Accounts integration - Multilevel controlling

Hello,
I try to adjust the following variant of integration - Multilevel controlling (Structure Element, manual).
I have the following situation:
1. I have the PS Project whith the project structure (project definition and wbs elements)
2. I have the  cProject Project with phases and tasks.
3. I have executed step 1 "Assign PS Project" of Account Assignment. (in cProject Project - Accounting -> Account Assignment)
Problem: In step 2 (Assign WBS elements) I did not see PS Structure on the right side of screen.
Dear colleagues in what there can be problem?

Hi Matthias,
I have checked PS project - status is released. If you were interested by a problem please look the customizings on a following reference - http://files.mail.ru/UM1ZMV
Thank you.

Similar Messages

  • Accounting integration - Multilevel Controlling - cProjects 4.0

    Hi,
    I am using cProjects 4.0.
    a) However in Multilevel controlling i am unable to convert the cProject project to SAP PS project. I am able to do the manual assignment but automatic conversion to PS is not taking place.
    I have checked all the IMG settings related to Accntg Integration. .
    b) Also while costing it gives an error - Internal error - Costing leads to exception.
    Please suggest
    Regards,
    Amit
    [email protected]
    9820502246.

    Hi Amit,
    I am facing the problem too, could you show me how you solved your problem and some recommend about this?
    Thanks
    Long
    [email protected]

  • Can not adjust the manual assignment function (Multilevel Controlling)

    Hello all.
    One more post throughout theme "Accounting Integration - Multilevel Controlling".
    At This time it is impossible to adjust manual assigning WBS Elements to cProjects project element.
    Current situation: We have achieved automatic creation a PS project from a project in cProjects. In this case we have assignment which was created automatically - It is healthy, it pleases us.
    But also we wish to use function of manual assigning WBS Elements to cProjects project element. By the current moment there is following:
    - "Select the cProjects project element and the WBS element you want to assign and then choose Assign"  - This step is fulfilled, and The WBS element is established as the Account Assignment Element.
    - "Save the cProjects project" - on this step there is error - "Recoil: account assignment should be dumped". Result of the given step is assignment cancellation. http://files.mail.ru/0GG4RQ
    Colleagues, prompt, in what there can be reason? Thanks.
    PS project is created by analogy to automatically created PS project.

    Hi Alex,
    I have a similar scenarion where we want to link WBS to cProject apart from automatic creation.
    I am getting following  error while manually linking WBS to cProject:
    "Costing data may not be up to date  Display Help
    Rollback: Account assignment must be reset "
    I have defined costing model and costing variant for ECP.
    Can you please tell me what you did for ECP which enabled to solve your problem.
    Thanks in advance,
    Manoj

  • Message no. DPR_FIN_GECCO024 Error occurred in accounting - see link controlling cockpit (cProjects)

    Hi, everyone
    I'm integrating PS( which is on IDES system ECC6 PH6) with cProjects( which is on DEV system ECC6 PH6 PPM 5.0). I've done customizing in DEV and IDES. The Controlling Method is Multilevel Controlling (Structure Element, Automatic).
    When I'm saving a project with status 'to be transferd', the warning message appeared and I'm failing to assign PS Project automaticlly. But manual assignment works fine.
    Error occurred in accounting - see link controlling cockpit (cProjects)
    Message no. DPR_FIN_GECCO024
    Diagnosis
    Errors occurred when transferring to accounting.
    System Response
    DPR_FIN_GECCO 024
    Procedure
    Choose the Controlling Cockpit (Project Management) link on the Accounting tab page. In the cockpit, you can create a variant with your Project Management project under Selection Variant Orders Project Management. The errors that occurred are then displayed. If no messages are displayed in the controlling cockpit, they have already been processed or deleted. If this is the case, trigger the transfer again.
    No more messages are displayed once the transfer has been carried out successfully (that is, no errors occurred).
    Here is the problem:
    In this Message, I was told to Choose the Controlling Cockpit (Project Management) link on the Accounting tab page. But actually, I can not find the Controlling Cockpit (Project Management) link on the Accounting tab page. It was missing.
    I don't konw what‘s the problem with the missing Controlling Cockpit and how to deal with this warning message getting automatic PS assignment done.
    By the way, I've done IDES test, cProjects and ERP system were integrated on the same system with RFC destination NONE. And that works fine on IDES, so I guess I've done the right customizing in the ERP system( IDES).
    Best Regards,Yemi

    Hi Yemi,
    Controlling cockpit is accessed to view the error details in the accounting integration. This can be accessed through two ways.
    1) In Project-->Accounting tab
    2) Through tcode - COCPCPR
    You can try the second method to view the error details.
    And coming back to your query on project profile config in PS, as Pramod said, by standard SAP delivers a standard profile in SAP PS for cProjects-->PS integration. You can find the same in the below SPRO path.
    Project System-->Structures-->Operative structure-->Work Breakdown structure(WBS)-->Create Project profile
    Project profile name : CPR0001
    This project profile is used when an automatic PS project is created through accounting integration.
    Hope this helps.
    Regards,
    Ravi

  • Problem in Accounting Integration in cProjects 4.0

    Hi,
    I am trying to customize the Accounting Integration in cProjects 4.0 with R/3. The  problem comes when I try to replicate the Cost/Revenue rates to the R/3 system. I get the following error: "<i>Cost/revenue rate PM01: organizational unit 40000582 does not exist</i>"
    The "organizational unit" is set in the cost/revenue rate as organization responsible. Why is that error poping up? Where can I create those organization responsibles? Do I have to create the data in my R/3 system?
    Thanks in advance!
    Best regards,

    Thank you very much for your info, but I am still having the same trouble.
    Apart form the former one I got two more customizing problems:
    The point "Make settings in ERP systems" returns in an error
    In the point Define Controlling Scenario in R/3 I don't have to option to choose Multilevel Controlling (can I customize those options?)
    Thanks again,
    Best regards,

  • CProject - The settings for Accounting integration contain errors

    Hi,
    I got error message "The settings for Accounting integration contain errors"  from cProject page when I choose controlling method  (Project Role, Automatic).
    If I choose other controlling method then this the error message disappear.
    Maybe some thing wrong while setup Role Type?.
    Please help!
    Thank you
    Long Nguyen

    Hi,
    Are you using MULTILEVEL CONTROLLING ( PROJECT ROLE , AUTOMATIC)
    that means
    Multilevel Controlling (Project Role, <b>Automatic</b>): In this method, the system automatically creates a PS project definition for the project definition and a WBS billing element at the first level of the hierarchy. More WBS elements are created for the project roles of the cProjects projects.
    Multilevel Controlling (Project Role, <b>Manua</b>l): In this method, a user has to create the PS project in the ERP system. The user then has to assign the project roles of a cProjects project to the WBS elements of this PS project manually in cProjects.
    thanks
    sunil

  • Error during multilevel controlling

    I am trying to perform a multilevel controlling. After marking flag to transfer I am getting the following error:
    "There is no internal order for project xxxxxxxx". The WBS element is also not created. I am using auto mode for multilevel controlling.
    Waiting for your feedback.

    Hi Anantharam,
    I am working on a requirement  to get Cost/Revenue Rates from ECC6.0 to cProjects ,  I know the standard configuration can replicate data from cProjects to ECC6.0 , I need to know do we have anything from the other way round,
    can you please send me the document which you have for cProjects Accounting Integration
    to email-id [email protected]
    Thanks
    Praveen

  • CProjects 4.0 - SAP R/3 4.7 - Accounting Integration problem.

    Dear all,
    I have performed all steps necesaary for accounting integration in cProjects and SAP R/3 FI System.
    I can even see and assign the cost rate that I have created in cProjects to a project role.
    System also calculates the  cost for the role multiplyin the cost rate with the number of hours the resource has been assigned.
    However, it also displays the following warning messages:
    1. An error occurred in Accounting (system QASCLNT777) 
    2. Function module "IAOM_CPRO_MISC_RFC_CPDEF_CHECK" not found. 
    3. No cost center could be determined for organizational unit 00000000 
    4. Maintain a revenue element for cost/revenue rate ZZ_000001 
    5. Error occurred in accounting - check the costing in the ERP system
    When I execute the transaction COCPCPR in R/3 system, I cannot see the internal order, but see the project name under "Internal Orders not created"
    Regards,
    Reema.

    Hi reema, if we refer to the documentation pertaining to accounting integration for cProjects 4.0, we see that the prerequisities is ECC 6.0
    Please see below from the help documentation
    Integration
    To be able to use the functions of accounting integration, you have to implement the Internal Orders (CO-OM-OPA) application component and Project System (PS) in SAP ECC 6.0.
    Prerequisites
    You need to make a number of Customizing settings in both the Collaboration Projects and SAP ECC Implementation Guides (IMG):
    Settings in the Collaboration Projects IMG
    You selected the Controlling in mySAP ERP setting in Customizing for Collaboration Projects under Connection to External Systems ® Accounting Integration ® Activate Integration as the Accounting Integration Scenario.
    I feel the error messages are thrown because you are using SAP R/3 4.7.  I see from the SAP notes, for CATS integration with cProjects 4.0 and SAP R/3, SAP consulting is available, but nothing is mentioned for accounting integration.

  • "Travel Expense - cProjects" without accounting integration

    Working with cProjects 4.0 (as a stand alone system),  can I have time and effort captured against task of cProjects' project? I am looking for a scenario where a consultant assigned to a task in cProjects would capture time and also travel expense corresponding to that task (transport / boarding / lodging) expenses in CATS. Can this be done? Where can I retrieve this data from (table name)?
    Accounting integration is not to be done. I am only looking for the manual entry of data from the consultant (resource) to be stored in some table in the system from which I can retrieve the data.

    Hi Swayam,
    Yes, the time capture can be done without the CO-Integration. If there is no co-integraion, the travel expense to cProjects is not possible, or make no sense.
    If you are interested, there are two ways by CATS Integration, with and without co-integration.
    Case A: without co integration.
    1.  Worklist (or timesheet?) in ERP will be generated according the cProject structure and custmoizing settings, which control, at which object can the confirmation done.  Such worklist does not have a co object.
    2. The user capture the time\efforts using CATS in ERP system.
    3. the confirmed time\efforts are transfered back to the cProject system, and write in the involved cProject element.
    Case B: with co-integration.
    1.  Worklist (or timesheet?) in ERP will be generated according
         - the cProject structure and
         - customizing settings, which control, at which object can the confirmation done
         - the assigned co-object of cProject elements.
        The worklist has a co object.
    2. The user capture the time\efforts using CATS in ERP system.
    3. the confirmed time\efforts are transfered back to the cProject system, and write in the involved cProject element.
    4. The (actual) costs are booked at ERP system due to the co-object in worklist.
    5. Additionally, the cProject evaluation can read the actual costs from ERP system and display it.
    Kind regards,
    Zhenbo

  • Cproject 3.1 accounting integration project problem

    Dear Sirs,
    I have some problems with accounting integration in cProjects. I got help previously with missing company code in thread;  This is now implemented and works fine.
    When I save a project and mark it for replication, i get the following error in the Cockpit for Controlling Integration (cprojects).
    Enter Order number.
      Message no. KO413
    I have been looking and looking for ways to solve this; Any hints from you guys?
    Best regards,
    Jørgen

    Hello Thorsten,
    you are quite right. We tried to swap to internal number range this morning, and it makes the error message to change to:
    +Company code is not defined:
       Messsage no. F5165
    Diagnosis
    Colmpany code "" has not been created in finacial accounting
    System response
    System error
    Procedure
    Correct the entry or create the company code using financial accounting customizing functions.+
    This is quite strange given we have implemented the badi for company code (DPR_FIN_GECCO_ATTR), with the correct values.
    Any hints are highly appricated, personally is wonder if there are other places we can look for more detailed error messages to find out excactly what goes wrong.
    Best regards,
    Jørgen

  • Internal Order not being created in cProjects-Accounting Integration

    Dear All,
    We are working on cProjects 4.0 with ECC 6.0,
    Trying to do Accounting Integration.
    For only one Project I am able to create Internal Order,
    But I am getting following error.
    “Cost/revenue rate YP002 is not valid in organization 00000000   “
    Inspite of assigning these rates to the organization 00000000
    For other projects, when I click on accounting:
    I get following error
    "Single-Obj.Controlling on InternalOrders 0188993B3E343947A046B554FD886E03 000006000032 does not exist"          
    When I go to Controlling Cockpit, I see this Internal Order not being created.
    Have revisited all settings, project type, etc.
    How do I go about this.
    Kindly help,
    Navendu

    Dear All,
    I was able to solve the one of the problem, with the following settings,
    Assign Cost Elements & Activity Types:
    Choose Organization, Start & End Dates, Cost and Revenue Elements, Currency.
    The start and end date of the cost/ revenue did not fall within the start and end date of the Organization.
    Regards,
    Navendu Shirali

  • Accounting Integration

    I am working on Cprojects Suite 4.0 and I have completed configuration as per the configuration guide. When I am creating I am getting following error.
    At the same time, Iam sure following listed configuration are done. I have a slight doubt about the object link part as RFC is "NONE" as Cprojects and ERP are on the same system.
    Can anybody help me in this regard.
    Best Regards,
    Joseph.
    [email protected]
    The settings for Accounting integration contain errors
    Message no. DPR_FIN_GECCO004
    System Response
    The accounting functions are not available.
    Procedure
    Check the following in Customizing for Collaboration Projects :
    Did you assign an object type to the project type for communicating with the accounting system? (See the IMG activity Make General Settings ).
    Does this object type have the proxy class CL_DPR_OLR3_GECCO (for single-object controlling on internal orders) or CL_DPR_OLR3_WBSELEMENT (for single-object controlling on WBS elements)? (See the IMG activity Define Object Types for Object Links ).
    Has an RFC destination been entered in this object type? (See the IMG activity Define Object Types for Object Links ).

    check RFC destination 'NONE' in transaction SM59 and maintain all the follwing data in cProjects > Connection to External system > Define Object Link for Acco int..
    for object type : 0FIN_INT_ERP_PS
    Proxy class: CL_DPR_OLR3_WBSELEMENT
    destination: NONE
    webserver: ITS_ALIAS
    and
    for object type : 0FIN_INT_SOC_R3
    Proxy class: CL_DPR_OLR3_GECCO
    destination: NONE
    webserver: ITS_ALIAS
    regards
    yasar

  • Accounting Integration Error

    I have setup Accounting Integration for Internal Order Automatic on saving.
    However when I run calculate Button it says There is no internal order for project
    I didnt find anything in cockpit COCPCPR
    PPM and ERP are on same server.
    I have maintained controlling scenario CPR1
    Assigned it to Project Type *
    Please help.
    Thanks and regards,
    Niketan

    Hi Ravi,
    Thanks I did that,
    However I am getting Following errors now
    Internal error: Calling costing leads to exception
    Costing data may not be up to date
    Error occurred in accounting - see link controlling cockpit (cProjects)
    I dont see anything in COCPCPR.
    in ST22 I see below error in source code
    RECEIVE RESULTS FROM FUNCTION 'IAOM_ACCOUNT_MANAGER_BASIC'
    Not Sure what I am missing.
    Thanks and regards,
    Niketan Maral

  • Problems with accounting integration cProjects

    Dear Sirs,
    I have some problems with accounting integration between my cProjects 3.10 and my ECC 5.0 system. I have followed the steps in the configuration guide as good I as can. However when I create a project, and go the accounting tab I get the following error:
    The project is unknown in Accounting
    Message no.
    DPR_FIN_GECCO006
    Diagnosis
    Etc..
    In the Cockpit for Controlling Integration I can see the following error at the time the project is created, and a new similar error is created when the status is set to released – replicated.
    No company code could be determined. Message No IAOM_CPROJECTS001. 
    In this message there is a reference to the fact that the company code can be set in the assigned model order for CPR1. I have created such a model order with a reference to company code 0100 for CPR1. However this does not seem to do the job.
    I seem to be stuck, as I have tried every possible and unpossible lead to get any further. Any input for someone with the knowhow is highly appreciated.
    Best regards,
    Jørgen Ruud

    Hello Jørgen,
    It sounds strange, normally after create a model order and assigned to the scenario CPR1, then the determination of company code should work.
    logic: CPR1 -> model order -> company code
    Would you please try the note 875275, if it can help.
    In case that it does not help, you can eithter use the Badi method  to set it hardly, or create a customer message to let SAP check it.
    name of Badi DPR_FIN_GECCO_ATTR
    code like following:
          ls_attribute-data_element     = space.
          ls_attribute-value            = '1000'. 
          ls_attribute-field_name_orext = 'BUKRS'.
          ls_attribute-fldname_receiver = space.
          ls_attribute-struc_name_copa  = space.
          ls_attribute-field_name_copa  = space.
          ls_attribute-ext_attr_name    = space.
          ls_attribute-ext_attr_value   = space.
          INSERT ls_attribute INTO TABLE ct_attributes.
    regards!
    Zhenbo

  • DPR_FIN_GECCO004 "The settings for Accounting integration contain errors"

    Hi all,
    I have the same trouble with Accounting Integration in new project:
    Cproject problems with accounting settings
    But this links isn't solve my problem. I've checked all following customizing in cProjects from detailed info from Message no. DPR_FIN_GECCO004:
    1) Did you assign an object type to the project type for communicating with the accounting system? (See the IMG activity Make General Settings).
    I've used predefined standard:
    - object type: Single-Obj. Controlling on WBS Elements (0FIN_INT_ERP_PS)
    -  frame: 0FRAME9
    - no costing: empty
    - revenue calc type: Use costs/revenue rates from cProjects
    2) Does this object type have the proxy class CL_DPR_OLR3_GECCO (for single-object controlling on internal orders) or CL_DPR_OLR3_WBSELEMENT (for single-object controlling on WBS elements)? (See the IMG activity Define Object Types for Object Links).
    Yes, proxy class is correct (CL_DPR_OLR3_WBSELEMENT).
    But I'm not sure that object type is active. I've viewed table V_DPR_OBL_OBTYP and the field Active is empty for this object type (0FIN_INT_ERP_PS)
    Besides, I can't see this object type (0FIN_INT_ERP_PS) in the following setting:
    SPRO -> ... -> Structures -> Define Object Types for Object Links (from message)
    But I can see it here:
    SPRO -> ... -> Connection to External Systems -> Accounting Integrations -> Define Object Links for Accounting Integration
    Is it correct?
    3) Has an RFC destination been entered in this object type? (See the IMG activity Define Object Types for Object Links).
    Yes, but not in this setting (see point 2).
    4) Have you chosen a suitable setting for confirmation with regards to 'Time Recording for' in the project type so that it matches the integration scenario? (See the IMG activity Define Project Types.) For example, time recording for roles is not permitted in a structure-based scenario.
    My setting is: 'Time Recording for' - Tasks
    Is anybody knows a solution of this trouble???

    In the target R/3 system COCPCPR shows a lot of messages like this:
    Object not known in CO
    Message no. IAOM028
    Diagnosis
    You want to post to the object with technical key E002D524BF9325F1A9D3001A4BE638F6 belonging to business scenario cProjects. However, there is no Controlling object assigned to this object.
    System Response
    Processing stopped.
    Procedure
    Example:
    You bill an order item in an external system and transfer the billing document to R/3 Accounting. An error occurs when the CO account assignment is determined, since the order item is not yet assigned to a Controlling object. The error occurs either when the order item is transferred to R/3, or while the transferred order item is being processed: Check the transfer log for the order item in the external system, and start the transfer of the order item again. Then start the transfer of the billing document to R/3 Accounting again.

Maybe you are looking for

  • G/L Account Opening Balances using DTW

    Is it possible to import G/L account opening balances using DTW? If so, what object would I use? Thank you, Mike

  • New File Mask

    I am testing out FMS3 (from FMS2) for linux, and while I'm enjoying some of the new features I'm running into a problem I can't track down... For my FMS2 setup in conf/Server.xml I set the Mask node to 022 so FMS created new files under those permiss

  • Wave reconstitu​tion

    Hello I am using a wave generator to simulate a 200 Hz wave and a NI acquisition board is used to acquire the signal. I think that according to Nyquist theorem, I must, at least, acquire at 2x the frequency of the wave. Thus, I'm acquiring, in contin

  • Can not carry the request

    Hi all, when I have changed a program at production side that is already being used in live systems, it asks me request to change the code, I create new one and want to carry this into live system; however I cannot, it just says it has been released

  • Pro9000 Mark II stuck in front load mode

    I printed using front load (13x19 sheet) on my last print job. I changed just now to using 8.5x11 (after the printer was shut off) and now it's stuck in front load mode and will not print (unless I printed from front load which makes no sense to do).