Activity variance and production variance seperate in COPA

Dear experts,
My client wanted to break production variance(ko88 in two parts in COPA reports
Total material variance
Total Activity variance
What i am thinking- In PA transfer structure of Production order.I will create four assignements
1)Material price variance-Only RM cost element(Cost element Group)-Price variance category-Material Variance(value field)
2)Material QTY variance-Only RM cost element(Cost element Group)-Qty variance category-Material Variance(value field)
So both assignment linked to material variance value fields.
same way for activity
1)Activity price variance-Only Activity cost element with 43 categoryt(Cost element Group)-Price variance category-Activity Variance(value field)
2)Activity QTY variance-Only Activity cost element with 43 category(Cost element Group)-Qty variance-category-Activity Variance(value field)
So both assignment linked to activity variance value fields.
Is it works for the above requirements or I will face any technical difficulties.
regards
RR

Hi
For sure, it will work....
Another approach can be to update the variance as per cost component structure instead of variance categories in COPA.... Stil the category wise variances can be seen in Other CO reports like Co03 / KKBC_HOE/KKO0 reports
br, Ajay M

Similar Messages

  • Actual COGS and Production Variances to COPA (KE27)

    Dear all,
    if the COGS is revaluated with the ML (revaluation of consumption)
    if the COGS is mapped as a dedicated value field in COPA
    if the COGS @ actual is passed to the COPA (KE27)
    Hence  is no longer needed to settle the production order variances to COPA!???
    Thanks

    Hello Francesco,
    Yes. Very True.
    Actual Costing will roll up the Cost for every next level. Without ML, the entry normally posted to FI when we run settlement.
    Dr/Cr. Production Variance
    Cr/Dr. COGM
    This is where it remains for information, since Both GL accounts belongs to P & L.
    When ML is activated, the variance is added to the next level of the product. Here , if we observe, settlement of variance neither impacted FI, When there is no ML Activation, nor impacted FI when ML is activated.

  • Production order variance and purchase variance go to one business area.

    Hi Experts,
    I have a issue while Purchase order we have ordered 3000 qty and while goods receipt we posted 300000 qty and same was issed for prodction order instead of 3000 and got variance.  Then afterward purchase order qty was rectified with correct qty then purchase variance happed.  The production order variance is getting offsetting by purchase order variance and no effect on gross profit.
    Now my question is production variance is going one business area and purchase variance is going another business area. It should not be like that.  Both should be showed only one business area.  Please provide solution. 
    Thanks in advance.
    Balu

    Dear Balu,
    You can try OKB9 wherein you need to select the indicator 'BAlrn' against the cost elements of Purchase price difference account. Then select the line item and click the folder 'Detail for business area/valuation area' and input your business area. Thereby you can capture this variance in same business area, even if any other business area is entered or derived differently.
    Further, if your production variance account is also a cost element, you can direct the postings to the same business area, we can do the same as explained above. If not, we have to think of another configuration or work around. Pl let me know.
    Trust this helps much!
    Regards,
    Ashok SINGH

  • Purchase order price variance and quantity variance

    Hi All ,
         I am working on a report development where we need price change , value change and quantity change in the report along with net value (ekpo-netwr) .
        Can anybody suggest me tables  in ECC where the changes (price,quantity and total value ) are captured ??? and if there is any BI content datasource which can satisfy this requirement.

    Hi All ,
         I am working on a report development where we need price change , value change and quantity change in purchase order in  the report along with net value (ekpo-netwr)
        Can anybody suggest me tables  in ECC where the changes (price,quantity and total value ) are captured ??? and if there is any BI content datasource which can satisfy this requirement.

  • Production variance in COPA

    Hi All,
    We are settling production variances to COPA and We have 3 values fields in COPA,Material Variance,production labor variance and Other variance.
    Variance categories are mapped to material, labor variance and others value fields.but i dont see any labor variances in Variance value field.i have reviewed and this is becuase of Variance categories.which are not one to one mapping to value fields.
    we have 9 Variance categories mapped to 3 value fields.
    client requirement is labor variances to settled to Variance value field,material variance to Material value field and Overhead and other variances to settlement others value field.is this possible?if yes.how can i do this?
    Any help is appreciated.
    Thanks,
    Anusha

    Hi,
    As explained earlier by other forum colleagues,variances captured at production can be assigned to COPA under value field.This assignment is happening through PA transfer structure for variance settlement.
    Normally this can be defined broadly into 2 categories : 1.Cost element and 2.Variance categories.
    After looking at your requirement,your main interest is in cost element based production variance push to COPA for reporting.i.e.Labor variance.
    Production order shows this variance under secondary cost element labor and difference between target/actual.COPA transfer structure doesn't push 2 seprate values (target/actual) ,whereas only delta gets posted.
    I feel your requirement is not possible through PA transfer structure.
    I would suggest,you push cost center specific labor expenses under new value field,capture cost component wise break up of standard cost udner different value field.
    Comparision of cost center expense and labor part of standard cost will provide you expected value.
    I know this complex thing to do,so discuss with client do they really want from COPA?
    Same reporting they can get from cost cente i.e.expense posted(labor ) and absorbed on product under secondary cost element.
    regards,ashok

  • Input Quantity Variance and Input Price Variance for Production Order

    Dear All
    I am running variance program KKS2 for calculating variance of production order. for Activity variances are coming under input price variance and input quantity varinace but for material the variances is now shown separately for quantity and price rather it is shown as variances total amount. Can someone help me in know why material quanitty variance and price variance not shown separately
    Regards

    How does input variance and output varia.nce will be calculated on the settlement of production order after TECO.
    VARIANCE CALCULATION DEPENDS ON CONFIGURATION IN THE FOLLOWING AREAS,
    1) VARIANCE VARIANT -  DETERMINES WHAT VAREIANCE CATEGORIES ARE CALCULATED, E.G MATERIAL PRICE , USAGE, LABOUR RATE , USAGE VARIANCE ETC..
    2) TARGET COST VERSIONS
    3) VALUATION VARIANT FOR WIP  AND SCRAP
    Can we check in KOB3 or COOIS.
    KOB3 -  YES
    COOIS -  CHECK IN COST REPORT

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

  • Hi production variance

    hi
    help me on report
    report for displaying actual start date,finish date,planned quantity,actual quantity and production variance.

    Hi,
    In OBYC you have to maintain gl account for production variance in PRD Transaction event key. If you want this field is to flow to COPA Then in PA Transfer structure you have to maintain allocation structure with this value field assignment.
    Regards,
    Sreekanth

  • Product Variance Calculation

    Gurus,
    How do we calculate Product variance?
    What is the procedure / process?
    Where can the effect be seen?
    Edited by: Bhatia on Oct 15, 2008 6:44 PM

    Hi,
    Variance Calculation
    As long the production order is not fully delivered or flagged Technical Complete the remaining order balance is treated as WIP. Otherwise the order balance shows up in variance calculation.
    If a lot-based product-controlling WIP, is valuated at actual costs. The WIP is calculated as the difference between the debit and credit of an order as long as the order does not have the status DLV (delivered).
    In lot-based product controlling the variances are not calculated until the order has the status DLV (finally delivered) or TECO (technically completed). This means that at the time the order has reached this status, the system no longer interprets the difference between the debit and the credit as work in process but as a variance. In lot-based product controlling orders never have work in process and variances at the same time.
    Variance calculation compares the actual costs incurred for the production/process order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    In this way you can find out which variances occurred between the value of the delivery and the actual costs and you can find the reason for the posting to the price difference account for materials with standard price control.
    Variances from production (target version 1)
    Variance calculation compares the actual costs incurred for the production order with the target costs for the production order and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variances occurred between the time the production order was created and the end of the production process.
    Variances from planning (target version 2):
    Variance calculation compares the planned costs for the production order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variance occurred between the time the standard cost estimate was created and the time the production order was created.
    Variance categories:
    The system assigns every variance to a variance category. The variance category indicates the cause of the variance (such as price change, lot-size variance). Variances are updated to the information system and passed on to Profitability Analysis according to variance category.
    You differentiate between variance categories on the input side and on the output side:
    u2022     Variances that occur because of goods issues, internal activity allocations, overhead and G/L account postings are displayed on the input side. Price variances, quantity variances, resource-usage variances and input variances are displayed on the input side.
    u2022     Variances that occur because too little or too much of the planned order quantity were delivered, or because the delivered quantity was valuated differently are displayed on the output side.
    Variances on the output side occur when you deliver using a price that differs from that found by dividing the target costs and the delivered quantity. If you deliver using the standard price, a variance can occur when the order lot size differs from the costing lot size. This is displayed as a lot-size variance.
    For config
    3.1.4.2     Variances & Settlement
    Variance Calculation determines differences between the actual costs incurred on a production order and the standard costs of the material produced. Variances are calculated not at once, but for different variance categories. The variances computed are then transferred to CO-PA.
    3.1.4.2.1     Define Default Variance Keys for Plants
    Use
    The Variance Key is part of the order header and controls variance calculation. The system selects the value set by this step as default value when a material master is created. From the material master the variance key then is transferred to the order when an order for the material is created.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKVW
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation -> Define Default Variance Keys for Plants
    2.     Make the following entries:
    Plant     Variance Key
    BP01     000001
    BP02     000001
    BP03     000001
    BP0X     000001
    3.1.4.2.2     Define Target Cost Versions
    Use
    The target cost version controls various parameters related to calculation of target costs in variance calculation. In variance calculation, target costs are needed as a comparison to the actual costs incurred.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKV6
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation  Define Target Cost Versions
    2.     Choose New entries and enter the following values or copy from default settings of CoArea 0001 to BP01:
    CoArea     TgtCostVsn     Text     Variance Variant     Control Cost     Target Cost
    BP01     0     Target Costs for Total Variances     001     Actual Costs     Current Std cost Est                                
    BP01     1     Target costs for production variances     001     Actual Costs     Plan Costs / Preliminary Cost Estimate
    BP01     2     Target costs for planning variances     001     Plan Costs     Current Std cost Est
    3.1.4.2.3     Create Settlement Profile
    Use
    The settlement profile controls various parameters related to settlement.
    Prerequisites
    Allocation Structure
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     SPRO
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling   Product Cost by  Order  Period-End Closing   Settlement  Create Settlement Profile
    2.     Choose New Entries and enter header data. Then for each new entry choose Details and enter remaining data.
    3.     Overview of data records:
    Profile     Text
    YGPI00      BP Process Order w/o CO-PA
    YGPP00     BP Production Order w/o CO-PA
    YGPI00     YGPP00
    Actual costs/costs of sales     
    To be settled in full     X     X
    Can be settled          
    Not for settlement          
    Default Values     
    Allocation Structure     A1     A1
    Source Structure          
    PA Transfer Struct.          
    Default object Type          
    Indicators     
    100% Validation     X     X
    %-Settlement     X     X
    Equivalence Nou2019s     X     X
    Amount Settlement          
    Var. to co. bsd. PA          
    Valid receivers     
    G/L account     N     N
    Cost center     O     O
    Order     O     O
    WBS Element     O     O
    Fixed asset     N     N
    Material     O     O
    Network     N     N
    Profit. Segment     N     N
    Sales order     O     O
    Cost objects     O     O
    Order item     O     O
    Business proc.     N     N
    Real est. object     N     N
    Other parameters     
    Document type      SA     SA
    Max.no.dist.rls     3     3
    Residence time     3     3
    You have to assign Variance Key in material master for semi-finished and Finished goods in costing 1 tab also.
    To Execute
    KKS1-Collective Variance calculation
    KKS2-Individual Variance calculation
    CO88-Collective settlement
    KO88-Individual settlement
    Thanks,
    Rau

  • Qty and Date Variance using Purchasing InfoCube

    Using Purchasing Cube, I want to find out the Qty Variance and Date variance,
    Iu2019m calculating these using GR Posting date and Requested Delivery Date and GR Qty and Qty in UoM.
    Iu2019ve the following doubts:
    1.     In order to calculate the Variance, do we need to filter the data pertaining to any particular BW Transaction Key (0PROCESSKEY) since we donu2019t want Goods Issues (can be Purchase Returns or intra company Stock Transfers ), If so what are the values for the Process Key to be considered for filter.
    2.     Though the Qty key figure matches the Requested Qty, the PO status is u2018Openu2019. What could be the possible reasons?
    3.     The qty. and days variance for the POs already received can be calculated. But what should be done incase of POs for which Goods are not yet received? Again in that scenario, we can have two cases: Delivery Past Due and Delivery Date in Future. How to tackle these 2 cases. As per our Requirement, we have to calculate the difference between System date and Requested Delivery Date incase of Past Delivery Date so that we can have the variance as of System Date. Like If the Delivery Date is 25th Nov, if we run the Query on 28th, it should show 3 days late and if run on 29th, it has to be 4 days if still undelivered. Please give me the code to be written in Transformations.
    We have not yet decided what has to be done in the second case i.e. Future Delivery Date. Please guide me what is the best option in that case.
    Thanks,
    Aryaman

    Hi,
    1. In order to calculate the Variance, do we need to filter the data pertaining to any particular BW Transaction Key (0PROCESSKEY) since we donu2019t want Goods Issues (can be Purchase Returns or intra company Stock Transfers ), If so what are the values for the Process Key to be considered for filter.
    You need to add Z-Keyfigures and then write Routines based on Process Keys in Update Rules/Transformations and filter the required Process Keys, you need to find required Process Keys in ECC, SPRO-->Reference IMG an dthen search for BW Transactional Key and see it disuss with MM FUnctional COnsultant and Identify it.
    2. Though the Qty key figure matches the Requested Qty, the PO status is u2018Openu2019. What could be the possible reasons?
    I faced the problem with 2LIS_02_* datasources so I created new generic data source and used it.  Just take only one record with that you track in ECC. You must take MM Consultants help, they will guide you.
    3. The qty. and days variance for the POs already received can be calculated. But what should be done incase of POs for which Goods are not yet received? Again in that scenario, we can have two cases: Delivery Past Due and Delivery Date in Future. How to tackle these 2 cases. As per our Requirement, we have to calculate the difference between System date and Requested Delivery Date incase of Past Delivery Date so that we can have the variance as of System Date. Like If the Delivery Date is 25th Nov, if we run the Query on 28th, it should show 3 days late and if run on 29th, it has to be 4 days if still undelivered. Please give me the code to be written in Transformations.
    We have not yet decided what has to be done in the second case i.e. Future Delivery Date. Please guide me what is the best option in that case.
    Once you have Qty and Dates from Transactional Data then it is easy to calculate the Date Varience and Qty varience, see the follwoing URL it is having one article How to Calculate Meterial Aging whcih will give how to calculate the differnce..
    http://wiki.sdn.sap.com/wiki/display/profile/Surendra+Reddy
    Thanks
    Reddy

  • Price and quantity variance

    Hi guru's,
                         Can any body explain how to find out price variance and quantity variance?thanx in advance

    hi,
    for price varience we need to assign gl account for transaction event key prd in obyc settings
    Thanks & Regards
    phaneendra

  • Co03 quantity and price variance

    Hi in Co03,
                     give order number enter then goto->cost->analysis in the out put
    i want to know how the quantity variance and price variance are being calculated please let me know

    Hi Revanth
    Please find the Help From SAP
    [SAP HELP|http://help.sap.com/saphelp_dimp50/helpdata/EN/90/ba6228446711d189420000e829fbbd/content.htm]
    [SAP HELP|http://help.sap.com/saphelp_dimp50/helpdata/en/90/ba6b15446711d189420000e829fbbd/content.htm]
    Hope they are Useful
    Thanks
    Kalyan

  • Settle Production Variances to COPA- Cost elements and Value fields

    Dear All,
    I know this question has been discussed in the past, but I have one specific doubt regarding this topic.:
    When assigning cost elements to variance categories in t-code KEI1, how do we figure out what combination of cost elements (in the top half of the screen) constitute Input Price Variance, Scrap variance etc (in the bottom half of the screen)? I know the net of the postings on those cost elements tells us what variances we are looking it, but how do we get the cost elements (group) for let's say, 'Input/Output Quanity Varinace or 'Lot size Variance' ?
    Or is this a futile exercise? May be I should just create three types of variances: Labor, Machine and Overhead. And I know what cost elements (net of the postings) would, in total, make up the $ variance in each of those categories. I can then use them in my report painter reports.
    Please help clear the fog for me.
    Ajay?
    Thanks a lot,
    Deepak

    Hi Deepak,
    Welcome to SDN!!
    There are 2 ways of updating variances in COPA... I Prefer the 2nd option always...
    1. Category wise variances (Input Prc, Usage var, etc) - Here, create a Cost ele group, where in you include all the Cost elements that can be posted to the Prod orders
    For the sake of simplicity, you can include Cost elements 1 to 99999999 in the Cost element group...
    2. Cost Comp Structure wise variances -
    a. Create as many assignment lines in PA Trf Structure as in your Cost Comp Str...
    Eg: If your Cost Comp Str in OKTZ has Raw Mat, Labor, Overhead - Create 3 Assignments in PA Trf Structure..
    b. Assign the same cost elements in the SOURCE as in the Cost Comp Str
    c. Choose the radio button "Costs/Revenues" in your assignment line, instead of " Variance on Production orders"
    d. Assign each Assignment line to a separate Value Field
    br, Ajay M

  • Production Variances of semifinished goods in COPA

    Hi,
    We are using Costing based COPA, which is updated at the time of billing.
    The production variances are posted to COPA when the settlement of the production orders are done.
    The production variances if brought within the purview of COPA report (based on sales), the plan vs actuals can be compared. However, in case of actuals, the production variances would appear only to the extent of tha particular product sold (that too, to the extent of qty produced and not qty sold)..
    I have two issues:
    1. Whether system can explode the BOM and bring in the production variances of semi-finished goods into the total production variances, if I drill down only on the Finished product sold. The total actual cost would include the variances of relevant SFG also. Is this possible, if so how?
    2. Whether, by bringing production qty and sales qty, the proportionate prod variances be calculated (total prod var * sales qty / prod qty). This can surely be done by inserting formulae. But is this justified from business point of view?
    Please help me resolving this issue..
    Edited by: Swapvik on Mar 17, 2009 7:11 AM

    Hi Swapvik,
    Issue No.1:
    When you are using only Standard Costing in CO-PC, variances will not get rolled-up to the next level. Only costs get rolled-up. As per your requirement, when you see the report in COPA, when you see the details of FG and you want to see the variances of it's SFG also, this would be possible only if you have activated Material Ledger. If ML is active, variances also get rolled-up along with costs.
    Issue No.2:
    The ultimate purpose of bringing Variances into COPA and making part of them in a report is to consider COGM subject to the variances. Though it is not 100% justified, it gives you the most appropriate analysis compared to where you don't consier the variances at all. If you don't consider variances there, that means, you are considering only COGM and not taking the effect of variances, which will definitely not a correct picture of Profitability.
    Pls revert back for further explanation...
    Srikanth Munnaluri

  • COPA Configuration for settlement of Production Variances

    Hi,
    Can anybody explain me detail configuration steps required to settle production variances to COPA in case of Make to Stock Scenario.
    Helpful answers will be rewarded with points.
    Regards
    Milind Nair

    Hi
    These are broadly the requirements for settling production variances:
    1.) The production variances first need to be calculated in CO-PC.
    2. Your PA transfer structure must contain assignments of variance categories to COPA value fields.
    3. In the settlement profile, you define the variances to be settled and profitability segments should be a valid receiver.
    4. The settlement rule to profitability segments is created automatically based on the information available in the production order (product, product group, plant and so on).
    5. You must have maintained number ranges for record type "C".
    6. The desired form of Profitability Analysis (costing based) must be active in the relevant controlling area.
    Hope this is useful
    S Jayaram

Maybe you are looking for

  • Autocomplete does not work (no drop-down-menu)

    Hi all I'm trying to setup the autocomplete-input, but it doesn't work. When I type anything into the textbox, the animated image beside the box shows activity and I see the submitted data from the backend in debug mode, but the drop-down-menu with t

  • Transformer throws exception

    Hi I am working with Transformer to transform a xml file using a xsl. I get the following exception :- javax.xml.transform.TransformerConfigurationException: javax.xml.transform.Trans formerException: javax.xml.transform.TransformerException: stylesh

  • Sessionscope variables

    I have an af:table in one .jspx page. When a particular row is selected and a link is clicked, according to the selected row, the second .jspx page should be populated. if no row is selected, second page should not be populated. For that, in the tabl

  • My Blackberry needs to be charged everyday

     I bought a Sprint Blackberry back in June of 2008. In November 2008 my phone needed to be charged everyday because the battery was draining fast. Regardless if I made 10 calls in one day or 1 call a day I have to recharge it everyday. I am not a hea

  • How to setup headphone with in-build microphone in hp 15 r-022tx

    hey, i have hp 15 r-022TX laptop and in this laptop as you know there is only 1 3.5 mm jack slot for headphone. i want to use headphone with in-build microphone (philips SHM1900) and for that i purchased a 2 in 1 jack to connect to laptop jack detail