Activate Cost Component Split in Controlling Area Currency

Hello,
I have controlling area currency USD and company code currency INR. When I do WIP run then system is giving error messages "contr.area currecy is missing" and "not find valid cost component structure" and suggesting to maintain "Cost Component Split in Controlling Area Currency".
When I maintain then after that I am not able to run CK11N for std.cost estimate only with the error "cost componenet spit costed with zero" and also system giving this message on front screen of ck11n, means not allowing to go into ck11n result screen.
Could you please give me some tips or check point on this issue.
Thanks
Regards
Ravi

I'd revert to the Cost Component per Co Area currency config that you were forced to delete (as per your other post) - but this time, just for a Costing Type or a specific Val Variant and check the results.
Maybe that'll throw some light... also check if you maintained all the Exchange Rate config in your system... check General Settings for all the config that is required.
Cheers.

Similar Messages

  • Cost component split costed with value of zero

    Hi,
    We have ML activated for the Plant/ Valuation area.
    We have Company Code Currency type -10 and Controlling Area Currency type - 30. Both Currencies are different.
    I have maintained in OKYW, the company code and costing type and Valuation variant.
    When I am running the cost estimate for the material and Plant I am getting the error..
    "Cost component split costed with value of zero".
    I have also checked that the cost element is assigned to Cost Component split and is active.
    I am not able to find out what is the reason for the error. I am stuck up and not bale to run the cost estimate.
    Please help/ suggestion.
    regards
    Kami

    Dear Kami,
    This error is probably caused by the currency conversion. Error CK 240 is raised if
    a) cost component split in co-area currency is zero
    b) the costing variant is used for standard price update
    c) cost component split in co-area currency is stored on database
        (this is a customizing setting of the costing variant)
    There are 3 ways to proceed:
    1) use a greater costing lot size for the raw materials with CK 240
          --> costing value in CO area currency will be greater 0
    2) disable saving of cost component split in co-area currency
    3) deactivate coding of note 927372 --> please review note 1004727 for details.
    Kind regards,
    Antje

  • Activating Cost Component Split

    Hi People,
    I have to do some tests and for while i need to activate the "cost component split" in the path:
    \IMG\ Controlling\ Product Cost Controlling \ Actual Costing/Material Ledger \ Actual Costing \ Activate Actual Cost Component Split  (by valuation area)
    I would like to know if there is some impacts for that and
    if we have some problems to revert, becuase at this moment it is only a test.
    Thanks,
    Rosana.

    Hello Paul,
    Thanks for your answer.
    We already use "material ledgder" but we don´t have activate component split. But look, what I am talkin is only one transaction (that I said before), becuase I have to do some test inside the aplication BW and it is a prerequisite.
    I would like to know what is the impact to activate the component split on that transaction I said before.
    It is only a test, but I don´t know if I put a flag in that transaction, the system will create some table internally.
    And other thing I don´t know is, if It it is possible to reverte the activation (only in that transaction) that I would update and if there is some impacts.
    Thanks a lot.

  • Need to de-activate Actual cost component split

    Hi All,
    I need to de-activate Actual cost component split in the test client.
    It has been activated by my testing associate by mistake.
    Please let me know the do and donts if anyone has done this de-activation before.
    I could not find any relevent OSS messages or consulting notes on this topic
    We are using ML Actual Costing and Multi Currency  - without actual cost component split.
    Thanks in advance,
    Regards,
    Vik Sood

    Hi Balram.
    If you have access to an IDES system, you can see a Cost Component split like this:
    As fas as I know, this is only for educational porpouses. In the standard System, its not recomended have the detail of the split per movement, due to the huge amount of data genereted. There is a Flag that control this, in a Txxx table (i dont have access to the system right now).
    If you really want this functionality, write SAP in the marketplace, and I guess their response is exactly what im saying.
    Arturo.

  • Controlling area currency copied to cost condition: DP90/91

    In my example, the transaction currrency is 0 USD but the CO area currency is -15.09 AUD. I can see that after running DP90, the controlling area currency has been picked up.
    When I checked ODP1 for transaction currency characteristic, the 'No summarization' has been checked. So it should have picked the transaction currency. But it is picking the CO currency. Is this so because cost in Trans currency is 0 and zero cost cannot be transferred to a cost condition?

    Check the following note whether it helps you:-
    Note 157020 - Assembly: Incorrect currency for transfer EK01/EK02
    G. Lakshmipathi

  • Cost component Split not transferring while costing using Spec Prc Key

    Hi Fellow CO consultants,
                                             I have come across an strange scenario in my work could you help me on it . We are using special procurement key to get the prices between cross company code costing while doing costing run the Materials which have the cost component split from KKPAN (costing without quantity structure ) we find an strange behaviour of update of the costing price .
    scenario 1:That is Using KKPAN  the FG materials are costed with fixed and variable cost and are marked (future ) but not released in the Production plant . Now while doing the CK40n at warehouse level the Cost component split is correctly picked up the receiver plant using the Spec Prc key properly the fixed and variable cost split .
    But
    Scenario 2: Using KKPAN the FG materials are  costed and then price is released and the material price is at current standard price .Now while doing the CK40N run the cost component split is not picking the variable and fixed contribution its picking up the Total price of the material .( this behavior is observed only in materials done with KKPAN other materials with quantity structure provides the variable and fixed itemization even in the current price of the material ) The prerequsite of the transfer control statergy is set as fist to check the future price for the fiscal year and next the current price of the material if no future price exist. The cost component split and the costing variant are the same .
    Appreciate your thoughts .. on helping Scenario 2 case why does the cost component split take the fixed and variable cost while the price of the material is in Current.
    regards
    GK

    Dear Prasad
    Try masking costing variant too at assignment to plant and co code.
    Rajneesh

  • Reference to note 434873 - Auxiliary cost component split

    1) We use material ledger. We already have a primary cost component split defined in our system.
    2) We want to activate an auxiliary cost component split.
    3) We read the note 434873, paragraph 2)b) (activating an auxiliary cost component split).
    4) Who can assist us to develop the customer-specific Z program that is referenced in the note?

    Hi to Evrybody,
    I am trying to configure Primary Cost Component Split,, but I am confused what are the technical steps to configure such a structure 
    http://help.sap.com/saphelp_40b/helpdata/en/7e/cb7e8643a311d189ee0000e81ddfac/content.htm
    There are several requirements how to configure in SAP Primary Cost Component Split:
    1)You assign a cost component structure in the CO version in Cost Center and Process cost planning!  Which Cost Component Structure? The Primary Cost Component Structure or the Cost Component Structure?
    2)You determined the prices through planned price iteration!                                                                 We set this indicator in the CO Version itself?
    3)You define a Cost Component Structure for Primary Cost Component Split of Product Cost Planning! How do we define it, via simply checking the check in OKTZ?
    I want to understand when you create Cost Component Structure and Primary Cost Component Structure, which one of these 2 needs to be assigned in the CO version in Cost Center Accounting? And the other thing is I do not make the difference between Cost Component Structure and Auxiliary Cost Component Structure? Could you please shortly describe what is the difference? Other thing is when you create Primary Cost Component Structure and its components, DO THEY INCLUDE ONLY RANGE OF PRIMARY COST ELEMENTS OR IT IS A TECHNICAL STEP ONLY TO CHECK THAT CHECK IN OKTZ FOR Primary Cost Component Split. Let me know, thank you very much for your help and cooperation again!
    Best Regards,
    Georgi Georgiev

  • Controlling area currency - urgent

    Hi,
    In a project we are using Controlling Area Currency as INR. As our group company is europe based they want us to change to EUR. We are also using PCA where currency is INR. I want to know the pros and cons of changing the same to EUR from INR.
    Bye,
    Ramesh

    Hello
    Check this if it could help you
    When you create a controlling area, you specify whether the controlling area currency may differ from the company code currency, and which particular currency is to be the controlling area currency.
    You can use the company code currency or the currency of a different organizational unit recorded as a parallel currency in the company code. You can also use a separate controlling area currency not dependent on the company code currency.
    Cross-company code cost accounting can therefore be performed for company codes that use values recorded in different currencies. SAP recommends that you specify a consistent parallel currency for the company codes, and use this as the controlling area currency. In this case, postings in Controlling are made that are relevant for Accounting.
    The following currencies are valid in Controlling:
    · Controlling area currency
    The system uses this currency for cost accounting. This currency is set up when you create the controlling area. It is based on the assignment control indicator and the currency type.
    (see:  Specifying Controlling Area Currency )
    · Object currency
    Each object in Controlling, such as cost center or internal order, may use a separate currency specified in its master data. When you create an object in CO, the SAP system defaults the currency of the company code to which the object is assigned as the object currency. You can specify a different object currency only if the controlling area currency is the same as the company code currency. There is an object currency for the sender as well as one for the receiver.
    · Transaction currency
    Documents in Controlling are posted in the transaction currency. The transaction currency can differ from the controlling area currency and the object currency. The system automatically converts the values to the controlling area currency at the exchange rate specified.
    The system always translates actual data with the average rate (exchange rate type M).
    You store the exchange rate type for each currency. You can specify a different exchange rate type for planning data in the version.
    All three currencies are saved in the totals records and the line items. This enables you to use the different currencies for evaluations in the information system. This is only possible if you specified that all currencies should be updated for the given controlling area (see: Maintain Controlling Area).
    The transaction currency is USD, the controlling area currency is EUR, and the object currency is SFR (Swiss francs). The system converts the amounts as follows:
    1.) From transaction currency to controlling area currency (USD ® EUR)
    2.) From controlling area currency to object currency (EUR ® SFR)
    The following additional currencies may also appear as controlling area currencies in Controlling if you use cross-company code cost controlling:
    Local Currency:
    Company code currency (country currency) used for local ledgers in external accounting.
    For each company code you can specify one or two parallel currencies (= second and third local currencies) which are stored in the documents and updated parallel to the local currency in the general ledger.
    Group Currency:
    Currency in which the group balance sheet is displayed.
    You can specify it as a parallel currency (additional local currency) for a company code.
    Hard Currency:
    Secondary currency for countries with high inflation. You can specify it as a parallel currency (additional local currency) for a company code. You need to specify the hard currency in the detail screen for the corresponding country.
    Index-Based Currency:
    Country-specific, fictitious currency stipulated in certain countries with high inflation for tax returns. You can specify it as a parallel currency (additional local currency) for a company code. You need to specify the index-based currency in the detail screen for the corresponding country.
    Global Company Currency:
    Currency used in a corporate group. In the CO application component you can create companies to represent divisions, regions, or product groups.
    You can specify it as a parallel currency (additional local currency) for a company code. You need to store the global company currency in the detail screen for the corresponding company.
    For more information on defining parallel currencies, see Customizing under Financial Accounting ® FI Global Settings ® Company Code ® Parallel Currencies ® Defining additional local currencies.
    Reg
    *Assign points if helpful

  • Actual Cost Component Split for cross company code transfers.

    Hi,
    My issue is as follows.
    Production process spans across 2 company codes.
    Goods are produced in production company code, transferred (via stock transport order) to marketing company code and sold to customers from marketing company code.
    Stock transport order follows sales scenario i.e.. marketing company code creates purchase order for goods from production company code and production company code bills marketing for the goods.
    Actual costing / Material ledger is implemented in both company codes.
    We would like to roll-up (transfer) actual cost component split from production company code to marketing company (in a similar way as in product cost planning in cross-company scenario).
    However, due to the fact that the transfer between the companies is in fact a "sales" the goods in marketing company code are seen as externally purchased and the only cost component we can create is based on PO conditions. But we want to get the info about production cost component split.
    Once again this is for ACTUAL cost component split.
    I would be grateful for any ideas.
    Thanks,
    Szymon

    Hi Udo / Szymon.
    I have a question about this issue.
    In the sap help  about multiple valuations / group costing:
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb848443a311d189ee0000e81ddfac/content.htm
    Its not clear if this can roll up the Actual CCS? or what it do? My question is because i read the documentation of  bussiness function: LOG_MM_SIT,and also the book *Actual Costing with The SAP Material Ledger*
    states that we can handle the rollup of actual cost component split inter-company only with this BF active.
    Could you clarify about this?
    thanks!!
    Arturo.
    Group Valuation
    Goods movements between affiliated companies not involving intercompany profits are processed using the group view. This view determines the actual cost of goods manufactured for the group, and does not include any intercompany profits. You can, however, display internal profits as delta profits in the legal and/or profit center views.
    When you define cost components, you can specify that internal profits between company codes and/or profit centers are shown in detail in the cost component split. You activate these delta profits for the group valuation in the attributes of the cost components.
    For each cost component structure, there can only be one cost component under which the delta profit is shown. This means that neither the legal view nor the profit center view can have more than one cost component for the delta profit.
    To cost multiple values, you define a costing type for each valuation approach in Customizing for Product Cost Planning. You use the costing type to specify which valuation approach you require. You define each costing type in a new costing variant and carry out a cost estimate with this costing variant.
    Group Costing and Multiple Valuation Approaches
    In-Depth Detail of the Value-Added Chain: Partner Cost Component Split
    You can display in detail the costs of materials and services of every company department in the value-added chain for every stage of the production process. The partner can be traced for every material used. To do this, you define a partner version, which enables the value-added portions of each manufacturing level to be displayed in detail. For further information about this, see Partners and Direct Partners.
    The group cost component split can be displayed according to your partner definition. You can display the cost structures of the partners hierarchically according to your requirements, such as the company code segments on the highest level and the plant or profit center segments underneath.
    To display partner cost component splits, define a partner version in Customizing and enter it in the costing type.

  • Material Ledger : Cost component split different in CO PC and ML

    Hello SAP People,
    In ML cost component split I don't have the same split that in CK13N COPC.
    History
    We changed the cost component structure in OKTZ, because we wanted to split on two different cost component the cost of Copper :
    -     Copper
    -     Primes :Premium cost (transformation cost for producer) on copper.
    In CK11N the split is OK and we can read the new cost element corresponding to premium cost.
    To split the costing tool goes on the purchase info records to read condition type that are different for copper and premium.
    The problem we have is that when we run Material ledger we are not able to see after a good receipt a similar split in the cost component view.
    We already run MLCCS_RESET and MLCCS_Startup programs this month and created new Raw material after. But it seems the ML do not take care of this and all the actual cost (I stop to single level) are on the copper cost component and there is nothing on Premium cost component.
    We just run single level on ML for current month.
    Could you please help me to explain why we are not able to obtain the correct split between Copper and u201CPrimesu201D

    Hi Marco,
    yes, these both are independent from each other. You will have no issue when these are different.
    It is very typical that you want to report different kind of information for activities as for materials.
    A typical setup might be
    Activity                                   Material
    Asset depreciation                   Raw Material Cost
    Room cost                               Energy
    Labour                                     Production Cost
    labour overhead                      Production Overhead
    Electricity                                 Packaging
    When you use the activity for the production of a material (confirmation CO15) the assignment goes normally to a single cost component in the material, above for example into production cost. This is controlled by the cost element. Only when the primary cost component split is activated and a transfer structure betweeen both is maintained you could achieve
    Asset depeciation, Room Cost, Labour overhead  -> Production overhead
    Labour -> Production Cost
    Electricity -> Energy
    Best regards,  Udo

  • Difference between cost component structure and cost component split

    can anyone explain me the difference between cost component structure and cost component split with simple example
    thanks
    santosh

    Hi ,
    cost component structure
    Definition
    Number that identifies the structure.
    Use
    In Product Cost Controlling, the cost component structure determines how the results of material costing are updated. The cost component structure groups the costs for each material according to cost component (such as material costs, internal activities, external activities, and overhead). If the material is used in the production of another material, the cost component split (which breaks down the costs according to material costs, internal activities, external activities, overhead, and so forth) remains in the system when the costs are rolled up.
    In the cost component split, you also define the following for material costing:
    Which part of the costs are fixed costs
    Which costs are
    cost of goods manufactured and what are sales and administration costs
    Which costs are relevant for stock valuation, commercial inventory valuation and tax inventory valuation
    When the cost component structure is assigned to the organizational units, you can specify that two cost component splits are created:
    Main cost component split
    This is the principal cost component split, meaning that it is used in the standard cost estimate, which can be used to update the material master. The main cost component split can be a cost component split for cost of goods manufactured or a primary cost component split.
    Auxiliary cost component split
    This can exist in addition to the main cost component split, and is not used in the standard cost estimate. It can be used for analysis purposes, in that it can be displayed with the cost estimate and passed on to Profitability Analysis.
    In Cost Center Accounting, the cost component structure determines how the results of the activity price calculation are updated. The cost component structure groups the costs for each activity type of the cost center according to components (such as material costs and labor costs). If an internal activity allocation is carried out, the cost component split (which breaks down the costs according to material, labor costs, and so forth) is retained at cost rollup.
    If the cost component split is not to be retained, you can create a switching structure for the cost component structure for Cost Center Accounting. In the switching structure, you specify which sender cost component goes into which receiver cost component.
    <b>require a cost component structure to calculate prices using cost component split.</b>
    For each cost component structure you define a component such as energy, personnel, or raw materials. The components combine all costs occuring for a particular cost element area. In this way, you ensure greater cost transparency in activity price calculation when putting together the activity type prices - for example, it becomes easier to find how much of the activity price is taken up by the material costs.
    In activity allocation, the cost component structure remains constant, meaning that the receiver takes on the sender cost elements and that the allocated costs are posted in the same cost components in the receiver as in the sender.
    A cost component structure can have a maximum of 40 defined cost components.
    Cost components are assigned to cost elements. You thereby determine which cost elements go to which rows in the structure, and how these components are updated in price calculation.
    Hope ths helps
    Please rewad points
    Sunil

  • REPORT S_ALR_87013558 - budget in Controlling area currency not correct

    Hi ,
    these are the budget column settings :
    Key figure          Overall in CAC
    Version     0     Plan/Act - Version
    Value Type     41     Budget
    Object ind.     P     Project item
    Debit type     1     Costs and credit-side payments
    My case is the following :
    Controlling Area Currency : USD
    WBS object currency : EUR .
    The budget on the wbs is in EUR ; unfortunately the bdg displayed into the report , has a Change rate that i dont' recognize .
    E.G. Budget on the wbs 110000 EUR - bdg displayed into report : 120.153,85
    If i launch the transaction cj31 i see the bdg , if i select controlling area currency , the bdg in USD >156.200,00.
    This value is read from the table BPGE .
    Why does the report S_ALR_87013558 don't read it also from there?
    thanks and regards

    hi
    in PS all the Cost reports are read from the Info Database.

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Actual Cost component split - Per PO

    Dear ML Experts,
    We have activated Material Ledger and Actual costing/ Actual cost component split in our implementation. The standard cost is based on delivery costs and there is no manufacturing involved. In order to test ML, we created some POs and did a GR and IR for those POs. When I look at the Material Price analysis on the Price Determination Structure View, I can see the Price differences per transaction (Goods receipt, Invoice receipt).
    But when I go to the Cost component View (Actual), I cannot drill down into the individual transactions. I am able to see the actual cost component split only at the summarized level across multiple transactions. I can see the category Purchase Order under Receipts, but I am unable to drill down to see the actual cost component split for the individual transactions (goods receipts, invoice receipts).  Did I miss anything on the configuration? The client wants to see the price differences per cost component per transaction and actual cost component split per transaction.
    Is it possible to view this information using standard configuration? Would I have to change the controlling level in order to achieve this?
    Can you please provide your advice?
    Thanks,
    Balram

    Hi Balram.
    If you have access to an IDES system, you can see a Cost Component split like this:
    As fas as I know, this is only for educational porpouses. In the standard System, its not recomended have the detail of the split per movement, due to the huge amount of data genereted. There is a Flag that control this, in a Txxx table (i dont have access to the system right now).
    If you really want this functionality, write SAP in the marketplace, and I guess their response is exactly what im saying.
    Arturo.

  • Primary cost component split not happening

    Hello Experts,
    I am trying to create a Primary cost component split for Products with following settings
    1. Creation of Primary cost component structure "1N" and marking it as Primary cost component
    2. Assigning the Primary cost elements to the Cost component structure
    3. Assigning the Primary cost component structure for the Company code and Plant
    4. Assigning the Primary cost component structure to "Version" under "Price calculation" tab.
    5. Activity type with Activity type category "1- Manual entry, Manual allocation" and Price Indicator "1 - Plan price, automatically based on activity"
    6. Activity output planning for Cost center
    7. Primary cost planning for the Cost centers
    8. Activity price calculation. (Update run) - Prices are changed in KP26 also
    9. After all the above steps I checked report S_ALR_87013644, Plan price is existing in the report as mentioned in SAP note: 1658589
    After all the above steps, I tried running Cost estimate for a product. I am getting the error message
    Cost element 90001 is not assigned to a cost component
    Message no. CK239
    Also, I am getting a message
    No structure could be determined for internal activity TEB (M0001)
    Message no. CK694
    Therefore the Cost component is showing only the Material component.
    Where "90001" is a secondary cost element. I am not sure why system is still searching for Secondary cost element where we have assigned Primary cost component structure. I also ensured that Primary cost elements used in planning are all assigned to a Component in Cost component structure.
    I checked for SAP note "1736332", which is not applicable for my system version. Current version of SAP_APPL is  Release 606 and Support package SAPKH60607.
    Please help. Am I missing any settings.
    Thank you in advance.
    Muneer Ahamed N

    Hi Muneer,
    Please check whether you have maintained cost center splitting structure properly and assigned to the respective cost center for which you have maintained output planning and input planning.
    This splitting structure is much required because there only we maintain the relationship between primary cost elements and activities.
    Coming to your first message, yes system expects maintenance of secondary cost elements also in the cost component structure which is not primary CCS.
    Inorder to show primary cost component structure view:
    First, system calculates the direct activity cost in terms of secondary cost elements...
    Next, it verifies the cost center splitting structure you made,
    Then, system is going to convert the direct activity cost in terms of primary cost elements based on the splitting structure and Finally displays the primary cost component view
    I suppose second message speaking about cost center splitting structure only, please go through it carefully
    Other than these whatever the process you specified is right only..
    Regards...
    Jose

Maybe you are looking for

  • ACR vs. Lightroom

    I have Photoshop CS3 and Lightroom 2.x (as well as beta 3).  I just bought a camera that is not supported in CS3 but Lightroom can open the RAW files.  Lightroom notifies me when I open a RAW file for PS that the version of ACR I have won't open the

  • Ipad mirroring or streaming for quality

    I now have two ways of streaming music and movies from my ipad and i phone.to my speakers and tv. Both use appletv. One is to connect using airplay and the other is to use mirroring. Is there any difference in the quality of media when these methods

  • Help needed to reset bios

    I have a Satellite A40-SP150, somebody entered a password into the bios, and can't start my laptop, how do I reset the bios or how do I reach the rtc battery to reset the bios? Have tried to download the service manual for the laptop but can't find i

  • ARE3 Creation

    Hi, While creating ARE-3 document the error is coming as "You cannot create ARE3 for duty paid Deemed exports excise invoice! Message no. 4F326". Can anybody guide me on this issue as it is urgent. Thanks&Regards PSK

  • Enhancing FD32 transaction

    Hi All, I need to add 4 new fields to "Status" screen of FD32 transaction. I cannot use the already existing standard fields so I need to add custom fields. I have searched the forum and found the following enhancement and BADI : RFDRRANZ FI_DUZI_ROU