Versions configuration for controlling from project system

Hi Guys,
I need to know the flow for add additional versions to the real version for CO-PS.
There is any how to or guide about it is?
Thank you very much.
Regards,
Jeysi

Hi Ahmed
Same material codes is used both for common use and also in PS as project items.
These material codes are defined as VB (reorder point material planning).
Now after MRP run, total requirements is coming considering existing unrestricted stock, project stock, project requirement from WBS.
I do not want project stock and requirement should participate in MRP.
Please help.
Regards
Pradipta Sahoo

Similar Messages

  • About reversal of Outbound delivery generated from Project system due to sale return

    Hi SAP Expert ,
    We have made delivery from project system using t.code CNS0 and billing document is generated with reference of sales order. Now Goods is return by customer due to some technical reason, We created return sales order with reference of billing document  and Credit memo with reference of Return sales order.
    What is T.code for making return delivery or reversal of  Delivery /PGI generated from Project system in sap r/3 ?
    Pls. suggest to me.
    regards
    VKM

    Hello,
    it depends whether in the billing document the material codes identifies the goods delivered and to be returned or not.
    If it's so, you can create a Return Sales Order with reference to the billing document, create the return delivery, and then the credit memo.
    If it's non so, you can create a Return Sales Order with reference to the billing document (but without copying the material items, and entering manually material code and quantity to be returned), then create the return delivery. Then you can create a Credit memo request with reference to the Billing Document or with reference to the Return Sales Order.
    To create the return delivery, you can run VL01N with reference to the Return Sales Order (just like for outboud deliveries), or from VA02, following the menu path "Sales document --> Deliver".
    Best regards,
    Andrea

  • SLD configuration for DXI / PXI technical systems

    Hello,
    we have a problem when transporting XI configuration objects from XI dev to XI prod. The transport objects arrive in XI prod, but the name of the business system (for the SAP backend system) is not converted from dev business system (T01CLNT010) to prod business system (P01CLNT01) although the transport target for T01CLNT010 business system was set correctly (we are using business system groups Dev and Prod). And the "related integration server" for T01CLNT010 was also set correctly to DXICLNT010.
    But then I noticed that the technical system for the DXI (XI Dev) is configured as follows:
    TMS Domain ("DOMAIN_PXI") and TMS Transport Group Name GROUP_PXI ("GROUP_PXI") have the same values as PXI. Is that correct ?? We are using file transport, not CMS.
    Another strange effect is that when I set the group in business system DXICLNT010 to Dev, that is also applied to business system PXICLNT010 ! Which is of course not what I want.
    I assume I have to associate DXICLNT010 to Dev and PXICLNT010 to Prod, same as for T01CLNT010 / P01CLNT010. Correct ? Or does the group in the XI business systems not matter ?
    Can anyone post an example of a working SLD configuration with two XI system dev and prod ? What values do I have to use in the XI technical and business systems, so that the transport will work ?
    CSY

    There's obviously something wrong in the SLD configuration for the exchange infrastructure systems. The error you're describing (one system pointing to another) usually occurs when one system is generated through homogeneous system copy of another system (was that your case?). I've seen that behaviour once and they corrected it by manually deleting the exchange infrastructure systems from SLD and creating them again from scratch.
    Anyway, I highly recommend you to get an expert NW Basis consultant to realize a check in it before you proceed any further.
    Aside of that, you're correct in your assumptions.
    Your config in SLD should be like:
    DEV_GROUP:
    - DXI
    - T01
    PRD_GROUP:
    - PXI
    - P01
    It's always 1 XI BS per group.
    Also, if you use separate SLDs for XI Dev and XI Prd, you have to make sure that this configuration is reflected in both SLDs. So, if you make it one SLD instance, you must generate a delta export zip file from the SLD where you did the configuration and import this zip file in the other SLD instance.
    If you use a central SLD, then it's not necessary.
    Regards,
    Henrique.

  • How can we explain the process from project system to final asset

    Dear masters,
    how can we explain from project system to final asset flow in the configuration level.
    thanks
    Moderator: Please, refer to basic SAP material

    Hi,
    Project & its related WBS will be initial cost collector (i.e invoices are booked against them). Once the status of Project/WBS is set to tech complet and AUC is assigned in the settlemnet rule. That particular asset record will recive values when we run the suttlemnets.
    This is an broad line view. Specific will depend on case to case.
    Thanks
    Vaibhav

  • Where does Plan Version field store in SAP project system table?

    Hi,
    I would like to know where where does Plan Version field store in SAP project system table.
    The plan version that I m refering is the Plan Version 1 in the menupath u201COn the Project Info System: Progress Analysis: Initial Screen, Choose Settings > Value display > Plan versionsu201D.
    T-Code: CNE5
    Thanks.

    hi,
    try table TKA09
    regards

  • SCOT configuration for internal & external email system in EP.

    Hi,
    I want to add SCOT configuration for internal & external email system in  SAP EP 7.0  ?
    What all steps I need to do ? any good documents on this ?

    Hi Haider,
    I have read the link you have given me to configure SCOT. I have 3  doubt plzz clarify.
    Doubt No. 1:
    In that link its mentioned that I have to add 2  profile parameter in the transaction RZ10 namely icm/server_port_<>*  and is/SMTP/virt_host_<>*
    My question is Can I put any value which i like in place of * like can I add either icm/server_port_2  OR  icm/server_port_3 OR icm/server_port_4  in icm parameter AND ALSO
    Can I put any value which i like in place of * in is/SMTP/virt parameter like can I add either is/SMTP/virt_host_0  OR  is/SMTP/virt_host_1  OR is/SMTP/virt_host_2 .
    Doubt No. 2:
    What port value I have to put in the profile parameter    icm/server_port_2  in RZ10.  Can I put any port value ? and automatically that port will work? say suppose I addded this profile parameter in RZ10
    icm/server_port_2 = PROT=SMTP,PORT=25000,TIMEOUT=180          so automatically 25000 port will work ? or will it give error?
    Doubt No. 3:
    When I go to SMICM transaction and go to services , I get the following:
    No.  Log         Service name/port     Host name           Keep Alive    Proc TimeOut   Active
    1     HTTP               8000                  epv.sopm.com           30                     60               Yes
    2     SMTP               0                       epv.sopm.com            30                    60                Yes
    3     HTTPS             8001                 epv.sopm.com            30                    180               Yes
    This means that HTTP port is 8000,   HTTPS port is 8001. My question is why in SMTP its showing 0, why no port is shown?
    I have not added any profile parameter like  icm/server_port_2 = PROT=SMTP,PORT=25000,TIMEOUT=180     for SMTP in RZ10 as of now.
    Is this the reason for this ?

  • Control for delivery from projects

    Hi
    Is there any way we can control the delivery of components from projects CNS0 using User statuses.
    The components in project stock should not be delivered until the User status permits it.
    Kindly advise.

    Hi,
    Please create a user status with business transaction "Goods Issue Delivery" as forbidden , and assign the status to the WBS element.
    It should work. I have not tried it out though.
    Muraleedharan.R

  • Update CO version 000 for controlling area

    Hi Experts,
    I need to update the values for CO versión 000 for a new controlling area created in the system. In order to do that I tried to customize in Project System--> Costs --> Create CO Versions. In the tables I choose version 0 but, when accessing sub-menu Controlling Area Settings, I cannot create settings for my new controlling area.
    Can someone help on how can we solve this?
    Thanks a lot!
    Kind regards,
    Neil

    Hi Neil,
    What do you mean by inability to create settings for conrolling area? What is exactly the problem/error message. Just set the conrolling area (OKKS) and access the path you mentioned.
    Regards,
    Eli

  • For 0PS_C02  cube  Project System - Dates update rules not activated!!

    Hi All,
    When we are trying to install update rules from the BI content for PS module  for the cube "0PS_C02  Project System - Dates",  the
    update rules are not activating. under the cube when BI content activation. What is the issue in activating the update rules from BI content. From BI content the available version objects only will be activated i think. Please rectify and resolve the same at the earliest friends.
    thanks,
    Sakali

    Hi,
    Try to activate through program RSAU_UPDR_REACTIVATE_ALL.

  • Interest Posting Periodic Allocation from Project System

    Guys,
    I am creating an automatic interest posting as part of the periodic allocations from the project system. We have new GL active and run parallel ledgers. The FI posting is into all ledgers, any idea how I can control posting to one ledger only?
    Kind regards,
    Rudolf

    Hi Anantharam,
    I tried defining an extract layout which assigned to the project type I am using and then creating an evaluation layout using the extract layout.
    However, it didn't really work as expected. In my scenario actual costs originate in cProjects (when the task is completed and the actual number of hours are entered in the confirmation field). Actual costs are not captured in the internal order. In this case if I define an evaluation will it update the actual cost if I define threshold value formula as follows (for testing I made it actual = planned just to see if I get a value).
    actual cost = confirmation * unit cost for task/role
    If the above is possible;
    1. How do I define the attribute and object types for unit cost for task/role which is based on the cost/revenue rates setup for the role? For example how do I find out the values for attribute and type name fields?
    2. I was under the impression that evaluations can only generate a report based on the existing values and update the criticality level field a threshold condition is defined. Is my understanding of this function incorrect?
    Apologies for all the questions, but I am still unclear how to update the actual cost which originates as result of cProject task confirmation to the internal order.
    Thanks for your help so far and appreciate if you provide some guidance on how I can get this working.
    Cheers,
    Lashan

  • Managed System configuration for SAP NW Java system in Solution Manager 7.1 SP10

    Hi All,
    I am doing Managed system configuration for my SAP NW 7.01 Java system and getting below error in step 6 create users SAPSUPPORT & SM_COLL_SID.
    "An unexpected error occured. An error occured while processing the UME command READ_USER from agent <hostname> : Server returned: 302 Found "
    I have checked my DAA as well as host agents are up and running fine. My Solution Manager is 7.1SP10.
    Please suggest.
    Regards,
    Manish

    Manish,
    Which UME you are using? portal/ABAP/LDAP
    Are you using the SOLMAN_ADMIN user while configuring.
    Also check the below forum.
    https://scn.sap.com/thread/1167282
    Regards,
    Raja. G

  • Hold AP invoice for payment from project

    My clients project managers want a say on AP invoice payments , after supplier invoice has been created against a project. Typically we are looking at some kind of "Hold" that can be put on Supplier invoice from projects module and then AP invoice should be disable for payment processing. This invoice should be enabled for payment only after this hhold is removed from Projects.
    Do we have this kind of function directly or indirectly?
    Cheers

    Hi
    The feature you are looking for in Projects is part of the newest release of 12.1 or the next point release.
    You could use a trigger for puting an hold, but then you need to have in place a work process where AP person sends an email to the project manager to ask for its approval, and upon the off-line approval the AP user will release the hold.
    Alternative approach is to utilize AME - Oracle Approval Management. You can set up the approval rules of the supplier invoices, so for project invoices the system will trigger the workflow and send notification to project manager. The Project Manager approval is releasing the invoice and make it available for payment.
    Dina

  • Can UWL are simontanously configure for two different sap systems ? How ?

    Hi,
    I am new in portal. Can any one tell me how to configure UWL . We have r/3 system as well as crm system. i want to show both UWL for both the system on one page.
    Please give ans in steps by steps.
    Please suggest me steps for that.
    Regards,
    Gurprit Bhatia
    Edited by: GURPRIT BHATIA on Dec 26, 2007 1:34 PM

    Hi GURPRIT,
    It is possible to display item from two different systems.
    All you need to do is create separate webflow connectors for the systems for which you required to configure the UWL and the systems must be available in the SLD.
    after creating the connectors register both of them and you can start receiving workitems from both the systems.
    reward if useful.
    Rgds,
    Vijay

  • Asset settlement issue from Project System

    Hello everyone,
    In SAP, we have tied Project System and Fixed Asset in the sense that for each network/activity in PS we create and link an asset in Asset Accounting. In the Purchase Order, the network/activity number is assigned and all the transactions that occur through this PO (including down payment, its clearing, GR/IR)  are then settled on the specified asset when we execute settlement run at month end through CJ88.
    However, we have encountered scenarios where an asset was not timely allocated to the network/activity but the transactions were carried out through the PO. When the settlement run was executed, its impact was not visible in Asset Accounting. Later, it was realized and the asset was created and assigned. Once the asset was assigned, all the subsequent transactions through the PO were then being settled successfully. But the problem is with those transactions for which the asset number was initially not assigned.
    Is there any program that can be executed to include the impact of the previous transactions. Otherwise, suggest alternatives.
    Thanks

    Hi Thanks for your reply, But that is not relevent to this issue.
    The issue here is -
    First 2 documents has value date of 4th period and the amount is 8800
    Next document has value date of 5th period and the amount is 1200
    Now i am trying to settle 10000(8800+1200) with 5th period date. Its givign an error Settlement amount is greater than Available amount
    Will it solve if i settle 4th period with 8800 first and then 1200 with 5t period? or any other process?
    Thanks
    Yadayya

  • Milestone payment for vendor in project system

    Dear sapient
    As per our client requirement vendor payment is based on the basis of milestone i.e activity based. As per the contract agreement payment is made on the basis of certain percentage as mention below.
    1st payment 5% of total order value (with out tax)
    2nd payment 10% of total order value  (with out tax)
    3rd payment 65% of total order value (Including tax 100 % )
    4th payment 20% of total order value (with out tax)
    Is there any standard or workaround functionality available in sap for vendor payment in project system ?
    Regards
    Soraj

    Thnx for reply
    As per our requirement payment is based on completion of work. can i use payment term on the basis of completion of work/activity not on due date basis?

Maybe you are looking for

  • Need a table with asset number and document number

    Hi to all experts. Im in a support project. There is an issue in the customized report the total expense for february is coming 10,322 dollars which is 322 dollars extra it should be 10,000 .but i see the table ANEP the value is 10,322 dollars,when i

  • Send collective invoice via (Single mail)email in pdf format

    Hi All, Please suggest me the solution option for the below requirement. The requirement is to send collective invoice to the customer via email in PDF format in a single email at the end of the day.ie they like to have a tool where they can enter th

  • IMAC 27 - attached a second monitor - mouse tracking problem

    After attaching a 19 inch lcd via the mini display port and a dvi adapter my mouse tracking has gone bad, not just from one screen to the other even just on the main screen if you move the mouse around it jumps several inches and is very inaccurate.

  • Define Object type(s) to transform relational tables to xml

    I have the Object type and query defined below and output. My problem is that I want to add an attribute to the CLM_MNGT_PROC_STEP_TYPE_NAME node in the XML. The samples I am using from OTN only show either an attribute or a nodevalue, not both. CREA

  • To read data from exel file into sap

    hi all, How to read data from exel file into the internal table in abap? Regards, sugeet.