Automatic batch determination with fixed batch number for production order

Hello all,
I want to create a production order where the batc number can be assigned for one component as Batch fixed value once the order is released.
1.- I have created the characteristic (CT04) assigned to the table MCHA and field CHARG (Batch number) and one value: LINER.
2.- I have created the class (CL02) and assign to this the characteristic.
3.- I have created the sort ZSORT and the batch (MSC1N).
4.- I have checked the classification in the material and it has assigned correctly the class and characteristic and the MRP2 view has the backflush = 1, batch entry = 3 and the prod. stor. location = COIL.
5.- I have created the strategy (COB1, strategy type CO02) and assigned the selection criteria and sort.
6.- I have created the order (CO01).
7.- I was releasing the order and the batch number was assigned but, with numbers!! and I need assign this with fixed value = LINER.
Could you help me please? How can I do it?
Kind regards,
SP
Edited by: SANDRA PALOMO on Mar 15, 2011 11:28 AM

Hi Vishwas.K
Thank you for your respone, but, doing more researching, let me explain you with more detail:
1.- I am going to the transaction CO02 in order to release the order, but, before it, I am checking the component by Go to > Overviews > Components.
2.- Then, I am selecting my component and making a click in "Batch determ. " button.
3.- The system is showing me many batch numbers and I select the "Selection criteria" button and the system said: "Selection class "LINERBATCH" does not contain any selection criteria". But, it has a characteristic that I have created before.
4.- Then, I select in the new screen "Selection criteria: Origin..." the"create" button.
5.- The system selection my class from the material classification and when I go back to the last screen, finally the system is showing me my batch: LINER.
Do you know why my selection criteria with my selection class is not working in automatic?
Thank you for your time and support.
Kind regards,
Sandra Palomo

Similar Messages

  • Report serial number for production order.

    Dear gurus,
    i activated the profile for use the serial nuber in the HALB material and in the FERT material.
    I created a production order for the HALB material and i good issue the production order whit the transaction MIGO and inserting the serial numer.
    After i created a new production order for the FERT material serial number 60 and i use the component HALB whit the serial number 38 .
    Now i can see the collegament to serial numer of component and serial number of the FERT material?
    I need insert the production order for the FERT material and see the serial number of the component used.
    In the CO11N is possible do the moviment 261 for the component  manage whit the serial number? I see the area for serial numeber.
    Thanks a lot
    Daniele Pistilli

    Dear ,
    In the CO11N is possible do the moviment 261 for the component manage whitout the serial number?
    Yes .It is possible to do the 261 whule perfoming CO11N for  production Order .Find belwo the set up requireed :
    Backflash can done based on the following set up  to have the 261 while perfoming co11n .
    1.In material master MRP2 view of the item , Backflash field should be kept -1-Alaways back Flash
    2.In work Center where the routing operations are done , -Goto-Basic Data View -Back Flash Indicator -to be marked .
    3.In Master Recipie Componenet Alocation Tab -Item Line -Back Flash Indicator to be ticked once assinged to a particualr operation .
    4.In OKP4 keep the All Components under Goods Movement option ticked so that system posts the withdrawal of all components displayed in the overview as a backflush
    Priority will be always Work centre even you keep the Material master MRP2 view kept always back flash
    So when you do the confirmtion , if you go inside the Goods Movement Tab  page , you will find 261 movement type along with 101 and same Material Documents will genertaed in one shot .
    Hope this is clear  to you .
    Regards
    JH
    Edited by: Jiaul Haque on May 19, 2010 2:13 PM

  • Default of fixed batch number for production order header????

    Hi Experts,
    In SAP, when create a production order, in the production order Header view, in the "Good Receipt" Tab, there is a field "Batch" , which means "Assigns a material that is manufactured in batches or production lots to a specific batch ".
    For some special reasons, we want for some certain materials,when create production order every time,the "Batch" field will be a fixed values.
    For example,for material "AB1" ,"CD2",when create production order every time,the "Batch" field will be "2345" automatically,do not need input manually.But for all the other materials, the "Batch" field would be null ,no value.
    How can I do this? How can assign fixed batch number values to some certain materials in production order?
    If there needs some ABAP development,which user exit do I need??
    Thanks for any reply!

    Hi V.SURESH
    Thanks very much!
    I know what you mean. Default batch number in the production order eans, there is no use of using batch management.
    In fact, my purpose is just want to  deactivate the batch management for some certain materials.
    So for some certain materials,when create production order every time,the "Batch" field will be a fixed values.
    How can I do this? How can assign fixed batch number values to some certain materials in production order?
    If there needs some ABAP development,which user exit do I need??

  • Transfer Order number for Production order

    Hi,
    what is the best way to get the transfer order number (LTAK-TANUM) for picking for a production order?
    Picking can occur first in IM (via MB1A for example) or in WM (via LP10). Requirement Tracking Number cannot be used as it has only a length of 10 characters (production order number up to 12 characters).
    Reservation number (LTAK-RSNUM) is only filled in case picking is done from IM first.
    Cheers
    Mathias

    Hi,
    how are other companies handling this if they want to pick from the warehouse (e.g. using CO27) for a production order and the production order number has 12 characters? The bin (LTAP-VLPLA) and the requirement number (LTAK-BENUM) only have up to 10 characters.
    Is there a standard way in SAP to print out the complete 12 character number on the picking list? I could not find another field where the production order number appears.
    P.S. There are already some production order types in use that have a number range with 12 characters.
    Cheers
    Mathias

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Automatic batch management for Production order receipt

    Hello ,
    I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
    To start with I have following questions .
    1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
    2. IF yes , is Batch management activation status be at material or plant level .
    3. As I need automatic assignment , should I be selecting Internal batch management .
    4. What should be selected for valuation for Goods movement in Inventory management.
    5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
    6. What would be standard Class / characteristics to be maintained for automatic determination.
    Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
    Appreciate all your expert advise.
    Regards,
    Lawrei

    Thanks Adler for your comments .
    With reference to your point , need further clarifications
    1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
    I see that in config node
    +Define Batch Creation for Goods Movements+
        +Using this function, you can define for each movement type whether a new+
        +batch is created for a goods receipt and how it is created.+
    Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
    & what about below config node
    +Define Batch Creation for Production Order / Process Order+
        +In this step you can make the following settings in batch management for+
        +the existing production control profiles:+
    Is it possible in this node .
    Please advise.
    Regards.
    Lawrei

  • Batch Determination with WM manual staging

    Hello,
    I found documentation that suggest to use Pick parts when using batch determination with WM in transfer orders.  However will/can determination be used with Manually staged components inducator 4?
    Thank you

    Hi!
    I am trying to get batched with shelf life larger than 370.
    We are in ECC6.0 and the note applies to releases up to 4.5. I read the note and also tried it but the characteristic does not take a range; only a numberic value. For => 370 I get an error. The date for SLED calculated for batch determination (from the batch determination analysis for a test) as shown below:
    Characteristic   Name                           Characteristic value
    LOBM_ZUSTD       Status of Batch                Released
    LOBM_LVORM       Deletion Ind. for Batches      Not Set
    LOBM_RLZ         Remaining Shelf Life for Batc  370 d
    LOBM_MBDAT       Material Availability Date     07/17/2008
    LOBM_LFDAT       Batch Determin. Delivery Date  07/30/2008
    LOBM_VFDAT       Expiration date, shelf life    08/04/2009
    I wonder if the problem is that the operator does not seem to appear in this criteria for the calculated LOBM_VFDAT?
    Thank you

  • Batch Determination for  production orders

    Hi Experts,
    How do we set up batch determination strategy for production order.My requirement is" Batch Determination at the time of releasing the orders using : - the FIFO strategy on finished product , - the LIFO strategy on components (raw material)".
    Please help me to setup this requirement.
    Thanks,
    Ravi.M

    Just some simple hints:
    You must create a batch class to classify the materials with a characteristcs for the expiration date.
    There exist std characteristic for this.
    In the material master you have a setting to trigger batch determination at release.
    You must create sort rules sorting this characteristic ascending for FIFO and descendign for LIFO. (CU70)
    For component in production/processs order:
    You have to create a search strategy with of a type included in the search procedure defined in production/process ordeer dependent parametersy og your choice. Tc COB1
    In this you use the sort rule and the batch class as selection class.
    Your finished goods goes to a sales order so you have to craete a strategy there as well.
    It follows similar procedure as above but relates to sales order types and other search procedure.
    Good luck!
    Regards,
    Tor Holter

  • Issue with fixed point number output from 9219 module for full bridge measurement (cRIO/FPGA)

    Hi,
    I have a question regarding the fixed point output acquired from a 9219 module (in FPGA on a cRIO) when setup to acquire a strain measurement (full bridge).
    Software: Labview 2009
    Hardware: cRIO-9012 (NI-RIO 3.2.1), NI-9219 module
    The 9219 module is configured in the project as follow:
    Ch0: Full-Bridge +/- 7.8mV/V
    Ch1: Voltage +/- 4V
    Ch2: Voltage +/- 15V
    Ch3: Voltage +/- 60V
    The calibration mode is 'Calibrated' so the FPGA outputs fixed point numbers. 
    My issue is that the precision of the fixed point number for Ch0 (strain) is "(fixed point <+/-32,-1>[-2.5e1,2.5e1]:1.16e-10)", which indicates that the fixed point number is a value between +/- 0.25 and not the +7.8mV/V as I expected?
    The fixed point number does not change in precision whether the range for the strain measurement is set at +/- 7.8mV/V or +/-64mV/V (the two available options).
    As the fixed point number doesn't change precision I'm assuming that changing the range of the strain measurement changes the resolution of the acquired number? And as such I will need to perform additional scaling on the fixed point number to convert it to the expected range?
    There is no mention of scaling of the voltage or strain measurements mentioned in any documentation or examples, with the only scaling example provided for the thermocouple measurements.
    Any help/clarification is much appreciated.
    Regards,
    Mike

    Hello Mike,
    Hopefully I can help clarify some of the behavior you are seeing.
    My issue is that the precision of the fixed point number for Ch0 (strain) is "(fixed point <+/-32,-1>[-2.5e1,2.5e1]:1.16e-10)", which indicates that the fixed point number is a value between +/- 0.25 and not the +7.8mV/V as I expected?
    For calibrated values on the FPGA VI, the returned data is a Voltage measurement, not a directly calculated strain value. Based on the specified ranges for the 9219 in a Full bridge configuration, 250 mV will encompass all possible input values, at the module provided excitation (2-2.7V dependent on the sensor gage resistance).
    The fixed point number does not change in precision whether the range for the strain measurement is set at +/- 7.8mV/V or +/-64mV/V (the two available options).
    As you may notice from the fix-point definition, the fixed point data contains 32-bit precision which is larger than the acquired precision of 24-bits provided by the 9219. The fixed point data-type is coded to accept input encompassing both the range and precision of the instrument; such that, no additional coercion of the input data values is required based on user-defined software settings, i.e. the bridge sensitivities +/- 7.8mV/V or +/-64mV/V. 
    As the fixed point number doesn't change precision I'm assuming that changing the range of the strain measurement changes the resolution of the acquired number? And as such I will need to perform additional scaling on the fixed point number to convert it to the expected range?
    The documentation does not clearly define that by varying the discrete levels of strain input (+/- 7.8mV/V or +/-64mV/V) the range of the ADC on the module is also adjusted. I am working to follow up further on this topic, to provide a clarification on the module documentation. As for scaling, the voltage values acquired regardless of the ADC resolution will still be related strain via the bridge sensitivity. The resolution of the ADC will simply define the smallest measurable change in the strain value. 
    There is no mention of scaling of the voltage or strain measurements mentioned in any documentation or examples, with the only scaling example provided for the thermocouple measurements.
    For converting the acquired voltage values to a strain measurement, I would recommend the documentation linked here for a detailed explanation on strain calculation. Often, users will forward the acquired voltage data as fixed point values through a DMA FIFO to the RT controller on the Compact RIO; such that, they may handle conversion from voltage to strain using floating point math in real-time. 
    I hopes these responses provided a bit of clarity. I will continue to work to provide additional information on the 9219 specification information. Please post back any further questions.
    Cheers!
     Edit: Forgot to add the link.
    Message Edited by Pcorcs on 04-14-2010 04:55 PM
    Patrick Corcoran
    Application Engineering Specialist | Control
    National Instruments

  • Enhancement for Production Order Release and Batch Fixing.

    Hi Experts,
    I have assigned a enhancement for production order.The user exit is also given in the req as PPCO0001 through which i have to call a Z-Program for Batch fixing using Trans CO01 and release the order before saving once it is assigned to components.
    Now my probs is where to start working for the enhancement -is it possible to use any BAPI instead of Batch (BDC) or I can use any BADI instead User Exit.
    So if you guys have similar scenario worked on it or have similar example approach to solve it.Please do help.I will reward for all helpful answers.

    I figured out thr friends !
    Thanks,
    SriRam

  • Batch Strategy for Production orders

    Hi All,
    I just wanted to find out that what are plant specific settings while implementing the batch determination strategy for Production orders? I have configured Batch determination and batch check for Plant A and Plant B. However, in Plant B, the system does not pick the batch automatically while in Plant A, it does. I have checked almost all the batch settings in SPRO but could not find any differences between plant A and plant B. Can anyone please guide me on this>?

    Hi,
    Pls. check in SPRO > Logistics general > Specify batch level and activate status management.
    SPRO > logistics general > Batch number assignment > activate internal batech number assignment
    Sachin

  • Batch Split during GR for Production Order Confirmation

    Hi All,
    We need to do batch splitting during GR for Production Order Confirmation.We are using CO11N for confirming the Production Order and in the PP settings auto GR is activated once the Confirmation is done.
    Currently it is generating only single batch number for the complete quantity, but our requirement is that we need that system should create separate batch for each piece.
    For ex.: Production Order is for 100 pce, when we do Production Order confirmation, system is automatically doing the GR by 101 movement type and it is creating one single batch for full 100 pce. But we want the batch number should be generated for 1 pce i.e. we want to split the 100 pce into 100 batches with 1 pce each.
    Please let me know what can be done for this requirement.
    Regards,
    Ankit

    Dear,
    In OPK0 you need to active the screen Mill: Goods Receipt (8485) for confirmation profile for the single-screen entry.
    Best way is use BAdI /SAPMP/SPLIT_CO11N for the Enter Time Ticket for Production Order transaction (CO11N)
    you must activate BAdI implementation /SAPMP/SPLIT_POPUP and/or /SAPMP/SPLIT_CO11N for this BAdI
    I have use the same BADI it will ask you number of split according to that it will split the GR line item.
    Please refer this link,
    http://help.sap.com/saphelp_dimp50/helpdata/EN/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    Regards,
    R.Brahmankar

  • Goods receipt of more than one batches for Production Order

    Hi ,
    We are assigning the Batch number in CO01 t code as A1234.1 for Order quantity 100.
    I am doing the partial GR and also for the next successive GR's I want to do the GR with batch number as A1234.2, A1234.3..
    System is not allowing me to do the Goods recipt for the Batch A1234.2, .3, .4...in MB31.
    Please let know if any other way to Goods Receipt.
    Amit Shah

    We are assigning the Batch number in CO01 t code as A1234.1 for Order quantity 100.
    Dear You are assigned the Batch number in production order, SO It won't allow other than That Batch Number during GR.
    IF you want different batch for each GR then remove the Batch assignment in Production order

  • User Exit for MSC2n( Batch) while doing a Good receipt for an order

    Is ther any exit to update the Date1 field(MCHA-FVDT1) in MSC2n( Batch) while doing a Good receipt for an order
    Thanks in advance

    Hi Varsha,
    Try these User Exit.
    BATCHCHK  Function Module Exits for Check in Case of Batch Change
    MBCFC010  Propose batch number on Inventory Management item scree
    SAPLCHVW  Batch where-used list
    SAPLMHD1  Shelf life expiration date
    SAPLV01D  Determining the initial status of a batch
    SAPLV01P  Function Module Exits at Time Batches Are Updated
    SAPLV01Z  CFCs for internal batch number assignment
    SAPLV1ZE  CFCs for external batch number assignment
    SAPLV1ZN  CFCs for batch valuation in VB_CREATE_BATCH
    Regards,
    Vijay

  • Batch assignment Mnadatory for production order

    Hi Friends,
    How can we restrict the  release of the production order if Batch not assigned in the Header (Goods receipt Tab).
    By using the status profile seems one possibility, can you tell the procedure or details how to acheive this.
    Apart from this is there  any other  option.
    Thanks,
    Ramnivas

    Hi, thanks a lot
    Actually i have  already used the  user exit for the  same but  was looking if  there could be  any standard functionality to restrict release without  batch assignment to order.
    Anyways i would like a help related to the same, i have considered an internal batch number for these orders which gets automatically generated  during order  creation using the same  exit. The issue is as soon as the batch number is created and  assigned to the order. System does not allow  me to change anything in the order.
    e.g. the  Basic  dates, Over/Under delivery tolerance, order quantity.
    What  could be the  reason and the  solution for this, as the order is  still in created state and not yet processed.
    Thanks/.Ramnivas