Credit Cost center in a Costing sheet

Hi,
In the costing sheet i have to credit the Overheads to a cost center. Are there any guidelines for doing the same.
What effect does it has on while reporting for the cost center. Can someone explain me the purpose of this 'Credit' Cost center option in a costing sheet.
Thanks in Advance,
Safi

Hi,
In case of Indirect production cost centers,
We get the debits directly from FI through Primary cost elements and through allocations (distribution or Assessment).
These costs need to be Absorbed to Product through Product costing or service orders or projects through Overheads
This absorption will result in:
Manufacturing Order/Service Order/Project etc  is debited and
Cost Center is Credited.
at the end of every month there will be debits and credits in the Cost center.
The difference between the Debits and Credits would results in Cost Center variances.  These variances will be settled to COPA periodically thereby making Cost Centers a Zero Balance
Effect on Reports:
Though There is Zero balance in the Cost Centers, this will not have any begetive bearing or the reporting.
Because, Cost Reports for analysis of the expenses would be based on Primary Cost Elements (Verification of costs by Origin of the costs) and Varainces between planned and actual comparison also can be done
Hope this will solve your query.
Please award points suitably
Best Regards
Surya

Similar Messages

  • Cost Center in the costing sheet

    Hello All,
    We have set up the costing sheet with the material overhead flowing to a cost center 99XX through cost element 8XXXXX (in the "credit" view of the costing sheet) for all production orders. Now, there is a requirement whereby the material overhead for production orders of a certain division need to be allocated to another cost center 91XX.
    Please let me know if this is feasible and if yes, how this can be done?
    Thanks,
    Rugmani

    Hi Rajan
    What is the basis of overhead absorption? I mean is it a % of some cost or Quantity based?
    Different credits for same secondary cost ele is possible only by way of origin group.... And origin group is applicable to the input components in a BOM and not the Output (Header) material
    A. So, if your overhead absorption is based on input materials and if these input materials are specific only to one Division/ Header material, you can achieve what you want with the std SAP functinality. But, normally in a prod scenario, this is not the case... One input material can be used across multiple divisions...
    B. If this is not your case, then may be you need to consider CO substitution using a user exit or the relevant exit/BAPI called during CO43
    C. Another option is to post the credit to one cost center and then do KB11N to transfer it to relevant cost center.... Info required to do this can be easily made available Like this
    1. Double click on the credit line items in a cost center report (S_ALR_87013611) and choose to display actual line items
    2. Plug in the partner object using change layout option
    3. partner object will show you the Prod Order No... From prod order no, you can get the material and the division....
    you can develop an ABAP report to give you this info...
    Regards
    Ajay M

  • MSS different cost center by approved time sheet

    Hello,
    In Table CATSDB seen we the results from time entry. The fields Send cost center and receiver cost center. An employee has an standard costcenter as masterdata. When this person works a couple of hours on a cost center that differs from his standard (master data), he giving in the cost center were he works on. Every thing is ok in ESS.
    In MSS in the team viewer this person belongs to a team. Bij the approval of time sheets he displays standard (master data) and the u2018differentu2019 cost center. This situation we want to avoid. The u2018differentu2019 cost center is somebody else his responsilibility.
    I try something with Cost center responsility. Can someone help me?
    Thank you

    Dear Dilek Ersoz 
                    I have the same requirement where i have to default the Sending cost center and Actiivty type from infotype 315  in the CAT2 sending cost center and activity , but in the cats profile defaults section i have kept the Cost Center and acitivyt type checboxes being checked , still iam not getting the values of the 0315, please could you let me know how to default the values in cat2.
    regards
    sai.

  • Cost Center Report with Cost Element wise Subtotal

    Hi All,
    We have a requirement where customer wants a Cost Center report with Cost Element wise Subtotal and selection options required are Company Code, Cost Center, Cost Element.
    KSB1 solves the requirement, but when executed for 2 or more company codes it is taking 3 to 4 hours.
    The other alternative report we tried is S_ALR_87013611- Actual/Plan but this report gives debit and credit values in seperate columns.
    Please let me know if we can copy the report S_ALR_87013611 and change it using report writer to have the output by Cost Element wise total.
    Also please let me how we can increse the speed of KSB1 report.
    Thanks
    Satish

    for KSB1 Report the following is my suggestion
    1. Please go to the selection criteria for the cost elements and de select the secondary cost elements in the the exclude range and try running the report this is generate the report faster.
    2. also check the date range please give the date range for 3 t months and if you want to run for multiple company codes. if you want to execute it for longer periods say 9 months or 6 months generate the report in 2 to 3 installments and download them to your excel and consilidate them in excel for your analysis
    Best Regards,

  • Transaction data from one cost center to another cost center

    Hi All
    Can any one tel me how to move the Transaction data from one cost center to another cost center .
    My scenario is basically : Users posted for  company code 1003 for Cost center S00570 for the period 01.04.2007  to 30.11.2007 but it has to go to company code 1000  instead of 1003  for the same Cost center .S00570 .
    What we have done is that we have changed the cost center from 01.12.2007 on words to the correct company code 1000 and now all postings are going to the right company code ie
    to company code 1000.
    Now the problem is how to bring back the old historical data posted  from 01.04.2007 to 30.11.2007  to wrong company code the 1003 to correct company code  1000 .
    Is there a way to bring back the historical data which has posted to wrong company code .
    Thanks in Advance .
    Any help highly appreciated and points are assigned .
    Cheers
    Ravindra.

    Ravindra
    Once you have changed the company code in the master data, then the entries with respect to the different company code cannot be transferred. Please follow the process below and let me know if it works.
    1. Revert the cost center master data to the original company code.
    2. Repost the line items from this cost center to another cost center. Use tcode KB61. The cost center you will be reposting will be a routing cost center (say XXXXX).
    3. Once all the line items have been reposted, change the master data of the cost center to the correct company code.
    4. Again repost the costs from the routing cost center(XXXXX) to the correct cost center. You should have all the line items to the correct cost center now.
    For more on reposting refer the link below:
    http://help.sap.com/SAPHELP_470/Helpdata/EN/27/c98a46db7011d1a5400060086e9494/frameset.htm
    Let me know if it worked.
    Karthik Coneru

  • Cost Center and res cost center

    Hi team,
    When i am going to settle the cost of PM Order , COst center pick from Equipment sonly. Then what is the use of assignemnt of cost center in work center.
    thanx in advance

    Hi,
    How do I call you? SAPPM is not appropriate!...
    You are attaching one cost center to your work center that supplies required resources (activity types) to perform the maintenance - in IR01. That cost center is to maintain the rate of the resource (Activity types) ie. Rs.500 / Hr or day - in KP26.
    Whenever you are utilizing a resource from a work center, system refers the cost center / activity type combination to determine the cost. Based on no. of hours or days utilization, the planned cost / actual cost are determined from the Wctr, Cctr, Acttypes.
    These are so called Source of cost center.
    After completing the order, the cost incurred are with the maint. order. Now we need to settle to a cost object, it may be a cost center / WBS / Contract / PSEG etc.. depends on your business requirement. You may use a cost center as a Cost receiver / cost object to observe your maintenance cost of an Equipment / Func loc / or its group.
    As a whole, the work center / cost center is used to determine the cost (Source). Equipment cost center observe the cost of maintenance(receiver).
    Hope this description gives required clarification . If not, Revert back.
    Babu

  • Functional areas vs. cost center groups for cost of goods sales

    What are the benefits of using functional areas over cost center groups when building your p&l for cost absorbtion or visa versa?  Which of the two is recommended?

    Hi,
    1: a P&L statement does not only contain cost-center related postings, you can have different CO-objects (Internal order, WBS-Element,...)but all of them contain the functional area in its master record.
    The P&L reporting structure (created via report painter) can use account groups but restricted to one functional area for porper P&L structure creation.
    Best regards, Christian

  • Deriving cost center from primary cost elements

    Hello CO Experts,
    For few types of cost,  we want to derive a cost centre when we enter a particular GL account in financial posting.
    Does anyone know if there is a way to link a primary cost element to more than one cost centre?
    The CE master data has only one cost centre field in the default acc assignment tab.
    I have two possibilities:
    - enhance the master data by additional fields eg. cost center group
    - is there some sort of derivation for primary cost element / cost centre?
    NOTE: We are not using activity types and are talking only of primary cost elements.
    Thanks in advance
    Best regards, Deb

    Hi,
    you could realize it via a substitution OKC9.
    Regards,
    Greta

  • Assign the desired activity type to cost center 1102 within cost center acc

    Dear all,
    I am facing the problem mentioned as subject during entering the activity type.
    please guide me to overcome this problem.
    rgds,
    Vijay Mankar

    Hi Vijay,
    The problem is as expected by me it is due to assignment and acitivty price details missing. This needs to be created in KP26.
    Once you enter txn KP26 you need to type active version generally "0", then enter period 1 to 12, Fiscal Year "2007" and populate field "Cost Center" and "Activity type" now use "F5".
    In the overview screen populate the value "Fixed Price" and "Variable Price" and save the transaction. (We are entering price for individual period but same across all period)
    Now try creating Workcenter and assigning the Cost Center and Activity type. It should work.
    Reward your points,
    Regards,
    Prasobh

  • How can I make a Splitting in Cost center accounting by Cost elements?

    Hi experts:
    I have defined a splitting structure and I would like to split the cost bettew fixed and variables cost.
    To to that I have defined two different assignments and in the selection for each assignment  I have completed the "Field label" with:
    In the first assigment I would like to have only the "fixed cost" and I did the next:
    1. Cost element (I have entered a Group) the cost which is in this cost element group is 4.000.0000 euros
    2.- Activity type (I have entered a Individual value)
    In the second assignment I did the same but with a different Cost element group (the original amount was 6.000.000 euros
    The problem is that when I have executed the transaction to do the split, the system split the 50% of the total cost (10.000.000 euros)  to each assignment.
    How can I make if I want that the system split the cost based only in the "cost element group" which are defined one of them for the "Fixed cost" and the another one for "Variable cost"??
    Are there any method which can split a total Cost for a Cost center based only in the cost amount for a cost element group??
    Thanks a regards!!
    Manuel

    sry. im not from the united states, and I never think to spell when posting on forums
    Your site's customers will think of it, and they will regard such errors as the mark of a sloppy vendor, not a sloppy webmaster.  And I'm not sure what being from the US has to do with anything.
    I want to position the container in the center while having absolute positioning, is that possible?
    I have doubts, I've seen a lot of people saying that u can't center a container with aboslute position.
    Then you should remove those people from your circle of trust.  Of course it's possible.
    Make the container relatively positioned, and centering with an explicit width and auto left/right margins.  The inner absolutely positioned elements will center along with their positioned ancestor.

  • Allocation of cost from service cost center  to production cost center

    Dear sir ,
    Will I use to distribute the cost from service department to production department  and that cost centers also using for activity planing will get currect result in product costing ?

    Hello,
    Can you clarify what you want to do ?
    Allocation of cost from service cost centers to production cost centers can be done with the help of Assessment / Distribution cycles and you can do a activity planning using the same costs as well. The steps for activity planning would be as under:
    1. Create primary cost planning in the service and production cost centers (KP06)
    2. Create activity planning in the production cost centers (KP26) without any rate
    3. Run assessment / distribution cycles to transfer cost from the service cost centers to production cost centers (KSUB / KSVB), in case you are not transferring based on activity quantity then also do SKF planning in KP46
    4. Run plan cost splitting in case you have more then one activity type (do config for splitting structure beforehand) (KSS4)
    5.  Calculate Plan price for the production cost center activity types (KSPI)
    BR // SG

  • How to get cost center group from cost center

    Hello
    I have cost center and i need to get the cost center group.
    Anyone having an idea how to get it???
    Thanks
    Parvez

    Hi,
    Cost centre could be assigned to different cost centre groups. For standard hierarchy, you can retrieve it from CSKS table, but for other groups SETLEAF table (class 0101) will provide you a complete answer.
    Regards,
    Eli

  • Cost Center Assessment to Cost Hierarchy based on Actual Consumption error

    Assessment is set up:
    SENDER:   Cost Center: Overhead Expenses (values in expense accounts)
    RECEIVER:  Top Node of Cost Object Hierarchy  (material consumption has been posted to two objects - related account has value and quantity fields)
    Segment is set up:
    Sender Rules: Posted Amounts
    Share:100%
    Actual value origin
    Receiving tracing factor:
    Receiver rule: Variable Portions
    Var. portion type: Actual Consumption
    No Scaling
    Assumption is that "Var. portion type: Actual Consumptions" means the quantity in the consumption account on the receiver from the inventory posting.     Is this true?
    Edited by: Chris Gibson on Apr 13, 2010 11:56 PM

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Change to cost center in time dependent data. Can I rerun depreciation YTD?

    I need to change the cost center in October (Period 10) Period 9 and prior are already closed.  I thought that since I put the Interval for the new cost center as 1/1/11 that it might do and adjustment in October reversing the depreciation posted for the old cost center and put the YTD depreciation in the new cost center, but it did not.  it only posted the current month depreciation to the new cost center.  Is there any way to do this?  Thank you very much.

    Hi.  Thanks for your reply.  I went into the ABAA screen, but I am afraid to process this transaction because I do not understand what is going to happen.  I cannot find any documentation that explains this.  I have already changed the cost center on the asset and run depreciation.  It posted the current month depreciation to the new cost center, but it did not make a correction to the prior periods.  I am not creating a new asset, i just want to reclass the prior months depreciation (in the current year) to the new cost center.  In case it will help I provide some details:
    Asset acquired 5/1/11 Depreciation posted to Cost Center A From May - Sept $1,796.06 per month x 5 = $8,980.30
    Before posting Oct depreciation, I went to Master Data - Time Dependent - and changed the cost center as of 1/1/11. So I now have two intervals: From 1/1/1900-Cost Center A, and From 1/1/11 - Cost Center B. I then ran the regular depreciation for Oct. It posted Oct Depreciation of $1,796.06 to the new Cost Center-Cost Center B.  My total YTD depreciation is now $10,776.36, but it is split between two cost centers.  I need to move the depreciation from Cost Center A to Cost Center B for the prior months.  If it was a Journal Entry, I would do it as follows in the month of October, so my YTD numbers would be correct.
    Debit Depreciation Cost Center B   $8,980.30
    Credit Depreciation Cost Center A $8,980.30
    Then when I run my October numbers it would show zero depreciation in Cost Center A Year To Date (and negative 8,980.30 in month of October)
    If i follow the steps you propose, what would be the result?  Thanks so much!

Maybe you are looking for

  • Return order in free Goods

    Dear Friends, Got a situation, where I created a sales order using Free goods (Inclusive) Concept. For every 10 goods you get 2 free ( 8+2). Delivery and billing is done. Customer returned the entire order. Then while creating return sales order with

  • What are the major responsibilites of abaper in implementation?

    Hi gurus,              tell me abapers full role in implementation. Thanks in advance...

  • Problem with Small Caps

    I have a problem with small caps when using Times New Roman and Helvetica, but not when using Adobe Garamond Pro, and would like to find out why. I generate the small caps within InDesign by the "TT" box in the Control Window. Adobe Garamond comes up

  • Mail crashes with ics-import using iOS8.1

    Mail crashes with import of ics sent by MS Outlook 2007. Didn't happen with my iPhone 5 before updating to iOS8.1. New bug in iOS8.1?

  • My airport is active but cannot be found by my MAC devices?

    Hi there, I have the following issue. My airport express is active and found by my router. It also shows a green light. Unfortunately all of my MAC devices can't find it. The airport config utility indicates that the airport device can't be found. Is