At the end of production, we want to bifurcate the material.

Dear Expert,
  Our requirement is such that we started the production of let say grade A material. But after checking quality parameter at the end of production, we come on the conclusion that partial lot is Grade B material. Both the material is finish material, we don't want to process further for Grade B material as it is low grade.
We take the e.g.
Grade A material plann to produce 100 Ton
But, at the end we get to know that Grade A is 60 Ton & Grade B is 40 Ton.
Some details: Type of manufacturing - Repetative
                       Materials created  - Grade A & Grade B
Please help to map above requirement.
regards,
Chetan

Hi Chetan,
There are 2 approaches to this issue; in my opinion, the best is to have one material number for both grades, but manage it with batches, and have the grade on the batch classification. This way it flows best with QM, planning, etc.
But if you must have different material numbers for the different grades, you could have the low grade as a by or co product. It means that you put it in the BOM with a negative sign and the statistical quantity known from the past. Later on you confirm the actuals, both for the high and the low grade. In REM you just need to correct the backflush quantity for the low grade according to the actuals.
Regards,
Mario

Similar Messages

  • ı did  down loaded the turkish version of Ps trial product, I want to delete it and download the english version, how can I do, can I do it With my same adobe ID?

    ı did  down loaded the turkish version of Ps trial product, I want to delete it and download the english version, how can I do, can I do it With my same adobe ID?

    I did “delete” ☹(((
    Windows Posta cihazından gönderildi
    Kimden: station_two
    Gönderme tarihi: 23 Mayıs 2014 Cuma 01:00
    Kime: canan kozan
    ı did  down loaded the turkish version of Ps trial product, I want to delete it and download the english version, how can I do, can I do it With my same adobe ID?
    created by station_two in Photoshop General Discussion - View the full discussion 
    Yes, you can download it using your Adobe ID.
    Just a word of caution here:  DO NOT just "delete" the other version.  Use the correct Adobe Uninstaller to UNISTALL it.  Otherwise you'll leave all kinds of leftovers and debris that can interfere with any new install.
    Please note that the Adobe Forums do not accept email attachments. If you want to embed a screen image in your message please visit the thread in the forum to embed the image at https://forums.adobe.com/message/6403163#6403163
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
    To unsubscribe from this thread, please visit the message page at . In the Actions box on the right, click the Stop Email Notifications link.
    Start a new discussion in Photoshop General Discussion by email or at Adobe Community
    For more information about maintaining your forum email notifications please go to http://forums.adobe.com/thread/416458?tstart=0.

  • How can I turn off the pop-up "Help HP Design Products You Want"? (8600 printer)

    The pop-up window "Help HP Design the Products you want" keeps returning every 5 minutes all day long
    regardless of how I respond to it!  Can this be turned Off?
    This question was solved.
    View Solution.

    What printer are you using?
    What OS do you have?
    Does it give a program name when it pops up, or does it just give you that message and a couple of options to choose from?
    -------------How do I give Kudos? | How do I mark a post as Solved? --------------------------------------------------------

  • To see the cost of production order  after settlement to header material

    hello guys,
       In make to stock,we settle the total cost of prodution order on header material,right(if we keep as the default rule( distribution rule in order type)?
         If i want to see that cost of production order which we settled against the header material,where should i check it?should i check in material account or somewhere else?
             Thanking you guys in advance.

    Dear,
    There is a little missunderstanding in your thought.
    If the material of price control S, When you do the GR, the STD cost of material is deducted from production order cost, then when you settle the production order, the variance is settled to variance account/PD account. hence the production order cost balance is zero.
    Example- Production order cost is 60000
    After GR the production order cost balance is 60000-50000 = 10000.
    After settlement production order cost balance is zero.
    Now your question is where can i see the production order cost?
    You can see the production order cost in the production order itself.
    In the production order...cost disply option just filter the origin with test settlement and GR.
    Then total up the cost, then you can see the cost as 60000.
    please come back if you need more help.

  • Plant specific fields in the material master for product move

    Hi, SAP gurus,
    My scenario is we are moving a existing product in US plant to Brazil plant. What are the fields in the material master that are specific to a plant that will change. For ex MRP controller will change from plant to plant. Like that can anybody please provide me a list of fields that i need to be looking at?
    Thank you
    Anusha

    Hi Anusha,
    First of all, list down all your materials those you want to extend to new plant.
    a) Secondly, pay attention to those fields you will find "filled" in those materials at plant level.
    b) MARC comes handy for you to analyse which fields are at plant level.
    Intersection of fields with values between a and b are the ones you need to work out.
    Good luck,
    Regards

  • Settling production variances when the price control of the material is "V

    Hi,
    Scenario: 1) Materials are maintained at moving average price.
                    2) Production variances need to settle to material and MAP need to be adjusted.
    Issue:  When the closing stock of the material is less than the negative variance need to be settled from the production order   the system is giving the message "Moving average price for material is negative"
    Questions: 1) What is the solution for settlement of negative variance to material when there is no stock?
                       2) Is there is any way to settle these variances to price difference account only when the stock is not available. if stock is available the variance has to adjust the stock, if not settle to the price difference account. Is there anys standard settling for this?
    Advance thanks for your help
    Regards
    Koteswararao Padarti

    Hi Rao
    You should never have Price Control V for In House made material...
    That will ruin your inventory valuation forever.. Consider the eg below if your price control is V
    1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and at period end if Qty is lying in stock, 10 variance will also be inventorized
    BUT, now consider this
    1. 1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    3. You Mfr on Jan 10 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    4. On jan 15, you consume Qty 1 and qty lying in stock is 1
    5. In period end, when you do settlement, following will happen
    a. For prod order 1: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price will shoot upto 110
    b. For prod order 2: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price (MAP) will shoot upto 120
    System wont check whether the qty lying in stock pertains to prod order 1 or 2... It will simply check if the Qty of prod order matches with qty lying in stock. hence, it will keep on inventorizing variance in this case.... and your MAP will touch the sky
    Regards
    Ajay M

  • Production Order Co01 enhancement to link the Material Documents from Mater

    Hi Friends,
    I have a reqirement I need to link the Material documents in the Production order, for Header material & Component material based on some condition, can any one tell which Enhancements will work for this.....
    Thanks,
    Ravi

    Hi Ravi,
    If you want to change the header field values during saving of the production order, Function Exit   EXIT_SAPLCOZV_001 can be implemented of enhancement PPCO0007.
    Regards,
    Surender Yadav

  • "Help Design Products You Want" popup message never goes away

    I installed my Photosmart 5510 a month ago on my Dell desktop.  The printer works fine.  But the HP popup message "Help Design Products You Want" keeps popping up, around once an hour all day long.  I've tried every option (Decline, Remind Me Later, Participate) several times over.  I've completely reinstalled the 5510 software.  Still the message pops up.  I've registered as an HP user and can see my HP products including the 5510 on my account on HP.  Running Vista Ver 6, SP2 on my desktop. 
    How can I get rid of this annoying popup? 
    Thanks

    I have the same problem on two computers and would be very intereseted in removing this permanentley. 
    HBrian wrote:
    I installed my Photosmart 5510 a month ago on my Dell desktop.  The printer works fine.  But the HP popup message "Help Design Products You Want" keeps popping up, around once an hour all day long.  I've tried every option (Decline, Remind Me Later, Participate) several times over.  I've completely reinstalled the 5510 software.  Still the message pops up.  I've registered as an HP user and can see my HP products including the 5510 on my account on HP.  Running Vista Ver 6, SP2 on my desktop. 
    How can I get rid of this annoying popup? 
    Thanks

  • Want to change the Material group in Scheduling aggrement after creation?

    Hi Gurus,
    I want to change the Material Group in scheduling aggrement. I am able to change in PO but i m not able to change in Scheduling aggrement. It is in display mode after creation.
    I have checked the SPRO setting it is in optional entry only.
    Can anyone please help me. Wr we have to check the settings..
    Ot this is Standard SAP has provided.
    Please help me..
    Thanks
    Venkatesh P

    Hi,
    Thanks for your reply.
    EKPO is standard table. That we cannot change and that do end user want to chagne the material group.. This is not for one time.
    Please help..
    Thanks
    Venkatesh P

  • My 4s iPhone keeps abruptly ending my app and wanting to shut down..

    My 4s iPhone keeps abruptly ending my apps and wants to shut down.

    Hello Patty.debonis
    Check out the Power/Battery section to resolve issues with your iPhone powering off. 
    iPhone: Hardware troubleshooting
    http://support.apple.com/kb/ts2802
    Regards,
    -Norm G.

  • I do not own an adobe product and want a one-time payment licence for students and teachers, what should I get?

    I do not own an adobe product and want a one-time payment licence for students and teachers, what should I get? There are so many licenses to choose from and at least 3 lightroom licenses for students.

    If all you are looking for is Lightroom, I would suggest going to your campus computer store. The computer store where I worked had Lightroom in stock. If your store doesn't have it in stock they can order it for you. There is really only one Lightroom 5 license that comes with the standalone version, student or otherwise. The program is identical either way. Licensing for the creative cloud is handled through the web and the payment method, But you aren't concerned about that.

  • While making a backup copy in Itunes of my Iphone I receive the following error message: While making a backup copy of this Iphone (-35) an error has occurred.  Do you want to continue with altering this Iphone? When you continue al the material on this I

    While making a backup copy in Itunes of my Iphone I receive the following error message: While making a backup copy of this iPhone (-35) an error has occurred.  Do you want to continue with altering this Iphone? When you continue al the material on this Iphone will be lost.
    I reinstalled iTunes but that dit not help. After synching iTunes with my iPhone it also asks to authorize my pc and when i Click on ok, it says it is already authorized.
    Please can somebody help me, so I can make backup.
    Greetz,
    Derk

    It's likely that your backup is corrupt. Try deleting the backup, then right click on the name of the phone in iTunes and choose "back up". To delete go to iTunes Preferences, Devices tab. Highlight and delete the most recent backup. Note that sometimes deleting this way leaves some garbage around that can still interfere with a new backup, so you should verify that the backup folder is empty.
    from: http://support.apple.com/kb/HT4946
    The folder where your backup data are stored varies depending on the computer's operating system.   Make sure the backup folder is included in your periodic data-backup routine.
    iTunes places the backup files in the following places:
    Mac:  ~/Library/Application Support/MobileSync/Backup/
    Windows XP:  \Documents and Settings\(username)\Application Data\Apple Computer\MobileSync\Backup\
    Note: To quickly access the Application Data folder, click Start, and choose Run. Type %appdata% and click OK.
    Windows Vista and Windows 7:  \Users\(username)\AppData\Roaming\Apple Computer\MobileSync\Backup\
    Note: To quickly access the AppData folder, click Start. In the search bar, type %appdata% and press the Return key.

  • I want better solution for adjusting the Material stock values for the last

    my Customer  need to adjust( Decrease)  the closing stock values for the following materials / plant wise as on 31.03.2006 for meeting statuary compliance.
    Material1 :  RS: 4149599    QTY : 10181.03 Ltrs
    Material 2  : RS: 1318596     QTY:  2152.76   Ltrs
    As per my knowledge MM posting periods can open current month and Previous month only. For the reason I proposed the solution as follows:
    Step 1 : post FI Journal Entry on 31.03.2006
    Opening Balance G/L  Account Dr 4149599 + 1318596
    Closting Stock a/c                      Cr 4149599 + 1318596
    Step 2.
    Change the Material Price in MM through T.Code: MR21
    ( Posting will be allowed in current or previous months)
    This makes our CO reports accurate.
    Please  suggest the better solution if it is possible in MM for adjusting the Material stock values for the last financial year.
    WIth Best Regards,
    Rajesh
    <b></b>

    Hi Madhavan,
    Unfortunately this forum deals with migrations from non-Oracle
    environments to Oracle. You seem to be dealing with migrations in
    an Oracle environment mainly.
    I would recommend that you contact Oracle Applications and RDBMS
    support directly. They will have the most up to date
    information/advice on performing these actions.
    Regards
    John
    Madhavan (guest) wrote:
    : Hi John
    : Thanks for your reply.
    : Actually I am planning to upgrade the system.
    : 1. I Want to Upgrade Oracle Financials release 10.7 to the
    : latest version (11.x)
    : 2. Oracle 7 database to oracle 8 or 8i.
    : 3. Oracle is running on NT service pack 3. Do I need to upgrade
    : this?. If not what is the impact on Windows NT?
    : 4. Is the majority still running smart client 10.7 and database
    : 7?
    : 5. What is the necessary time to implement these upgrades? What
    : type of consulting I need to have?
    : 6. I have some employees working on it? Will these changes
    : affect them?
    : What type of precautions I need to take on the whole??
    : Thank You
    : Madhavan
    Oracle Technology Network
    http://technet.oracle.com
    null

  • Product hierarchy in the material master record

    Hi,
    I am handig Data migration project.
    This is related to Product Hirerarchy.
    I one business Product Hirerarchy have been configured. But in another buisiness, Product Hirerarchy has not been configured.
    There are some common materials using by both business processes.
    For coomon mateials  if I am maintaining Product Hirerarchy value in the material master record, is there any impact on business which is not being used Product Hirerarchy. Whether it will stop / impact on business processes.
    Can you explain plz
    Thanks in advance
    Regards

    Hi karthink,
    Thanks for your inputs.
    we are meging two servers. In that in one server, product highrechy have been configuredand in another server not configured.
    There are some materials with the numbers calling as a common parts exists in both servers.
    ex: plat 0001 in one server 1         &          plant 0002 in server2
    Common part is : m1
    plant 0001  not using product hierarchy and plant 0002 not using product hierarchy,.
    After golive, all the common parts are being used by both plants and same basic data 1 view.
    If we are maintaing product hierarchy in the basic data 1 view, it will flow into sales view as well.
    Then what about impact on the plant 0001 business since it is not using product hierarchy.
    In the configuration, is there any settings to activate / deactive product hierarchy at sales area level.
    Is there any impact on MM / FICO side.
    Please explain.
    THANKS IN ADVANCE.
    Regards
    KRK

  • I want the report which gives the material having Shelf life.

    I want the report which gives the material having Shelf life, but without batch management in the master .
    Thanks in adavnce...
    Vikrant

    Hi,
    Report MB5M can be used for this.

Maybe you are looking for