At the time of cost run CK40N, cost relese in previous month.

Hi,
At the time of cost run CK40N, executing today or previous (05.04.2010). But Cost release in previouse month 31.03.2010.
I tried but system not allowing and saving the varient in previous period(31.03.2010).
Please provide solution and little biturgent.If any clarifiaction ask i will explain in detail.

Hi Sreekanth,
We also faced the same issue with CK40N costing in previous month. What happened is that during testing in quality the new month started and the system is not allowing back date release. So we have to now open and close periods in MMPV and OB52 which is not possible because MM postings are pending. So the new costing release has to be carried after opening and closing of periods.
Syed Abid Hussain
Edited by: sabidh on Apr 5, 2010 2:45 PM

Similar Messages

  • Error during costing run(CK40n)

    Dears
    During costing run (ck40n),we got following errors,
    1)Consumption account cannot be determined
    2)Costing items for material R150 in plant EZP1 without cost element
    3)Cost component split costed with value of Zero.
    Can anyone tell what rectification has to be done ?
    Regards
    Akshay

    1)Consumption account cannot be determined - Please see that consumption GL account for the raw material valuation class is assigned in OBYC..
    If you doub le click on the message it gives the combination of
    transaction/Controlling area/Valuation class/account modifier... for which you need to assign a consumotion account in transaction OBYC.
    2)Costing items for material R150 in plant EZP1 without cost element - Please doubkle click on give the description of the message...this may be due to one of the primery cost element is not created as GL a/c or visaversa.
    3)Cost component split costed with value of Zero.--if you solve the above this message will disapper.
    pl come back

  • How to make marking allowed in costing run CK40N?

    I am doing a costing run CK40N with quantity structure. For the cost variant I have chosen, I can do the steps up to the analysis. But it doesn't allow me to do the marking. In the authorization column for the marking, it says "X" - Allowance not possible". When I click that "X" sign, the cost variant is not in the permitted variant for the company code. How do I make the marking allowed? Your help is much appreciated. Thanks.
    Richard

    Hi Richard,
    When making the marking allowance, the user specifies a costing variant, but really the system allows the marking for the valuation variant. So if 3 costing variants all have the same valuation variant - all 3 will be allowed for marking.
    In your case it appears that the wrong variant was used.
    If you find you cannot revoke the marking because of marked cost estimates you
    can use the REDO function in CKR1 like in note 410619.
    You can technically over ride the setting in FVMK-FREIG via SE16(N), debug mode, but you have to be careful to ensure nothing is released.
    Regards,Elaine

  • Error message at the time create new Hierarchy for Cost Centers (OKEON)

    Dear Experts,
    we have create new company code with reference to old company code. at the time  create new Hierarchy for Cost Center with t code OKEON system given the error message "Overlapping intervals or identical values have occurred".
    we have already checked the duplicate entry but not found the same.
    Please help.
    Regards
    BK GAIKWAD

    the long text to the message is:
    Diagnosis
    You want to use cost center together with activity type . For this combination, however, no master data record was created in fiscal year . The record is defined in CCA during activity type planning.
    System Response
    Procedure
    1.Create the master data record.
    Activity type planning
    1.Or, check your entries.
    I think you should discuss it with your functional consultant

  • While running F110 mail trigger should happen at the time of payment Run

    Hi Experts,
    I have configured FBZP and automatic mail trigger for Payment Advice also.  Now while running F110 then at the time of Proposal Run the mail is getting triggered. But since its proposal it can be edited also. So I need the mail should trigger at the time of Payment Run. Plz suggest how to achieve this.
    Thanks in Advance,
    Arabinda

    Check this note: 836169
    may be helpful with the config and setup, its a consulting note....

  • House Bank selection at the time of Payment run

    Hello All,
    At the time of automatic payment program, The user has to select the house bank for the payment irrespective of ranking order maintained in the FBZP. And I dont want to give the house bank in all the line item at the time of posting or reallocate at the time of payment run.
    Is there any option to maintain the house bank in a single place before the payment run, so that for that particular payment run picks the house bank.
    Hope the question is clear.
    Raja.A

    Hi,
    the user should use the "available amounts" in bank selection and put zero in the bank he doesn't want to use, and put an amount in the bank he wants tu use.
    The available amounts may be changed from the F110 transaction, environment menu, maintain config, bank determination.

  • Interest posting at the time of dunning run

    Hello Fi experts,
    In the dunning process, we can define that interest is to be calculated or not by making the desired setiings at dunning procedure as well as at the dunning level. I have a small query in that. Is interest posted also at the time of dunning run or its just calculated, and posted on at later stage? Please help.
    Regards,
    Van

    Hi,
    In Post Dunning Run, you can see the interest amount on the print form, but There will not be an FI Entry for the same. if you want to have Interest calculations posted to FI , for this You need to Maintain a Separate config settings and also the GL Account ,should be activated with Interest Calculation indicator i.e in GL Master. you can do the required Config Settings at SPRO -Financial Accounting (New)-Accounts Receivable and Accounts Payable-Business Transactions-Interest Calculation-Prepare Interest on Arrears Calculation-Excute  go to New entries or Click on the Indicator for which you want to maintain and give the details as per the requirment.
    also check the other settings in the same path for furdhur requirments.
    Hope the above clarifies your Doupts.
    Thanks
    Goutam

  • How do I get the Time Capsule to run both 5GHz and 2.4GHz networks at the same time.

    How do I get the Time Capsule to run both 5GHz and 2.4GHz networks at the same time.

    Thanks for digging out the facts.
    You have a 1st Generation Time Capsule.
    Your model can produce two bands....either 2.4 GHz or 5 GHz....but not both simultaneously.
    You would need a Generation 2, 3 or 4 Time Capsule for simultaneous dual band capability.

  • How to ignore the material with error in costing run ck40n

    Hi
    Pls, advice how to ignore parent material form costing run if the components of that material have errors. I need to run the costing run excluding erroneous parent item. Is any configuration on this..
    Pls help..
    K

    Hi Kesharika Goona... 
    If you want to exclude any material from Costing Run, there are two ways...
    1. Go to Material Master, Costing1 view, take the check box "Do Not Cost". If you opt for this check box, the system will not consider this material for costing.
    2. Where you run the standard cost estimate in CK40N, once you save you costing run with the parameters like Costing Variant etc, When you select the "Parameters" agains the Flow step of "Selection", you will be asked to give the inputs like Material Number, Plant etc.
    There, against the Material Number, on the extrem right side, you will see a arrow, press that arrow, and there you can see a tab "Exclude Single Values". There you have to give the material number which you want to exclude from the costing run press "Execute" icon on the botoom-left corner of that pop-up window..
    If you still face problem, pls revert back
    Srikanth Munnaluri

  • Several costing runs (CK40N)

    Hi Gurus!
    I´ve got a question about CK40N/CK11N. If we have two standard cost estimates for one material with different result:
    COST1 valid from 12.12 til 31.12 --> cost for material XXX 1.000
    COST2 valid from 13.12 til 31.12 ---> cost fom material XXX 1.020
    If we want to mark and release the price of the material XXX, what price will be marked/released?
    Other question: Navigating to the Analisis Result of cost estimate COST1 we get the result of this cost estimate COST1: 1.000, but, if we click on the material to navigate to the detail, we see the costs from the other cost estimate (COST2), 1.020!!! How is this possible?
    Thanks!!

    Standard is last cost run will pick for Mark and release at CK24
    However you can select at CK24 by clicking Other prices icon your costing variant/date/version.
    Srinivas

  • No Error Log generated in 'Costing' step in Costing Run (CK40N)

    In the Costing Run, when the 'Costing' step is run (after 'Material selection'  and 'BOM Explosion' steps), it gives a hard stop when it encounters the 1st error, instead of completing the 'Costing ' step and giving an Error Log with material information and nature of errors. This makes it very cumbersome to resolve all the errors.
    In the Costing Variant setting in config, the u2018Save Error Log' indicator has been checked.
    Please let me know if I am missing something.
    Venkat

    Hi Vimal,
    Your proposal does not resolve the issue. I found OSS Note 375901, which addresses this issue - see below
    :In Customizing for the costing variant (Transaction OKKN) in the tab "Misc.", you chose "Messages online" for the Error Management option.
    Solution
    Change the error management for the costing variant to
    "Log and Save Messages..."
    Many thanks for your inputs.
    Venkat

  • Import Duty added to costing run CK40n

    Hi all,
    We are looking to have the system automatically add the import duty on materials imported from outside of China into China during the SAP costing run. Was lookign at using CK74 additive option to set this up in the costing run or maybe somewhere in MM-PUR?. Has any one done this before or have any information on how to set this up please?
    Cheers

    Hi sree-
    You can use x-plant material status indicator during costing run. you can set up all the parts that are active with an indicator and use this indicator during cost run. you will find this indicator in dynamic selections.
    Hope this helps...
    RNarayan

  • Error at the time of dep. run

    Dear All,
    I have assigned the cost centers in the asset master & also create the Dep. GL accounts as a cost element but the problem arise when i run the depreciation.
    At the time of running the depreciation run, we are getting the following error, "GL account requires a CO assignment".
    The problem is we can't  assign one cost center to the cost element because assets are related to different cost centers and depreciation should be posted to different relevant cost centers so we can't assign the cost center in the Depreciation GL cost element.
    The requirement is when we run the planned dep., all the dep. related cost should post to relevant asset cost centers.
    Even in the OKB9 settings, we can assign only one cost center against that dep.gl cost element.
    Kindly do the needful.
    Regards
    Anuj

    Hi
    It is clear that your Org structure is different.  You cant post deprciation to various cost centres.  Post it to one cost centre and then go for assement/distribution. Alternatively you can use TCode KB11N for manual reposting from one cost centre to another.
    Cheers
    Srinivas

  • Difference between normal Costing run and Costing run in Material Ledger

    Hi everybody,
    I have a question i wanted to know why we implement Material Ledger .
    If material ledger is for settling variances on material then that is also possible without material ledger
    Please clear the doubt what is different in ML as compared to normal costing run
    thanks in advance
    Regards
    Deepa

    Costing run is to calculate the std cost estimate of materials and Material Ledger costing run is to calculate Actual cost of production of materials.

  • Cost Running -  Fixed Cost

    Hi experts,
    Until last day I was able see my fixed costs in cost running, suddenly no fixed cost is displaying in cost run.
    I maintained work center, activity types against cost center, created routing and maintained value of costs in routing but still it is not displaying.
    Please help on this issue.
    Regards,
    mohdsams.

    hi
    Can you please check the followings :
    1. In routing operation view pl check whether activity is assigned.
    2. Control key in routing properly define ie. confirm with costing
    3.In work centre formula is properly defined
    kkumar