80000 that are not assigned to any line I

    Hi,
    While calulating WIP I am getting below error:
    There are values for cost element 80000 that are not assigned to any line ID
    Message no. KJ161
    Diagnosis
    Not all values for the cost element are assigned to a line ID.
    Procedure
    Assign the cost element to a line ID. If you don't want to include the cost element in results analysis, assign it to a line ID of category N.
    You can access a detailed list of unassigned cost elements as follows: Start results analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3). Select the field Full log. Execute the function. On the next screen, choose Logs -> Parameter List in the menu. A list is generated. The unassigned values are shown at the end of the list.
    If cost element "+++++++++" was shown in the message, this is because in the assignment of costs and revenues to line IDs, you have not used a cost element other than the full masking "+++++++++". In this case a presummarization eliminates the information on the cost element.
    Cost Element 80000 is of type 43 Internal activity allocation, I have Masked this in OKGB as below:
    Controlling Area = FLGP
    RA Version = 0
    Masked Cost Element = 000008++++
    Masked Cost Center = ++++++++++
    Masked Activity Type = +++++
    ReqToCap= COS (Secondary Cost)
    I have Configure OKGA also but still system is giving error.
    Please help me to understand.
    Regards,
    Vivek

    I was wondering if you could help me I am trying to configure the RA key for Refurb orders and when I go into txn OKGB for the Assignment of C/E for WIP there is sample config already there which I copied.  But I am having difficulty getting the KK1A to work I am getting the message as outlined above.  Could you explain how this OKGB works and how to configure it a bit more fully.  In my sample config there is a ReqTOCap section and in it there are letters like ABR, EK, FK, EL what do they mean.  This is a screen shot of it.  I am not sure how to go about this entirely so any light you could shed would be greatly appreciated.  Can you suggest a good resource or documentation you may have, would be greatly appreciated.

  • Assign direct material cost to value field in copa while issue to Prod orde

    Dear All,
    My requirement is like this:
    There are some 16 material groups from A to P each containing some materials(finished goods).
    I want to allocate overhead to different material groups(Charecteristic in copa) in COPA using the periodic assesment cycles. I am able to allocate overhead(admin & sales cost) to different value fields in copa from different cost centers.
    I want to analyse the product cost and also the profitability of each material group in COPA using Report painter. Iam able to pull all the costs which i assign to value fields using assessment. But, i am NOT able to get the direct material cost which is issued to production orders using BOM.
    My question is whether we can assign the direct material cost to any user defined value field(material cost value field) while the material is being issued to production orders. Is there any automated way where we can directly assign the direct material cost to value field in copa while issuing the material to Production orders.
    Pls explain me whether we can do it. if yes how?
    Thank you very much in advance.
    Regards,
    Vishnu
    VST-IT.

    PA is a Profitability analysis tool. That means it gets updated when a sale is made, not before. (Except for settlements and assessment of overheads.)
    Goods issues for production gets updated in CO-PC, and needs to be analysed there. If you don't, you loose all the inbuilt tools for variance analysis, cost estimate comparisons, Wip Calculation etc. To the best of my knowledge, a Profitability Segment cannot be used as a cost object in Production Planning, because amongst others, you need to be able to capitalise the produced materials to stock at the end of the production run, or to WIP at the end of the Financial period,which is not possible with PS.
    Similarly, overheads are recorded in CCA and needs to be analysed there.
    If one goes against these big groupings in SAP, you always run into problems.

  • Change value in cost element report

    Dear Experts,
                           Is dere any option to change value in the cost element report ie S_ALR_87013543...If it is possible please let me know......
    By
    AS

    Hi,
    I don't think that Price Change Functionality would be possible in any of the PS reports.
    Regards,
    Harsh.

  • Overlapping values were maintained for characteristic Cost Element

    Dear SAP Gurus,
    I am Finding one error while chaing my Primary Cost Planning in CJ40. The error note as follows.
    *"Overlapping values were maintained for characteristic Cost Element*
    *Message no. K9050
    Diagnosis
    You maintained several characterisic values for characteristic Cost Element in layout maintenance or in the entry screen for planning.
    Within these characteristic values
    individual values appear more than once
    individual values are included in an inteval
    intervals overlap
    These duplications and overlaps are not forseen in planning.
    System Response
    The entries for characteristic Cost Element are rejected.
    Procedure
    Change the entries in the layout maintenance/entry screen for planning."
    Please help.
    Rgds
    Rohit

    Hi,
    Step1. Go to CJ40.
    enter in the cost planning area->Select the topmost line item->Primary cost.
    Then Extras->Group Display--> Cost element
    Is it the same what you have checked in the KAH2?
    Step2: Then check Extras---> Error Log
    Step3: Then check Extras--->Diplay Profile
    Step4: Now Go to Tcode: KP34 and check the layout assigned to WBS elements: Cost element/acty inputs and make sure the check mark is present against it in item column.
    Step 5: Now check Extras--> Display Profile.
    Make sure its same as that of Step4.
    Hope its useful.
    Reward points if useful.
    Thanks..

  • Activity types cost Elements not reflecting in Cost Centre Report.

    Hello SAP Gurus,,
    1. Here we are facing one issue in Zreport. total is not matching, compare with KSB1.
    Values are more in Zreport, in other words activity type cost elements are not reflecting in Zreport, but it reflecting in KSB1.
    example: flow from PM module.
    Actually we had used logic based on the Cost Centres, in that cost centre by taking Object number and it passes to COEP table, then we are getting values as same as KSB1.
    As per investigation i found that the object number is differ from COEP table and CSKS table.
    Exapmple : 1410000 object number in CSKS table, 1410000EL in COEP table, thats why in Zreport these values are not reflecting.Finally our requirment is , Zreport values should same as KSB1 vlaues.
    2. We need same functionality as same as KSB1 for match code or drop down menu functionality for Cost Centre Group and Cost Element Group,  but while user wants select from match code or drop menu (F4), as of now i didnt given any logic to abap for match code functionality or drop down menu (F4),so in this case which logic or table i have to use.
    So please give me inputs or logic how to over come the above points.
    Regards,
    Raj.

    The OBJNR field structure is as follows :-
    AABBBBCCCCCCCCCCDDDDDD
    AA = object type eg. KS (cost center)
    BBBB = controlling area
    CCCCCCCCCC = cost center
    DDDDDD = activity type
    Based on the structure, you will be able to filter the relevant cost center/activity types. You can also use other fields eg. cost element, partner object, source object, value type, etc. to get your desired figures as per KSB1.

  • Cost elements for WIP (TCODE : OKGA)

    Hi All,
    I am working with Production Order wip calculation, varaince and settlement.
    In the RA key configuraion,(for WIP calculation)In OKGA, tcode we define, the cost elements for a perticular line id, for WIP calculation.
    I wanted to know, what is the purpose of these two cost elements.
    If I execute line item report, I dont see any value on these cost elements, after wip calc and settlement.
    However, I see the work in process on it, in the layout. I want to know, the exact purpose of these cost elements assignment.
    Is there any internal controlling document that is getting posted?
    Regards
    SR

    Hi Swastik,
    Those cost elements (category 31) are used to calculate and store WIP values at the detailed level of so called line IDs.
    Line IDs are groups of cost elements that were posted to production order.
    For example you can calculate and store WIP separately for Raw Materials, Semis, Activities and overhead.
    You can also settle them to different GL Accounts via mapping in txn.OKG8.
    Hope it helps,
    Szymon

  • Cost Elements in mtl_transactions_interface

    Hi all,
    We have EBS 11i (11.5.10.2) .
    We are migrating stock using MTL_TRANSACTIONS_INTERFACE . It's working fine but our problem is to migrate the value according to cost elements means we want to bifurcate the material value, Resource value, Material Overhead value , OSP value etc.
    How it is possible ? Please guide me me if you anybody has an idea.
    Thanks
    regards
    Sanjay

    Burak,
    Please see if these docs help.
    Note: 875702.1 - Interface Trip Stop Ends In Warning - Stuck In MTL_TRANSACTIONS_INTERFACE - No Concurrent Manager Is Defined
    Note: 278861.1 - Interface Trip Stop Ends In Warning. Records Stuck in MTL_TRANSACTIONS_INTERFACE
    Note: 981792.1 - Nonshippable Item Stuck With Sales Order Issue in MTI or MMTT / WSHINTERFACE - Interface Trip Stop (ITS) Completes in Warning
    Note: 863761.1 - FAQ: Troubleshooting Stuck Pick Release and Shipping Transactions]
    Thanks,
    Hussein

  • Value Field Analysis

    Hello gurus
    Actually i am not a consultant but i have query, like the client where i am working with has recently implemented SAP. But the problem is that CO and FI is not Reconciled so they told me to find the differences and their possibilites. Can anyone tell me how i can find the G/L mapping against value field like in specific value field which G/L are mapped. Kindly tell me any T-code or the process for this. 
    Thanks and Best Regards,
    Hassan Ali

    Hi..
    The system uses the flows of actual values to transfer data from other module to value fields in CO-PA.
    You should understand the flows of actual values  through the below sap help portal site to find the G/L mapping against value field.
    Flows of Actual Values - Profitability Analysis (COPA) - SAP Library
    In case of Billing Documents, Values in billing documents are assigned to condition types in SD, accounts in FI and value fields in CO-PA.
    You can use t-code KEAT to reconcile the data between FI and CO-PA.
    Refer to http://help.sap.com/erp2005_ehp_07/helpdata/en/40/c52df80d1e11d2b5cf0000e82de856/content.htm.
    In case of Direct Postings from FI, all assignments of values and quantities to the value fields in costing-based CO-PA are defined using the PA transfer structure "FI“ through the following IMG path: Profitability Analysis->Flows of Actual Values->Direct Posting from FI/MM->Maintain PA Transfer Structure.
    Refer to http://help.sap.com/erp2005_ehp_07/helpdata/en/7a/4c3aba4a0111d1894c0000e829fbbd/content.htm?frameset=/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    In case of Periodic Overhead Allocation, the cost of cost centers is transferred into co-pa using PA Transfer Structure for Assessmentof co-pa cycles.
    Refer to http://help.sap.com/erp2005_ehp_07/helpdata/en/7a/4c3ac74a0111d1894c0000e829fbbd/content.htm?frameset=/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm

  • Statistical Cost Element / category 90

    Hello all:
    I have create statistical cost element with category 90 .
    I assign one cost center to Asset too.
    Then I do f-90 to acquisition asset already, it really debit my G/L reconciliation (which I have stat cost element =90)
    but which report I can see report total of this stat cost element ? with cost center that I assign in G/L?
    Standard cost actual /plan report (S_ALR_87013611) not show the value of statistical cost element???
    Thanks in advance.
    Best Regards,
    Manthana

    Hi,
    that is right, the S_ALR_87013611 (report 1SIP-001) is only selecting value type 4. You can copy the report 1SIP-001
    and create a customer-defined report  in GRR1. After that, you can add the value type 11 to the column definition
    in GRR2.
    Regards,
    Greta

  • Restricting G/L (Cost element)

    Hi,
    While creating a mainteannce order, how to restrict a user to a particular G/Ls (Cost element in external services).
    Regards

    Hi
    Go to user role and profile and search for authorization object K_ORDER.
    If u dont get then add it and for this object you have authorization field for Cost element. Mention your cost element over here.
    There are several combination of auth field available.
    Check it and match with your requirement.

Maybe you are looking for

  • ITunes crashes my internet connection almost every time I launch it

    Hello, since my last upgrading to iTunes 10.1.2, (I did not do it for a long while), I am experiencing severe disconnections from the internet. These disconnections do not usually occur at the moment of the lauching, but a little bit later, when I am

  • Stacks and exporting to Flickr

    I'm fairly sure this is pilot error, but I can't see where I'm going wrong...first, let me describe what I want to do. I have a RAW image called "A.NEF" (Nikon D300 RAW). I want to edit it externally in CS5 (could be any editor). When it comes back t

  • Photos get auto-cropped and ken burns. stop it.

    Trying to do a stop motion. don't need the photos to movie. Cant get imovie to stop auto cropping and ken burns-ing the photos on import from iphoto. Would be fine, but i can't bulk adjust them either, tired of going through frame by frame and puttin

  • Listener Log in 11gR2

    I have located my listener.log my using lsnrctl stat <listener name> my particular log is in $ORACLE_HOME/log/diag/tnslsnr/<host name>/<sid>/alert/log.xml Where is this log file and location actually specified ? For the same lsnrctl stat command from

  • Depot sales doubts

    hi friends, my company have 5 plants and  24 C& F in india. my doubt is how i configure  these 24 C & f in sap system?? is these C & F's are depot's or Plants?? tell me the process floe of depot sales and export sales... thanks mehar