AFAB - PRPS Relation (Network Relations - Work Breakdown Structure)
Hi Experts.
How can i find the relation between these two tables : AFAB-PRPS, i need to know wich Work Breajdown Structure are direct retaled with the Network relations in PS. Andy Ideas?, tnxs for your hlp.
AD03OBJTV - Plan data handling WBS objects, type and version
This is the table through which objnr is linked from AFAB.
AFAB & PRPS objnr is the field through which they are linked.
does this help you ? or else we can discuss more.
award points if it helps.
Similar Messages
-
Standard Objects for Work Breakdown Structure Element (WBS Element)
In 0FI_GL_4 , there are two fields :
Component | Component Type | Data Type | Length | Short Description
PROJK | PS_PSP_PNR | NUMC | 8 Work Breakdown Structure Element (WBS Element)
PS_POSID | PS_POSID | CHAR | 24 Work Breakdown Structure Element (WBS Element)
For "PS_POSID", there is a standard Object "0WBS_ELEMT" to be matched.
But ,Which object to match the "PROJK " ? Is that "0WBS_ELM_EX" ?Hi,
The object 0WBS_ELEMT_EX is actually for a different puspose.
Check this. http://help.sap.com/saphelp_em70/helpdata/en/d7/22417391807646910d01ee241628e1/content.htm
So for PROJK, i'd advise you to check what kind of output you get for this field in RSA3 and then go from there.
If you already know what it means, you can try to find a similar object in the content, otherwise just create one with similar element type.
-RMP -
I need an advice regarding my site Work Breakdown Structure.
Hi,
I need an advice on how to design my work breakdown structure?!
I have my WBS divided to Phases and each phase divided to task, there is no details in task(i.e. no lowest tasks under each task).
So may i design my WBS structure as follow:-
Project
Phases "top task"
Task under phases "Lowest task"
Please advice, Thanks in advance.Hi
The structure you have described in a valid one.
The level of granularity of a WBS depends on the practicality of planning and collecting accurate cost for each one of the individual tasks. This may also depend on the company culture, the team discipline, and customer or management control requirements.
Dina -
Work breakdown structure (WBS) - Element
Hi Friends,
can anyone explain me about <b>work breakdown structure (WMS)</b> , how it is used and where it is used and tables involved in it .
Please let me know .
Thanks in Advance.
Regards,
Roberts.KI can tell you a little about it, I ran into it some time ago on a brief project. The WBS elements are part of a project management system spans several modules in SAP. The basic idea is that a project may be broken down into many components and sub projects spread out over the entire enterprise. A project add new construction to a building for example will have a budget, construction costs, finance costs, etc. and involve resources and time from many different departments within the enterprise.
The WBS elements are the means by which activities these projects and their associated costs are connected to particular components of the project and to the project as a whole.
At least that's what I remember from 4 years ago. -
How to upload WBS(Work Breakdown Structure Element) in FB03
Hello,
In Financial Accounting, the data to be transferred to the SAP system is prepared in a sequential file.Data from final internal table(isegtab) is transfered to the file(fileout).
We need to upload WBS but the isegtab uses structure bbseg.We cannot find wbs element in bbseg .
abap code
DATA : BEGIN OF isegtab OCCURS 0 .
INCLUDE STRUCTURE bbseg .
DATA : END OF isegtab .
TRANSFER isegtab TO fileout .
SUBMIT rfbibl00 WITH ds_name = fileout "Submit the prepared file
WITH fl_check = c_no " to the SAP screen for
WITH os_xon = c_no " upload.
WITH callmode = c_b
WITH max_comm = '1000'
WITH pa_xprot = c_9
AND RETURN .
Kindly susggest us a solution ASAP.Use the field BBSEG-PROJK, it's the WBS number in external formay (Batch-Input format) (ie PRPS-POSID)
Look in (old) [Batch Input Documents|http://help.sap.com/saphelp_45b/helpdata/en/35/a47e63763e0392e10000009b38f9b7/content.htm] for :
Structure BBSEG also contains the fields for one-time data and the data for the coding block. The screen for one-time data is displayed if you have to post to a one-time account or if an alternative payee is to be specified in the document. The data for the coding block in batch input is generally displayed on a separate screen. Here, you should note the following name differences:
COBL-KDAUF = BBSEG-VBEL2 Sales order number
COBL-KDPOS = BBSEG-POSN2
Item in sales order
COBL-RMVCT = BBSEG-BEWAR Transaction type
COBL-PS_PSP_PNR = BBSEG-PROJK Project account assignment
COBL-PPRCTR = BBSEG-PPRCT Partner profit center
COBL-KDEIN = BBSEG-ETEN2 Schedule line in sales order
Regards,
Raymond -
Table EKKN-PS_PSP_PNR [Work breakdown structure element]
Hi,
-> Go to EKKN Table
-> Select one EBENL on the selection screen, execute
-> Menu - Settings - List format - Choose fields
-> Select EBELN, EBELP, PS_PSP_PNR fields
-> Check the Value on the PS_PSP_PNR, it would be some thing like 00000010, etc
-> Double click on the List
-> Please, check once again PS_PSP_PNR values, it would be appearing as 971020005.01
-> My requirement is to collect the PS_PSP_PNR value from EKKN table and
-> Need to collect the PSPHI value from the PRPS table for the above PS_PSP_PNR value
-> I have debugged the program, During the runtime, the PS_PSP_PNR field holds the value 00000010 and in the List it's displaying the value 971020005.01
Please, pass your comments.
Thanks,
KalyanHi,
In PS (project systems) system creates internal number(OBJNR) for WBS element.
you can see the internal number for WBS element in PRPS table.
WBS element and Object number fields are same.
PSPHI fields is project number.
Now goto PRPS table, enter WBS element press execute. choose details button get the PSPHI value.
Goto PROJ table enter value in PSPID field and execute you will project ID details.
Under project definition we create WBS elements
Regards,
Chandra -
Define field selection for work breakdown structure
Hello,
I have the follow problem in PS.
I want a structure with the operative indicators dependent from company code and level.
EXAMPLE
Company code A Level 1: only Billing elements inputable
Company code B Level 1: Billing elements displayed , accounting element required
In the transaction OPUK I can do this for only company code or only level.
Is that right?
Can you help me to resolve this problem?
Thanks allHi,
You can set up like this
If billing element is : Yes
Than following fields are required / optional / Hide
If billing element is: No
Than following fields are required / optional / Hide
Using the influencing option button.
I dont think you can setup at company code level , but defiantly can do at authorization level
Enjoy SAP
Please give points if ans is useful -
To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
You can also go back to the SAP help page.Hi,
I am sending only answers.If wrong pls correct me.
1.A,C
2.C
3.A,B,D,E
4.ACE
5.ABCD
6.B
7.BE
8.ALL
9.ABC
10.ABCDE
11.A
12.ABCD
13.E
14.BC
15.ALL
16.ABC
17.ACD
18.AC
19.B
20.ACDE
21.DE
22.B
23.ABCD
24.CD
25.C
26.BDE
27.BCE
28.C
29.CDE
30.BCDE
31.BDE
32.A
33.B
34.ALL
35.ABC
36.ALL
37.ABC
38.A
39.ACDE
40.AB
41.ABE
42.CD
43.ABCE
44.CD
45.ACDE
46.BD
47.AC
48.CD
I have sent answers for the questions.If any answer is wrong pls correct me.
Assign points if useful
Regards,
S.VINAYA KUMAR -
Hi! We are using WBS as a tool in collecting our Capex Projects. When the capex is closed we tagged this as TECO (Technically Completed). My question is, i cannot find a report in IM where you can have the option to view status of the WBS, i.e. Created, TECO, Cancel, Close, etc.
Appreciate your inputs,
ThanksHi Robert,
Use transaction code <b>CN41</b>. Input the WBS Element you want to see the status and execute. When the report is generated, if "<b>Status</b>" is not part of the Display/output field, select the <b>fifth icon</b> on the Application toolbar(Click on the <b>little Balck arrow</b> pointing downward on this icon and select "<b>Change Layout</b>"). This would display all the available fields for you. Select "<b>Status</b>" from the left(<b>Column Set</b>) and send it to the right(<b>Column</b>), using the directional arrow and press enter. You would now be able to see the status of your WBS Element.
I hope the above helps.
Do not forget to award the points please.
Regards,
Jacob
<u><b>PS:</b></u> Hi Robert, Is this problem solved now? Please revert to let me know.
Message was edited by:
Jacob Taiwo -
Upgraded from 10.6 to 10.6.2, network stopped working on an iMac.
Went to the Apple store yesterday, bought Snow Leopard. Installed it, everything seemed to work fine at 10.6.0. Did Software Update, it said there was a 10.6.2 update (guess it combined 10.6.1 and 10.6.2 into one?), so I downloaded it, it installed and rebooted. Ever since then, I can not get networking to work, using either cabled gigabit ethernet, or wireless to a Time Capsule wireless access point.
Trying rebooting several times, disabling/re-enabling networking, no help. It sees the router, gets a local ip address, can ping the router, but can't get to the outside world.
This is an older iMac, 24", "white plastic soapdish" model, before the newer models came out. I'm hoping someone can provide some other hints.You mentioned having a network problem. Regardless, being able to get to the outside world is a common problem under Sno. Adding a new location has worked for some.
Go System Preferences > Network > Location.
Edit location (whatever name you want).
Click + and then click done.
Try your browser.
And, here is another possibility that has worked for others.
Go Finder > Your HD > Library > Preferences > SystemConfiguration.
Move the SystemConfiguration folder to your Desktop.
Restart.
Try your browser.
Try something a little different.
Go Finder > Your HD > Library > Preferences > SystemConfiguration.
Move the SystemConfiguration folder to your Desktop.
Go System Preferences > Network > Delete all locations, and use Automatic.
Restart.
Try your browser.
You may have to reconnect to your wireless network if applicable. And, you may need to go System Preferences > Sharing and re-enter your computer's name. Check what name is given in sharing before following my instructions. If problems develop, then your can move the original folder back where it started—overwriting any folder recreated.
Finally, try deleting any KeyChain entries related to the apps, etc., you mention. -
My Samsung Network Extender worked for years. I switched away from Verizon only to find out it won't work when my phone is on another network. I have since switched back to Verizon and now my Network Extender does not work AT ALL. I will switch away again if this problem is not resolved.
We would be delighted to assist elsdpe! Have you contacted us to readd the Network Extender to your account? If not please contact us directly at 800-922-0204. We look forward to hearing from you soon, thanks!
MatthewS_VZW
Follow us on Twitter @VZWSUPPORT -
Almost with the coming of the new year, the 2.4 GHZ net slowed down to nearly nothing.
That is to say that it works only very slightly, and is usually not even visible as an option to select.
But the 5 GHz network is available and works fine.
Here is my setup:
Speed touch modem supplied by Telus
Linksys router WRT610n ( i think version 1, because there is nothing written to tell me otherwise - there is no ver 2 next to the model number)
Macbook Pro laptop (new)
dell windows laptop (old)
two pc desktop machines (one running 2.4 GHz wireless net adapter, the other running a 5GHz net adaptor)
an iPhone (new) --> only works at 2.4 GHz (i checked)
the wireless networks are named as follows:
"SHONESY 5 GHZ" for the 5 GHz signal
"SHONESY 2.4 GHz" for the 2.4 GHz signal
for months, everything worked fine. the macbook communicated on the 5 Ghz net along with one pc downstairs (wirelessly).,
my iPhone communicated nicely with a full strength signal and good speed.
then, something changed and the 2.4 GHz net all but failed.
when the dell is plugged in via a hard line ethernet cable to the router, no problems - i get 1.3 MBPS on the speed test
the macbook can only see the 5 GHz network, but works fine.
same for the pc downstairs that runs on a 5GHz wireless network USB adapter
the iPhone now only gets one bar (if anything at all), and usually cannot connect (but can usually see the SHONESY 2.4GHz network in the utilities/wifi setup area)
i am really stumped.
could the router have failed? how can i check it?
what could explain what I am seeing.
Thanks in advance for any help you can provide.
colinTry resetting the device by holding down the reset button on the rear of the device for 30 seconds. If this does not resolve your issue, then it may be a hardware malfuntion. I have noticed that my 610n was running very hot and it was a common problem so I put a laptop cooler under it and its been keeping it nice and cool. May have just burned out. I hope you get it working.
-
After updating my iPhone 5 to iOS 8.1 it will not connect to the wifi network at work even though it recognizes it. It however still automatically connects to the network at home (this is the network I used to update the phone). My iPad however does not seem to have any problem connecting. I have restared the phone, toggled the router, re-entered the network password but there's still no connection.
When your device is trying to connect to the work Wi-Fi network, go to Settings > Wi-Fi > then tap on the name of the Netowrk that she is having trouble with. Then tap on forget this network. Let the device attempt to connect again and make absolutely sure she is trying to connect to the work network and not a nearby network, then make absolutely sure the password is entered correctly.
-
I keep getting a Networking Error: when i run Software update. i have 10.5.8 and want to upgrade to at least 10.6 or later. i know the network is working perfectly.
Snow Leopard OS 10.6 is not available via Software Update, it is paid upgrade.
Start by checking if you can run Snow Leopard:
Requirements for OS X 10.6 'Snow Leopard'
http://support.apple.com/kb/SP575
OS 10.6 Snow Leopard is available for $19.99 from the Apple Store:
http://store.apple.com/us/product/MC573/mac-os-x-106-snow-leopard
and in the UK:
http://store.apple.com/uk/product/MC573/mac-os-x-106-snow-leopard
but nobody knows for how long it will be available.
When you have installed it, run Software Update to download and install the latest updates for Snow Leopard.
To use iCloud you have to upgrade at least to Lion, but some functions are only available in Mountain Lion:
http://support.apple.com/kb/HT4759
You can also purchase the code to use to download Lion (Lion requires an Intel-based Mac with a Core 2 Duo, i3, i5, i7 or Xeon processor and 2GB of RAM, running the latest version of Snow Leopard), or you can purchase Mountain Lion from the App Store - if you can run that:
http://www.apple.com/osx/specs/ -
Wi-Fi icon in general settings is not illuminated and to the right of the icon it says "No Wi-Fi". All other icons in "General Settings" are illuminated and accessible. My Wi-Fi network is working, as evidenced by the fact I'm able to do this. A week ago the Wi-Fi setting was working fine and now nothing. I have completely updated the software.
Help appreciated.What you see means that the Broadcom WiFi/Bluetooth chip is not being recognized by iOS.
There are some steps recommended by Apple to solve this but you may have a hardware problem.
See: http://support.apple.com/kb/TS1559
Maybe you are looking for
-
Write to SharePoint 2007 list using Web Services, getting Soap error
Hello! I have never worked with XML or SharePoint's Web Services but am not facing a need to use it. I am attempting to write to my SharePoint 2007 list with the following code and am getting the following error : Exception of type 'Microsoft.SharePo
-
I have several Smart mailboxes set up on my Mac. Some of them hold all mail for years and others delete after about a month. All settings are the same on all mailboxes.
-
Dynamic Report Generation C# Win Appl
Hi to all, My task is i have a DataSet object with some records. I want to bind all columns at run time. Using C#.Net Windows application , C# 11 R2. I already did this type of work in Web application but some of th property
-
**** This Question Needs Some iTunes App Experts ****
Recently replaced my iPhone and spent the last few days re-downloading the Apps/Games I used to have on my other iPhone. I've ended up with a short list of Apps that are no longer in the App Store. I've paid money for these Apps and can't redownload
-
ITunes cannot read contents of iPod Touch
Hi, I have come across the same issue as this post: http://discussions.apple.com/thread.jspa?messageID=11125727 Differences lie in that I hardly have any non-standard apps installed, just 2 at the moment, and probably have (had) more songs. I can't r