Project Server 2010 SP2 - Use with IE11, Firefox and Safari

More groups in my company are being onboarded to start reporting time and managing projects out of Project Server /PWA 2010.  We found that one of the groups have MACs and use either Safari or Firefox.  There are some members of that
same team who are using an HP machine but are using IE 11. 
From what I am reading and what I am seeing it appears that with Firefox and Safari you cannot access Manage Timesheets or Project Center.  Has anyone found a work-around for this?
The work-around we are using for IE11 is to add Project Serrver to the Compatability View.  Does anyone know of a problem with this approach?
Thank you

Look into using the 'IE tab' for Chrome/Firefox as a work-around. I had a similar scenario with Mac users and installed IE tab in their Chrome/Firefox browsers for them and worked pretty good for the most part. Hope this helps.

Similar Messages

  • Project Server 2010 SP2 Timesheet Errors

    Hi,
    We use Project Server 2010, SP2 in SEM mode. Users use IE9. Some of our users complaining that while entering timesheet, sometimes "h" for hours is auto populated next to the hours entered in the cell... and sometimes dont appear and then timesheet
    freezes. Anyone have any suggestions when would this happen and any resolutions?
    And some users also get the following error...
    An error occurred when communicating with the server. Check connectivity with your administrator to determine whether further action is necessary", then attempt to approve TimeSheet"
    Please suggest.
    Kishore Dodda

    Let us know what turns up. It certainly looks like you are losing connectivity. The other possibility is that your databases are in need of attention. Ask your SQL DBAs whether they are following best practices for Database management and have a SQL maintenance
    plan running on the Project Server databases.
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • Do I *really* need a Service Connection Point in AD to complete a Project Server 2010 SP2 installation?

    Hi all,
    I have installed Project Server 2010 SP2 and run psconfig.exe
    PSCONFIG is failing because it cannot set up a Service Connection Point in AD. I've checked in AD and the contains 'Microsoft SharePoint Products' does not exist. All the resolutions I can find suggest adding the container into AD.
    The issue I have is that I have no control of the AD, and adding containers will take lengthily negotiation.
    Is there any way of completing the installation and getting my site back without adding the container into AD?
    Thanks in advance.

    other solutions
    1) check timer service see if it is running
    http://www.jonthenerd.com/2011/06/30/sharepoint-2010-sp1-upgrade-error-unable-to-create-a-service-connection-point-in-the-current-active-directory-domain/
    2) check UAC (and the rest of the technet answers - some are listed below)
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    3) My workaround:I
    run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent -install -cmd installfeatures“  in
    the “Bin” Folder as an administrator console session.In the moment I saw the staus “Configurationtask 5 of 6 is executed”
    I start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a parallel administrator console session and after that the configuration task finished successfully.
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    4) Try running the psconfig.exe command a second time
    5) had the same issue and called Microsoft support.  Here is the fix:
    Stop the "SharePoint 2010 Timer" service
    Delete ONLY the xml files from C:\ProgramData\Microsoft\SharePoint\Config\216f8013-b78b-4e5b-8631-3a5f4c7277e8
    Note: Do NOT delete the cache.ini file in this folder
    Edit cache.ini and change to "1"
    Start "SharePoint
    2010 Timer" service
    Run psconfig again:  PSConfig.exe -cmd upgrade -inplace b2b -wait -force
    6) Initially I tried http://support.microsoft.com/kb/2009272 but
    it did not help (I re-implemented later).
    I re-registered the DLL’s as perhttp://social.technet.microsoft.com/Forums/da/winservergen/thread/b4bd0deb-45d0-4661-8c50-a2b45db41103 from
    NareshD.  I do not believe this is necessary unless there is a corruption in the system but I am noting here just
    in case.
    I tried to run The PSConfig but it was failing:  I
    had to do the following in order to make it finish successfully:
    (from same page at http://social.technet.microsoft.com/Forums/en-US/smallbusinessserver/thread/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/)
    On the migrated SBS2011 PSCDiagnostic Log I found no entry to detect or start the services SPWriterServiceInstance and SPTimerServiceInstance.
    I run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent
    -install -cmd installfeatures“ in the “Bin” Folder as an administrator console session.
    In
    the moment I saw the status “Configuration task 5 of 6 is executed” I
    start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a
    parallel administrator console session and after that, the configuration task finished successfully.  (I
    just opened another cmd window and copy/paste the sequence below when I saw the status “Configuration Task x of y” on the screen:
    net start SPTraceV4 
    net start SPWriterV4 
    net start SPAdminV4 
    net start SPSearch4 
    net start SPTimerV4
    -Note SPSearch4 is disabled in our system…
    Very awkward but it worked…
    I implemented http://support.microsoft.com/kb/2009272 again.
    Backup started working with no errors.

  • HELP! My old mac was requested to upgrade Firefox to 14.0.1. After the sucessfully installation, I received a message saying my old Mac couldn't use the new Firefox and Safari crashes. I have NO browser now!!!

    My old mac was requested to upgrade Firefox to 14.0.1. After the sucessfully installation, I received a message saying my old Mac couldn't use the new Firefox and Safari crashes. I have NO browser now! Any help would be appreciated.

    Hmmm...  So you upgraded Firefox and now neither Firefox or Safari will work?  Very weird.  I have no idea what might have gone wrong.  That said, when things start acting wierd, I always try a bit of maintenance first.  About 95% of the time, I luck out and it works.
    I use the free program Onyx.  I run all the clean up routines.  Then I boot to the recovery partition (Lion) or the OS X Install Disc and repair permissions and verify/repair the hard disk.
    Hope this helps.

  • Add Bulk Users to Project Server 2010 site using a Script

    I have 100 users that I need to add to a Project Server 2010 site. Add these through server settings would take a week to do. Is there a way to add users in bulk like with a script or something that can pull from an CSV
    Thank you for your help!

    Hi,
    I am not sure if I got your question?
    If you want to add these users to a site of a specific project, just add them as team members to this project. This will provide read access to them. If you assign them to a task within this project, they will alos get write access in this site.
    If you want to add this users as Project Server resources and users and just have a list of them, you can use copy/paste. Go to Resource Center and click on Open. Project client will start with checked out Enterprise Resources. Add columns Windows User Account,
    Email Address, and all other fields you want to fill. Make sure that the columns and the sequence of columns does match the columns in your file. Use copy/paste to insert all users into Project. Save and Close. Use Option Bulk Edit, if you want to define
    eg Timesheet Manager. As a last step go to Server Settings - Manage Groups and add them to the appropriate groups.
    Does this answer your question?
    Barbara

  • Updating custom fields in project server 2010/2013 using psi

    Hi,
    I have two custom fields . Lets call them A and B.
    A has some content. Now i want B to have the same content as A . B is a formula custom field wher b=[A] .
    now b is empty data and A has data.
    how do i get column in B be populated.
    i tried manual publish. IT worked but i have several projects.so iam looking for a script to do bulk publish so that data in B can be populated with data in A
    a) i checked out project (CheckOutProject)
    b) published project (QueuePublish())
    c) checked in project (QueueCheckInProject())
    however i donot get the value of A reflected in B using. Am i doing something wrong?
    Pls help.Any pointers towards a script would behighly appreciated.
    i am using project server 2010
    Thanks
    Su

    Hello,
    You probably want to use Project Pro to do the publish so the calculation happens and updates field B. For bulk publish using project pro use VBA to automate project pro to open each project then do save and publish etc.
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS |
    MVP | Downloads

  • How to : Configure Project Server 2010 to work with Exchange Server 2013

    Hi everybody. I have a problem. I did integration success project server 2010 with exchange server 2010. But now my customer use exchange server 2013. So my question is "Have a way to integration project server 2010 with exchange server 2013 ?"

    I haven't seen any document with Project 2010 and Exchange 2013. You could still try the old document with Project 2010 and Exchange 2010.
    http://technet.microsoft.com/en-us/library/ff468700(v=office.14).aspx
    It might just work.
    Thanks Gaurav Wason MCITP, PMP

  • Project Server 2010 failover environment with Database SQL Mirroring

     
    Hello,
    We have prod and failover environment. Failover environment created by using farm backup and restore of prod.
    my question is : Can we do SQL Mirroring (from prod to failover) of 5 databases (4 PS databases and content db) to keep both the environment in sync. Will this process work in the case of Project
    Server 2010. i am in doubt due to timestamp and GUID in config DB.
    Also will this process is supportable.
    Any help much appreciated.
    Thanks

    Hello MOhit2020,
    I haven't done this type of failover, but I think you would need to setup all your SharePoint  and project databases to use a SQL Alias to point to your production databases.  When and if your production databases failed, you would update
    your SQL Alias to point to the mirror location.
    The other nice feature about having SQL Alias setup in SharePoint, is that in the future, if you switch to another SQL Server, the SQL alias makes it easier to handle.
    Cheers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Project server 2010. Troubles with resource availability

    A problem occurred while checking resource usage using PWA. 
    Using the PS 2010 
    the total number of projects about 2000, about 1600 resources (for 5 years) 
    We have a project - project1 and resource involved in it - res1 
    In the project, each week for the resource specified work (20 - 30 hours), the project is saved and published. (When publishing a project there are no errors.) 
    In MS Project and PWA in Project center values ​ per weeks are the same. Go to the resource center, choose res1 and check its work in resource availability and see that for some weeks value of work is 0, at some 1.75. some 0.462 etc. 
    For other projects work of this resource displayed normally. Moreover, for all other resources is displayed correctly in this project. 
    When re-saving project data and republishing it the situation is same. 
    This issue takes place to be for some other projects. 
    questions: 
    1 - what database of PS take the data for plotting in resource availability? 
    2 - than similar behavior can be caused? 
    3 - how possible to solve this problem? 
    Thanks for help!

    Hi,
    The resource availability in PWA-resource center is based on the Published DB data.
    In order to trouble shoot, can you check in the data grid under the resource availability graph the capacity of the resource? Indeed the availability is calculated based on work versus capacity. The capacity might vary with calendar exceptions (holidays)
    and non-working administrative time in the resource timesheet. I'd suggest that you check in detail the periods where you have this unexpected behavior and see the resource calendar and timesheets.
    Also what you can do is to open a blank project plan (be sure to check the option "load summary resources assignments when starting MS Project Pro), insert the resource, go to the resource usage and add the remaining availability and work availability.
    Then you could confirm if the data are correct or not.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • What is wrong with my Firefox and Safari?

    Hi all,
    Since one of the recent software updates (Nov/Dec time) my Firefox has been left pretty useless as it takes AGES to load and then AGES to display a web site.. Anyone else having this issue??
    Also, Safari is generally pretty good but is crap with hotmail most of the time. I can't reach my inbox unless I reset the cache each time.. Highly annoying... But bearable... It's the Firefox issue that is bugging me the most.

    I think it might be my 'Firebug' web developer plugin that is causing the Firefox issue - when I disable it things run slighlty better. Still takes ages to load initially, though...

  • Function works in MS Project Pro 2010, but not in MS Project Server 2010

    I have an custom enterprise text field in Project Server 2010 that uses the "Instr" function and it works fine.  I created a local custom text field in MS Project Pro 2010 that was similar, but uses the "InstrRev" function and
    it works fine.  I then go to project server 2010 and try to create a custom enterprise text field using the "InstrRev" function and I get a message that says, "This formula contains errors.  Correct the formula and try again." 
    It's the exact same formula that I tried in project pro - copied and pasted.  Why is that?  Does Project Pro allow for a wider range of VBA functions in local custom fields than Project Server does when creating enterprise custom fields? 
    Is there some way around this? 
    Thanks,
    Joe

    Hi Joe,
    There is a way around it.
    Logon to MS Project Professional.
    Creat that field there
    Add Field to Enterprise while in MS Project.
    It has just worked for me.
    Please let me know if it worked for you.
    Best Regards,
    Alex

  • Setting Up Earned Value Reporting in Project Server 2010, Using Hours Not Dollars

    Hello All,
    Are there instructions for setting up Project Server 2010 for Earned Value data capture and reporting?  I'm not certain that we are capturing the correct data to report EVM (i.e., Physical % Complete), and I was unable to find any videos on YouTube.
    Also, I noticed that Project Server 2010 defaults to reporting EV in Dollars.  Can we set it up to report in Hours instead?
    Julie  

    Hi Julie,
    If you allow to jump in to complement Dale's excellent reply and comment some of your concern...
    5. The status date is a fundamental parameter while talking about the EVM (it is ANYWAY a key setting for tracking projects with MS Project). The EV field will take into account actuals up to this date. Meaning that if your project plans have been updated
    by the PM on tuesday and you are running the analysis on friday, you set the status date to tuesday and the uncomplete work between tuesday and friday will not be considered as late work since you are running the analysis as of tuesday. The status date can
    be set from the "project" tab either in the project information dialog box or directly in the project tab, status group.
    6. MS Project proposes 3 EVM tables by default. A table is a predefined set of column which composes a view, together with a Gantt chart or a timephased grid. If you go to the view tab, click on "tables" then "more tables",
    you will find EV, EV cost indicators and EV Schedule indicators tables which will display the out of the box EVM fields calculated by MS Project based on the costs, actuals, Baseline, status date.
    Then about the cumulative data, you might be refering to S-curves which are a representation allowing you showing the cumulative values of the EV. To do that, you'll have severals ways:
    Use the cumulative calculated field in the visuals reports
    Create
    Dashboards from the report tab using the cumulative data (actual, Baseline, cost)
    Create
    MDX mesures in the OLAP cubes for cumulative data and create excel reports
    Develop custom SSRS reports
    Buy a 3rd-party addon
    Finally please let me give you an excellent reference for the EVM in MS Project with EPM Central blog articles:
    http://www.epmcentral.com/msproject/evintro.php
    http://www.epmcentral.com/msproject/evprereq.php
    http://www.epmcentral.com/msproject/evterms.php
    http://www.epmcentral.com/msproject/evexplain.php
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project Server 2010 Active Directory Synchronization - duplicate Windows Name - Event ID 7734

    Environment: SharePoint Server 2010, Project Server 2010, SP2, DEC 2013 CU (Farm Build number: 14.0.7113.5001)
    Scenario: 
    Domain user has been added to the Active Directory group being synchronized with Project Server for the Team Members group.
    That user has participated as a team member in numerous projects, added documents, been assigned tasks, typical project stuff...
    Employee quits.
    AD account is deleted. (NOT deactivated or moved into another OU)
    Time passes...
    Employee gets rehired.  NEW AD account is set up: same display name, SamAccountName, email address, different GUID of course.
    Daily Active Directory job runs again and throws event ID 7734 and the sync ends with a partial fail.
    I understand why this is happening.  Solutions I've found point me to deleting the Enterprise Object resource in Project Server and then rerunning the sync.  Sure, this works BUT won't all of the previous documents, tasks,
    etc. be disassociated from that user?  If so, this is not ideal.
    2 questions:
    Is there a better way to deal with the fixing of the resource in Project Server to somehow link the old resource to the new resource allowing the sync to run successfully while still leaving the association to all old content intact?
    How are other organizations dealing with rehires when they have been added as resources in Project Server?  What is the best practice guidance from Microsoft on this?  Are other companies not actually deleting AD accounts when users leave organizations
    or are they putting them into a "ARCHIVE" OU or something like that? This happens at least half a dozen times a year at my company. We would like to keep our AD as clean as possible, but this appears to change our approach.
    Any suggestion/guidance is appreciated.

    For the question to relink the new account to the account which is already available in Project Server. You will have to update the WRES_AD_GUID to Null for the the Resource in MSP_RESOURCES table in the published database.
    Whenever a users gets synchronized to the PWA his ADGUID, SAMAccountName, Display Name, Email Address and DepartmentName is Synchronized from AD to Project Server. When the user was deleted and recreated the ADGUID got changed. During the next sync, project
    found the user with similar properties but different ADGUID which was updated in WRES_AD_GUID column in MSP_RESOURCES table. Hence it says that there is a duplicate account in the table with the same properties but a different ADGUID
    Nullifying the WRES_AD_GUID column value in MSP_RESOURCES table should get the user synchronized to Project server in the next sync.
    Cheers! Happy troubleshooting !!! Dinesh S. Rai - MSFT Enterprise Project Management Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you. This can be beneficial to other community members reading
    the thread.

  • Project Server 2010 - Import Project Wizard - Local Resource Import Error

    Using Project Server 2010 SP2 with admin rights when I encountered the following error:
    Steps:
    Upon importing a local mpp file with Import Projects Wizard
    Mapped Resources.  Some were mapped to enterprise resources and others were left as local.
    Following completion of import process (mapped task fields, and save), the resources that were marked as "keep as local" were imported to the server as enterprise resources.
    I have never encountered this issue with previous versions of project server and am wondering if anyone else has run into the same issue and if there is a patch?  The error is consistently repeatable and I will check utilizing the account
    of someone without admin rights to see if it happens there as well. 
    It appears that in proceeding to validation step, the import field is automatically defaulted to Yes when proceeding to step 2.  If the user doesn't manually flag this back to No, then the resource is imported to project server.

    Hi Luis,
    I just ran a quick test and I couldn't reproduce your issue with PS2010 SP2. My local resources have been kept as local resources after the import process whereas the resources with a similar name than enterprise resources have been mapped with enterprise
    resources.
    Not sure which CU I have but I'd suggest you to upgrade to the
    latest CU.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

Maybe you are looking for

  • Adobe Bridge CC -- ongoing problems with Photo Downloader (scrolling, crashing, etc)

    Hello Community, Thanks in advance for any suggestions to improve my Bridge CC experience! I have recurring problems, esp. when using the Photo Downloader (in other words, daily problems) -- scrolling either up or down to select photos is a nightmare

  • Anticipated battery life

    I guess it has not been out that long to have a practical assessment but what is the anticipated battery life of the iPad with normal average 2-3 hour everyday use (browsing, emails,games,etc.)? What is the battery replacement procedure?

  • Swapping A Hardrive For SSD?

    Am looking to buy a Samsung 850 pro SSD. What is the procedure for swapping all my data/drivers etc from the old drive to a new SSD? Is there a sticky somewhere?...will there be any issue with the Windows 7 licence key?

  • Creating Threads : New thread doesn't run( )

    Hello ! Can anyone please check the error in this code. It does not start the new thread. God bless you. NADEEM. // Create a second thread class NewThread implements Runnable {   Thread t ;   NewThread() {   try {    t = new Thread(this.t , "New Thre

  • Update failure, Photoshop Elements 9

    I have been trying for several days to update PSE 9, continually getting error message " Some updates failed to install". and "...error downloading.... Please quit and try again later." same message for both PSE 9.0.3 and Camera Raw 6.5. Help/suggest