Webforms with Microsoft Project

Hello,
Our requirement is, we need to open Microsoft Project with a link in webforms. The microsoft project (.mpp) file will be placed in a folder on the network drive. We are using Forms 6i running on UNIX environment and MS project 2002 professional edition.
If possible what libraries do I need to use within webforms?
I will be happy to provide more information if asked.
Thanks in advance,
Arun.

Arun,
you don't need to do antything in Forms. Just define a MIME type on the client browser to open MS Projects each time a file of type mpp gets downloaded. A similar MIME type needs to be defined on the server to determine the client application that should be launched.
Frank

Similar Messages

  • Is there any way to Integrate Sap b1 with microsoft project

    Hi,
    I would like to do add-on  Project Management.
    Before that I would like to get some idea from you experts
    Is there anyway  to integrate SAP B1 with Microsoft Project.
    I appreciate your help, and desperately need your help.
    Thanks in advance
    Regards
    Parthiban

    Hi,
    It all depends of what you want to accomplish, but both MS Project and SAP B1 have SDK's so yes, it's possible to integrate both the applications.
    MS Project SDK Documentation
    Regards,
    Vítor

  • Integration of cproject with microsoft project 2003

    dear all,
    i want to integrate cproject with microsoft project 2003.
    can u send me documents related this. what are settings required for this.
    my email id: <b>[email protected]</b>
    thanks
    amit

    Hi Amit,
    Can you share  DOCUMENT  with me
    my mail id [email protected]
    thanks
    sunil

  • Integrate cProjects with Microsoft Project server

    Dear all,
    Does anyone know how to integrate cProjects 4.0 with Microsoft Project server 2003 in details? Pls kindly help.
    Thanks and best regards
    Trung

    Hi Murali,
    Do you have any documents showing how to configure cProjects step by step to integrate with Microsoft Project server? Pls help.
    Hi Niranjan,
    Pls check your email.
    Thanks and best regards,
    Trung

  • Using Flex with Microsoft Project

    I am absolutely brand new to FLEX. What I saw on the Adobe
    site was a data chart that could be drilled down to expose
    additional layers of "contriburory detail" for the master graph.
    What I am wondering is if it is possible to do something
    similar using Micrsoft Project Data as the basis. MS Project will
    allow users to save the file as XML. So, all the data should be
    available in a form understandable to FLEX.
    Here's the tricky part (and I can add more detail if needed).
    Project will create a summary line (at some level of indentue) and
    show you a calculated %Complete such as 47%. So, level of indenture
    1 I have the major summary tasks of the project at various status
    of %Complete. I believe FLEX can make some type of bar or pie chart
    out of that for me. What I want to do is click on a "Level1"
    indenture and have it expose the Level2 indure that contributes to
    that 47%. Then drill on one of the Level2's to Level3 .... to Level
    "n".
    This needs to be accomplished in "stand alone" fashion so the
    ultimate user can launch a desktop application and tell the
    application the name of the Microsoft Project XML file. We will not
    be able to use Client/Server ... client side only with the file
    located either locally or at least on a network drive.
    Can this be done? Has anyone looked at a MS Project XML
    schema to see if there is sufficeint information available?
    OK, now the blunt truth. It ain't %Complete that I care
    about. What I care about is BCWS, BCWP, ACWP, %Complete, and a few
    other parameters. These are the "Earned Value Fields". If you do
    not know what they are, don't worry about it just now .... it is
    really all just time phased data.
    Can anyone give me some advice or an opinion? TIA.
    Jim

    Hi,
    Pls check out these links below for this info -
    Adobe Flex with RFC - 
    Binding Data through function module in adobe to display charts
    How to connect to SAP Database from a Adobe flex application?
    Adobe flex and Sap
    Adobe Flex within SAP NetWeaver Developer
    Regards
    Lekha

  • Lync with Microsoft Project 2013

    Hi,
    I have Microsoft Lync 2013 and Microsoft Project 2013.
    Can anyone send me the steps to integrate these two so that i can get the updates from the team members without leaving Microsoft Project?
    K.Gokulraj

    In addition to Ben his answer.
    The integration with Lync is not supported in Project Standard only in Pro & Web App:
    http://blogs.office.com/2012/10/19/project-and-lync-together-reducing-communication-barriers/
    https://technet.microsoft.com/en-us/library/ee683978.aspx
    - Dennis | Netherlands | Blog |
    Twitter

  • Integration with Microsoft project

    Hi
    I am trying to create a ECC project from MSP(using OPENPS). However one of the field in SAP is mandatory at project definition(ex Company code). But I cant see the same field in MSP hence system does not create any project and showing a message enter the Company Code.
    I created a column in microsoft project as "Company code" but it did'nt work. Please suggest how to create project in this case.
    Thanks & Regards
    Aby

    Hi,
    OPENPS can not handle different company codes. It takes company code mentioned in the project profile.
    You can try different project profiles for each company code.
    You can also make the company code field as input field and then make changes manually after uploading from OPENPS. Can make a BDC or LSMW for this also.
    Try MPS tool, but it is not free tool, it works on top of OPENPS so you still need OPENPS installed on your system but MPS gives many more options to work with; download its free version and test if it can fulfill your requirement.
    [http://www.mpshp.com/]
    Regards,
    Harsh.

  • How do mac users deal with Microsoft Projects

    What programs do Project Managers use insted of Microsoft Projects?

    iTaskX looks good. OpenProj is junk. I'm sure there are other tools as well.

  • Has anyone Connected a Crystal Report directly to a Microsoft Project file (MPP)?

    Post Author: Brian Morris
    CA Forum: Data Connectivity and SQL
    Iu2019m aware I can save Microsoft Project Files (MPP) to an Access Database, Excel document etc. and there are ways to connect to a Microsoft Project Server.
    I wanted to know if anyone has managed to connect directly to one though. Currently we use MPPs to report project status and other deliverables, and itu2019s been an annoyance to have to save the project file then export the data over into a new excel document when ever we have changes (since not all users have project or need all the data in the file).
    Preferably, a user should be able to save that project file and anyone that has the Crystal report should be able to run the report against the MPP file. In addition to this, it would be extremely helpful in getting a formalized and nicely formatted report when running reports against rational and MMP files, thus giving an alternative from SODA reports in Microsoft word, which doesnu2019t always work well.
    Thanks!

    Post Author: Brian Morris
    CA Forum: Data Connectivity and SQL
    Ok, I answered my own question on the connection issue, but I'm having issues with the predefined fields that enter into the report. The Database Expert shows the correct table names, but when I select them and look at the fields, they are all showing fields that are part of the "Project" table. when I use "Add Command" and use SQL to do a "Select * From TableName" ,where TableName is the name of the respective table, I get the data I'm looking for. Has anyone else run into this error? Is the error on Crystal Reports side or the Data provider's OLE DB driver? Has anyone with a fully patched system encountered the same errors?
    Current SetupCrystal Version: 11.0.0.1282CR Professional; Product Type:FullOLE DB Driver: Microsoft Project 10.0 OLE DB Provider
    I have pasted my findings below, hopefully other people won't have the same issues I did trying to find this information. if anyone else wants to test and see if they get the same issues I did it would be greatly appreciated.
    Connecting a Crystal Report XI to a Microsoft Project File (MPP)
    Prerequisites (as I know them)
    -          Have an installation of Crystal Reports on the machine (a given)
    -          Have Microsoft Project 2000/2003 installed OR  the Microsoft Project OLE DB provider which is installed with Microsoft Project (NOTE: Microsoft 2007 supposedly no longer supports OLE DB and requires an OLAP cube be made or a SOAP connection be used, which I donu2019t deal with personally)
    Creating the connection
    Start Crystal Reports
    Click u201CBlank Reportu201D on the start page
    in the u201CDatabase Expertu201D window, under u201CAvailable Data Sourcesu201D, Select u201C+u201D next to u201CCreate New Connectionu201D
    Select the u201C+u201D beside u201COLE DB(ADO)u201D
    If a u201COLE DB (ADO)u201D  window does not come up, double click u201CMake New Connectionu201D 
    In the u201Cprovider:u201D box Select the u201CMicrosoft Project 10.0 OLE DB Provideru201D
    The name may be different depending on the version of project you install and the patch you have on the machine
    Select u201CNext >u201D
    Under u201CDatabase:u201D copy/paste in the path and project file name
    I donu2019t believe the other fields u201CData Source:u201D, u201CUser ID:u201D, or u201CPasswordu201D need to be filled out, and in fact, I got an error when entering in data into them
    Example: u201CC:\Projects\Project Name\Current Schedule.mppu201D
    Select u201CNext >u201D
    In the Advaned information window, verify the project Name is the path of the project.
    I have not found the use of u201CEnterprise Modeu201D (default: 0), u201CAlways Loadu201D (default: 0), u201COLE DB Servicesu201D(default: -5), or u201CEnterprise RUID Listu201D (default: blank), removing them or changing them did cause errors though.
    Click u201CFinishu201D
    Adding in Tables and extracting data
    You now have a connection to the project File you listed. There is an issue Iu2019ve found though that all the tables you see listed are filling their fields in from the u201CProjectu201D Table, rather then their respective tables (Example: u201CAssignmentsu201D is pointing at u201CProjectu201D rather then the obvious connection u201CAssignmentsu201D). You can, however, use the u201CAdd Commandu201D and select the table you want with just a little SQL code:
    Select *
    From Assignments
    After creating the command, highlight it and hit u201CF2u201D. You should be able to edit the name and change it from u201CCommandu201D to something more meaningful. At the current time Iu2019m unsure if the issue with the default tables all pointing toward the project table is an error on the provider side or Crystal Reports end, and if one of the new patches will fix it. I will update this document accordingly when I have more information and do more testing. I will note however, there is no way to change which table these preset fields point to.
    Thank you for your time.

  • Microsoft Project Standard vs. Microsoft Project Professional

    Hey gang,
    I always thought that the difference between Standard and Professional could be summed up this way:
    One of them (Professional) permits you to connect to Microsoft® Project Server (particularly now in version 2013).
    However, in reading this: http://msdn.microsoft.com/en-us/library/cc750929.aspx
    It states: 
    " ... Microsoft Project Standard can be used stand-alone, or in combination with Microsoft Project Server for more advanced team collaboration..."
    Is this true/ correct?  Can Project Standalone 2013 connect to Project Server???
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hi Spiro, This article applied to 2002 version. I do not have enough experience with Project 2002 to confirm it, but at least since Project 2003, you do need MS Project Pro in order to create an account and connect to Project Server.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • How to integrate Microsoft project to Oracle Project Management?

    Dear All,
    How to integrate Microsoft project to Oracle Project Management?
    I tried to find Oracle Project button in Microsoft Project to send Project plan to oracle projects. But I didn’t not found any button like Oracle project to upload.
    Can anyone please let me know what the prerequisites to integrate and how to import the same data in oracle Project Management Module from Microsoft Project?

    Hi,
    Please see "Oracle Project Management User Guide", Chapter 5.
    Applications Releases 11i and 12
    http://www.oracle.com/technology/documentation/applications.html
    The following documents should be also helpful.
    Note: 277096.1 - **FAQ Integration with Microsoft Projects**
    Note: 236522.1 - Oracle Project Management Release & Installation Notes
    Note: 236585.1 - Oracle Project Management Documentation
    Note: 804746.1 - Is It Possible To Use Microsoft Projects Integration Without Oracle Project Management?
    Regards,
    Hussein

  • CRM and Microsoft Project Server Integration

    Hello,
    Can anyone explain what solutions are available that can help in integrating SAP CRM with Microsoft Project Server? Is there any documentation available on this? Thanks.

    Hello Roberto,
    E-Mail rerouting is possible with an Exchange server. We use an adress [email protected] provided from the Exchangeserver. The mail is then forwarded to [email protected] to be retrieved by our CRM System for further processing. Please ask your Exchange admin again. I think he has to get wome more information about configuration possibilities.
    Regards
    Gregor

  • Incorrect Duration while integrating MSP with Oracle Projects (OP)

    Please help with regard to the below mentioned issue:
    1. Created a WBS in MSP file. (Task T1.1 Duration = 5d in MSP)
    2. Created a project from MSP. The structure used is a partially shared structure.
    3. The duration received in OP is not the same as that in MSP. (Task T1.1 Duration = 7d in OP)
    4. Entered progress for the project in OP.
    5. Received the workplan (WBS) from OP into the same MSP file, the duration was neither 5d nor 7d but 1.67 d.(Task T1.1 Duration = 1.67d in MSP)
    The calendar used in MSP is a standard calendar 5 days * 8 hrs. Which calendar in OP is being used for calculating the duration? I've defined a schedule calendar that is attached to the project template in Additional Information. The schedule calendar is 6 days * 8 hrs.
    Regards,
    Sahoo
    Edited by: user12209290 on Jan 2, 2012 5:49 AM
    Edited by: user12209290 on Jan 2, 2012 5:49 AM

    The Scheduled Start and/or Finish dates in Oracle Projects are not used by MSP to schedule a project if task level Scheduling Options have been populated in Oracle Projects. Constraint Type/Date, Scheduled Duration and Slack fields are used to schedule the project in MSP, not the Scheduled Dates.
    To review the Scheduling Options for a task:-
    Projects: Delivery -> Search Projects [Find project and open it]
    Go to the Workplan tab
    Update the current working version of the workplan
    Update a task (using the pencil icon) in the workplan
    In the Task Details page, select the Schedule sub-tab
    Expand the Options section at the bottom of the page
    To sumamrise, if you schedule a project in MSP then you should continue to use MSP for all scheduling activity on that project. Updates to the scheduled dates in Oracle Projects will be ignored when the plan is downloaded to MSP. MSP will build the plan based on the following fields:-
    Constraint Type
    Constraint Date
    Free Slack
    Total Slack
    Task Type (Schedule task type, not to be confused with Oracle task type)
    Scheduled Duration (not to be confused with the difference between the Scheduled Start and Finish dates in Oracle Projects)
    Actual Duration
    Remaining Duration
    Effort Driven Flag
    Level Assignments Flag
    This is all not documented very well in the Oracle Projects manuals, and comes as a surprise to most users. Some useful additional reading can be found on MOS:-
    Integration with Microsoft Project, Volume 1: Best Practices [ID 987752.1]
    Integration with Microsoft Project, Volume 2: Implementation Recommendations for Project Process [ID 1166372.1]
    Integration with Microsoft Project, Volume 3: Implementation Tips for Project Structures [ID 1166396.1]
    Hope this helps,
    Andy.

  • HELP! Microsoft Project 2013 on windows RT with Lenovo Yoga 11

    Hello, I recently purchased a brand new Lenovo yoga 11. I tried downloading Microsoft Project 2013 via dreamspark, but I get stuck when I try to install secure download manager. It says "the app you are trying to run is not supported on this version of windows". What can I possibly do about this? Thanks.

    Dear Babi
    Welcome in Lenovo forums
    It seems that the version you are trying to install are not compatible with the installed windows (RT) , so please try to contact the service provider for ( Microsoft Project 2013 ) to get the applicable one
    Thanks
    Alaa
    Did someone help you today? Press the star on the left to thank them with a Kudo!
    If you find a post helpful and it answers your question, please mark it as an "Accepted Solution"! This will help the rest of the Community with similar issues identify the verified solution and benefit from it.
    Follow @LenovoForums on Twitter!

  • A project which specifies SQL Server 2012 as the target platform may experience compatibility issues with Microsoft Azure SQL Database.

    Hello
    When I try to publis my asp.net application in azure, i have the next error:
    >C:\Program Files (x86)\MSBuild\Microsoft\VisualStudio\v12.0\Web\Microsoft.Web.Publishing.targets(4253,5): Warning : A project which specifies SQL Server 2012 as the target platform may experience compatibility issues with Microsoft Azure SQL Database.
    >C:\Program Files (x86)\MSBuild\Microsoft\VisualStudio\v12.0\Web\Microsoft.Web.Publishing.targets(4253,5): Warning : The project and target databases have different collation settings. Deployment errors might occur.

    Hello
    When I try to publis my asp.net application in azure, i have the next error:
    >C:\Program Files (x86)\MSBuild\Microsoft\VisualStudio\v12.0\Web\Microsoft.Web.Publishing.targets(4253,5): Warning : A project which specifies SQL Server 2012 as the target platform may experience compatibility issues with Microsoft Azure SQL Database.
    >C:\Program Files (x86)\MSBuild\Microsoft\VisualStudio\v12.0\Web\Microsoft.Web.Publishing.targets(4253,5): Warning : The project and target databases have different collation settings. Deployment errors might occur.
    Hello,
    This forum is to discuss vb.net issues, your issue is mainly regarding Azure SQL Database, I found that you have posted another thread in that forum
    https://social.msdn.microsoft.com/Forums/azure/en-US/f435921a-14d1-4441-8b2b-32ba3d937aea/a-project-which-specifies-sql-server-2012-as-the-target-platform-may-experience-compatibility-issues?forum=ssdsgetstarted#f435921a-14d1-4441-8b2b-32ba3d937aea.
    I would recommend you focus on that thread to get help.
    Regards,
    Carl
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

Maybe you are looking for

  • Dbx check -access report wua when call vsnprintf

    I don't undertand WHY I would get this "Write to unallocated (wua)" error? I tried purify, purify does NOT report this error. #include <stdio.h> #include <stdarg.h> int write(char* buffer,const char* format, ...) va_list vlist; va_start(vlist,format)

  • Printing orientation in os 10.6.8 update

    I updated an iMac running Snow Leopard to the latest version: 10.6.8. Now whenever I try to print an email from Mail on letter size paper only the top part prints at the bottom of the page. I have tried uninstalling the Accelawriter 4N printer and re

  • MRNB - FI/CO interface: Balance in transaction currency

    Hi We have recently upgraded support package level 0010 (Highest Imported Support Package SAPKH60610). After this upgradation we are getting " FI/CO interface: Balance in transaction currency" while processing revaluation with LIV in Tcode MRNB. We h

  • Upgrading Mac OSX 10.3.9 to Panther w/o Tiger

    My operating systems is now having problems downloading upgrades to Mozilla, flashplayer, etc due to it being out of date. The Apple Store does not sell Tiger any more how do I upgrade w/o buying Tiger or how do I get my hands on a copy of Tiger.

  • Apple Configurator error on launch "Please reinstall iTunes (Error -42110)"

    I'm running OS X 10.8.5 and iTunes 11.1.1 I had Apple Configurator 1.4 working for a while, but one day opened it up and it's coming up with this same error: "Please reinstall iTunes (Error: -42110)" I've deleted iTunes.app from the the Applications