Material Ledger : Cost component split different in CO PC and ML

Hello SAP People,
In ML cost component split I don't have the same split that in CK13N COPC.
History
We changed the cost component structure in OKTZ, because we wanted to split on two different cost component the cost of Copper :
-     Copper
-     Primes :Premium cost (transformation cost for producer) on copper.
In CK11N the split is OK and we can read the new cost element corresponding to premium cost.
To split the costing tool goes on the purchase info records to read condition type that are different for copper and premium.
The problem we have is that when we run Material ledger we are not able to see after a good receipt a similar split in the cost component view.
We already run MLCCS_RESET and MLCCS_Startup programs this month and created new Raw material after. But it seems the ML do not take care of this and all the actual cost (I stop to single level) are on the copper cost component and there is nothing on Premium cost component.
We just run single level on ML for current month.
Could you please help me to explain why we are not able to obtain the correct split between Copper and u201CPrimesu201D

Hi Marco,
yes, these both are independent from each other. You will have no issue when these are different.
It is very typical that you want to report different kind of information for activities as for materials.
A typical setup might be
Activity                                   Material
Asset depreciation                   Raw Material Cost
Room cost                               Energy
Labour                                     Production Cost
labour overhead                      Production Overhead
Electricity                                 Packaging
When you use the activity for the production of a material (confirmation CO15) the assignment goes normally to a single cost component in the material, above for example into production cost. This is controlled by the cost element. Only when the primary cost component split is activated and a transfer structure betweeen both is maintained you could achieve
Asset depeciation, Room Cost, Labour overhead  -> Production overhead
Labour -> Production Cost
Electricity -> Energy
Best regards,  Udo

Similar Messages

  • Material Ledger: Cost Component Split (Elements) table CKMLKEPH

    Hi All,
    Whats the use of this table, what information get updated in this table while creating invoice.
    Message was edited by:
            Alexander

    Hi Alexander,
    CKMLKEPH belongs to material ledgers actual cost component split database:
    Differences from Actual Costs to Standard Price
    Entries per material, update, cost element structure, kind of difference and level
    Created per any update where occur differences
    so if ML is active with actual CCS and your invoice has a price diference than CKMLKEPH will store the split of the price difference posting.
    it is related to CKMLKEV.
    this note gives some further links
    <a href="https://websmp206.sap-ag.de/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=398941&_NLANG=E">Note 398941 - INFORMATION: CO-PC-ACT (Data structures)</a>
    best regards,
                         Udo

  • Difference between cost component structure and cost component split

    can anyone explain me the difference between cost component structure and cost component split with simple example
    thanks
    santosh

    Hi ,
    cost component structure
    Definition
    Number that identifies the structure.
    Use
    In Product Cost Controlling, the cost component structure determines how the results of material costing are updated. The cost component structure groups the costs for each material according to cost component (such as material costs, internal activities, external activities, and overhead). If the material is used in the production of another material, the cost component split (which breaks down the costs according to material costs, internal activities, external activities, overhead, and so forth) remains in the system when the costs are rolled up.
    In the cost component split, you also define the following for material costing:
    Which part of the costs are fixed costs
    Which costs are
    cost of goods manufactured and what are sales and administration costs
    Which costs are relevant for stock valuation, commercial inventory valuation and tax inventory valuation
    When the cost component structure is assigned to the organizational units, you can specify that two cost component splits are created:
    Main cost component split
    This is the principal cost component split, meaning that it is used in the standard cost estimate, which can be used to update the material master. The main cost component split can be a cost component split for cost of goods manufactured or a primary cost component split.
    Auxiliary cost component split
    This can exist in addition to the main cost component split, and is not used in the standard cost estimate. It can be used for analysis purposes, in that it can be displayed with the cost estimate and passed on to Profitability Analysis.
    In Cost Center Accounting, the cost component structure determines how the results of the activity price calculation are updated. The cost component structure groups the costs for each activity type of the cost center according to components (such as material costs and labor costs). If an internal activity allocation is carried out, the cost component split (which breaks down the costs according to material, labor costs, and so forth) is retained at cost rollup.
    If the cost component split is not to be retained, you can create a switching structure for the cost component structure for Cost Center Accounting. In the switching structure, you specify which sender cost component goes into which receiver cost component.
    <b>require a cost component structure to calculate prices using cost component split.</b>
    For each cost component structure you define a component such as energy, personnel, or raw materials. The components combine all costs occuring for a particular cost element area. In this way, you ensure greater cost transparency in activity price calculation when putting together the activity type prices - for example, it becomes easier to find how much of the activity price is taken up by the material costs.
    In activity allocation, the cost component structure remains constant, meaning that the receiver takes on the sender cost elements and that the allocated costs are posted in the same cost components in the receiver as in the sender.
    A cost component structure can have a maximum of 40 defined cost components.
    Cost components are assigned to cost elements. You thereby determine which cost elements go to which rows in the structure, and how these components are updated in price calculation.
    Hope ths helps
    Please rewad points
    Sunil

  • Material ledger wrong cost component split

    i have change the price detemination from '2' to '3' in the material ledger in period 04/2011.
    now i wont to execute costing run for actual cost in period 10/2010. to do this i have update tables CKMLPRKEKO e CKMLPRKEPH..
    in this mode I don't have error in costing run, but i have a big problem . i don'have a correct cost component split becouse all the value is on row material.
    i give a look to the SAP table and i find table MLAUFKEPH and table MLKEPH that don't have data for period 10/2010.
    someone can help me?
    thank you.
    Your issue is not related to FI but with MM, therefore your thread was moved to MM forum so the experts will be able to help you better.
    FI Moderator.

    I think this table gets updated only during changes to the material price(Accounting View) thats basically price change.
    Once the Material is created, price changes are carried out using MR21.
    Rajeev

  • Cost component split transfer for Profit center valuation in ke27

    Dear All,
    We have activated multiple valuation/transfer prices. Material ledger is also activated.
    We want to transfer cost component split to CO-PA by ke27.
    We have defined separate costing keys for access to actual cost estimate for legal and profit center valuations.
    But cost component split transfer to COPA works only for legal valution. Even we have defined type of valution for profit center  costing key -transfer cost component split and total costs.
    What should be else customized to transfer cost components splitting in profit center valuation to CO-PA from actual cost estimates?
    With best regards,
    Kamila.

    Hi,
    I have assigned the same value fields used for legal valuation to column 2, which was pointed in message.
    But now I got following message in ke27:
    For actual data, value fields that were already populated before CO-PA valuation cannot be changed in valuation.
    1. As a rule, value fields that were filled before CO-PA valuation - be it from SD or by a manual entry of a line item - can only be changed by means of user exits.
    (Note that for plan data, CO-PA valuation always has priority over the values planned manually.)
    2. The valuation steps in a CO-PA valuation strategy are numbered sequentially. These numbers determine the order in which the steps are carried out within that strategy. As a rule, value fields populated in one step can be used as a basis for calculating values for other value fields in a subsequent step.
    Value fields that were populated in a previous step are generally not overwritten by subsequent steps.
    The exception to this are steps that use a CO-PA user exit. User exits let you change individual value fields.
    3. If you valuate using multiple material cost estimates simultaneously, this means that the values of different cost components within the same cost estimate are aggregated and then entered in one CO-PA value field. However, value fields that already contain data from a previous cost estimate are not overwritten by a later cost estimate. Consequently, you should assign value fields in Customizing so that the values of different cost estimates are entered in different sets of value fields.
    4. When condition values are transferred to CO-PA value fields, note that condition types that are assigned to the same value field are added together. This is also the case when the condition types come from different costing sheets within the valuation strategy.
    So does it mean we should define separate value fields for PC valuation?
    With best regards,
    Kamila.

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Actual Cost component split - Per PO

    Dear ML Experts,
    We have activated Material Ledger and Actual costing/ Actual cost component split in our implementation. The standard cost is based on delivery costs and there is no manufacturing involved. In order to test ML, we created some POs and did a GR and IR for those POs. When I look at the Material Price analysis on the Price Determination Structure View, I can see the Price differences per transaction (Goods receipt, Invoice receipt).
    But when I go to the Cost component View (Actual), I cannot drill down into the individual transactions. I am able to see the actual cost component split only at the summarized level across multiple transactions. I can see the category Purchase Order under Receipts, but I am unable to drill down to see the actual cost component split for the individual transactions (goods receipts, invoice receipts).  Did I miss anything on the configuration? The client wants to see the price differences per cost component per transaction and actual cost component split per transaction.
    Is it possible to view this information using standard configuration? Would I have to change the controlling level in order to achieve this?
    Can you please provide your advice?
    Thanks,
    Balram

    Hi Balram.
    If you have access to an IDES system, you can see a Cost Component split like this:
    As fas as I know, this is only for educational porpouses. In the standard System, its not recomended have the detail of the split per movement, due to the huge amount of data genereted. There is a Flag that control this, in a Txxx table (i dont have access to the system right now).
    If you really want this functionality, write SAP in the marketplace, and I guess their response is exactly what im saying.
    Arturo.

  • Itemization does not match cost component split

    Hi,
    I need your help or could you please shed some light as to how to fix .
    A new Overhead was created, in order to add expenses to the pricing of the product. For it a variant  of different pricing to which is used currently was created, and so for maintain a historic one of the information.
    In addition, in the cost component Structure an adjustment of the configuration was carried out, this was done because the previous the cost component Structure contained 18 elements of costs, which the most of the elements were specified as fixed and variable costs, therefore the  system only permitted the addition of  2 more elements  (SAP only permits 20 elements of fixed and variable costs), nevertheless was necessary to create a total of 23 elements of costs. For it  the previous elements have to be modified and to change some elements as variable costs, specifically the elements corresponding to the accounts of materials.  using tcode OKTZ
    The addition of 5 more elements of costs, corresponding to overhead  elements, where the type 41 costs classes were configured from the plan of surcharge created. 
    After carrying out the changes and to transport them the client of production, when i execute the T-code ck13n an inconsistency in the previous pricings was generated, because  the cost component Structure was modified and the the following one Nº message was showed:  CK869 " Mat.XXX in plant XXX: itemization does not match cost component split, the report of itemization shows different values to the reports of Costed Mutilevel BOM and of Cost  Components.  Additionally to the error shown by the system, also is observed that to the Cost  Components report    a cost in the new elements of overhead  was added, even when the  calculation of previous cost did not contain the determination of overhead.
    In order to fix the error, I modified the cost component structure as it was before and the created another  cost component structure with the required changes requested by the client specifying that it should start to be current this year. However after that change the error message nºCK869 continue: Mat. XXX in plant XXX: itemization does not match cost component split. Adding to that error message, the cost of the finished product changes with reference to the calculus of the previous product after modified the configuration and that is because the cost of the semifinished product is not being taken the values of the row material, and it is appearing with cost 0 and the only value that is taking on the matter are the costs of the activities types.

    If you want the message to go away then you need to mark and releasse the estimate.  However, there is no requirement that you do this.  The message you are getting is an informational message only.  You can continue without re-costing the item.  If you do re-cost the material the new cost estimate will reflect and changes you've made to the components, so there is a good chance you will get a different value with the new estimate.  So if that's ok, go ahead and mark and release the new estimate.

  • Cost component split in copa

    Hi,
    I am looking cost component split in copa document ,
    Price for FERT(FG) materil valuation will at manufactured plant level is Standard price(S) and Depo level Moving avg price(V) i am doing standard cost estimate
    for that i have done ..setting.
    1) cost component structure ( Raw material, reprocess cost, additive cost, and overheads)
    2)Valuation Strategy (maintained with Point of valuation 01,02,03,04)
    3)Costing key  (Y01)
    4)Assign Costing Keys to Material Types  ( ROH and FERT, PV=01,02,03,04.)
    5)Assign Value Fields , ( Operating concern & Value fields are Raw material, reprocess cost, additive cost, and overheads)
    6)I have written copa report
    Cost breakup i am geting when i maintained standard price of the material, but
    when i maintain price indicator V (MAP) stock value will be different it depends on Goods movement, i am getting price converted standard price.
    Is their any setting missing to fulfill the same ( meet the requirement if goods movement taken in consideration)
    I am not getting proper cost split in COPA report.
    Please help me i am stuckup.
    Thanks in Advance
    Regards.
    Vinu
    Edited by: vinutha1010 on Jun 17, 2010 7:08 PM

    HI PietStrydom ,
    thanks for your valuable replay.
    could u tel me in detail..how can i achive in this transaction ..ie somthig like SCE access .
    I have taken parameater in t.code KEPC (source =  POV, Record type, material type, plant, Target = costing key, plant, type of error,
    Regards.
    Vinu,

  • Reference to note 434873 - Auxiliary cost component split

    1) We use material ledger. We already have a primary cost component split defined in our system.
    2) We want to activate an auxiliary cost component split.
    3) We read the note 434873, paragraph 2)b) (activating an auxiliary cost component split).
    4) Who can assist us to develop the customer-specific Z program that is referenced in the note?

    Hi to Evrybody,
    I am trying to configure Primary Cost Component Split,, but I am confused what are the technical steps to configure such a structure 
    http://help.sap.com/saphelp_40b/helpdata/en/7e/cb7e8643a311d189ee0000e81ddfac/content.htm
    There are several requirements how to configure in SAP Primary Cost Component Split:
    1)You assign a cost component structure in the CO version in Cost Center and Process cost planning!  Which Cost Component Structure? The Primary Cost Component Structure or the Cost Component Structure?
    2)You determined the prices through planned price iteration!                                                                 We set this indicator in the CO Version itself?
    3)You define a Cost Component Structure for Primary Cost Component Split of Product Cost Planning! How do we define it, via simply checking the check in OKTZ?
    I want to understand when you create Cost Component Structure and Primary Cost Component Structure, which one of these 2 needs to be assigned in the CO version in Cost Center Accounting? And the other thing is I do not make the difference between Cost Component Structure and Auxiliary Cost Component Structure? Could you please shortly describe what is the difference? Other thing is when you create Primary Cost Component Structure and its components, DO THEY INCLUDE ONLY RANGE OF PRIMARY COST ELEMENTS OR IT IS A TECHNICAL STEP ONLY TO CHECK THAT CHECK IN OKTZ FOR Primary Cost Component Split. Let me know, thank you very much for your help and cooperation again!
    Best Regards,
    Georgi Georgiev

  • Activating Cost Component Split

    Hi People,
    I have to do some tests and for while i need to activate the "cost component split" in the path:
    \IMG\ Controlling\ Product Cost Controlling \ Actual Costing/Material Ledger \ Actual Costing \ Activate Actual Cost Component Split  (by valuation area)
    I would like to know if there is some impacts for that and
    if we have some problems to revert, becuase at this moment it is only a test.
    Thanks,
    Rosana.

    Hello Paul,
    Thanks for your answer.
    We already use "material ledgder" but we don´t have activate component split. But look, what I am talkin is only one transaction (that I said before), becuase I have to do some test inside the aplication BW and it is a prerequisite.
    I would like to know what is the impact to activate the component split on that transaction I said before.
    It is only a test, but I don´t know if I put a flag in that transaction, the system will create some table internally.
    And other thing I don´t know is, if It it is possible to reverte the activation (only in that transaction) that I would update and if there is some impacts.
    Thanks a lot.

  • Actual Cost Component Split for cross company code transfers.

    Hi,
    My issue is as follows.
    Production process spans across 2 company codes.
    Goods are produced in production company code, transferred (via stock transport order) to marketing company code and sold to customers from marketing company code.
    Stock transport order follows sales scenario i.e.. marketing company code creates purchase order for goods from production company code and production company code bills marketing for the goods.
    Actual costing / Material ledger is implemented in both company codes.
    We would like to roll-up (transfer) actual cost component split from production company code to marketing company (in a similar way as in product cost planning in cross-company scenario).
    However, due to the fact that the transfer between the companies is in fact a "sales" the goods in marketing company code are seen as externally purchased and the only cost component we can create is based on PO conditions. But we want to get the info about production cost component split.
    Once again this is for ACTUAL cost component split.
    I would be grateful for any ideas.
    Thanks,
    Szymon

    Hi Udo / Szymon.
    I have a question about this issue.
    In the sap help  about multiple valuations / group costing:
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb848443a311d189ee0000e81ddfac/content.htm
    Its not clear if this can roll up the Actual CCS? or what it do? My question is because i read the documentation of  bussiness function: LOG_MM_SIT,and also the book *Actual Costing with The SAP Material Ledger*
    states that we can handle the rollup of actual cost component split inter-company only with this BF active.
    Could you clarify about this?
    thanks!!
    Arturo.
    Group Valuation
    Goods movements between affiliated companies not involving intercompany profits are processed using the group view. This view determines the actual cost of goods manufactured for the group, and does not include any intercompany profits. You can, however, display internal profits as delta profits in the legal and/or profit center views.
    When you define cost components, you can specify that internal profits between company codes and/or profit centers are shown in detail in the cost component split. You activate these delta profits for the group valuation in the attributes of the cost components.
    For each cost component structure, there can only be one cost component under which the delta profit is shown. This means that neither the legal view nor the profit center view can have more than one cost component for the delta profit.
    To cost multiple values, you define a costing type for each valuation approach in Customizing for Product Cost Planning. You use the costing type to specify which valuation approach you require. You define each costing type in a new costing variant and carry out a cost estimate with this costing variant.
    Group Costing and Multiple Valuation Approaches
    In-Depth Detail of the Value-Added Chain: Partner Cost Component Split
    You can display in detail the costs of materials and services of every company department in the value-added chain for every stage of the production process. The partner can be traced for every material used. To do this, you define a partner version, which enables the value-added portions of each manufacturing level to be displayed in detail. For further information about this, see Partners and Direct Partners.
    The group cost component split can be displayed according to your partner definition. You can display the cost structures of the partners hierarchically according to your requirements, such as the company code segments on the highest level and the plant or profit center segments underneath.
    To display partner cost component splits, define a partner version in Customizing and enter it in the costing type.

  • Cost Component Splitting in Joint Production

    Hello.
    I meet a trouble in the cost component splitting for the co-product.
    I tried to creat a BOM like :
                                 A                       B
                                  C (CCS1)           D(CCS2)
    the raw material C&D are in different cost component,and the manufacturing matertials are A&B.
    and I set the apportionment structure like A(CCS1 100%,CCS2 50%)   B(CCS1 0%, CCS2 50%)
    Then i run the CK11N,and the result is correct.
    But the problem is as following:
    when I creat a BOM like :
                                 A                       B
                                              E
                                  C (CCS1)          D(CCS2)
    the raw material C&D are in different cost component,and the semi-product matertial is E,then E is producted for finished product A&B.
    and I set the apportionment structure like A(CCS1 100%,CCS2 50%)   B(CCS1 0%, CCS2 50%)
    then i run the CK11N,and the result is wrong.
    whatever i set the apportionment structure,the result of the CCS is  A (CCS1 50%,CCS2 50%),B(CCS1 50%,CCS2 50%)
    anybody can tell me how i can get the correct result?
                                                                                    Roc
    Edited by: Roc Roc on Jan 4, 2010 11:42 AM

    Hi
    Make cost splitting structure and assigne to Production Cost Center.
    Run Cost splitting KSS2 for cost splitting according to activity types.
    bukhari

  • ML Document: Cost Component Split (Elements) for Values

    Hi peolple!
    Could you help me to know how I can find the table to find de follow situation:
    The line of diference that is created after the Material Ledger is closed, for example, in the line Production Receipts.
    After closing month, In the CKM3, in the line "Production", the line "Receipts from lower levels" is created (we know the reason).
    I neeed the table where we can find the values of this diference by cost component.
    I already saw the table: MLKEPH.
    This one give me the information, but show us other registers with values, and based on only this table, we don´t have how to take only the register we need.
    Thanks,

    MLPRKEKO                       ML Document: Cost Component Split (Header)
    MLPRKEPH                       ML Document: Cost Component Split (Compone

  • Cost component split costed with value of zero

    Hi,
    We have ML activated for the Plant/ Valuation area.
    We have Company Code Currency type -10 and Controlling Area Currency type - 30. Both Currencies are different.
    I have maintained in OKYW, the company code and costing type and Valuation variant.
    When I am running the cost estimate for the material and Plant I am getting the error..
    "Cost component split costed with value of zero".
    I have also checked that the cost element is assigned to Cost Component split and is active.
    I am not able to find out what is the reason for the error. I am stuck up and not bale to run the cost estimate.
    Please help/ suggestion.
    regards
    Kami

    Dear Kami,
    This error is probably caused by the currency conversion. Error CK 240 is raised if
    a) cost component split in co-area currency is zero
    b) the costing variant is used for standard price update
    c) cost component split in co-area currency is stored on database
        (this is a customizing setting of the costing variant)
    There are 3 ways to proceed:
    1) use a greater costing lot size for the raw materials with CK 240
          --> costing value in CO area currency will be greater 0
    2) disable saving of cost component split in co-area currency
    3) deactivate coding of note 927372 --> please review note 1004727 for details.
    Kind regards,
    Antje

Maybe you are looking for

  • How do we anchor to top of page on page load?

    HI! I use iframes and when a user clicks a link in the middle of a page it loads the new child iframe in the iframe BUT the new page is at the same vertical spot as the previous page. I want the page to be loaded at the top so the user can see the se

  • Issue with Oracle 10g database connectivity

    Hi, Oracle 10g Express edition is been installed in my machine at the location C:\Oracle10g. When i tried to connect the same from toad it is working fine. Visual studio-2008 is been installed in machine at loc C:\Program files(x86)\ Problem I am fac

  • JTAPI answer forwarded call

    Hi I've written a small app that registers as a CTI PORT and accepts calls, confers with a hunt group and then transfers once the call has been picked up by the hunt. (essentially creating hold music for the customer until someone in the hunt answers

  • When I create a new tab it always presents a Yahoo search engine rather than my home page (Google). A new session of firefox does not do this but acts normally

    When opening a new tab, the 'homepage' presented in the new tab is a Yahoo homepage. If however, I open a new session of Firefox rather than a new tab, I get my normal Google homepage.

  • Terminating JVM

    Hi, Im not sure if what I am thinking can be done, please bear with me... I have two Java program A and B (I would rather not change the source for B as its a proven app), program A instantiates B through using Runtime.exec(). However program B also