5 steps of sap implementation

Hi Gurus,
Could you tell me the 5 steps of implementing the SAP.
Thanks & Regards
Rishabh Soni

Hi Rishabh,
Please go through the following links................you'll have a clear picture on all 5 steps of implementing SAP in very detail, including the activities involved in each phase.
<a href="http://www.sapfans.com/sapfans/asap/be_01_e.htm">Introduction</a>
<a href="http://www.sapfans.com/sapfans/asap/be_02_e.htm">Accelerated SAP</a>
<a href="http://www.sapfans.com/sapfans/asap/be_03_e.htm">Phase 1: Project Preparation</a>
<a href="http://www.sapfans.com/sapfans/asap/be_04_e.htm">Phase 2: Business Blueprint</a>
<a href="http://www.sapfans.com/sapfans/asap/be_05_e.htm">Phase 3: Realization</a>
<a href="http://www.sapfans.com/sapfans/asap/be_06_e.htm">Phase 4: Final Preparation</a>
<a href="http://www.sapfans.com/sapfans/asap/be_07_e.htm">Phase 5: Go Live & Support</a>
<b>Reward points if helpful</b>
Regards
Sai

Similar Messages

  • Steps and documentation help in SAP implementation

    Hi Experts,
    I need some documents and documentation help.i have never worked in SAP implementation projects.
    So,any body knows the steps and documentation when implementing SAP.
      please,tell me details and example documents with steps.and tell me the difference between support and implementation.What we will do extrain implementation.
    As a ABAP programmer what can i fill in se38 documentation.
    Please tell me.
    It'll be very helpful to me.
    Thanks in advance.
    Regards,
    Nandha

    Any SAP R/3 implementation is a big effort which is done by a team of experts from different backgrounds, not by an individual. So if you are going to be on a project as technical person, in all probability you will join the team as a member of the technical team during the implementation phase. By this time, the blueprint and design phases would have been almost complete and some standards and procedures with regards to documentation, coding, transports and migration accross systems will have been established.
    A team lead will brief you all the requirements of the project as far as documentation standards are concerned and migration of the objects, testing procedures etc. You don't have to worry about that. This will be specific to the project, so you cannot generalize it and apply it to every project.
    Now the difference between a new implementation and support is that the first one is new one which goes through the phases of blueprinting, design, implementation, testing and go-live. The support phase comes after go-live. You will just be supporting the production system, in that you will be fixing any bugs in the existing programs or change some existing programs to add some more logic or remove some logic, or write new reports or programs as per the users' request.
    Srinivas

  • Step by step process to implement the SAP ITS Mobile application

    Hello Experts ,
    I need Information on the SAP ITS mobile (Internet tranasaction server ).
    We are currently using the RF transaction through character based hand held devices through SAP Console , Now we would like to use the GUI Touch Screen based devices .
    For this we need to convert from the existing SAP Console transactions to use the functionality of ITS mobile.
    I am new for this , Can you please provide the detailed configuration with step by step process to implement the SAP ITS         Mobile application to fulfilll above requirment .
    Best Regards,
    Rp

    Hello,
    Please refer to this documents:
    [Implementation WM for Mobile Devices Using ITS|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/0026c5f5-0eca-2c10-25a3-c0ed87478812&overridelayout=true]
    [ITSmobile wiki|http://wiki.sdn.sap.com/wiki/display/HOME/ITSmobile]

  • Implementation Steps for SAP Business One..

    Hello everyone,
    Can I have any link where I can get the implementation process(step-by-step) for SAP B1  right from the beginning?
    regards
    Raj

    Hi Raj,
    you could start with the ['Best practise guide' |https://sapneth4.wdf.sap.corp/sapidb/011000358700001151332007E.pdf] & then check out the ['Accelerated Implementation webcast'|https://sapneth4.wdf.sap.corp/sapidb/011000358700000022142007E.wrf].
    You will find a wealth of links & documents in the [Documentation Resource Centre |https://sapneth4.wdf.sap.corp/smb/sbo/documentation]on the SMP.
    All the best,
    Kerstin

  • Critical Issues During SAP Implementation or After Golive

    Can anybody tell me one of  the most critical/ challenging issues During SAP Implementation or After Golive
    in these modules:-
    MM implementation
    PP implementation
    SD implementation
    FI/CO implementation
    PS implementation
    QM implementation
    HR implementation
    BI implementation
    XI implementation
    Thanks and regards
    RS

    hi,
    I will list out few of critical issues in
    Implementation :
    1 . Ensure 100% mapping of business process for all modules with SAP(avoid customization in support phase)
    2.  Unit & Integeration testing should be through with all validations
    3.  Master datas(Vendor,Customer) care must be taken will uploading datas thru LSMW,
    If there are common vendors for all plants,Create a vendor for a plant extend it to other plants
    4. Check tax procedures are customized according to requirements.
    5. Complete all print document customizations before go live
    6. Complete end user training(2 or more cycles) should be top priority before go live(This will avoid
    cancellation/reversal of documents after post go live)
    7. Ready with standard MIS reports & customized reports for business decision making
    8. Excise opening balance updation in tables for RG1 register in tables(Note 951955) on go live
    9. Check all tables datas are updating correctly
    10. Declare go live to SAP Support
    11. Check All user authorization should be correct according to their roles.
    12. Centeralize all master datas creation(avoid duplication)
    13. Create transaction variants to avoid entires in unnecessary fields & make certain fields mandatory.
    14. Ensure document numbering is completed for all documents
    15. Validate accounting entries are hit properly according to requirement in quality client with FI CTM(Core team member).
    After Go live :
    1. Missing authorization for users will play key part here,For ex : PGI while doing delivery,Excise capture & post in MIGO/J1IEX.
    2. Do internal audit every month,identify transactions if there will possibility for misuse or wrong entries,requires validation,identify users weak in certain areas.
    3. Identify there is enhancements to be done in transaction process(By step-2)
    4. Prepare a list of month & year end activities to be performed for all modules give to users
    5. Prepare  a list of frequently used transaction codes module wise give it to users
    6. If there is subcontracting,ensure challan creation,GR,reconcillation should be done regulary(monthly)
    7. Train the users,take reports in respective modules.
    8. Additonal customization might be done in print documents.
    9. Instruct users/CTM's to adapt SAP Standard practise
    10. Update excise tax rates after every indian budget
    Hope it helps.
    Edited by: Jeyakanthan A on Apr 29, 2010 6:48 PM

  • "Case use" technique for SAP implementation?

    Hello all,
    has anyone used "case use" technique for SAP implementation? I mean for standard process, not only developing.
    Any recommendation about it?
    Thanks in advance and best regards,
    Adolfo

    It would be helpful to go through the help document of ASAP Methodology.
    The following information may clarify some doubts/requirements you have.
    Generating the Project IMG through ASAP:
    After you have set the project scope, the next step is to generate the Project IMG. From the Business Process Master List (BPML), you can directly access the IMG activities relevant for configuring each process.
    BPML: The Business Process Master List, along with the Business Blueprint, is a key result of the second phase of the Roadmap. Microsoft Excel tables contain the SAP scenarios, process groups, and processes that have been set in scope in the SAP Reference Structure, and are crucial for configuring your SAP System. In Realization, the third phase of the Roadmap, the BPML provides the basis for monitoring and steering test activities and for configuring your SAP System. It contains the titles of the structure items, and displays the status, the owner, links to documentation and links to the SAP System. Amongst other things, the BPML allows you to:
    1) Set your baseline and final scope. These are used for baseline and final configuration.
    2) Access the Project IMG and specific IMG activities assigned to structure items.
    3) Access integration test plans, which help you carry out all required integration tests.
    The Prerequisite is you have set the project scope.
    Process Flow to use the Business Blueprint as a basis for configuring your SAP System:
    1) Set the project scope.
    2) Generate the Project IMG.
    3) Generate the BPML.
    4) From a specific processes in the BPML, you can go to the relevant IMG activities and make Customizing settings.

  • SAP Implementation Process !!!

    Hi Folks,
    I need brief information about the SAP implementation process. As per the ASAP Methodology we have different phases involved in the entire implementation process from Project preparation,Blue print analysis,Realization,Final Preparation and Go Live Support.
    I did not involve myself into implementation. Being a Basis consultant I would like to know what is the involvement of basis consultant in each phase in detail and what are the activities being carry out by a basis team, what would be the avg team size and what would be the duration of the project approximately. I know it depends on the project and modules being used,architecture and all. i just wanted to know the rough details for information.
    I would really appreciate for any useful information.
    Regards,
    Vinod

    Hi Viond,
    Please find below an elaborated details for SAP Implementaion.
    The ASAP (Accelerated SAP) Roadmap provides the methodology for implementing and continuously optimizing your SAP System. It divides the implementation process into five major phases and offers detailed Project Plans to assist you (Microsoft Project format). The documentation stored at each level of the Roadmap tree structure contains recommendations on implementing your SAP System and links to helpful tools and accelerators. We use SAP Solution Manager for the same and define the steps and this information can be transformed into MPP.
    The implementation of your SAP System covers the following major phases:
    Project Preparation
    In this phase you plan your project and lay the foundations for successful implementation. It is at this stage that you make the strategic decisions crucial to your project:
    Define your project goals and objectives
    Clarify the scope of your implementation
    Define your project schedule, budget plan, and implementation sequence
    Establish the project organization and relevant committees and assign resources
    Sizing for the SAP Servers (SAPS) Important for Basis.
    Business Blueprint
    In this phase you create a blueprint using the Question & Answer database (Q&Adb) older versions and now it has been replaced by new value adds from SAP in Solution Manager, which documents your enterpriseu2019s requirements and establishes how your business processes and organizational structure are to be represented in the SAP System. You also refine the original project goals and objectives and revise the overall project schedule in this phase.  In short its As is >> To be its from from functional consultant (mapping of business process) Basis will be involved how and when backup will be taken what 3rd party/vendor will be used, how users will be handled (CUA or normal procedure).
    Realization
    In this phase, you configure the requirements contained in the Business Blueprint. Baseline configuration (major scope) is followed by final configuration (remaining scope), which can consist of up to four cycles. Other key focal areas of this phase are conducting integration tests and drawing up end user documentation. Major part will be creation of transport requests and transportation to QAS system. Configuration of SAProuter, Solution manager and its various configuration
    Final Preparation
    In this phase you complete your preparations, including testing, end user training, system management, and cutover activities. You also need to resolve all open issues in this phase. At this stage you need to ensure that all the prerequisites for your system to go live have been fulfilled...Final Check.
    Go Live & Support
    In this phase you move from a pre-production environment to the live system. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.
    You can also download an HTML version of the ASAP Core Roadmap 7.1 on [SAP Services Marketplace - ASAP Roadmaps and Run SAP Roadmaps|http://service.sap.com/asap] (SMP login required).
    All the best !

  • SAP Implementation Starting

    Hi all
    I am heading an SAP implementation for my company .
    I want to make sure that the implementing company
    delivers a fine and within time and budget solution.
    What are the points that are usually written in contracts
    to avoid delays / bad solutioning ?Pls give me tips as to
    what all I can have as part of the contract .
    All suggestions / Inputs welcome.
    Thanks

    Dear Oops Kooops,
    You question is broad in spectrum. To start with you can refer to some good Project Management books in SAP.
    These are some of the details you can look for:
    Business Goals
    Know how your project will benefit the business, and make sure you communicate those benefits to the employees who will use the technology. Poorly defined goals doom a technology project; well-defined goals help keep all project personnel working together. The system with unclear business benefits is one better left unsponsored and undone.
    User Involvement
    Getting user buy-in requires more than just communicating benefits. It also helps dramatically to enlist users' collaboration in designing or selecting the system.
    To convince business line managers to lend their workers to the front end of a project, executives recommend talking to their wallets.
    Risk Management
    Every I.T. project faces risk, whether it is technical (caused by unproven technology or integration problems) or business risk. Veterans say project sponsors should not only understand the risks but also demand that contingency plans be put in place before the first nail is hammered. But even though risk management is a project management basic, it is easy for executives with little technical knowledge to ignore it because they are intimidated by the technology. Fortunately, they also say technical risk is easier to manage than business risk. If the project hinges on a relatively new technology, it makes sense to build and test a prototype before going whole hog.
    Scope Management
    Keeping requests for new features from derailing or slowing down a project is a step that should be handled by the project manager, but occasionally the executive sponsor has the clout to say no to a request the IT leaders can't refuse.  Besides inflating costs, scope creep can deflate user enthusiasm as the project's benefits are pushed off. Getting the project done quickly is a good goal for the executive sponsor to champion; bells and whistles can be added later, after the initial rollout. "Vanilla is a very good flavor"
    Appropriate Accountability
    No accountability, no progress--that's no surprise. The challenge in IT projects is to hold the right people accountable for the right deliverables. The IS department's job is to hand over the specified level of system functionality by the due date. After that, it's up to the business workers to get the specified business benefits out of the system. And the executive sponsor should make sure accountability is in place to enforce that division of labor.
        Non-IT execs have a tendency to exaggerate the role IS workers will play after a system is rolled out. As a result, it is common to point the finger for system failure at IS. That gives the other employees less incentive to make the new system work.
        IS and business line workers develop a lot more synergy when both feel an equal burden of responsibility.
    Helpful Hype
    Amidst all the spreadsheets, numbers, risk analyses and so forth, remember to add a spoonful of sugar for those who will actually have to use the technology.
    Do let me know in case of any queries.
    Hope this helps you.
    Regards,
    Rakesh

  • SAP implementation methology

    Dear,
             In interview someone sak me about the standard methology used in sap implementation?
           Can any one tell me about this ?Or any link will be help full>
    Regards.

    ASAP Methodology.
    You can refer following links
    https://websmp105.sap-ag.de/asap
    http://www.sap-basis-abap.com/sapgeneral/what-is-asap.htm
    http://www.erpgenie.com/index.php?option=com_content&task=view&id=422&Itemid=76
    http://sap.ittoolbox.com/documents/popular-q-and-a/steps-to-implement-asap-methodology-3581

  • Stages of a SAP implementation

    HI..
    Can anyone direct me to information on stages of a SAP implementation ?
    Thanks
    Keshi

    hi,
    SAP project steps in brief
    functional consultants job
    1. bussinees study
    2.identifying the gaps( already available in SAP - new thing we have to develop for the bissiness)
    3.bussiness blue print preparetion.
    4.developing Development request Form( DRF)
    ABAPER comes into picture
    1.preparing High level design of the DRF created
    2.fill the gaps identified => by developing code
    3.prepare Low level design
    Funtional consultant + ABAPER
    1.testing the bussiness process.
    2.make it live.
    Regards
    Anver

  • Role & Responsibilities of an ABAPer during SAP Implementation

    Dear Friends,
    Shall anyone of you kindly let me know of a link or send a document addressing the Role & Responsibilities of an ABAPer during SAP Implementation?
    Regards,
    Alok.

    Hi,
                  ABAPer is required after installation and business study by functional consultant...
    In case of upgrade project, ABAPer is required during upgrade (Basis activity) itself in SPAU and SPDD step.
    Otherwise, ABAPer has following role in their area:
    1. Business study in brief. (To resolve simple issue and to understand logic)
    2. Coding for User exits / enhancements to co-operate with functional consultant.
    3. Custom reports / Program developement (Normally print programs and some analytical reports)
    4. Upload program implementation thru' BDC / BAPI / LSMW
    etc.
    5. Interface developement if required. (in case of legacy system integration projects)
    These are the major tasks of ABAPer in implementation project.
    Activities that form the SAP implementation process are:
    1. Project Preparation
    2. Sizing and blue printing
    3. SAP Functinal development - here abap comes into picture
    4. Final Preparation
    5. Go live
    Have a look at below link. It will give you more details abt the same.
    http://en.wikipedia.org/wiki/SAP_Implementation
    <b>Reward points</b>
    Regards

  • Any step-by-step guide for implementing intermediate event?

    Hi All,
    I am trying to implement intermediate event in my BPM and so far I have created:
    1) An intermediate event
    2) WSDL file
    3) A message trigger
    But I am not getting how to proceed further. In the following document I found that a context DO needs to be used: http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0369539-e876-2d10-ef93-8f30e112ee6d?quicklink=index&overridelayout=true
    But I am not sure which context it is referring to?
    Is there any step-by-step guide to implement this? or any wiki link?
    Ameya

    Hi Ameya,
    Follow below steps:
    1. Create WSDL file
    2. Create an intermediate event in process modeling screen
    3. Click on Intermediate event> Properties>Event Trigger
    4. TRIGGER Drop Down> New
    5. Give Name to your Message Trigger>Next
    6. SERVICE dropdown>Select the WSDL created> Finish.
    And I suppose they have mentioned Data Object for using it in coorelation condition.
    Correlation condition is a boolean test which should be True(default) for the ntermediate message to be triggered.
    As there will be mutliple process instances, when PI (in your case) trigger the intermediate event (consume WS) we can give a correlation conditon to check  whether it is for the right process instance.
    In you case you can store the Request ID in BPM DO, and also request it from PI while consuming WS and validate it in correlation condition.
    Regards,
    Unni
    Edited by: UnnikrishnanSreekumar on Oct 13, 2011 12:51 PM
    Edited by: UnnikrishnanSreekumar on Oct 13, 2011 1:00 PM

  • Step by step guide to implement SSL

    Hi
    Is there any PPT or PDF or BLOGS or any document that showing step by step procedure to implement SSL ?? Any links in this regard is highly appreciated
    thanks
    kumar

    Kumar,
    Check this document on how to configure this in J2EE engine:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/23894238-0701-0010-40b0-a0a6d5c4ad9f?prtmode=navigate
    Regards,
    ---Satish

  • QGM for Greenfield SAP Implementation

    Hi All,
    We are doing a greenfield SAP implementation. As of now we are done with DEV landscape build. We would like to utilize Quality Gate Management for Change Management in our project. I have few queries:
    1) How should I define Transport routes at this stage to activate QGM? We have only DEV systems as of now. QAS and PRD would be ready in next few months. Can I activate QGM now with logical component containing only DEV systems?
    2) Once the QAS and PRD systems are ready; How to include them in the existing QGM project?
    Any documentation or input are really appreciated.
    Regards,
    Vivek

    Achieved this using the virtual systems as mentioned in this excellent blog.
    http://scn.sap.com/docs/DOC-31352
    Regards,
    Vivek

  • Help required in the last step of SAP Query

    Hi Experts,
    I have walked through all the steps of SAP Query except for the last one.Please tell what to do in the attached screen shot of SAP Query.
    Thanks and regards
    Rajeev Chhabra

    Hi Vinod
    My problem is that
    1.I am not getting the screen Basic List Line structure in the Tcode SQ01 can you tell me how to get that.
    2. In the last step of the SQ01 transaction code Can you please tell what to do on the screen Query layout design(Please give adetailed response)
    Thanks and regards
    Rajeev Chhabra
    Message was edited by: rajeev chhabra

Maybe you are looking for

  • Can you help me on these 6 SAP BW interview questions?

    Hi, Can you help me get a better understanding of the expectations in the following interview questions? Please explain them in your on words and if you think there is an additional information, you may provide the link but I am more interested in yo

  • Div id without definition in css layout file

    Hi, I noticed that I can insert a div id which doesn't have the corresponding definition in my css file? I don't see any warning from Dreamweaver 4. <div id="main-content"> Is this allowed? what is supposed to happen in this situation? I was expectin

  • Passing the name of a table to a procedure

    Can anyone tell me how you can pass the name of a table to a procedure ? I am trying to write a generic procedure that will have the table name and the fieldname passed to it :- as in :- Select Fieldname FROM Tablename; null

  • After apple store erased and re-installed iPhoto has gone. how do I get it back ?

    macbook air 14 mths old wouldn't turn on. apple store said corrupted hard drive. erased and re-installed os x 10.8 . now restoring back up but iPhoto missing and iTunes and app stores says os version doesn't support them. What can I do ?

  • BAPI_CUSTOMER_CHANGEFROMDATA1 message 826

    I am using BAPI_CUSTOMER_CHANGEFROMDATA1 to change only Transportation Zone.  I get msg 826 "Contact Person Address Different from company address" for some customers. I am sending: lastname, city, post code, country, langu, region, kunnr, sls org, t