Approved activity types per sales unit/organisation in 2009

Hello and nice days between christmas and new year,
I would like to see which activity types are approved for the different sales unit/organisation.
There is the T-Code KP25 and KP26 to see the planned activity types but can I get a list of the planned activity types associated with the sales units?
Thank you very much in advance,
  Vanessa

Hi,
Hi,
The T-code-KE27-Run Periodic Valuation of Actual data is actually meant for actual data related postings for CO-PA. Periodic valuation makes it possible for you to select and valuate actual data which has already been posted to Profitability Analysis (CO-PA). It uses a valuation strategy defined especially for the point of valuation 02 (Periodic actual valuation). This function is available for the record types A (incoming sales orders) and F (billing data) as well as user-defined record types.
Periodic valuation is useful, for example, if you posted line items to CO-PA at the beginning of the period using the standard cost of goods manufactured, and want to evaluate them again later using the most up-to-date costs or using the actual costs of goods manufactured determined in Material Ledger.
The system posts the difference between the original values of the line item and the new values in a new, separate line item. If you perform periodic valuation more than once for a single line item, the system posts a new "difference" line item each time the values change.
Once you have performed periodic valuation, you can display the new values in the information system.
For valuation using material cost estimates, you can choose the alternative option of displaying the periodically calculated values separately from the original values. To do this, you need to define special value fields into which to store the values from periodic valuation.
Only values that are calculated in CO-PA during valuation can be recalculated in periodic valuation. However, those quantities and values that are stored according to the same value field assignment found in SD pricing when transferred from sales orders and billing documents remain unchanged
CKMLCP is not must for KE27.
Revert for clarification.
S.Subbiah.

Similar Messages

  • Change the ITEM PER SALES UNIT

    Hi experts.
    I try to change the value in Items per sales unit, but the system give me an error 'CAN NOT BE CHANGED TO AN ITEM WITH TRANSACTION.
    Now we plan for the next month to change the package for abaout 2500 products that we produced.
    Someone can explain me why i can not change this value?
    Serching in the forum i try a link to note n. 1059753 with the workaround.. But is not a good way form me.
    There is another solution??
    My system is SAP B1 2007 SAP01 PL10
    Thamk's in advance.

    Hi,
    The functionality has changed in 8.8.
    Kind regards
    Carin

  • How can we change Item per Sales Unit if define Wrong

    Hi all,
         I facing an item that the Item per Sales Unit in Item Master Files had define in wrong quantity. Initialize quantity for Item Per Sales Unit is 10. After they said want change to 8 because of they define wrong. The System doesn't allow to change once had transaction.
    Besides creating a new item code, is that any other best solution to change item master ->Item Per Sales Unit?
    Thank for Reply..
    From :
    Eric

    I think the option left is to create a new item.

  • Activity Price per TON

    Hi,
    Is it possible to maintain the activity price perio TON instead of machine hours or Labour hours or Set up.
    if it is possible,kindly adivce me how to Maintain Activity type per TON.
    Thanks
    Sunitha

    Hi, Sunitha,
    Of course you can use any unit of measure, and you can use your-self defined unit of measure for the activity measure. e.g. some transportation department use the Kilometre for its activity type.
    Usually the activity type is by time is due to the time is reasonable for labor or machine's cost allocation. Each activity type price is independent to products, so the more time processed to a product, the more cost should be charged to the product. And the time is easy for collection both for plan or actual.

  • KP26 activity type / price planning

    Hi ,
    After giving cost center , activity type , fiscal year and period ,
    1) How system automatically proposes plan activity , capacity , Priced fixed  etc values ? From where it gets data ?
    2)How values entered in plan activity , capacity , fixed price , variable price , price unit , plan price indicator etc affect /calculate activity cost ?
    I know SAP help is available , If some one can explain with examples it would be great help .
    Let us say I have work center WKCN and I have maintained capacity , scheduling and costing tab . I have maintained plan activity as 102 , capacity as 108 , price fixed as 80 , price unit as 00001 ....Please explain how the next chain of events happen .
    NP

    In KP26, activity pricing will done for the combination of labor cost center & activity type assigned in work center. Here activity price will be maintained on hour basis or day basis.
    In task list or order, work hours will be given for the internal activity. Here for the internal operations, work center & activity type will be defined.
    If work hours is 15 hrs & fixed price is 80 INR (as per your example), the total activity cost will be 1200 INR for order (15 x 80).
    Price Unit
    The price unit is 10 for activity type "Drilling" with unit "Hours".
    The price applies to 10 hours of drilling.
    The price unit is 1 for activity type "Drilling" with unit "Hours".
    The price applies to 1 hours of drilling.
    Plan Price Indicator
    001:
    The price of the activity type is determined automatically based on the planned activity and the planned costs required for this plan activity quantity.
    002:
    The variable portion of the price is calculated based on the plan activity quantity. To determine the fixed portion, the system uses the capacity and not the plan activity quantity.

  • Maintain Multiple Sale Unit of Measure

    Dear all,
    How can we maintain multiple sale unit of measure for a particular material in single sales area.  Meaning different sales orders can have different unit of measure for the same material in the same sales area.
    Regards and Thanks,

    Check (MM02) Material Master - Additional Data button in menu bar - Unit of Measurement Tab
    OR
    Scenario: - BP buys ItemA in Kg and sells in Gr. (Refer SAP Note 883504 - Different UoM for the same Item)
    1. Define ItemA with kg as the unit of measure in the Purchasing Data tab - and Gr as the sales unit of measure in Sales Data tab. Enter items per purchase unit as 1000 and the items per sales unit as 1.
    2. Generate an AP invoice with a quantity of 1, the items per purchase unit is 1000 so 1000 items enter the stock.
    3. Generate an AR invoice with a quantity of 1, the items per purchase unit is 1 so the stock of the item is reduced by a quantity of 1 gram.
    There is no way to indicate that the stock has been reduced by 1000kg which is equal to 1 gram.
    Workaround:
    1. Duplicate ItemA as Purchase Item (UoM=Kg) and Sales Item (UoM=Gr) - This means that you will have 2 items, ItemA1 and ItemA2
    OR
    2. Generate ItemA (both Sales and Purchase Item) by configuring UoM and Price according to the smallest UoM and perform every transaction by keeping this UoM
    NB: Do not forget to define UoM in Administration - System Initialization - General Settings - Display tab - Default Weight Unit
    Also check following links for understanding:
    Price by multiple unit of measure
    Re: Multiple UOM's
    Thanks & Regards
    JP

  • Timesheet Booking - Master record for CC and Activity Type

    Hi All,
    We have maintained the Personnel number HR Master Data for Info Type = 315 as follows:
    Period: Start 01.02.2010 to 31.12.9999
    Sender Cost Center: 101067106
    Activity Type: 007000
    Period: Start 01.05.2009 to 31.01.2010
    Sender Cost Center: 101067101
    Activity Type: 006240
    I am trying to book/edit the time for Week 04.2010 [Data Entry Period 25.01.2010 - 31.01.2010] in CAT2 Transaction Code then getting an error message as-
    u201CCreate a master record for 101067106/007000u201D
    Message no. KL001
    Also Price Planning is not yet done for new/latest combination of CC and Activity Type i.e. Period: Start 01.02.2010 to 31.12.9999
    I think system is picking up latest/current Cost Center and Activity Type in an error message and not according to Data entry Period entered CC and Activity type in CAT2.
    Also one thing we have observed that in CAT2 Transaction Code CC filed is showing current Period cost Center only for all Period.
    Is it standard behaviour from Logic point of view.?
    Please suggest the solution regarding the above mentioned situation.
    Many Thanks in advance.
    Swapnil Kharul

    note that
    When are default values used from the employee master record?
    The default values are only used for new CATS records, not for changing,
    not for copying. If you also want to use the default values changing,
    not for copying. If you also want to use the default values from the
    employee master record when changing and copying from the work list, you
    can use SAP enhancement CATS0002.
    The system only uses default values, if you enter a number of hours and
    choose 'Return'.
    The cost center from infotype 0001 ('Organizational Assignment') is
    proposed, if in Customizing of the data entry profile, you selected the
    'Master cost center' field in the 'Default values' area.
    The system proposes the cost center and the activity type from infotype
    0315 ('Time Sheet Defaults'), if in Customizing of the data entry
    profile you selected the 'Cost center' field (or the 'Activity type'
    field).
    If you have chosen both fields, the cost center from infotype 0315 has
    priority, if you have defined it for the corresponding period.
    read the note 333884 it explains that only creating new values the data from 0315 defaults

  • Re: Unit of measure for Activity Type

    Dear All,
    I am using 4 activity types i.e. POWER/MACHINE/STEAM/LABOUR.
    MACHINE & LABOUR are calculated using same formula: like
    Machine=machine*(SAP_09/SAP_08)
    Labour=Labour*(SAP_09/SAP_08)
    & for POWER & STEAM  I am using:
    Power=(Power(machine(SAP_09/SAP_08)))
    Steam=(Steamr(machine(SAP_09/SAP_08)))
    But on seeing the lof for cost while creating a process Order I am getting only the machine & labour correct,The steam & Power are getting calculated wrongly.
    For example
    If my base SAP_08=1200000
    & SAP_09=1200000
    & my activity values in the recipe =
    Machine= 16 Hr
    Labour= 64 hr
    Steam= 127 Kg/Hr
    Power=388 KW
    Please advice how to resolve this issue.
    Regards,
    Vivek

    HI
    can u plz explain why for one routing Base  unit are different?
    As per my knowledge the base qty should be the same which is same as BUM in case of routing and depends upon client requirement in case of Rate routing.
    For  Power consumption formula should be like (base unit/power consumption for base unit)* total qty of process order * rate
    Check and revert
    regards
    Anupam Sharma

  • Storage unit types per storage type

    Hello all,
    i would like to know how to maintain/allow storage unit types per storage type. it would be much helpful if you could mention the SAP IMG path and the t-code.
    thanks,
    Maxx

    Hi,
    Goto SPRO --> Logistics Exection --> Warehouse Management --> Master data --> Define Storage type
    In this node for your warehouse number and storage type combination activate the check box SUT check active.
    Regards,
    DilliB

  • Creation of Sales Activity type

    Hi,
    I am creating a new Sales activity type (say: ZEEE)
    In SPRO I have defined this sales activity type but few fields are greyed out. I have to fill 'TextDetermProc' under TEXTS section and 'Partner det' under PARTNERS section but both are greyed out.
    Can some one pls guide me how to fill these two fields?
    Thanks and regards,
    Pankaj Bist.

    Hi Marcin,
    Text determination Procedure and Partner determination procedure is already defined in BASIC FUNCTION.
    But my problem is: how can i assign a particular text/partner determination procedure to my activity, as these two fields are GREYED-OUT in the sales activity creation screen.
    Regards,
    Pankaj Bist.

  • Authorization need in Sales Activity Type

    An Account(Customer) moved to discarded (Sales Activity Type), can be brought back to Active, but only thr' Authorization of GM.
    How we can do it?
    This all about Real Estate - Where Sales Activity Type is Created. Sales Activity Types Can be -- New, Hot, Negotiation, Pending Brochure, Discard, Pending Decision, Sales Completed....etc
    There is Authorization for Partner Function in Sales Activity - For Change or Display Sales Activity. But it doesn't solve the problem.
    Client needs Authorization, by which anybody can be able to change the customer's Discard Activity Type (If he turns back, to buy the Villa again) to Other Type.
    Regards
    Veneet.

    There is an OSS [Note 818276 - Sales activity change: incorrect language for messages|https://service.sap.com/sap/support/notes/818276] that may help you to solve your problem.
    Regards

  • Default document currency as per document type for sales order

    Dear All,
    We are facing problem in Default document currency as per document type for sales order,
    Our requirement is not to give currency in customer master & set it as default document currency as per document type,
    for example: Document type 'OR' default currency 'INR',
                         Document type 'ZEU' default currency 'EUR',
                         Document type 'ZUS' default currency 'USD',
                         Document type 'ZNP' default currency 'NRP,'
                         Document type 'ZAF' default currency 'RAND,'
    Is it any how possible in standard setting ?,
    Regards,
    Sai

    Hi,
    The system proposes the sales document currency from the customer master record of the sold-to party. You can change the currency manually in the document or change in currency in customer master. If you change the currency, the system recalculates prices for the entire document.
    to determine different currrency in sales docuement you need to write an user exit and then overwrite the docuement currency copied from customer master. Try user exit 'USEREXIT_MOVE_FIELD_TO_VBAK' under include MV45AFZZ for this change.
    with regards
    vivek.

  • Fiori Approve Timesheets - Activity Type not Displayed

    According to the BPD document for the Approve Timesheets App, the Activity Type should be displayed in the details area of the timesheet.
    However, when a user selects the details option, the following is displayed.
    Has anyone else experienced this issue?  I'm testing in Chrome and we're on the latest service pack that was just released last week.

    HI Pankaj,
    Thank you for supplying these notes. They look like exactly what I need. We have implemented Fiori App My Timesheet and Approve Timesheet, but during the approval process, the approving manager cannot see what kind of time (attendance type) is being approved. All of the days shown below were entered as 8hrs of sick time, but that doesn't show up anywhere.
    I was able to install the first OSS note 1994214 on the ECC back-end, but when I try to install 1994889 on the gateway, it won't because it can't find the right place to insert the new code in many objects.
    I could find no prerequisite notes that were not already installed. Incidentally, the code it was looking for in the first one was a copyright notice for 2013, but instead the code had a copyright notice going to 2014.
    We just installed UIX01HCM SP03. Was this OSS note included in that support pack? If so, it doesn't look like was effective because we are still not seeing any attendance types in the approval app.
    In case, its helpful here is a list of which components are installed on our gateway:
    SAP_ABA
    740
    0007
    SAPKA74007
    Cross-Application Component
    SAP_GWFND
    740
    0007
    SAPK-74007INSAPGWFND
    SAP Gateway Foundation 7.40
    SAP_UI
    740
    0009
    SAPK-74009INSAPUI
    User Interface Technology 7.40
    PI_BASIS
    740
    0007
    SAPK-74007INPIBASIS
    Basis Plug-In
    ST-PI
    2008_1_710
    0007
    SAPKITLRE7
    SAP Solution Tools Plug-In
    SAP_BW
    740
    0002
    SAPKW74002
    SAP Business Warehouse
    IW_PGW
    100
    0005
    SAPK-10005INIWPGW
    Process Gateway
    IW_SPI
    100
    0004
    SAPK-10004INIWSPI
    Service Provider Infrastructure
    IW_SCS
    200
    0008
    SAPK-20008INIWSCS
    Screen Scraping
    UIAPP001
    100
    0005
    SAPK-10005INUIAPP001
    UIAPP001 100: Add-On Installation
    UIAPP002
    100
    0004
    SAPK-10004INUIAPP002
    UIAPP002 100: Add-On Installation
    UISRA001
    100
    0003
    SAPK-10003INUISRA001
    HTML 5 Purchase contract approval
    UISRA002
    100
    0004
    SAPK-10004INUISRA002
    HTML5 Time Recording
    UISRA010
    100
    0004
    SAPK-10004INUISRA010
    HTML5 Staffing List
    UISRA012
    100
    0004
    SAPK-10004INUISRA012
    HTML5 My Department Spend
    UISRA020
    100
    0005
    SAPK-10005INUISRA020
    HTML5 Change Order (Address/Delivery Date)
    UIX01HCM
    100
    0003
    SAPK-10003INUIX01HCM
    UI for HCM Application
    Likewise, in case its helpful, here are our component versions on the ECC system in case that's helpful:
    GBAPP002
    600
    0005
    SAPK-60005INGBAPP002
    GBAPP002
    SRA001
    600
    0003
    SAPK-60003INSRA001
    Approve Purchasing Contracts OData Integration Component
    SRA002
    600
    0004
    SAPK-60004INSRA002
    Time Recording OData Integration Component
    SRA010
    600
    0004
    SAPK-60004INSRA010
    Staffing List OData Integration Component
    SRA012
    600
    0003
    SAPK-60003INSRA012
    My Department Spend
    SRA020
    600
    0005
    SAPK-60005INSRA020
    Purchase Order Status (In Process, Approved)
    thanks for any advice or suggestions you might have!
    -Rob Solomon

  • Base Unit of Measure to Sales Unit Conversion

    Hi,
    Currently we are selling material in MT and all other transactions in MM and Production are in MT only.
    Now client wants material to be sold in Meters, also in some cases the same material will be sold in MT also.
    (As per my knowledge generally if the conversion is one to one i.e. base unit of measure is pieces and Sales unit of measure will be boxes and
    1 box = 10 pieces can be maintained in material master.)
    Here for conversion between Metric tonne to Meters there is formula involved so how and where this conversion needs to maintained in system.
    How to map this type of scenario.
    What all activities needs to be done from SD side and which other modules need to be involved this process.
    Note: SAP is installed for more than 3 years now.
    Hope i clear enough.
    Regards,

    Hi following is the formula.
    OD = Outer diameter, thickness, length, Number of tubes are maintained in sales order charateristics during sales order creation.
    OD
    Thickness
    Weight in Kgs / M
    length of tube
    Nos of tubes
    Total length in Mtrs
    Rate / MT
    Rate / Mtr
    A
    X = (A-B)*B*0.02456
    'L
    N
    T= L xN/1000
    R
    M=R/1000*X
    Regards,

  • Assign sales order type to Sales Area

    Hello everybody,
    I am trying to assign a sales order type to my sales area, and i have an error : the system tells me that my sales area is not defined. What can i do?
    I already defined my sales area, and i can see it in IMG->Entreprise Structure->Assignment->Sales and Distribution->Set up Sales Area.
    whwn i try to assign my sales order type to the predifined Sales Area it works. what am I supposed to do to be able to assign a document type to my sales area.
    Thank you in advance,
    Silvia

    <b>1.</b> Defining Common Distribution Channels for Master Data
    Use
    The purpose of this activity is to define distribution channels which have common master data..
    Procedure
    Access the activity using one of the following navigation options:
    IMG Menu -> Sales and Distribution -> Master Data -> Define Common Distribution Channels
    Transaction Code: VOR1
    <b>2.</b> Defining Common Divisions for Master DataUse
    The purpose of this activity is to define distribution channels which have common master data..
    Procedure
    Access the activity using one of the following navigation options:
    IMG Menu -> Sales and Distribution -> Master Data -> Define Common Division
    Transaction Code: VOR2
    <b>3.</b> Assign Sales Area To Sales Document Types:
    <b>A.</b><u><i><b> Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.</b></i></u><b>B.</b> Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Check the above configuration. It should resolve the error once it is maintained appropriately.
    Regards,
    Rajesh Banka
    Reward points if helpful.

Maybe you are looking for

  • How to use the scanner class to ask for a character?

    Hey guys, this is my assignment: Ask the user for a single letter and a sentence, and print out the number of times that letter shows up in the sentence. Please tell me how to scan for a character. I tried this: import java.util.Scanner; public class

  • Powerbook 17" and PDFs

    My wife's 17" Powerbook creates pdf shortcuts on the desktop whenever she goes to a site on the web. How would I go in and stop this from happening? Thanks. Barrister

  • Build array efficiency

    Hello, I would like to know, wheather my solution is efficient, or it can be done in a better way. I have a mass spectrometer with a shipped labview driver and example VIs. I want to modify one of the VI. Here the used structure of the spectrum is a

  • Calculation of Vat On total amt(Basic price+Exices duty+Freight condition)

    Dear friends,                    My client requirement is that the Vat should calculate on total amount including freight condition while creating PO that is Basic price=100 ED 10%=10 cess on ED 2%=2 Total amount=112 Freight=20 Total amount after add

  • Full Database Backup in DB13 for MS SQL Server databases

    Hello, We have some SAP systems using the MS SQL Server database. I want to know if it is possible to setup the Full Database Backup option in transaction DB13 to store the files in a hard disk space. I already did this type of configuration in SAP s