Adding switches to stack
Hello,
I've have 2 x 3750G stacks with 3 switches in each and I need to add 2 more 3750Gs to it, can I still get these switches are the X range is out?
Stack 1
WS-C3750G-24T-S
WS-C3750G-48TS-S
WS-C3750G-24T-S
Stack 2
WS-C3750G-24T-S
WS-C3750G-48TS-S
WS-C3750G-24T-S
All are running 12.2(53)SE C3750-IPBASE-M
Also when adding a new switch to the stack does the stack need to be relaoded?
Thanks
Disclaimer
The Author of this posting offers the information contained within this posting without consideration and with the reader's understanding that there's no implied or expressed suitability or fitness for any purpose. Information provided is for informational purposes only and should not be construed as rendering professional advice of any kind. Usage of this posting's information is solely at reader's own risk.
Liability Disclaimer
In no event shall Author be liable for any damages whatsoever (including, without limitation, damages for loss of use, data or profit) arising out of the use or inability to use the posting's information even if Author has been advised of the possibility of such damage.
Posting
You can add the 12-Ss to your stack, however beware these switches support (additional) SDM templates unique to them. I.e. insure they use a "standard" SDM template.
Similar Messages
-
Added switch to stack, has wrong number now
switch 1 provision ws-c2960s-24pd-l
switch 2 provision ws-c2960s-48fpd-l
switch 4 provision ws-c2960s-48fpd-l
Do I need to worry about this? or is there a way to make it number 3?
Switch Ports Model SW Version SW Image
1 28 WS-C2960S-24PD-L 15.0(1)SE3 C2960S-UNIVERSALK9-M
* 2 52 WS-C2960S-48FPD-L 15.0(1)SE3 C2960S-UNIVERSALK9-M
4 52 WS-C2960S-48FPD-L 15.0(1)SE3 C2960S-UNIVERSALK9-MDoh, I fixed it.
-
Adding switch into an existing stack
Hi all,
I have an existing stack which comprises of 6 switches, please help with the following questions :
1/ adding another switch into this stack will cause all switches in stack to reboot ? anything that I should be aware of such as different versions ?
2/ maximum switches in one stack should be ?
Thanks for all help.Hi Duc,
If you are stacking 3750 switches you can have a max of 9 switches in one stack. The only thing you have to make sure before adding the new switch is that its IOS version should be exactly same as the IOS version of rest of the stack.
You dont have to worry about any reload of existing stack. Connect the stack cables to the new switch, power it up and it will be added to the existing stack.
http://www.cisco.com/en/US/products/hw/switches/ps5023/products_configuration_example09186a00807811ad.shtml
Thanks
Ankur
"Please rate the post if found useful" -
Single flash for switches in stack
Hi,
Is it possible to use a single flash for all the switches in stack?
In one of my locations, I found four switches in stack. When I try to check the IOS for all the switches in stack, except in master, all other are not showing any output for sh flash:
If the master switch is down, how the other switches will run!!!
Here is the output of sh ver:
Cisco IOS Software, C3750 Software (C3750-IPBASE-M), Version 12.2(25)SEB4, RELE
SE SOFTWARE (fc1)
Copyright (c) 1986-2005 by Cisco Systems, Inc.
Compiled Tue 30-Aug-05 15:47 by yenanh
ROM: Bootstrap program is C3750 boot loader
BOOTLDR: C3750 Boot Loader (C3750-HBOOT-M) Version 12.2(18)SE1, RELEASE SOFTWAR
(fc2)
XYZ uptime is 1 year, 13 weeks, 3 days, 19 hours, 18 minutes
System returned to ROM by power-on
System restarted at 16:38:59 CDT Sat Jul 29 2006
System image file is "flash:/c3750-ipbase-mz.122-25.SEB4/c3750-ipbase-mz.122-25
SEB4.bin"
cisco WS-C3750G-16TD (PowerPC405) processor (revision G0) with 118784K/12280K b
tes of memory.
Processor board ID CAT1017N1PT
Last reset from power-on
2 Virtual Ethernet interfaces
136 Gigabit Ethernet interfaces
2 Ten Gigabit Ethernet interfaces
The password-recovery mechanism is enabled.
512K bytes of flash-simulated non-volatile configuration memory.
Base ethernet MAC Address : 00:17:E0:47:F8:00
Motherboard assembly number : 73-9143-09
Power supply part number : 341-0045-01
Motherboard serial number : CAT1016149A
Power supply serial number : LIT10070EBD
Model revision number : G0
Motherboard revision number : A0
Model number : WS-C3750G-16TD-S
System serial number : CAT1017N1PT
Top Assembly Part Number : 800-24591-04
Top Assembly Revision Number : C0
CLEI Code Number : COM1D10ARB
Hardware Board Revision Number : 0x01
Switch Ports Model SW Version SW Image
* 1 17 WS-C3750G-16TD 12.2(25)SEB4 C3750-IPBASE-M
2 17 WS-C3750G-16TD 12.2(25)SEB4 C3750-IPBASE-M
3 52 WS-C3750G-48TS 12.2(25)SEB4 C3750-IPBASE-M
4 52 WS-C3750G-48TS 12.2(25)SEB4 C3750-IPBASE-M
Switch 02
Switch Uptime : 1 year, 13 weeks, 3 days, 19 hours, 5 minutes
Base ethernet MAC Address : 00:17:E0:4D:B3:00
Motherboard assembly number : 73-9143-09
Power supply part number : 341-0045-01
Motherboard serial number : CAT1016149D
Power supply serial number : LIT10070ECB
Model revision number : G0
Motherboard revision number : A0
Model number : WS-C3750G-16TD-S
System serial number : CAT1017N1S8
Top assembly part number : 800-24591-04
Top assembly revision number : C0
CLEI Code Number : COM1D10ARB
Switch 03
Switch Uptime : 1 year, 13 weeks, 3 days, 19 hours, 17 minute
Base ethernet MAC Address : 00:18:18:42:08:80
Motherboard assembly number : 73-9366-08
Power supply part number : 341-0107-01
Motherboard serial number : FOC10190GFQ
Power supply serial number : AZS101201Q7
Model revision number : C0
Motherboard revision number : A0
Model number : WS-C3750G-48TS-S
System serial number : FOC1019Y3Y0
SFP Module assembly part number : 73-7757-03
SFP Module revision number : A0
SFP Module serial number : CAT10160WDS
Top assembly part number : 800-25409-02
Top assembly revision number : B0
Version ID : V02
CLEI Code Number : CNMWU00ARB
Switch 04
Switch Uptime : 1 year, 13 weeks, 3 days, 19 hours, 20 minute
Base ethernet MAC Address : 00:18:18:42:00:80
Motherboard assembly number : 73-9366-08
Power supply part number : 341-0107-01
Motherboard serial number : FOC10182QNZ
Power supply serial number : AZS101201Q8
Model revision number : C0
Motherboard revision number : A0
Model number : WS-C3750G-48TS-S
System serial number : FOC1019Y3X9
SFP Module assembly part number : 73-7757-03
SFP Module revision number : A0
SFP Module serial number : CAT10160V68
Top assembly part number : 800-25409-02
Top assembly revision number : B0
Version ID : V02
CLEI Code Number : CNMWU00ARB
Configuration register is 0xFHi
You should be able the do a sh flash2 and see the image version
If it's not there, the switch will continue working but will not boot if reseted
You must always have a valid image on every switch in the stack
Please rate helpful post -
Dynamic switching between stacked and non-stacked detail groups?
Hi guys,
Is it possible to dynamically switch off/on stacking of detail groups?
I would like to give the user the option to switch between stacked and non stacked
Regards
Bar
JDev: 10.1.3.2
JHS: 10.1.2.26Yes and No. No because it is not supported out-of-the-box by JHeadstart, yes because you can do this post-generation and then move the custom code to JHeadstart templates.
However, it is not a trivial thing to build, you can try the JDeveloepr forum for any help, we can help you with moving the post-generation code to custom templates, since that is the JHeadstart-related part of your question.
Steven Davelaar,
JHeadstart Team. -
CiscoWorks how many switches in stack + dual Power supply usage
Hi,
Please tell me that is it possible to see in CiscoWorks that device with dual power supplies is using both or just one. e.g 6500
Also I need to count the total number of physical switches in the company but I am only able to generate a inventory report that only shows logical devices, but it do not show if the switch is stack then how many physical switches are in stack.
Is it also possible to count the total number of physical devices in the company instead of just logical devices.
I am using the
LMS: 1.2.0
RME: 4.3.0
CS: 3.3.0
CM: 5.2.1
DFM: 3.2.0
Thanks.Thanks for reply.
In the detailed device view I am able to see that switch has 2 power supply, but but unable to see that its using either only one or both. But I understand your point that if its not visible here then its not possible.
Explainantion of my second query: My company want to know that how many physical switches has been installed. We manage over 2500 logical switches in the company and management want to have a report showing that how many total physical switches exist.
Is it possible to generate a report which shows that each logical switch contains how many physical swithes and/ or total number of physical switches in the company.
e.g MLS001 (logical switch) contains sw1 (physical switch), sw2 (physical switch), sw3 (physical switch), sw4 (physical switch)
MLS002 (logical switch) contains sw1 (physical switch), sw2 (physical switch)
CiscoWorks generate a report shows that 6 physical switches exist.
Please reply ASAP. Thanks -
Hello,
I just moved a 3750 switch from a stack where it was #4. I wiped out the config by holding in the mode button, then checked it through the console port.
Then I installed it in another stack as the #3 switch, removing the stack cables while the other 2 switches were powered up and connecting them to the unpowered switch #3.
I then powered up the #3 switch. Everthing seemed to work fine except that the switch shows up as #4 instead of three. Did I miss something here?If you manually change the stack member number by using the switch current-stack-member-number renumber new-stack-member-number global configuration command, the new number goes into effect after that stack member resets (or after you use the reload slot stack-member-numberprivileged EXEC command) and only if that number is not already assigned to any other members in the stack.
Here is the link for the bible of 3750 STACk :-
http://www.cisco.com/en/US/docs/switches/lan/catalyst3750/software/release/12.2_20_se/configuration/guide/swstack.html
Regards,
Varun -
Connecting 2 3750 Switches in Stack with 2 2960 switches in full Mesh
Hi Friends,
I have attached a pics which DC design of one of our customer , as network engineer i have design this , so i am responsible for implementing it, now request you all to kindly guide me what would be technical problem i have to face in achieving this and how can i over come .Please be in detail. Waiting for your response .
Regards
Amit KulshresthaI have attached modified diagram , please suggest.
The major issue I see is that you have not mentioned whether the 2960's are stacked? For the design to work, they need to be stacked because you cannot create port-channels between them and the Core switches unless then 2960's are stacked.
==> You are right , surely 2960 Switch need to be in stack form.
Personally I would look at more powerful switches than the 2960's, something along the lines of the 3750x range or probably now the 3850's.
==> This is constrain of customer, not our responsibility.
The second issue I see is that your servers are connected to the WAN switches. Is there a reason for this? Usually they would be connected to the core switches.
==> For this If 1 separate 2960 series switch can be used ?.
The final point is that you only have single connections from each of your WAN connections which begs the question as to the purpose of having two WAN switches?
==> Customer is having 1900 series of router , only two ports one used for WAN and other used for LAN.
The objective of having two switches is to provide redundancy/resiliency. If you have only one connection from each WAN then why do you need two switches as there is no redundancy?
==> Customer has agreed to have manual change at the time of failure. -
Adding switcher to seeded page
Hi All
I have one requirement where we need to add a switcher to a seeded Oracle SSHR page. I found the code in OAF developer guide to add the switcher but I need to add this to a seeded page(not the custom page). I can not add the "Switcher" using the personalization to this page.I would like to know the steps without changing the page definition.Is there any way you can substitute the Oracle page. Can any one give me the brief idea on this how can we do that.
Thanksuser5722239 wrote:
Hi All
I have one requirement where we need to add a switcher to a seeded Oracle SSHR page. I found the code in OAF developer guide to add the switcher but I need to add this to a seeded page(not the custom page). I can not add the "Switcher" using the personalization to this page.I would like to know the steps without changing the page definition.Is there any way you can substitute the Oracle page. Can any one give me the brief idea on this how can we do that.
ThanksOne of the best approach would be to create a switcher in table region in Jdev.
Now the second step is to create a Stack Layout Region or Flexible Content Layout region under flexible layout region & set its extend property through personalization.
Regards
--Anil -
Replace master switch in stack
Hi Community,
I have a stack of 3750G and i want to replace the master switch priority 15 coz of faulty port .
And I receive new switch from cisco WS-C3750X-24
Switch Ports Model SW Version SW Image
* 1 30 WS-C3750X-24 12.2(55)SE4 C3750E-IPBASEK9-M
If I connect a new blank 3750X through the stack ports, will the OLD switch sync its config to the new one without causing problems? or i need to change switch only
Switch Ports Model SW Version SW Image
* 1 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
2 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
I change IOS of new switch to c3750e-ipbasek9-mz.122-55.SE4.bin
Please help me with this.
Awaiting your reply.hi Leo Laohoo,
thankx for the reply,
and one more thing i want to conform that about IOS coz in my live switch having this version
Switch Ports Model SW Version SW Image
* 1 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
2 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
and new 3750X having
Switch Ports Model SW Version SW Image
* 1 30 WS-C3750X-24 12.2(55)SE4 C3750E-IPBASEK9-M
So this cause any issue??? -
Dear all,
I have 02 C6504-E with VSS (Virtual Switching System)
and 02 C3750X-24T-L used Stack
How to you Cisco Prime Infrastructure to monitor VSS & Stack tatus?
Thanks.Virtual Switching technology is the process of combining two standalone distribution switches found in the local distribution layer into a single management point.
The Virtual Switching System functions and appears as a single switch to the wiring closet and the core layer. You can also create Virtual Switching Systems with a pair of standalone switches available in the core layer.
For configuration please check the below link:
http://www.cisco.com/en/US/docs/net_mgmt/ciscoworks_lan_management_solution/4.1/user/guide/configuration/configvss.html#wp1042960 -
Add configured switch to stack
Hello.
I have the next situation. I have 3850 switch stack of 4 switches. I also have standalone switch, totally configured. Is there any way I could add this standalone switch with saved config?I also have standalone switch, totally configured. Is there any way I could add this standalone switch with saved config?
Your standalone switch must have NO CONFIG.
Your standalone switch must have the same IOS XE version as the current stack.
Your standalone switch must have the same Feature Set (IP Base, Advanced IP, etc.) as the current stack. -
375o switch in stack, only 2nd and 3rd switch reboots
Hi,
In customer place we are having three 3750 switch and it was stacked and working fine. Few days back the in stacked switches 2nd and 3rd switches are rebooted continuously and found in the show version command as: Data TLB Miss Exception (0x1100)!.
From last 4 days we are not found any reboot. Please let us know any software bug is triggered to cause this problem, if upgraded please let us know the image to be put in all the three switches. I am sending the show tech output of all the 3 switches and show stack output.
Thanks in advance.
Regards,
RamThis URL should help you:
http://www.cisco.com/en/US/products/hw/switches/ps5023/prod_release_note09186a00801b476a.html -
Prime Infrastructure 2.1 switch in stack down alert
Hi all,
Have a question regarding the Cisco Prime Infrastructure 2.1 - How to configure the prime to monitor/send an alert when one of the switches (c3750) from a stack goes down (not the master, so the stack appears as 'up' ) ?
In old cisco LMS i was able to configured a script based on a syslog sent from a switch, but I'm not sure how to do it in Prime.
Thanks for help :]
PawelPawel,
Unfortunately PI 2.1 (and 2.2) do not yet allow us to define automated actions in the event of a specific syslog message being received. -
Hi folks,
Quick question: Is there any way of allocating a keyword to an entire stack, rather than having to expand the stack and shift-select all the images? The stacking system I use maintains all similar images in the same stack, so being able to apply a keyword to all images in a stack just by selecting the top image in a collapsed stack would save time. I've tried in Library grid view and no joy. Any help appreciated.
Kind regards,
DaveNot now. There is a feature request somewhere - add your name to it.
Maybe you are looking for
-
Text Field not shown in Adobe 6.0 and 7.0
I created a simple pdf file with a text field in Adobe LiveCycle Designer 7.0. After I fill the text field with a third party tool in a program, the field's value dosen't appear in Adobe Professional 7.0 while appears in Adobe Professional 6.0. What
-
Hi, folks. I'm developing a racing game in MIDP 2.0. I've added some wav sounds to the menu and other UIs, which seems to have a short delay on playing. Now, I've got another problem! How can I add sound to the race? I need to find a way to synchroni
-
my ipad is asking for a "passCODE" not password after downloading i07 but will not accept my apple id,password or email address.my ipad is now disabled. help please donna
-
Intregration Scenario in Repository
Hello all- I am very new to XI and i don't know if my question really makes sense,is it compulsary to create integration scenario for every collaboration that we plan,the reason being i have created all the message interfaces,mappings in my Integrati
-
Settings pictures of my 5d mark ii (raw .cr2) does not stay in Aperture 3.3
Hello everybody, When I develop my photos on aperture. This one does not keep the camera settings. For example a black and white photo. My file : Raw CR2 Dear Thomas