Allocating a production order to a sales order

Hi all,
we have a requirement to allocate a production order to a sales order WAY before the production order has been received.
Can someone please tell me if this is possible - and if so, how it can be done?
We are on 4.6C and AFS 3.0B
Thanks is Advance

Girish,
I seem to have never replied to you - sorry.
My email is rjoubert @ warnaco . com
(plesae note that the spaces in the address need to be removed if you do a copy and paste)

Similar Messages

  • Allocation of production order to sales order

    Hi Gurus
    Problem: Currently if there is a order that has line item with say a qty of 8 but the production order is to only fill a qty of 7, the allocation is directly given to another order leaving the one it should go to behind. The process keeps happening until there is a production order for 8 or more.
    Kindly suggest me how can we allocate production order quantity to the respective sales order eventhough the production order quantity is lessthan the sales order quantity.
    Thanks,
    JM

    Hi JM
    Here are two URLs which could possibly guide you
    http://sap-helper.blogspot.com/2008/03/availability-check.html
    http://www.saptechies.com/faq-independent-requirements-reductionwithdrawal-quantity/
    Kalpesh

  • Component allocation in production order not match that in routing

    Hi
    My problem is that the operation allocated to a component in production order does not match that assigned in routing.  For example, component A in the routing (CA03, tab CompAlloc) is allocated to operation 0050, but when we convert a planned order to a production order, component A got allocated to a different operation, say 0020.  I have no idea how that happened.  Can anyone help?
    Thanks,
    Lin-Lin Li

    Lin,
    One possibility might be, you might be having multiple BOMs for that FG.
    The alternative which is assigned in the routing might be different from the alternative read in the order.
    Check & revert.
    Hope this helps you.
    SmanS

  • Component allocation in planned order and production order

    Hi all,
    I want  table  or Function module for component allocation in production order and planned order.If component changes done in
    planned order or production order.
    In Table PLMZ and STPO I am getting component which are allocated in routing MASTER DATA.But if after generation of
    production order or planned order and I had changed one component in production order then it will not show in PLMZ and STPO
    table.
    Please reply.
    Regards,
    Vidyasagar

    Dear
    Please check the following table :
    AFKO         Order Header
    AFPO          Order Item Detail -Compoenets
    AFVC          Order Operations Detail
    AUFG         Allocation Table Sub-Item, Store Group
    AUFI           Allocation Table, Document Sub-item, Store
    AUFK          Order master data
    RESB
    FM: CO_BC_INSERT_CMP_OF_ORDERS . BAPI : BAPI_PRODORDCONF_GETDETAIL.
    Refer : Change components and Routing of production order
    Edited by: Jiaul Haque on Dec 13, 2010 7:54 PM

  • To allocate to production order using template

    hi everybody!
    I am having issue about allocating cost.
    In product costing, there is a cost, called Batch cost. That means all cost which is relevant a production batch is only allocated to production orders belong that batch. I am opposed to use Business process to collect all cost relevant a Batch cost. Then allocate cost by template from Business process to Production orders which belong that Batch.
    But i don't know what will i maintain and configure template?
    may anybody help me?
    Thanks in advance

    hi..
      Actually Batch is nothing but to identify a product by defining some unique number throughout the process of manufacture.
    So, (1) One individual prod can be a batch
          (2) On bundle of products may be a batch
          (3) One process cycle can be a batch
              so on ....
    So if you have specific order for specific batch, then  you allocate cost to that order it will go productwise/batchwise.
    If you give some more details it will be easy to suggest.
    kkumar

  • Production order from sales order with multiple line item(for one material)

    Dear Gurus,
    I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
    (Here for one material, multiple line item is required for some specific reason)
    Regards
    Rajib Pathak

    Hi,
    This is not possible.
    In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
    Regards,
    V. Suresh

  • Different CUOBJ between sales order item and production order

    Hi gurus,
    Our SAP solution is IS Mill & Variant configuration based, we're using ECC6 as OLTP system mapped to APO PP/DS from which module we trigger the planned order into production order conversion. We're exclusively using the 2 different production type : MTO & MTS. When Sales order based (MTO), it was not possible so far to change the configuration of the production order since following Message no. CO661 was advising the data for the configuration was taken from the allocated SO:
    Here is an old thread we'd posted where we were requesting further details about above message: Message CO 661 - Characteristics values were copied - you can only display
    We recently upgraded SP level (SAP_BASIS) from 15 to 30 on ECC6 side, SAP Basis Component on SCM side has been remaining unchanged with release 700 level 016.
    We now observe the message is unexpectively NOT raising anymore so-that the configuration can be freely adjusted; reason seem to be a different CUOBJ between the SO and its production order; please not the issue do not take place when creating the production order directly from ECC6 through CO08.
    Would you please help to clarify the reason of such a behaviour? Thanks in advance.
    Remark: snote 1326891 has been patched but w/o any added value as it do not really apply (= CTP not used)
    BR,
    Pascal.

    UP
    Below as an illustration CUOBJ from VBAP versus CUOBJ from AFPO
    Both WO have been created from APO, difference is the first one was created prior our SP level upgrade. I have to admitt CUOBJ mechanism between ECC & APO is quite unclear, below CUOBJ found when reading planned order data with FM /SAPAPO/RRP_LC_ORDER_GET_DATA (reading executed prior conversion, same outcome when reading prior its creation)
    BR,
    Pascal.

  • BAPI for creation of Production Order with Ref to sales order

    Hi all,
    we are using BAPI_PRODORD_CREATE  for creating Production Order with ref to sales order.
    As per the Business Scenario, we are not creating any masters like BOM and Routing, instead
    we are creating Routing directly into the Production Order under operation overview screen.
    during creation of routing system is generating a default operation.
    the following is the error results after running the Bapi.
    "No routing selected"
    Best Regards.
    GTNRNR.

    Hi GTNRNR,
    with out creation of BOM you created routing and in routing for the operations which components did you allocated so that can be used to manufacture the final product. Can you be please specific?
    Regards,
    Madhu.G

  • Production Order settlement to Sale Order

    Hi Gurus,
    I have crated a sale order through VA01, I crated sale order specific BOM through CS61 and after that I executed Cost Estimate for the sale order.
    Sale Order No: 260
    Finished Product : 610
    Semi Finished: 611
    Semi Finished: 612
    I executed MRP for sale order 260, System has created planned production for Material 610,611 and 612.
    When I am trying to convert the planned production order to production order, system is automatically picking up settlement rule as Material instead of sale order for all the production orders. System is not allowing to change the settlement rule manually.
    Our requirement is, Production Order of SFGs(611 and 612) should be settle to Production order of Finished Product(610). and the total cost of the production order of Finished Product(610) should be settle to Sale Order (260).
    How can I get the above settlement rule into my production orders as default.
    Please help me in this regards and guide me if i am going in wrong way.
    Thanks in Advance
    Ganesh
    Note:
    1. Our scenario is Make-To-Order.
    2. I am using same Order Type for all the production orders.

    Hi Venkat
    When u manf SFG - SFG declared to stock and all calculations for WIP or Variances are done for SFG material depending on the order status
    When u settle if the material is SFG in the production order - FI postings are done to relevant accounts for SFG matl
    Now when the SFG matl is used in production of FG, SFG is consumed and Production order created for FG will have either WIP or variances and settlement is executed. 
    For settling to sales order
    Create settlement profile with sales order selected as valid receiver, and assign the profile to the Production order type.  Here u need two production order types
    1)  One normal production order - here normal settlement profile is attached
    2)  One order type for sales order production.  Here u attach sales order settlement profile.  Create allocation structure for this purpose
    You can only one order type and settlement profile for both SFG and FG
    Postings to relevant accoutns for SFG and FG is taken care thru valuation class and account determination
    Hope the above clarifies - pls assign points if the above is useful

  • How to find out the list of Production orders created for sales orders

    Dear All,
    Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
    How to identify the production orders which are created based on Sales orders.
    Kindly suggest.
    Regards,
    Mullairaja

    Check these threads
    [Sale Order & Production Order|Sale Order & Production Order;
    [Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
    thanks
    G. Lakshmipathi

  • Changing the Assignment of production order in sales order in MTO scenario.

    Hello all!
    I have following problem:
    After the MRP a production order was created for a sales order. Because of the production in another plant
    the production order which was created automatically had to be technically completed and a new one
    created.
    If you want to check now the availability, the sales order finds nothing, because it's linked to the one,
    which was technically completed. Now is the question how can I change the production order for this
    sales order. (In the production order the correct sales order is connected!)
    As I found out it's connected to the field AUFNR in the table VBEP. But how can I change this
    field within a transaction and not in the database?!?

    No replies

  • Production Order and Internal Order for each item of the sales order

    Hi
       I am developing Make To Order Report where I have to display the MTO Line Items and non MTO Line Items. For non MTO Line Items I have to display Internal order with Planned and Actual Costs and also Production Order with Planned and Actual Costs. Could anybody tell how to get the Internal order no and production order with Planned and Actual costs for each line item for a sales order.
    Thanks
    Naga

    Hi,
    You can get the Production orders, Planned orders, Internal orders generated for Sales order item from AFPO table (use fields KDAUF-Sales order number & KDPOS-Sales order item). Then to identify the order type use order category (AUTYP) from table AUFK.
    Once you have the Production/internal order, you can ge the cost from COSS and COSP table. Use the object number from AUFK to get the cost entries from COSS & COSP.
    You can use the following sample code as reference.
    Hope this is helps.. (Don't forget to mark it... )
    Form GET_COSTS                                                       *
    Get the material cost, labour hours and the labour cost for the      *
    sales order material.                                                *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_COSTS.
      DATA V_OBJNR LIKE AUFK-OBJNR.
    DATA v_menge LIKE vbap-kwmeng.
      SELECT SINGLE OBJNR
        INTO V_OBJNR
        FROM AUFK
       WHERE AUFNR EQ AFPO-AUFNR.
      SELECT * FROM COSS
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04'). " p_wrttp. "Labour Cost ( Plan, Actual)
        PERFORM GET_VALUES_FROM_COSS.
      ENDSELECT.
      SELECT * FROM COSP
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04')         " p_wrttp
         AND KSTAR NE '0000510033'. " EQ p_kstar2.      "Material Cost
        PERFORM GET_VALUE_FROM_COSP.
      ENDSELECT.
    Get the unit cost of the production order by dividing the production
    cost by the order quantity. The result will be multiplied by the
    GL posting qunatity (Delivery quantity) to get the production cost
    for the quantity being deluivered.
      IF NOT AFPO-PSMNG IS INITIAL.
        OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_ACT =
                          OUT_REC-ADDNL_LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_PLN =
                         OUT_REC-ADDNL_LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_ACT = OUT_REC-LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_ACT =
                         OUT_REC-ADDNL_LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_PLN = OUT_REC-LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_PLN =
                         OUT_REC-ADDNL_LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_ACT =
                         OUT_REC-ADDNL_MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_PLN =
                         OUT_REC-ADDNL_MATERIAL_COST_PLN / AFPO-PSMNG.
      ENDIF.
    Multiply the calculated Unit Production costs with the GL quantity to
    get the actual production cost of the quantity delivered.
    Calculation for Labour Hours
      OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_ACT = OUT_REC-ADDNL_LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_PLN = OUT_REC-ADDNL_LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
    Calculation for Material Cost
      OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_ACT =
          OUT_REC-ADDNL_MATERIAL_COST_ACT * OUT_REC-QUANTITY.
      OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_PLN =
          OUT_REC-ADDNL_MATERIAL_COST_PLN * OUT_REC-QUANTITY.
    Calculation for Labour cost
      OUT_REC-LABOUR_COST_ACT   = OUT_REC-LABOUR_COST_ACT *
                                   OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_ACT = OUT_REC-ADDNL_LABOUR_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-LABOUR_COST_PLN   = OUT_REC-LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_PLN = OUT_REC-ADDNL_LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
    Get the planned material cost from the total of the planned cost of
    the component materials in the production order confirmations.
      SELECT BWART MENGE MATNR SHKZG FROM AUFM
        INTO (AUFM-BWART, AUFM-MENGE, AUFM-MATNR, AUFM-SHKZG)
       WHERE AUFNR EQ AFPO-AUFNR.
        CHECK AUFM-BWART NE '101'.
        READ TABLE I_MBEW WITH KEY MATNR = AUFM-MATNR
                                   BWKEY = AFPO-DWERK.
        IF SY-SUBRC NE 0.
          SELECT MATNR BWKEY ZPLPR LPLPR PEINH
            FROM MBEW
            INTO I_MBEW
           WHERE MATNR EQ AUFM-MATNR
             AND BWKEY EQ AFPO-DWERK.
            APPEND I_MBEW.
          ENDSELECT.
        ENDIF.
        IF SY-SUBRC EQ 0.
          IF I_MBEW-ZPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST +
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST -
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ELSEIF I_MBEW-LPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST +
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST -
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ENDIF.
        ENDIF.
      ENDSELECT.
    Get the Future material cost per Unit by deviding the calculated
    Future material cost above with the goods reciept quantity to, then
    multiply the unit cost with the GL quantity to get the Future material
    Cost for the Quantity delivered. (Quantity in the entery from GLPCA
    Table).
      IF NOT AFPO-WEMNG IS INITIAL.
        OUT_REC-PLANNED_MATERIAL_COST =
           OUT_REC-PLANNED_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
        OUT_REC-CURRENT_MATERIAL_COST =
           OUT_REC-CURRENT_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
      ENDIF.
    ENDFORM.                               " GET_COSTS
    Form GET_VALUE_FROM_COSP                                             *
    Get the Material cost from COSP table.                               *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUE_FROM_COSP.
      FIELD-SYMBOLS: <FS> TYPE ANY.
      DATA: V_COMPONENT TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT = 15.
      DO 16 TIMES.
        ADD 1 TO V_COMPONENT.
        ASSIGN COMPONENT V_COMPONENT OF STRUCTURE COSP TO <FS>.
        IF COSP-WRTTP EQ '04' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '04'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '01' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_PLN.
        ELSEIF COSP-WRTTP EQ '01'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUE_FROM_COSP
    Form GET_VALUES_FROM_COSS                                            *
    Get the Labour cost and Labour hours from the COSS table.            *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUES_FROM_COSS.
      FIELD-SYMBOLS: <FS1> TYPE ANY,
                     <FS2> TYPE ANY.
      DATA: V_COMPONENT1 TYPE I,
            V_COMPONENT2 TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT1 = 15.
      V_COMPONENT2 = 111.
      DO 16 TIMES.
        ADD 1 TO: V_COMPONENT1, V_COMPONENT2.
        ASSIGN COMPONENT V_COMPONENT1 OF STRUCTURE COSS TO <FS1>.
        ASSIGN COMPONENT V_COMPONENT2 OF STRUCTURE COSS TO <FS2>.
        IF COSS-WRTTP EQ '04' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '04'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '01' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_PLN.
        ELSEIF COSS-WRTTP EQ '01'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUES_FROM_COSS

  • Fields required for linking production order with sales order

    I need to link production order and sales order to get the part no#. need to see in md04.

    The link between production order and sales order can be made by using the KDAUF KDPOS fields of AUFK or AFPO and linking them to VBELN and POSNR of VBAP.
    Regards,
    Rich Heilman

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Confirmation of the production order qty equal to sales order qty

    Hi Experts,
    I need to control the confirmation of the production order should be equal to sales order qty.
    I'm having the scenario as follows
    If sale order qty for X material = 3
    while running the MRP, system will plan the order qty as 8 because of we maintained rounding profile in the Material master and enhancement we used for this.
    Rounding Profile Qty=5
    Total Production Order Qty=8.
    But, finally they will do the GRN for sales order qty only, remaining will be used for testing purpose.
    So, the confirmation also has to happen for only sales order qty. There, we need to control the qty based on the sales order.
    Is there any exit or Enhancement is available for this.
    Please help me.
    Naren

    Hi,
    Exit for confirmation check is CONFPP04.
    However, opening orders for quantities higher than demand and leaving pieces undelivered and unconfirmed in production orders does not make sense. I could not get the requirement of incresing production quantity by adding rounding value? Moreover, if rounding is to be used for test purposes, why not do you receive them into stock? Why don't you receive 8 pieces into stock, deliver 3 pieces to sales order and transfer 5 pieces to related department?
    If it is because of MRP and you really do not want to produce extra 5 piece immediately, you may use material reservation or any other form of demand for 5 pieces, use EX for lot size calculation and have MRP create two planned orders for sales order and testing requirement, then you can convert planned order for sales order requirement into production order and continue processing.
    Regards.

Maybe you are looking for

  • Single Sign-on and SSL problems

    We are using WebLogic Portal and Server (version 8.1 SP3). We want to have a single sign-on when entering the portal, so that users do not need to reauthenticate each time they access an application via an applet in the portal. We also want to protec

  • Why does a face show up on my iPad when I have deleted it from aperture

    I am using aperture to tag a modestly large library (about 22,000 photos) all for personal use. I've been going through these photos and tagging faces. As a sort of "holding pen" for faces that I wasn't sure about in the unnamed faces strip at the bo

  • Is there a modified version of Lightroom that will run on a tablet?

    What can I take when traveling to download and review images that would be smaller than a laptop?

  • Unable to update profit center or plant code in the customer line item

    Hi, We require the profit center and plant code and division in FI documents (Posted through billing document or through direct FI entry) We are unable to input plant or profit center in the customer line item while using F-21 or any other FI transac

  • Rendered Video has Glitches

    I'm from Toronto, Canada and right now working on an online for a PAL tv series. This project's been a long process, originally all the required files were on the suite's FW800 RAID drives but now they're all on drives supplied by the client: FW 400,