Approval for issueing safety stock

Dear Experts,
I have one requirement...
I need a control / approval... while issuing the material from Saftey stock level..
I 'll explain in detail.. If i mentioned a mtl A with safety stock 10.... till the time it reaches 10.. it needs to allow the issue...
Once it reached the limit of 10..(stock).. then it needs to restrict the issuing process.. And the issue can be further performed only after approval...
Please explain the possibility and how to configure for this in SAP.
Thanks and regards..

Hi,
In OPJJ, you can control the availability check of safety stock for the combination of Availability check and Checking rule.
But for the consumption and issue you have to manually do goods issue.

Similar Messages

  • Safety Stock Issue

    Hello Gurus,
    We are in SCM 4.0 and currently we are facing an issue in safety stock calculation.
    We run a macro to calculate the safety stock. The safety stock for a particular bucket is calculated by the sum of total demand of next consecutive 4 buckets. The problem is that the macro works fine if we select a single product-location combination but when we select a product at multiple locations combination (aggregated level) the macro doesnt work. The value is not displayed in the planning book. However, we could see the total demand value for that particular bucket.
    Hope I am clear and please help me on this.
    Thanks,
    Sai

    Hello all,
    I have a quick question:
    Do we need to maintain the data at Location-Product Group level to go for Aggregated Safety Stock Planning?
    Let me explain my case:
    We have the following selections at Location-Product level:
    Sel1: Prod1 at Loc1
    Sel2: Prod1 at Loc2
    Sel3: Prod1 at Loc3
    When I make either of these selections individully in the Planning book the safety stock macro works fine but if I make any of these two selections or all the three selections at a time, then the values does not show up at the Total but I can see the values at 'Details' level if I select Location at the Header Information.
    We are thinking of Aggregated Safety Stock Planning and We do not mainatain the data at Group level. Can we still go for Aggregated Safety Stock Planning?
    Could anyone give me some suggestions on this?
    Thanks
    Sai

  • Mrp requirement qty including safety stock

    I have tested and got results as follows with VB/EX:
    RO Point = 10 ea
    Safety stock = 5 ea
    Stock = 5 ea
    But the mrp element generated for 5 ea only.
    I need to get requirment qty considering the safety stock also.
    HOW TO INCLUDE SAFETY STOCK IN REQUIREMENT QTY?
    warm regards
    marias

    Hi,
    the safety stock is relevant when you are carrying out goods issues.
    the system will stop you from placing orders against the safety stock (because you don't want to sell this you want to keep it for emergencies) and yet it will allow you to goods issue to a delivery from safety stock (because that is why it is there, to ensure that you have spare items in case of shortages).
    You control what can and can't issue safety stock by using different configurations for the availability checks for each function..
    So even though the reorder point MRP seems to ignore safety stock it still warns you when you fall below this (with an exception message) and it is still used for goods issues and transfers etc.
    Steve B

  • Dynamic Safety Stock and Calculate based on past consumption

    Hello experts,
    I have set up my coverage profile in configuration for dynamic safety stock.  However, the value is going off of the current net requirements in the system.  How do I set it up so that the target stock level (DSS) is determined by 30 days of our past consumption and so many days of near future requirements?
    I assume I need to set up the MRP 3 tab in a specific way.  These materials that will be using dynamic safety stock are not forecasted, therefore, the material master had PD as MRP type (not VM or VV as discussed for setting DSS with forecasted materials), lot size of DY, and the coverage profile.
    Please let me know.
    Thanks.

    Hi,
    Hi the configuration should be like this..
    First Create range of actual coverage profile SPRO and enter the following data.
    Period Indicator - M
    Number of Periods - 2
    Type of Period length - Working days
    Number of days per period - 30
    Range of coverage in the first period - target - 30
    Then assign this profile to the material in MRP3 screen in the field range of coverage profile field.
    Regards
    Prasanna

  • Dynamic Safety stock calculation based on Future Requirements

    Dear All PP experts
    Our company wants to calculate the Dynamic Safety stock based on requirements in future period. Based on Standard SAP, it calculates dynamic stock based on current period only. So is there any way to do that. We are using MRP type PD.

    Use MRP type VM(Automatic reorder point plng) for Dynamic safety stock calculation.
    Also you can use coverage profile calculating dynamic safety stock.
    Use Tcode OMIA to define the coverage profile.
    For example if you  have defined a minimum range of coverage of 3 days, a maximum range of coverage
    of 7 days and a target range of coverage of 5 days.
    The system calculates the following:
    Minimum stock level = 3 x 15 pieces = 45 pieces
    Maximum stock level = 7 x 15 pieces = 105 pieces
    Target stock level = 5 x 15 pieces = 75 pieces
    The available quantity is 40 pieces and is therefore less than the minimum stock level. Therefore, the system creates a procurement proposal for 35 pieces (= target stock level 75 pieces u2013 actual quantity of 40 pieces) during the planning run.
    Regards
    S.Senthil

  • Dynamic safety Stock "Range of Coverage profiles

    Hi Friends,
    Need help for Dynamic Safety Stock
    I'm  new in MM and I want to know how to configure the  range of  coverage profile in SAP.
    I need your help to know the fonctionnality of this profile in SAP and his utility for the business
    Please help
    Foued

    Hi,
    Please post on appropriate forum - this is a forum from SAP PI - integration
    Thank you,
    Regards,
    Michal Krawczyk

  • Safety stock, forecasting doubts

    Can anyone guide me on my doubts,
    1) Safety stock : While describing safety stock in oracle, we are mentioning date and quantity. Take a example - item = xyz, Date = 01 Jan 2012, Qty = 10. is it means that 01 Jan 2011 onward, stock level of item xyz should be atleast 10. If it is less that 10 after 10 Jan, then suggest planned order from ASCP.. ?
    2.1) I can see that we can manually mention safety stock, system will calculate safety stock. In case of manual, xyz item attribute should be 'Not MRP" Planned. I can mention item, date and qty for in safety stock form.
    2.2) In case of system to calculate Safety stock, I have mentioned attribute value as " MRP planned", mentioned safety stock days as well. Here I have created a forecast and ran "Reload safety stocks" with method as "User defined %" with forecast created for SS calculation. Now I can see corresponding newly created SS in system.
    Now I have ran data collection with calculate safety stock = Yes, and after than launched plan as well. But I am not able to see both type of safety stock in ASCP workbench. I will say, I am not able to see any safety stock demand in workbench in any one of organization. Like to inform you that while doing collection, I have selected all organizations which are enabled and also same was selected while launching plan.. so whats wrong and so not able to see any safety stock demand in system.
    3) Forecasting: I can put forecasting at component instead of products level ( ie finished good). Now suppose, I have kept forecasting at component level, means I have mentioned component item, qty and due date in forecast form. Now ASCP will consider this as demand and drive material, may suggest planned order. Now same time, I have booked a SO, having a products, which requires that forecasted component to do assembly. As there is demand against forecast and demand for SO, will drive material and this will be duplication. So netting of forecast is must, which we can do through forecast consumption. Now in my scenario, I have mentioned forecast for child in forecast and SO is booked against finished item. Now my question is - is there any provision for component level consumption based on finished good SO.. ?
    Let me know if anyone needs more clarity on above case,
    Thanks and Regards,
    Dipak

    Thanks Partha your help. Following solution is working on MRP, but it seems that not working on ASCP. I am pasting process here, Here V is long LT item.
    1) Define a planning bill forecast, consider FC00. This contains aggregated demand of V against a particular date.
    2) We will explode forecast from FC00 to FC01, where you can see forecast against component of ‘planning bill item’ along with Qty and date. Qty will be derived from planning percentage mentioned in planning bill.
    3) In order to convert these forecast demand in purchase order, we have to use a plan.. say ‘Small Plan’. Purpose of this plan is to consider ‘Forecast FC01’ only as demand ( ie do not consider any SO, On-hand etc for calculation ), and create a supply by release planned order. Here needs to run collection and also needs to mention demand schedule as ‘FC01’ in plan parameter.
    4) Now all planned order as per forecast will be released and converted either requisition / PO. This may be firm / non firm.
    5) Now define another Master plan, ( in order case, this plan will be global plan) which consider all supply and all demand sources. But ensure that we will not mention FC00 / FC01 forecast in this plan demand schedule. This plan will consider PO / requisition supply created via ‘Small Plan’, and will peg to actual SO. This will not peg to FC 01 as we have not attached this forecast to master plan demand schedule.
    6) Now if SO dependent demand of V is less than PO qty, then master plan will suggest to raise PO vice versa it will suggest to cancel / re-schedule in –out. We can filter such suggestion by exception / action / supplier name etc. So we will NOT do cancellation / reschedule out, but we will do re-schedule in if possible. This will ensure that we will have enough supply of V irrespective of SO demand.
    From above, we can use planning bill as input for long LT items planning and output will purchase order in advance of SO, also consumption ( indirectly) of forecast can happen. If we will mention ‘include past due forecast = 0’ in planning parameter, then automatically past forecast will be excluded from planning.In addition, we can use master plan ‘supply-demand’ workbecnch output for monitering SO demand trend with forecast entry done by planner.
    Now am checking on ASCP and believe that it will work in ASCP as well.
    Thanks for support ,
    Dipak

  • Safety stock planning and use of CTM in APO

    I want to use advanced safety stock planning and CTM in APO for a range of finished products.
    For advanced safety stock planning, the available safety stock methods are AS, BS, AT, BT.
    For CTM, I want to use time based safety stock method MB.
    So how can the use of these different methods be reconciled?
    Ady advice appreciated...

    Hi,
    Please check following SDN threads:
    Re: CTM ignores Extended Safety Stock Methods (like BS, BT etc...)
    Please also check OSS note 426563 .
    For Planning a  time phased safety stock ( e.g. when using advanced safety stock methods from SNP) CTM provides two alternative methods  which have their own restrictions:
    1. Standard saftey stock  Planning .The standard safety stock method of CTM consists of two internal runs of CTM engine which are not visible for the user. Because of this two runs it is not possbile to consider decreasing safety stock. CTM interval planning can be used herein.
    2. Alternative saftey  stock  method (Control parameter SSTOCK_MODE). This method carries out only one run.  However there are some restrictions. For details of the above, please check oss note 1413545.
    regards
    Datta

  • How to use forecast and safety stock

    Hi
    We have below business case for MRP case  and scenarios , please guide me how to use safety stock in this case.
    Requirement : System should always raise PR for quantity of forecast only , if forecast in not available then for the safety stock 
    Planning cycle
    100 (Monday)
    Deliver cycle
    500(Friday)
    Forecast model
    S
    Lead time
    4
    Safety stock
    10

    Hi
    Did anyone have idea how to use safety stock with forecast in such a way that System should always raise PR for quantity of forecast only , if forecast in not available or less then the safety stock quantity PR will be raise with safety stock quantity

  • Approval hierarchy to issue Minimum safety stock

    Hi Guys,
    We have a requirement to have an automated approval hierarchy for issuing the inventory below a safety stock limit defined. How can we achieve that. I know that there is some option as "minimum safety stock" in SAP, but we need that a workfklow to be activated when the stock reaches to this level and only after approval it should be allowd to be issued. Is it possible to implement?

    Hi,
        There is no approval concept in this case. But you may check the below work around, Activate availability check for the material. Then you may maintain the message  M7181 as user specific and maintain it as error message for the users who are NOT supposed to issue the goods below the safety stock. Refer the thread: message to be make error for specific user id
       You may create a program to find the materials with stock equal to safety stock and send the result. You may schedule the job in background with specific interval.  Also refer the thread: Material alert workflow
    Regards,
    AKPT

  • Issue with -ve safety stock not allowing items of smaller demand to be isue

    We have a material with  a safety stock value of 300 with only 119 available in inventory.  Looking at MD04 the available qty immediately goes negative (-181). We have requirement of 30 but was prevented by the system from ussing the material - no iventory available message.  The workaround, which is not acceptable, was to reduice the safety stock to zero, create the delivery and then re-instate the safety stock level back to 300.
    So the issue is that  material could not be issued to PrdOrds.  Is there a possibilty that we have some missing config / master data settings that are preventing the issuing of material when safety stock is factored in and available quantity is less than zero?

    From planning perspective, there are two options available for your scenario.
    You may try if the dynamic safety stock works for you. You may have to configure the minimum, maximum  and target stock levels. The system calculates the average daily requirements of the material and determines the proposals.
    If your business process demands only static ss, you can configure the % share of ss that can be used for smaller requirements. Check the config node Production >> MRP >> Planning >> MRP calculation >> Stocks >> Define SS availability. This way the smaller requirements would be considered for use from SS by planning. You will have to define the % share of SS that can be used by planning based on MRP groups.
    Edited by: Arun.CBE on Feb 17, 2012 9:25 AM

  • Whether it is possible to make auto goods issue below safety stock level

    Hi SAP Gurus,
    I am implementing MRP for generating stock transfer Planned orders from a Main Mother Plant to different Plants. We have defined a Safety stock level for materials at main Plant level.
    There is a auto program available for generating auto goods issue against Purchase orders.
    System picks up Qty as long as unrestricted stock exists for the material during auto goods issue.
    System dont pick up any Qty below safety stock level (manual goods issue works below safety stock level).
    We are defining safety stock to meet sudden requirements and have time for new procurement.
    But it should allow us to do auto goods issue below safety stock level.
    Whether this is possible and what need to be done ?
    Thanks and Regards,
    R.Velmurugan.

    Hi Velmurugan,
    I don't think auto GR is a problem from safety stock. Auto Gr can be done by two ways.
    1. Control key and assigning the control key in operation(Preferably in last operation)
    2. In production scheduling profile you can do it. You have to assign the production scheduling profile in material master work scheduling view.
    Regards,
    Krishnendu.

  • Report for Reorder point, safety stock, current stock and fixed lot size

    Hi,
    Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
    They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
    Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
    Thanks in Advance.
    Regards,
    Shankar Goud.

    Hi,
    There is no standard report because this is meant to be managed by the MRP run.
    The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
    Are you using MRP?
    If so then please use the standard functions in MRP to get this.
    If not, then WHY NOT?
    Steve B

  • No planning file entry for safety stock

    hello!
    i do not have a planning file entry for safety stock. my material has required safety stock and no quantity on plant stock. therefore MD01 should create a purchase requisition - but is does not. i do not have an entry in the planning file as well.
    any ideas what could be the reason?
    thanks!
    matthias

    Hi,
    - First of all check whether MRP is activated or not for Perticuller Plant.T.code is OMDU.
    - Which MRP type is maintained for that material?
    - In rare cases (Materials uploaded by LSMW using Badi) it is observed that system miss to make the entry in Planing File.So better will be set a Back Ground job to activate Planing file OMD0 or make manual entry using T.code MD20.
    Regards,
    Dhaval

  • Issue with Negative Value for Total valuated stock 0VALSTCKQTY.

    Hi Experts,
    we loaded the Cube with datasources 2LIS_03_BX, 2LIS_03_BF and 2LIS_03_UM.
    We mapped the quanity field from 2LIS_03_BF in transformation either into Key figures "Quantity issued from valuated stock" (0ISSVALSTCK) or "Quantity received into valuated stock" (0RECVALSTCK ) of the cube.
    For obtaining the Total Valuated stock, we used the Key figure 0VALSTCKQTY. This key figure is having the Inflow and Out flow values as 0RECVALSTCK and 0ISSVALSTCK. When i tried to check the content of 0VALSTCKQTY, the key figure  0VALSTCKQTY is not present in the infoCube content. I understood that the value for this key figure would be calculated at the time of query execution with the formula
    { Last obtained Valuated stock + (Received Valuated Stock u2013 Issued Valuated Stock ) }.
    The issue is the first records in the query is obtained with negative value for the total valuated stock 0VALSTCKQTY even though the values of Received Valuated Stock  and  Issued Valuated Stock are with Zero.  Could any one please help me on how the first record in the query is with a negative value eventhough the inflow and out flow fields of it are with Zero.
    Many Thanks in advance.
    Jeswanth

    Hi Srini,
    I observed an interresting reason for the stock being with negative in the first record.
    Issue : While executing the BEx report, we have the first record with a negative value.
    Let me explain with an example
    Material  : XYZ
    Plant      : A
    Date of Stock Initialization for data source 2LIS_03_BX -
    >  12th April 2009.
    So on 12 Th April 2009 consider that we have a stock in store with a value of 2640.
    Then we have loaded wih Data source 2LIS_03_BF for all Historic Movement types.
    At the time of query execution we will have the first record with a negative of available stock present on the day of initialization .
    So, as we have initilized the data source 2LIS_03_BX on 12 th April 2009, we have at that time a stock of 2640 in availability.
    Exactly with the same value of 2640, we are having a negative value i.e. -2640.
    and also one more point to be noted is ...as we have initialized the data source 2LIS_03_BX on 12 th APril 2009...it has created a
    opening balance of 2640 on the day of initiailization i.e on 12 th April 2009 in infocube....(which is an extra record...)...so if the previous record of 12,04,2009 is having some value in it..then it will get added to 2640 EA..which will give incorrect stock
    So in the query the records will appear in the below following manner
    Calendar Day     Total stock                                                                Received stock                                          Issued Stock         
    28.12.2005 --->  - 2640 EA
    29.12.2005 --->    2000 EA                                                                       640 EA                                                        0
    10.04.2009 --->      0                                                                                0                                                               2000 EA      
    11.04.2009 -
    >    0                                                                                0                                                                0          
                                 (For making
                                  the earlier record of  initilization to 0  a negative value -2640 EA is created in the first record )
    12.04.2009 (Initializtion day) --->  2640 EA                                                 0                                                                0
    13.04.2009 
    the day before initialization the total stock will be 0 due to the negative effect introduced by the first record and from the day of initialization the records will be the accurate values...  On 12 th april 2009 we can see that a stock of 2640 is brought into the total stock. In fact if there is no negative value i.e. -2640 in the first record then ...the value on 11.04.2009 will be 2640 Ea and this will get summed up with the Opening balance of 2640 EA created by 2LIS_03_BX on the day of intitialization. So on 12 .04. 2009 the total stock will be shown as 5280 EA...so in order to prevent the double value only we observed that the first record is created with the negative of available stock present on the initialization ...to make the record before the day of initialization i.e. 11.04.2009...to be 0...so that from 12 th April 2009 ..will start to see the actual total stock in the query result...
    This is happening only if we use  both the data sources 2LIS_03_BX and 2LIS_03_BF  for loading into BW.....
    If we load alone by 2LIS_03_BF ...then as 2LIS_03_BX is ruled out in the loading...then no negative of available stock will be created ...because there will be bno opening balance created on the day of initialization.....and the opeing balance available will be flowing into consecutive records due to the movement types and 12 th April 2009 will be shown with avaialable total stock of 2640 EA.
    Kindly let us know your opinions on this...
    Thanks.
    regards,
    Jeswanth

Maybe you are looking for

  • How can I make two copies of the same picture one with my watermark and one without for printing for clients?

    how can I make two copies of the same picture one with my watermark and one without for printing for clients?

  • Freed goods from vendor with delivery charges

    Dear Gurus, Here is one requirement, one vendor offered some free goodsto the client and client has to pay the delivery costs, when creating PO with free goods indicator , the conditions tab is not reflected, this delivery is a planned delivery, how

  • Thumbnail doesn't match actual photo

    Something very strange is going on with my iPhoto. I have just imported some photos but when you click on the thumbnail, it expands to a completely different photo! Its therefore impossible to see the full size photo of a particular thumbnail/preview

  • Loading a picture or stream in BLOB

    Dear experts, I am able to update a BFILE field like the below example update emp set emp_photo=BFILENAME('IMAGE_DIR','Tired.JPG') where empno='7566'; But is there any simple way to update BLOB field with a picture. What i can find in my book is a pr

  • OSB Transformation Mapping values missing

    Hi, I'm new to OSB.We have a requirement where it structured in 3 layered architecture consists of BPEL(1),OSB(2),OSB(3). So i have created a Business service of my client WSDL from OSB(3) then proxy of type created bussiness service which is having