Production Order settlement to Sale Order

Hi Gurus,
I have crated a sale order through VA01, I crated sale order specific BOM through CS61 and after that I executed Cost Estimate for the sale order.
Sale Order No: 260
Finished Product : 610
Semi Finished: 611
Semi Finished: 612
I executed MRP for sale order 260, System has created planned production for Material 610,611 and 612.
When I am trying to convert the planned production order to production order, system is automatically picking up settlement rule as Material instead of sale order for all the production orders. System is not allowing to change the settlement rule manually.
Our requirement is, Production Order of SFGs(611 and 612) should be settle to Production order of Finished Product(610). and the total cost of the production order of Finished Product(610) should be settle to Sale Order (260).
How can I get the above settlement rule into my production orders as default.
Please help me in this regards and guide me if i am going in wrong way.
Thanks in Advance
Ganesh
Note:
1. Our scenario is Make-To-Order.
2. I am using same Order Type for all the production orders.

Hi Venkat
When u manf SFG - SFG declared to stock and all calculations for WIP or Variances are done for SFG material depending on the order status
When u settle if the material is SFG in the production order - FI postings are done to relevant accounts for SFG matl
Now when the SFG matl is used in production of FG, SFG is consumed and Production order created for FG will have either WIP or variances and settlement is executed. 
For settling to sales order
Create settlement profile with sales order selected as valid receiver, and assign the profile to the Production order type.  Here u need two production order types
1)  One normal production order - here normal settlement profile is attached
2)  One order type for sales order production.  Here u attach sales order settlement profile.  Create allocation structure for this purpose
You can only one order type and settlement profile for both SFG and FG
Postings to relevant accoutns for SFG and FG is taken care thru valuation class and account determination
Hope the above clarifies - pls assign points if the above is useful

Similar Messages

  • Order Settle to Sales Order

    Dear Co Experts,
    Accourding to our scnario, we have to settle the Project to the Sales Order.  Regarding this if u maintain Sales Order is Required in Settlement Profile, then what can i mantain in Default Object Type. 
    Can u give some info
    Regards
    Raj

    Dear VR,
    I got ur explanation, valid receivers is Order Item, then what about  the default order tyep.  What can i menction as a default order type in that settlement profile.
    Regards
    Raj

  • Settlement of Sale Order issue.

    Dear friends
    I am getting the following error while settling the Sale Order in VA88.
    Please guide me in this issue, how to handle?
    There are no accrued amounts; settlement is not possible.
    Message no. KD256
    Diagnosis
    The sender has a results analysis key, but no accrued values.
    Either the accrual was not yet started for the sender, or the values to be settled from the accrual equal zero.
    Note
    Actual costs are only settled once the sender is technically completed or finally delivered.
    This applies to
    Projects that cannot carry revenues
    In Service Management for sales order production to the indicator (Calculate WIP for orders in sales order production) set in the accrual version for
    Production orders
    Internal orders with no revenues
    Orders with no revenues
    In Service Management for engineer-to-order production to the indicator (Calculate WIP for orders in engineer-to-order production ) set in the accrual version for
    Internal orders with no revenues
    Orders with no revenues
    In Service Management to the indicator (Calculate WIP for internal and service orders with no revenues) set in the accrual version for
    Internal orders with no revenues
    Orders with no revenues
    To the indicator (Calculate WIP for production orders without settlement to material) set in the accrual version for
    Production orders without settlement to material
    Procedure
    1. If necessary, start the accrual calculation for the sender
    2. Restart settlement

    Now I am getting another error.
    Complete PA transfer structure ZR
    Message no. KD514
    Diagnosis
    There is no value field assignment for cost element 911400 / *_variance category COSR_* in PA transfer structure ZR, or
    PA transfer structure ZR has no assignments, or
    No "Origin" is maintained for the assignments in PA transfer structure ZR (cost element group and, if applicable, variance category)
    When I see the Variance Category I didnt find any Variance Category COSR?
    What could be the reason.
    Thanks in advance
    Kiran

  • MTO - Settlement of Sales Order to COPA

    Hi,
    We have a scenario wherein production order is created with reference to Sales order.
    No standard / Sale order BOM is maintained. As such no cost estimate is available for either Header material or sales order. Header material does not have any value.
    Goods are issued to production order with reference to such sales order, as special stock. So consumption posted to Sales order.
    Revenue is captured on Sales order.
    At this point of time, can I settle the sales order through VA88. What all will it settle.
    Is RA excution a must for VA88 settlement?
    Please suggest.

    HI,
    if you need to have WIP-value posting, result analysis is a must before settlement.
    Best regards, Christian

  • Product cost by sales order with Valuated Sales order stock

    Hi Gurus,
    I am working on Poduct cost by Sales Order with Valuated stock. but i have doubt ragarding to Cost estimation.
    1.In sales order scenario also Standard Cost estiamtion (CK11n and CK24) and Marking, Releasing is Mandatory? if not how can we estimate the cost?
    2. If we are estimating the cost by using Standard Cost estimate, when can we estimate the cost?
                can anybody please give me the steps which we are following in Poduct cost by Sales Order with Valuated stock from starting to end Settlement
    Thanks&Regards
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

  • How to settle the sales orders

    Hi experts,
    Can anyone tell me how to settle the sales orders? What is the transaction code?
    regards
    vk

    Hi VK ,
                 Being production consultant I think production order which is created with reference to sale order will be settled in ko88 or co88 after calulating variance ( and settling in variance a/c ) , Work in progress .
    Prod order should have TECO indicator before you settle .
    Neal

  • Settlement to Sales Order

    Dear All,
    I am trying to do the Settlement to Sales Order.
    In the Project I maintain the Settlement Rule for the Each and Every WBS as uppar WBS, and the Final Upper WBS/ 1st Level WBS i maintained to Settlement Rule to Sales Order Lilne Item.  ( Before i created Sales Order and I assinged 1st Level WBS to that Sales Order)
    When i am doing Settlement Rule for the 1st level WBS, system shows, the following mesage
    The sales document is assigned to WBS element  XXXXX
       Message no. V1139
    Diagnosis
    The sales order item contains a project account assignment.
    Procedure
    Enter the  number of a work breakdown structure element which is included in the same project definition as the work breakdown structure  element from the sales order item or assign a sales order item without project assignment.
    Regards

    As your scenario is of Assembly processing.  You have to consider how the requirement type & Requirment class get determined for the Material entered in your Sales Order.   You might be aware but check below link how the requirement type & Class get determined in case of Assembly processing.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/ab/5d487a733311d2b6600000e82d8bd1/content.htm
    Either you might be using SD Item Category or Material Master Main Stretgy will be prevailing for determining requirement type.  From that you find the Requirement class And in requirement class there will Acct. Assign Category ..
    Also check you customization in below nod.
    IMG>PS>Material>Control of Sales-Order-Related Production>Selection of Requirements Type Through MRP Group
    IMG>PS>Material>Control of Sales-Order-Related Production>Selection of Requirements Type Through SD Item Category
    With Regards
    Nitin P.

  • How to find out the list of Production orders created for sales orders

    Dear All,
    Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
    How to identify the production orders which are created based on Sales orders.
    Kindly suggest.
    Regards,
    Mullairaja

    Check these threads
    [Sale Order & Production Order|Sale Order & Production Order;
    [Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
    thanks
    G. Lakshmipathi

  • Settlement of Sale Order to Sale Order

    Dear experts
    I need help in the following scenario:
    At my client place we are doing job work for external material. All the material are supplied by the customer and our client will do the processing and send it back to customer's customer on customers request.
    To create Excise Invoice against the Customers Customer we are handling through 2 sale orders.
    First One Sale order will be created against the Customer Order and Sale price will be the selling price of Customers to Customer.
    Second Sale Order will be created for Job Work Charges for the processing the materials.
    On settling the process orders all the cost is settling to Sale Order One, Clients revenue is coming from Sale Order Two.
    Here I need to settle the First Sale Order to Second Sale Order. I have given the second sale Order number in first sale order number in Settlement rule.
    But when I settle the First sale Order all the amount it going to Price Differance Account.
    How to settle the Cost of First Sale Order to Second Sale Order?
    Regards
    Kiran A

    Dear Experts
    any advises.
    Can I go for Sale Order to Sale Order Settlement ?
    Regards
    Kiran

  • Duplicate production order due to sales order on credit block

    Dear Experts !
    Need feedback on the following scenario:
    - Sales order is entered for material which is produced in-house specific to the sales order (ie customer's logo is on product).
    - Schedule line in sales order creates a production order specific to the sales order.
    - Customer runs into credit check a few days later and consequently the schedule line in the sales order is removed due to credit block, however the linked production order still remains and is produced by factory.
    - Sales order is released from credit check and a new schedule line is created resulting in another production order being released.
    Any ideas on how to prevent duplication of production order?
    Thanks in advance!
       -Alvin

    Hello,
    Apologies for the confusion, let me explain it a bit more.
    - Sales order is entered for material with planning strategy group of make-to-order, the schedule line initiates new production order for make-to-order material.
    - A few days later - the customer goes over credit limit or has overdue invoices, etc..
    - During background rescheduling (or any sales order change) the sales order gets a credit block due to static check.
    - Sales order block deleted schedule line in sales order, however the production order remains active.
    - Once the sales order is released from credit block, a new schedule line is created which initiates a new production order.
    - Duplicate production order is now being made in shop floor.
    I hope the above explains my scnario a little clearer.
    Thanks and regards,
    Alvin

  • Error while creating a production order from a sales order

    Hi
       Even though the product has BOM when i try to create order with a sales order reference it is showing a warning message " NO BOM FOUND" . How to correct this error .
    regards,
    PradeepM.

    Dear ,
    Goto -CS02-Enter FG -Goto Header -Staus Long Text -Check wether BOM status is set to 1 -Active .
    Check the usage of the BOM -Should  be 1-Production .
    Check wether BOM is locked and Deltion Flag set -Header Status Long txt tab
    Check the valididty of the BOM and Sales Order Schedule delivery date
    Try and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jul 6, 2010 9:03 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM

  • Rebate settlement at Sales order level

    Insight requested..
    How to do rebate settlement at sales order level, generally rebate settlement is done after the invoice creation and with reference to accounting document.

    Dear sud
    The definition for rebate is A rebate is a special discount which is paid retroactively to a customer. This discount is based on the customer's sales volume over a specified time period.
    Having said that if you are willing to give some discount to your customer, on the order itself, we can call it as DISCOUNT and it should not be called as REBATES.
    For discounts, you can create a condition type and assign it to your pricing procedure.
    Incidentally, can you please let me know what warrants you to ask this question.  I am sure, the sales process won't be like that.
    Thanks
    G. Lakshmipathi

  • Issues to Production Orders created from Sales Order

    We have multiline Sales Orders that create a Production order for each sales order line (can be up to 70 or 80 per SO). We normally backflush these via multiple MB1A transactions after the SO has been completed. It is a lot of work doing the required issues to reduce stock levels and consequently they are always "late" being done and the stock is always out of date until the movements (type 261) are processed - generally monthly!!
    As a result, an Access Database has been created that reduces stock in that by entering the SO number and this is used for Stock enquiries. I would like to get rid of this Access database so as I'm sure other people have hit this same problem, is there a way of doing the same in SAP i.e. enter SO number and then relevant stocks are reduced accordingly.
    Any help would be appreciated.
    Thanks in advance
    Jim

    Hi,
    I am not clear why you are manually doing the process? When the production order is confirmed for each operation (CO11) the goods movement should be posted then, backflush selected in work centre or in the production order.
    Any failures can be processed via COGI rather than a database.
    Thanks.

  • MRP Generated production orders greys out Sales Order and Customer fields

    Hi there,
    The MRP generated production orders greys out the Sales Order and Customer fields for some reasons. These fields are really important as they link the production order to the sales order and the customer's purchase order. Could the SAP team please fix this or advise alternative way of getting the sales order and customer info on production order? Thanks.

    Hello
    MRP only poulated this fields in case the material master has been set up with a strategy group hich is make to order (normally 20). Otherwise MRP summarizes all the requirements from different Customer orders and creates a production order
    Stephan

  • Allocating a production order to a sales order

    Hi all,
    we have a requirement to allocate a production order to a sales order WAY before the production order has been received.
    Can someone please tell me if this is possible - and if so, how it can be done?
    We are on 4.6C and AFS 3.0B
    Thanks is Advance

    Girish,
    I seem to have never replied to you - sorry.
    My email is rjoubert @ warnaco . com
    (plesae note that the spaces in the address need to be removed if you do a copy and paste)