Dear Expert ,
I had the follow case would like to have your comment on is that possible and any thing post step need to do.
In before we only have 2 PI system . One is DEV ( XID) , the other one is PRD ( XIP ) .Now we would like to have 1 more QAS (XIQ) on our system lanscape.
I would like to know is that possible for us to system copy XIP and change to SID from XIP to XIQ , so that we will have a QAS system for testing.Please help to advise is this method possible or not and will there any risk we need to take care.
( If possible I would like to know the post step and other information may usefull too )
thx,
Tony
Am not a basis guy, But, out of experience, i can say that,
it can be easily done with the help of basis guys,
1) Make system copy of XIP & rename it to XIQ.
2)Change all the connections to QAS server of ECC. Like proxy, RFC Destinations, SLD, etc.
3)Update the file locations of XIQ to QA file locations in FILE ,FTP,SFTP CC's.
4)Also, Need to verify all other CC's , if they are pointing to PROD, those needs to be changed to QAS.
-santosh.
Similar Messages
-
Logical system on QAS after remote client copy from PRD to QAS
I wander after remote client copy from PRD to QAS do I have to change Logical system on QAS. Do I have to run some postprocessing program?
Thank you in advanceHi Branko,
After the system copy, go to transaction SALE -> Sending and receiving Systems -> Logical systems -> Define Logical System , click New Entries and create a new logical system for your QAS; then go to SALE -> Sending and receiving Systems -> Logical systems -> Assign Client to Logical System, click on the client, click change and assign the new Logical system.
Other activities, check Jobs, RFC's, etc...
Regards
Juan
Please reward with points if helpful -
System copy from PRD to QAS based ABAP system EHP4.
Hi guys,
I have to perform homogenous system copy from PRD to QAS.
My PRD is ECC6.0 EHP4 release 701 sp 103( SAP_basis) with oracle ver 10.2.0.4.0.
Is there any specific procedure for EHP4 or i can follow the below mentioned guide.
https://websmp204.sap-ag.de/~sapidb/011000358700000514722009E.pdf.
What pre-requisite i need to take care before doing the system copy?
Regards
AbhishekHi,
All pre-requisite is there in system copy guide.Apart from that take user master backup of quality system and after system copy, import the user master data back so that you have same users in quality system.
Also, take RFC's backup also.
Thanks
Sunny -
Oracle DB copy from PRD system 10g to TEST system 11g
Hi All,
I have recently upgraded Oracle in the test system from 10.2.0.4 to 11.2.0.2. My Production system ran still with the old oracle version 10.2.0.4.
Now I need to refresh the test system.
Is that possible to be made at all, a database copy from production system (with old oracle version 10g) into test system (with the new version 11g) ?
Thanks in advance for your reply.
Regards
LatifWe must have taken the
When you upgraded 10.2.0.X.X to 11.2.0.2.0 on TST System
You would have defintiely taken the 10.2.0.X.X. ( Oracle Home Backup)
I Strongly feel..
Resotre home folder in Qty System
Change the Environment Variables of s<sid>adm & ora<sid> users to oracle 10.2.0.X.X home directory
Change listener file entires.
Restore backup of Production of 10.2.0.X.X
recover system as you have not done any upgrade on QTY and release.
...The rest all approaches may consume your extensive .
You are the best judge...
How you want to build TST System ....want to make easy ...want to make hard your self.
Business wants data ..The rest all yours decission i think
Rgds -
BW System copy from PRD to DEV - Reduce database size
Hi All
We are in the process of copying our existing Production BW system (3.5) to become a new Development & test system. We want to reduce the database size significantly from 1.4 Tb to about 150 - 200 Gb. We have deleted all cube and ODS data as well as much of the master data but still have much tablespace tied up in monitor entries (eg table RSMONMESS) and IDOCs. All of the notes I read say that we cannot delete from RSMONMESS in a "Prodcution" environment, however we are creating a new DEV system and really need to get rid of monitor entries anyway. So there are two questions:
1. Any idea how we can clear up table RSMONMESS or delete unwanted monitor entries ?
2. How can we delete IDOCs copied from our production system without archiving them ? (They are of no use in our new test system.)
Please help.
Many thanks in anticipation.
Paul Sullivan
Orica ITHi Paul,
See SAP Note 694895 - Performance and tables RSMON, RSDONE
Note Language: English Version: 5 Validity: Valid Since 29.11.2005
Summary
Symptom
Tables RSMON* (for example, table RSMONMESS) and tables RS*DONE (for
example, table RSSELDONE) continuously increase in size in the BW system
with each request that is created.
Currently there is no option to reduce these tables.
Do not delete any entries from these tables. If you did, this would have
the following consequences:
When you carry out the next check for the requests for which you have
deleted records from these tables, the check will not run properly.
The status of the relevant requests turns RED in the monitor, and also in
all affected data targets that contain the request.
The affected request and all subsequent requests are no longer visible in
the reporting - all queries on the affected data targets then only display
old data.
Numerous dumps will occur in various situations.
You will not be able to repair the errors caused by the deletion.
More Terms
RSMONMESS; RSSELDONE; Performance; RSMON; RSDONE;
Cause and Prerequisites
This is caused by a program error.
Solution
In the next BW release (BI in SAP NetWeaver 2004s - that is BW 7.0), you
will be able to archive entries from the RSMON* and RS*DONE tables using a
request archiving process that archives the administrative information for
requests.
After archiving, these tables are then considerably reduced in size.
Until then, there is unfortunately no option for reducing the tables.
Rgds,
Colum -
After System Copy from prd to qua,unable to start the oracle.
Dear expeerts,
I have successfully restored the Oracle database 10.2.0.4 from Production to Quality.but when i am trying to start the oracle it giving error message."ORA-00205: error in identifying control file, check alert log for more info"
Please check the logs in alerts_ois.log file.
ORA-00202: control file: 'F:\ORACLE\OIS\ORIGLOGA\CNTRL\CNTRLOIS.DBF'
ORA-27047: unable to read the header block of file
OSD-04001: invalid logical block size (OS 1551067503)
Thu Dec 22 14:58:19 2011
ORA-205 signalled during: ALTER DATABASE MOUNT...
check the results of
SQL> show parameter control_files;
NAME TYPE
VALUE
control_files string
F:\ORACLE\OIS\ORIGLOGA\CNTRL\C
NTRLOIS.DBF, F:\ORACLE\OIS\ORI
GLOGB\CNTRL\CNTRLOIS.DBF, G:\O
RACLE\OIS\SAPDATA1\CNTRL\CNTRL
OIS.DBF
Please let me know some command to resolved this issue . I am trying it from 2 days.
Regards,
AkashDear Experts,
I have again tried restoring the Prodcution offline database on Test server.
Today also I am getting the error u201CORA-00205: error in identifying control file, check alert log for more infou201D
And alert log is showing u201C
Sat Dec 31 13:16:50 2011
Starting ORACLE instance (normal)
Sat Dec 31 13:16:50 2011
Specified value of sga_max_size is too small, bumping to 1006632960
LICENSE_MAX_SESSION = 0
LICENSE_SESSIONS_WARNING = 0
Picked latch-free SCN scheme 3
Autotune of undo retention is turned on.
LICENSE_MAX_USERS = 0
SYS auditing is disabled
ksdpec: called for event 13740 prior to event group initialization
Starting up ORACLE RDBMS Version: 10.2.0.2.0.
System parameters with non-default values:
processes = 80
sessions = 96
event = 10191 trace name context forever, level 1
sga_max_size = 1006632960
shared_pool_size = 486539264
shared_pool_reserved_size= 48302653
filesystemio_options = setall
control_files = F:\ORACLE\OIS\ORIGLOGA\CNTRL\CNTRLOIS.DBF, F:\ORACLE\OIS\ORIGLOGB\CNTRL\CNTRLOIS.DBF, G:\ORACLE\OIS\SAPDATA1\CNTRL\CNTRLOIS.DBF
control_file_record_keep_time= 30
db_block_size = 8192
db_cache_size = 486539264
compatible = 10.2.0
log_archive_dest = J:\oracle\OIS\oraarch\OISarch
log_buffer = 6135808
log_checkpoint_interval = 0
db_files = 254
log_checkpoints_to_alert = TRUE
dml_locks = 4000
replication_dependency_tracking= FALSE
undo_management = AUTO
undo_tablespace = PSAPUNDO
inmemory_undo = FALSE
undo_retention = 43200
recyclebin = off
remote_os_authent = TRUE
remote_login_passwordfile= EXCLUSIVE
job_queue_processes = 1
parallel_execution_message_size= 16384
tablelookup_prefetch_size= 0
background_dump_dest = G:\ORACLE\OIS\SAPTRACE\BACKGROUND
user_dump_dest = G:\ORACLE\OIS\SAPTRACE\USERTRACE
core_dump_dest = G:\ORACLE\OIS\SAPTRACE\BACKGROUND
sort_area_size = 2097152
sort_area_retained_size = 0
db_name = OIS
open_cursors = 800
sortelimination_cost_ratio= 10
btree_bitmap_plans = FALSE
star_transformation_enabled= true
query_rewrite_enabled = false
indexjoin_enabled = FALSE
optimpeek_user_binds = FALSE
pga_aggregate_target = 629145600
optimizermjc_enabled = FALSE
PMON started with pid=2, OS id=1116
PSP0 started with pid=3, OS id=5668
MMAN started with pid=4, OS id=4752
DBW0 started with pid=5, OS id=3284
LGWR started with pid=6, OS id=1848
CKPT started with pid=7, OS id=5576
SMON started with pid=8, OS id=2000
RECO started with pid=9, OS id=1624
CJQ0 started with pid=10, OS id=3484
MMON started with pid=11, OS id=2288
MMNL started with pid=12, OS id=5436
Sat Dec 31 13:16:51 2011
ALTER DATABASE MOUNT
Sat Dec 31 13:16:51 2011
ORA-00202: control file: 'F:\ORACLE\OIS\ORIGLOGA\CNTRL\CNTRLOIS.DBF'
Please give me the commands to proceed further i am just getting frustrated with this error, I know that I am doing somthing wrong but what?& how should I resloved it ?
Thanks in advance.
Akash -
Hi,
We have ERP 2004 on Windows 2003 with SQL 2005.
Due to some corrections(config changes and abap corrections) were made directly made in our PRD System, we now need to completely refresh our DEV and QAS system with PRD.
As we do not have enough space to make a system copy, please suggest me a way to do a complete refresh without PRD data getting into DEV and QAS servers.
Thanks and Regards
DevHi Mukund,
In your scenario , better to go for client export / Import process in order to refresh .
Select the appropriate profile :
SAP_ALL All Client-Specific Data w/o Change Documents
SAP_CUST Customizing
SAP_CUSV Customizing and User Variants
SAP_CUSX Customizing w/o Authorization Profiles and Roles
SAP_EXBC Customizing, Users and Cross-Client Customizing
SAP_EXPA SAP_ALL with Cross-Client Customizing
SAP_EXPC Customizing Including Cross-Client Customizing
SAP_PROF Only Authorization Profiles and Roles
SAP_RECO Recovery (Only if Source Client = Target Client)
SAP_UCSV Customizing, User Master Records and User Variants
SAP_UCUS Customizing and User Master Records
SAP_UONL User Without Authorization Profiles and Roles
SAP_USER User Master Records and Authorization Profiles
I think you need SAP_EXPC " Customizing Including Cross-Client Customizing " .
Do not go for SAP_ALL as it contains all config and data .
Regards,
Nibu -
Add third physical system to logical system
Hi ,
We are using GRC AC 5.3 SP12 ( Back end ECC6 HR ) , we have connected our GRC DEV system to DEV 100 and DEV 200 clients , now i have connected QAS 100 client to the same system ( GRC DEV) , we have already created a logical system ERP( with Both DEV 100,DEV 200 ), now when i add QAS 100 to this logical system, I am not getting any risks/Violations for the newly attached system Could you please help me out , If i am missing something here.
So far i have done following tasks
1) Created a JCO connector for QAS 100 in Webdynpro
2) Created a connector here in SAP RAR ( This is 3rd Connector , We are using SAP HR connectors )
3) Add new system(QAS 100) to logical system ERP
4) Generated Ruleset against Logical system
5) Full Sync for newly created system to GRC ( after this job, I can see uploaded Users,Roles)
6) Now its not showing any risk violation results in RAR
Looking forward for your response
Thanks & Regards
Uma Shankar T
SAP GRC ConsultantActual issues is , our basis team deleted some old Jco connectors and give this new connector in back-end system when they created a new connector , But we could see 4 connectors from the GRC side configuration--> Connectors
We have restarted the JAVA server and done the full sync again , Surprisingly problem got resolved now . Looks like a small issue but we got the solution after spending 2 to 3 days and tried different options finally restarting the JAVA server resolved our issue .
Thanks & Regards
Uma Shankar T
SAP GRC Consultant -
When creating system copy of PRD sistem to QAS system how to create transpo
when creating system copy of PRD sistem to QAS system how to create transport request queue on QAS with:
everything transported to QAS previously but
not transported to PRD.
We have an approval procedure with delete form queue on QAS after import.
Basically all tr.req from import queue(there I do not have delete from import queue) should be entered in same sequence to QAS.
I know how to add technically one transport request to queue but how to do that for many(all)Jan
Check the import history of both QAS and PRD from a date which is just after your previous system copy.
Use the V-lookup function of MS Excel. You can determine those request which were there in QAS but have not been moved to PRD yet.
Now, if you want to add multiple request in the import queue , I would recommend to do it from OS level but writing a script.
You will find multiple threads in SDN for how to add request in import queue from OS level. Below one might be helpful
Link: [Re: need TP command for Add Transport Request to import Queue all at a time;
Regards
Anindya
Edited by: Anindya Bose on Feb 22, 2010 10:02 AM -
OBN: How can we add the tcode of target system into Source System.?
Dear Experts,
I want to add a t-code ME53n of ERP) into a role as OBN target in my SAP TM.
I tried to add this t-code but could not find this t-code in SAP TM system.
How can we add the tcode of target system into Source System.?
I tries to import the role of target system but that does not work.
Please help!
Regards,
SaurabhHi Saurabh,
Logically there is no need to add a tcode of the target system in the source system.
If you have right roles in the system then system should allow you to add tcode in the OBN target simply by going to PFCG roles and using add transaction feature.
To make sure it works properly you have to check the Method & Parameter assignment to the newly added tcode.
Thanks & Regards,
Tarun Kumar -
Java Add-In installation on a existing ABAP System (MSCS Cluster)
Hi all
we try to install a Java Add-In for a already existing ABAP System with
SAPinst. The ABAP System is a NetWeaver2004s SR1 System in a MSCS Cluster.
We have the Problem that we can´t choose the Installation Drive during
the SAPInst Define Parameter Step during the "Central Services Instance (SCS) Java Add-In" Installation.
But in the Installation Manual for
NW2004s Java AS in Chapter 4.3.2 is stated:
"Caution: You must install it on the same shared disk as the ASCS instance."
If I run the Installation, the SCS will be installed on the local disk E:
beside the Central Instance. But it need to be on the shared Disk P:
beside the ASCS installation. How can I control this?
Stefanobviously the network share saploc is existing in your system an pointing to a local device.
Delete the local saploc share, install SCS instance, run MSCS first node, additional node, create the local share saploc again (don't forget to set permissions on the share, the default permission did only allow Read vor Everyone) and proceed with installation.
There is a note in creation for this issue.
peter -
Add one field in LM51 ( while LM51) system should ask Material Scan
HI gurus ,
I am carring out WM inventory through RF device for that,
1. I want to add one field in LM51 ( while LM51) system should ask Material Scan.
2. In LM51 system ask SUT twice this time,
if i enter the SUT ones & save the entry then system pick direct system quantity .
i want one check over here.
CAN any body guide me ,
Answer of any problem is helpful for me.
devHave you searched in SCN / Google how to add a new field in field catelogue? Since you have recently joined SCN, you may not be aware of SCN rules which you better go through to your right screen where it has been very clearly indicated that posting any basic or repeated query is not allowed.
G. Lakshmipathi -
How to add more disk space into / root file system
Hi All,
Linux 2.6.18-128
can anyone please let us know how to add more disk space into "/" root file system.
i have added new hard disk with space of 20GB,
[root@rac2 shm]# df -h
Filesystem Size Used Avail Use% Mounted on
/dev/hda1 965M 767M 149M 84% /
/dev/hda7 1.9G 234M 1.6G 13% /var
/dev/hda6 2.9G 69M 2.7G 3% /tmp
/dev/hda3 7.6G 4.2G 3.0G 59% /usr
/dev/hda2 18G 12G 4.8G 71% /u01
LABLE=/ 2.0G 0 2.0G 0% /dev/shm
/dev/hdb2 8.9G 149M 8.3G 2% /vm
[root@rac2 shm]#Dude! wrote:
I would actually question whether or not more disks increase the risk of a disk failure. One disk can break as likely as one of two of more disks.
Simple stats. Buying 2 lottery tickets instead of one, gives you 2 chances to win the lottery prize. Not 1. Even though the odds of winning per ticket remains unchanged.
2 disks buy you 2 tickets in The-Drive-Failure lottery.
Back in the 90's, BT (British Telecom) had a 80+ node OPS cluster build with Pyramid MPP hardware. They had a dedicated store of scsi disks for replacing failed disks - as there were disk failure fairly often due to the number of disks. (a Pryamid MPP chassis looked like a Xmas tree with all the scsi drive LEDs, and BT had several)
In my experience - one should rather expect a drive failure sooner, than later. And have some kind of contingency plan in place to recover from the failure.
The use of symbolic links instead of striping the filesystem protects from the complete loss of the enchilada if a volume member fails, but it does not reduce the risk of loosing data.
I would rather buy a single ticket for the drive failure lottery for a root drive, than 2 tickets in this case. And using symbolic links to "offload" non-critical files to the 2nd drive means that its lottery ticket prize is not a non-bootable server due to a toasted root drive. -
How to add tape drive in hyper V operating system
how to add tape drive in hyper V operating system
tape drive may be to scsci or USB port.
how to add pls suggesthow to add tape drive in hyper V operating system
tape drive may be to scsci or USB port.
how to add pls suggest
You need something like StarWind Tape Redirector that "iSCSI-izes" hardware attached to host. So you'll be able to connect with iSCSI initiator from inside a VM running on this host, some other host or even other physical machine (as long as it
has iSCSI connectivity), see:
StarWind Tape Redirector
http://www.starwindsoftware.com/download-starwind-tape-redirector
So at the end of the day you'll have something like on the picture below:
Good news: this software offering is 100% free so you don't need to pay anything to anybody :)
Hope this helped!
StarWind Virtual SAN clusters Hyper-V without SAS, Fibre Channel, SMB 3.0 or iSCSI, uses Ethernet to mirror internally mounted SATA disks between hosts. -
DEV- QAS : Obligatory transport target for business system not found
Hi guys!
I have read all the other threads about this subject, but since I still have no success, I´m feeling obligated to ask you for a help (deadline approaching fast!)
I´m trying to transport a Communication Channel, from DEV environment to QAS. I'm having the 'usual' error:
Import failed because of business system transfer of object Communication Channel * | SIGA | SOAP_SYNC_SENDER: Obligatory transport target for business system SIGA not found in System Landscape Directory
Here were my steps:
Keep in mind that in DEV, everything was up and running: Software Component, Product, Technical System and Business System for this name "SIGA".
1 - In DEV, I created a new Technical System, named "SIGA_QAS", pointing to my QAS server. (Keeping in mind I already had a "SIGA" pointing to my DEV server.)
2 - Still in DEV, I did create two groups: GROUP_DEV and GROUP_QAS, one points to INTEGRATION_SERVER_DX1 (DEV) and the other INTEGRATION_SERVER_QX1 (QAS).
3 - Still in DEV, I created the Business System called "SIGA_QAS" also, pointing to my QAS server.
4 - Still in DEV, I went inside both Business Systems and put: "SIGA_QAS" as TARGET BS of "SIGA" (which automatically puts "SIGA" as SOURCE BS of "SIGA_QAS")
If I look at my QAS SLD, I can see all of these objects already there, since my BASIS team did activate the 'sync' between these two environments. So, I dont need to create anything 'new' in my QAS SLD, all the objects are there, same as DEV SLD.
If I try to EXPORT/IMPORT a simple Communication Channel (using file system or even CTS - I tried both) I get the error mentioned above.
But this is 'wierd' for me, since the error says: "business system SIGA not found in System Landscape Directory", but it is there, in both SLDs.
Am I missing something here?
Thanks!
Ricardo Sancio Lóra
BrazilHi,
If you not tried this then try it. Delete the Business System SIGA from Integration Directory in your QAS system and then again import the business system from SLD. Acitvate the changes and then import the CC from Dev to QAS.
Regards,
Sarvesh
Maybe you are looking for
-
Trying to play from an external drive created unexpected results
I have a Firelight drive that was full of music from another computer so I plugged it into my iMac then held down the option key while opening itunes.\ Choose Library didn't work so I clicked on Create a new Library in itunes. I wanted to just play a
-
ALBLUM cover view in itunes.
Hi. I just down loaded the new i-tunes... I see I can songs view and sort by date... but I can't find how to show the cover art on the side... most of my music I reconize the by art work.. and want to have it sorted by date added... Can you please he
-
Problem with return value of stored function
Hi, I've made a stored function that insert a new row in a table and return the primary key (see at the end of the message the function script). In VS 2005 with Visual basic, using the designer, I've created a dataset containing a tableAdapter to be
-
I can install all other programs in this Suite including photoshop and AI ..in design...etc But installation failed for Acrobat X pro with the following message even I tried turning off my Anti-Virus or restarted my machine to use Safe mode .... the
-
HT4623 i was updating my iphone 3gs to ios6.0.1
im stuck as my phone is not working it isnt showing any network and isnt activating