Assigning work centers to cost center

Hi, In a Z-report we found that one work center is assigned to more than one cost center. Pls advice how to ensure that particular work center is assigned to one cc only? pls advice.

Hi,
At any given point in time, you can assign one work center to one Cost center only..
The situation may so arise that, the Cost center walidity may be limited and we may be forced to change the Cost center afterwards in the work center..
Check with the Table: CRCO
Check the Cost center validity in the T.code: KS03.
Regards,
Siva

Similar Messages

  • Routings/Work Centers to Cost Center Relationship

    Hi,
    For routing, work center and cost center master data setup, is there a limitation on the number of:
    Routings to cost centers?
    Work centers to cost centers?
    I want to find out if there are only a certain # of routings allowed when tie to a cost center, and same with work centers.
    Thanks,
    Alice

    Hi,
    Routing
    A routing is a description of which operations (process steps) have to be carried out and in which order to produce a material (product).
    Thus in routing  contains details about the work centers at which they are carried out, standard value  and component.
    Therefore there is no limitation for assigning number of time for same work center.
    Regards
    Suresh

  • Work order to cost center settlement does not post to GL module (FI)

    Dear Expert,
    I find the Maintenance Work order to cost center settlement does not post to GL module (FI)?Also, the settlement cost element is primary element define in GL chart of account.
    When an maintenance order is settled with KO88 or KO8G the work order value posted cost center and  the value is display in cost center report but not post to GL module in FI.As I notice only good issue or receive to/from work order is posted in GL but not the settlement of work order.Why?
    Between, Kindly advise what are the report or T-code to view the maintenance order is done the settlement and what are the value is settle for maintenance work order?
    Kindly advice under what circumstance when maintenance work order to cost center settlement is posted to GL(FI module)?
    Please advice.
    Thank you.
    KH

    Hi Kiran,
    The error message clearly says that "Cost Center validity starts from 01.10.2014" i.e. in the future period.
    Change the cost center from period in the past date and try.
    BR, Srinivas Salpala

  • Work Order to cost center settlement with line item detail

    Iu2019m having difficulty finding a method to settle from a work order to a cost center with line item detail.  When an order is settled with KO88 or KO8G the total value for that work order/cost element combination is combined and posted to the cost center as a lump sum with the description of CTR\######.  Users would like to see the individual values that posted to the work order in a cost center report such as  KSB1.
    I donu2019t see anything in the settlement rule, settlement profile or allocation structure that will allow line item settlement from work order to cost center.     Is line item settlement possible when settling to a cost center?   Is there an alternate way to see these expenses as line items in KSB1?
    Thanks,
    Jeff

    Thanks Christian,
    We've defined an allocation structure that we use for Project System and Work Order settlement and have Receiver Categories established as FXA, CTR and WBS with "by Cost Element"  checked.  Work order costs do settle to the cost center entered in the settlement rule, the problem is it combines all items values as a single amount when posting to the cost center.
    For example:  
    expenses post to the work order under cost element 500000 for $500, $200, $300 and cost element 600000 for $250 and $250.  The settlement rule says to settle to cost center 170000.  When the settlement takes place cost center 170000 is debited $1000 to cost element 500000 and $500 to cost element 600000.  We would prefer to see individual posting of $500, $200, $300 to 500000  and $250, $250 to 600000.
    Thanks,
    Jeff

  • How to assign activity type to cost center

    hi Gurus,
    Sir i have got error during the T.Code: CRC1.  in which i have to assign Activity type to cost center. which is as follow: ( I have also made tickmark in cotrolling area for Activity type)
    ( Error :No activity type assigned to cost center #1301,Controlling area ABCD on 01.02.2008)
    Pls provide me the solution where the activity type should be assign to cost center.
    Than'x & Regards,
    Dhananjay

    Hi,
    Planning at KP26 for Activities itself is integration between Activity and Cost center.
    Once you do this, your problems is solved.
    Assigned points suitably
    Best Regards
    surya

  • Overtime assignment to a different cost center

    Hello,
    Scenario:
    Overtime with different cost center
    DWS: 0800 - 1700
    Actual IN: 0800
    Actual OUT: 2300
    Approved OT: 1800 - 2400
    Cost center: 10100 (This cost center is different from the cost center in IT0001) should be charged for the overtime only.
    Given the scenario above, I could not use infotype 2002 (create an attendance type as overtime) since if i input 1800-2400 the system will valuate the whole six hours (6) as overtime (note: the system should only valuate 5 hours- 1800-2300; approved overtime with comparison to actual in/out).
    If I will use infotype 2005, it will have the same behavior as it 2002. 1800-2400 will be paid.
    If I will use infotype 2007 via the GOT function, it will valuate the overtime as 1800-2300 (approved overtime with comparison to actual in/out) correctly BUT i could not charged the corresponding cost center. I already checked the spro and it 2007's cost center could not be activated.
    Do you have any ideas in mind? Any comments are appreciated.
    Thanks.

    Hello,
    Thank you for your answers.
    I am considering using IT2007 since it automatically distinguish which work should be valuated as overtime with regards to comparing the filed overtime (via input in IT2007) with regards to the time entries(clock in/out) of the employee.
    Example:
    if daily workschedule is 0800- 1700
    actual in/out   0800 - 2300
    entry in IT2007 is   1700 - 2400
    The overtime that the system will recognize is 1700-2300.
    Unlike in using IT2005, if i input 1700-2400, it will valuate 1700-2400 without considering the actual in/out of the employee.
    I can manually change the IT2005 but the overtime of the employees which are assigned to another cost center are 1000+records in a day.  If I manually edit the entries in IT2005, it will be very tedious. Same goes if it is via 2010.
    Do you guys have other ideas in mind?
    Btw, I am using positive time eval.
    Thanks in advance.
    Edited by: Maya Fajardo on Feb 10, 2011 12:02 PM

  • Assign Business Area to cost center

    HI Guru's
    i would like to assign the business area to existing cost center, which is having some posted entries.
    But system throws the below error message
    "For change Business area is not possible (transaction data already exists)"
    Pls help me
    Rgds,

    Hi,
    You cannot change buisness area for a cost as this field is for each fiscal year. For example, you can change the field content for a new fiscal year by changing the validity period. Mean splitting the validity period provided there is no transaction data. The data in this field is always time-based.
    This is to for the consistency of data in SAP.
    Please also check out the following link:
    http://help.sap.com/saphelp_47x200/helpdata/EN/08/51457143b511d182b30000e829fbfe/frameset.htm
    However, I think you can use substitution rule to subtitute business area in document level for cost center. I am not sure whether this will work.
    Hope this helps.
    Please assign points as a way to say thanks.
    Regards,

  • Where to assign GL Account to cost center?

    Hello Friends,
    Actually in MIGO T.C , I  am issuing the material against the cost center.Now in MIGO T.C ,  in Account Assignment tab i give the cost center and other requied data and save.And in display mode when i check that document than by default system takes the GL Account.Now my question is where we assign the G/L Account to cost center?In FS00 T.C i checked in Edit cost element for that account, there in Default account assignment , no cost center is maintained.So from where system is picking this G/L Account?
    Thanks and Regards,
    Jitendra Dilip Chauhan

    Hi Jitendra,
    This setting is made in OBYC. This actually MM & FI integration.
    You check this in OBYC.
    1.First check your valuation class in material master.
    2.Then goto OBYC.
    3. Double click on GBB transaction key
    4.This will pop up chart of account.Maintain chart of account & enter.
    5.Here you will see that GL account for combination of Genral modification VBR & Valuation class.
    VBR: for internal goods issues (for example, for cost center)
    That means whenever you do Goods issue of material  for cost center which having same valuation class,this GL account will be automatically assigned.
    Hope this clear you.
    Regards,
    Raja.
    Edited by: Raja on May 8, 2009 9:46 AM

  • Error when Assign Order Reason to Cost Center& Sales Area

    Hi,
    SAP Guru,
    I Define the Order Reason.
    Now I want To Assign This Order Reason to Sales Area & Cost Center.
    When I am Doing this I got the Error SYST:Date 00/00/0000 not Expected. Message No.FGV004
    Please Advice me.
    Thanks & Regards
    Bhushan

    Hi,
    Just define the order reason and it will automatically come in the header irrespective of the Sales area. But if the system is giving you this error FGV004, then consult the abapper that the system might be seekin the date from the program bcoz normally the system pics up the OS date.
    Regards
    Gaurav

  • What is the different between account assignment P Project & K Cost center?

    Hi ,
    I need to raise a PR and PO for repairing damge of our Project's Product.
    In this stituation, I should create PR with account assigment P (Project) or K (Cost center)?
    Thanks

    Hi,
    Material are procured as stock or non-stock materials. When you procure material which can be used in production of finished product ,stock is maintained.
    Account assignment category describes how the procured material is being used (for eg: Cost Center, Sales Order, etc). It also determines how the accounting entries made when a GR document or IR document is posted.
    When you use the Account Assignment Category "K", it means the material is allocated to a cost center for consumption. The Materials is accounted to the particular cost center.
    Account Assignment Category "P" is used for materials that are required for the project related.
    Hope it helps.
    Regards,
    Bijoy Kumar

  • CO Account Assignment: Profit Centers and Cost Centers Assignment

    Hello Experts,
    I am trying to understand profit/cost center assignment at the contract level. My client has requirement to assign them based on utility type. So I was wondering should I assign them during move-in at contract? Any suggestions would be of great help.
    Thanks.
    Kind Regards,
    Nikhil J.

    Nikhil:
    Firstly - the assumption here is that 'utility type' equates exactly to contract or service.  If not, then assignment is not appropriate, and should be looked at in the account assignment EK01.
    If it is equivalent, then you can use various ways of defaulting depending on the initiator.  If CRM, then it can be filled in CRM and passed to ERP or filled by the MDT when bdoc is processed in ERP.  If ERP then it can be filled with CMOD enhancement.
    There is no configuration for assignment default at contract level, only at charge level.
    regards,
    bill.

  • Account assignment category Asset to Cost Center in po items

    Hey,
    We have a Question how to handle this Exception:
    We have purchase order items with the account assignment category "A - Asset" and we have created Asset master data. Later, this assignment category is changed to "K - Cost Center". But the Asset Master Data is still there.
    How to handle this in the future? Do we have to delete the purchase order items with the account assignment category "A - Asset" and have to create new items with assignment category "K - Cost Center"?
    Thanks!

    Hi
    Once you change the acct assnment category to K, then there is no need for asset master. You can take help of your FICO consultant for deleting the asset master. You changed acct assnment in PO?
    Thanks

  • Acct assignment po's to cost center

    Hello friends
    i need to know if a PO that is acct assigned to costcenter and there is no material master on the po it is only text item. will i be able to do three way compariosn for invoice verification. also please tell me if we can do gr for the text line item on the po.
    Regards

    hi,
    Yes you can do Gr for the PO...
    but the difference will be this that instead of stock account the posting will be for the consumption accountie. to the defined Valuation class for the Cost centre...
    When you do Gr the posting will be :
    GR/IR Consumption account - Credit
    Vendor account - Debit
    Atthe MIRO ie. at IR:
    GR/IR : Debit
    Vendor account - Credit...
    Hope it helps...
    Regards
    Priyanka.P

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • Cost Center Assignment-OrgManagement

    Dear experts,
    I have created Org Units, and I have assigned multiple Suborgunits and under those suborgunits, and I have maintained multiple positions.
    Now i have assigned Cost Centers at each suborgunit level, since each suborgunit(Department) is a separte cost, and I have not assigned any cost center to the Main Org unit(which are Head office,multipleLocations ). Just assigned Cost center at suborg unit level.
    And now when i am hiring an employee and select the Position, under the suborgunit, which I have assigned the cost center and when the prompt goes to Org Assignment Infotype, this system doesnt pick the Cost center assignment that as assigned to it in Org managment.
    Can any you guide me if I need to follow any other process in Cost Center assignment, so that my problem gets rectified.
    Thanks,
    KishoreJ.

    Hi Renato,
    Are you using the same cost center for more than one org unit?
    Yes absolutely, I am using the Same cost Center for more than one Org Unit, for clear understanding
    My org structure is this
    I have ABC-Org Unit,(Company) under that I have Sub orgunit which are Multiple locations (Paris,London,Berlin,Chicago etc.,) and under those suborgunits, I again have multiple Org Units(Departments(Legal,HR,Admin,Sales etc.,) and these Departments mentioned would be there for all Locataions. So, Under Paris, I have HR,Sales etc., and even In London I have HR,Sales etc.,)
    Now Finance has given me only One Cost Center per each Department Like HR corporate, Sales Corporate etc.,)
    Although I have multiple orgunits Like Berlin,Paris and under them I have same suborgunits, HR,Sales etc., where I use HR,Sales or other departments, I need to only assign only one Corporte Cost Center which is being given to me against each Department(HR,Sales,IT etc.,) no matter wheter it is Paris HR department or Chicago HR department they only gave me one Cost center for HR and I need to only assign this Cost Center against any HR department across the company.
    When hiring the employee and in infotype 0001 the system brings you a different cost center, have you checked in ppose if the cost center assigned to that org unit and the one in infotype 0001 are the same?
    I have checked in PPOSE, although I assign Cost Centers to Org Units and save I can view the assignments done in this transaction code but when I hiire an employee by giving the position under its relevent Org unit (either for Paris or chicago) in 000 and when I go to 0001-Org assignment, the Cost Center assigment which I have done, is not getting picked up and its not getting reflected in 0001
    Please answer these questions because I'm getting the feeling that your problem is the time constraint of the relationship K B011 O.
    I don't know what is this. Please guide me on this.
    Regards,
    KishoreJ.

Maybe you are looking for

  • Attaching Attributes to Image For Loading to SharePoint Document Library

    We currently have a need to create a searchable document library which will consist solely of images. The standard metadata for a file/image won't suffice in this case. We have some custom attributes that will need to be searchable. Essentially, we w

  • Measuring Point Description Change-MassChange

    I have several (hundreds of ) Measuring points which i need to change .The fields to be changed include the Measuring position    and measuring descriptions. Since its a time consuming process to change individual record, can some one suggest any mas

  • Tape plays fine in camera, but stutters when logging

    Hey everyone, I'm working on a project where we are bringing in a lot of archival materials shot on miniDV. The tape plays back in the camera, but when I attempt to actually "capture now", the camera rapidly blinks between "pause" and "play" and stop

  • Install Warnings on Mac OS X

    I'd like to install an AIR application on my MacBook, but I get a dire warning panel when doing so: Is it safe to proceed in the face of this warning?  Is this behavior unique to Mac OS X or to Safari? The panel comes up on any application install an

  • What are the possible LdapException.ErrorCode values when using System.DirectoryServices.Protocols?

    When making Ldap calls using the System.DirectoryServices.Protocols Namespace classes and a request generates an LdapException the ErrorCode property contains a numeric value describing the error. However, I cannot find any documentation describing w