Automatic PR creation for stock items (Category - L)

Hi All,
My requirement is as follows:
When I create PM orders for stock item, system generates a reservation number.
But the actual qty is sytem for such items are less than planned qty or NIL qty.
How to create PR's for such items automatically by system ?
Is MRP run required to be activated for such items (i.e: maintenance of MRP views in material master) or any other way to do it for stock items (L) ?
If so, what all fields need to be filled in material master?
Is there a way for doing MRP run only for material type ERSA (spare parts) or only against reservation numbers created through maintenance orders or against MRP controller?
Kindly post your valuable feedback.
Thanks in advance and best regards.
Kannan J

Hi,
     For automatic p.o creation, you can use reorder point.
In material master mrp1 view, use mrp type VB, reorder level ex. 50 pc.
Maintain lot size HB, maintain max stock level 100 pc.
When the requirement comes it will consume from stock. If the stock goes below reorder ponit(50), it will create planning file entry.
When you run mrp (MD01), it will automatically create p.o.
But without running mrp, system can not create p.o
With that you can maintain your stock.
Hope it will help.
Regards,
Dharma

Similar Messages

  • Goods receipt indicator is PO is not set for Stock -item

    Hi Gurus,
    I have created PO for a raw material but it is so strange that the Goods receipt indicator in Delivery tab is not set (it is greyed out also). Then, I cannot do Goods receipt for PO anymore.
    Normally, this Goods receipt indicator is set automatically if material is stock-item.
    Can anyone help me find out the reason?
    Thanks,
    Hong

    Hi,
    For the material type RAW MATERIAL ,  aganist your plant ( Which is given in the PO) have you activated QTY UPDATE check box?
    Check in the transcation OMS2
    Select your material type and click on the Qty update / Value update ( Which is in the left hand side window).
    Check QTY UPDATE check box aganist ur plant code. If not activated, check / activate check box.
    If this check box is activated, then only GR checkbox is activated in the PO - Delivery screen
    Regards
    KRK

  • PR and PO should be display in IWBK report for stock item.

    Hi Exterts,
    Our client requirement is to display PR and PO number in IWBK report for stock item as well.
    I know PR and PO can be display in IWBK report for non-stock item but how we can display PR and PO for stock item,as PR is generated through MRP for stock item.
    Please share your ideas on this.
    Regards
    Vishu

    Vishu,
    In typical MRP settings you "procure to stock" not "procure to order".
    This means that there is no direct link between the PM/CS orders and any PR/POs created via MRP.
    Subsequently you will not be able to show this data in IWBK.
    However, we are currently designing a customer-specific report similar to IWBK that also counts the number of open POs for a given material on a PM/CS work order. The user can then navigate to ME2M (PO list) or MD04 (stock requirements list) to get further details.
    PeteA

  • Automatic TO creation for delivery

    Dear Experts ,
    We are facing a problem with Automatic TO creation for delivery only in some storage types ( not all the types , some types are working fine )
    The problem happened after we applied a user exit for a specific picking strategy , but even after we have cancelled that user exit still problem remained.
    We have checked the following settings, and everything seems fine:
    1-Warehouse management - Activities u2013 transfers u2013 define Mvt type
    2-Warehouse management u2013 interfaces- Automatic TO creation
    Looking for your help in this issue
    Thanks ,
    Malik

    Hi Malik,
    You mentioned that you have previously implemented the picking user-exit and removed it later. Did you enter the correct picking strategy for the effected storage types after removing the user-exit? This could be one reason.
    What happens when you try to create the TO manually?
    Regards,
    Osman

  • Automatic TO Creation for 321 movement (WM and QM integration)

    Dear experts,
    Can anybody guide for how to create auto transfer orders with reference to posting change number for 321 movement document?
    Best Regards,
    Anand Rao

    This has to be done in WM. Activate the automatic TO creation for the releavnt Inventory/warehouse movement . Its under interafces - inventory management in the WM component in config.
    Thanks,
    Ram

  • Multiple PR doc type for Maintenance order - Non stock item category

    For non-stock item requirement in PM, we create a maintenance order and indicate item category as "N" in components tab. Accordingly a purchase requisition is created as per configuration. We have assigned PR doc. Type “FO – Framework requisition” for Maintenance Order Category.
    SPRO - PLANT MAINTENANCE & CS - Maintenance and Service Processing - Maintenance and Service Orders - General Data - Define Account Assignment Cat. and Document Type for Purchase Requisitions
    Now according to the new requirement, we need to have different PR Doc type as per CONTROL KEY mentioned in the Maintenance Order.
    Example:
    If the Control Key is “PM01 - Plant maintenance – internal” the purchase requisition document type should be “NB – Purchase Requisition”. If the Control Key is “PM03 - Plant maintenance-External(services)” the purchase requisition document type should be “FO – Framework Requisition”.
    Please advise how to configure the same.
    Regards
    Sathish Kumar Balakrishnan

    Hi Partha,
    This is a simple enhancement. In our scenario, we had configured PR document type "FO" in SPRO settings for "Document Type for Purchase Requisitions".
    Hence to have "NB" PR document type whenever material components are being indented through maintenance order, we used this enhancement COZF0002
    Please instruct your abaper to add similar logic, as shown below.
    Enhancement:COZF0002
    Functional module:EXIT_SAPLCOZF_002
    Include: ZXCOZU02
    Logic:
    IF sy-tcode eq 'IW21' or sy-tcode eq 'IW22' OR sy-tcode eq 'IW28'  OR sy-tcode eq 'IW31' or sy-tcode eq 'IW32'  OR sy-tcode eq 'IW38' .
      IF resbd_imp-postp = 'N'.
        eban_ord_cust_chg-bsart = 'NB'.
      ENDIF.
    endif.
    Hope this helps.
    Regards
    Sathish K B

  • PM - Task List Components with "Non-Stock" item Category

    Hi:
    I am setting the PM module, in concret the preventive task lists. For a certain operations I have to assign some components to certain operations, but the system only allows to add "Stock Items", I mean the item category of the material row is set automatically by the system as "L" (Stock Item).
    I am very interested in to assign "Non-stock items" (Item category = "N").
    Is it posiible??
    If the answer is yes, what I have to do? Have I to change some customizing settings?
    Thank you very much in advanced,
    Kind regards,
    Jordi Palau.

    hi
    In task list you cannot able to assign item category other than L which is stock item.there is no customization to allow the same
    but you can indirectly assign the material with item category N.create BOM for the equipment then while adding the material you have to select from the BOM which is having item category N
    regards
    thyagarajan

  • Automatic TO Creation for QM Usage Decision

    Dear Gurus
    We all know WM TO to releasing stock from QI to UU or return goods to vendor can be created automatically,
    My question is, when the usage decision is split into two, some material going into stock, and some returned to vendor. for return to vendor, SAP will do automatic transfer, but for material go into stock, SAP is not release Q status in WMS to unrestricted (blank), I have set the movement 321 to create TO automatically and post into same bin.
    FYI, if the transaction is separated, SAP perform well (transfer Q to unrestricted done automatically and return to vendor also done automatically)
    Is there any solution for this problem?
    Thanks and Regards
    CJ Lee

    Hi,
    In case of a usage decision for a partial quantity, it is not possible to create the TO for the generated posting change notice automatically. This is only possible when the full quantity is released. The same happens if you release a partial quantity and post the rest using a different stock posting. The reason is, there needs to be a user decision, which part of the quantity has to be posted, this is necessary for example when the quantity is distributed in the warehouse over many storage bins. But even if the full quantity is on one storage bin, there is no automatic TO creation. You can see this also in the online processing LT05), in case of partial quantities you have to enter the selected quantity in the quant list, for a full posting this is not necessary.
    Hope this helps.
    Regards,
    Sinéad Curran

  • Creation of cProjects automatically from creation of Portfolio Item in xRPM

    Hi,
    If we check out the box for the automatic creation of cProject along with creation of Portfolio item then the cProject as well as an internal order is created in the system.
    While I am creating an item and selecting for automatic creation, I am not able to get the internal order and not even the corresponding cProjects.
    Help please !!
    Regards,
    Nishit

    Hello,
    I am looking for a cProjects knowledge resource to start after a brief demo or just discussion on how cProjects would be implemented at out site. The company is a Global chemical company and we know we want cProjects but need more info before we get started. We are looking for a resource willing to provide this info. This is for an 18  month project. Work can be done remotely.
    Jan Valeriano
    jan.valeriano  @  els-it.  com
    215  668 -  3854
    ASAP
    Thanks
    jv
    +

  • Creation of New Item Category

    Hi All
    Can anyone give an example of when a new item category creation will be required in practical ?
    Anil

    Hi Anil,
    It is always recommended to use standard item categories. Create new item categories if the functionality you require cannot be covered by the standard item categories. Following are the attributes and functions of a BOM  item category.                                                                               
    o   Is a material number required?                                                                               
    o   Is the item to be used in inventory management on a quantity basis
    o   Is the item a text item only, with no other functionality?                                                                               
    o   Is the item to be used as a variable-size item with the option of entering individual sizes ?                                                                               
    o   Is the item a document item?                                     
         The document item category allows you to enter a document which you created using the document management system.                                                                               
    o   Is the item a class item?                                        
         For configurable material BOMs, you can enter a class in which materials or documents are classified. When you assign characteristic values during BOM configuration, the class node is replaced by the object with the required characteristic values. In this way, the workload involved in maintaining BOMs with many variants is reduced, because you no longer have to enter all items individually and assign selection conditions to them.                                                                               
    o   Are sub-items supported?                                                                               
    o   Is the item a plant maintenance structure elment?               
         If the item is a PM structure element, the system does not check 
    If the requirement is to obtain the functionality by shuffling the above combinations, only than go ahead. 99 out of 100 times, the standard categories are suffiecient.
    Reward if cleared and close the thread.
    Keerthi

  • Account assignment question (for subcontracting item category)

    Hello
    Is it possible to have a account assignment category with a consumption posting indicator V work with a subcontracting item category L?
    Our scenario is that a SD item category TAB auto generates a Subcontracting PO with account assignment M and item category L.
    The problem with account assignment M is that it references sales order, and does not propose BOM component material/quantity, like a standalone subcontracting movement (541 reference to PO)
    We want to issue components to the subcontractor referencing a PO, and maintain visibility thru ME2O (Which account assignment M wont allow).
    Is this possible ?
    I tried tweaking the account assignment category M by changing the consumption posting indicator to V.
    This allowed me to do the subcontracting issue 541 movement referencing a PO.
    However, I got 2 accounting errors at MIGO.
    No direct postings possible to G/L account 03-010
    I then changed the FS00 settings to allow direct postings, but got the next error and was stuck. I guess if these accounts are postable, my problem is solved but I don’t know how to do that!
    Acct. 03-010 for trans./event key BSX, postable directly
    If anyone is knowledgeable on account assignments or knows how I can solve these, I would greatly appreciate your input.
    Regards
    Ken

    Thanks for replying again, Gopala.
    Let me clarify, the SAP error I am receiving is at MIGO, following the successful transfer posting at MB1B (mtype 541 referencing the PO number. If I can get the proper account postings at MIGO (as in a standalone MM subcon scenario) here, my problem is resolved.
    When I hit post at MIGO (Finished Product mov type +101/Component reduction is -543 O) I receive the error "Acct. 03-010 for trans./event key BSX, postable directly " I then goto FS00 (G/L accounts) and uncheck the 'post automatically only' box. But then when I goto re-post at MIGO, I get the message
    "No direct postings possible to G/L account 03-010"
    So I am stuck in this circular error.
    Is this correctable?
    Thanks Again
    Ken

  • Daily Automatic delivery creation for Finished Products

    Dear All,
    As per my client requirement, they need automatic delivery creation when ever the finished products posted(Reached) in to the Finished Products Storage location with out time specification.
    Scenario is like this.
    1.Scheduling agreement will be created for one month or one year for the specific customer with specific products.
    2.After producing the material, from the production line finished products will taken in to the Finished product Storage location with some acknowledgement.
    3.When ever the acknowledgement happen(stock get added) automatic delivery need to be created for that acknowledged quantity with reference the scheduling agreement.
    4.There is no time specification When ever the finished products stock acknowledgement happen automatic delivery need to be created.
    5.There is no quantity specification also what is the quantity at finished products Storage location acknowledged for that quantity automatic delivery need to be created .
    6.If there is no production-->There is finished products -->No delivery should trigger.
    This will be applicable to specific customer and specific material only.
    Please give your valuable inputs as early as possible.
    Regards,
    Murali.

    Dear Rohit,
    1) Who creates the acknowledgement..
    -->Finished Products Storage location people will run this entry when they recieve the finished product from the production line.
    2) How frequently is this acknowledgement created..
    -->When ever receives the finished products from the production line,
    3) Is this acknowledgement a print out or a documetn type.
    -->It is not a print or document type, it is just an Transfer posting entry to add the Finished products qty to the existing stock at that particular storage location.
    4) If it is document type does it appear in document flow.
    -->No it will not come in the document flow.
    I hope it will clear for you,
    Regards,
    Murali.

  • Bin determination in automatic TO creation for posting changes

    Hello guys,
    could someone provide some information or some links on how the automatic bin determination for posting changes will be processed in SAP WM?
    Actually I'm looking for some further information for automated processing during a posting with movement type 309.
    What data from the posting change will be taken into account for the automated bin determination?
    Or is it 100 % comparable to the standard putaway / stock removal strategies?
    Thanks for some hints on that.

    Hi,
    I would like to add a point here that there is possibility of transmitting a screen widow to hav the value of GR number. You can do the settings  in OMLR in the AddlData for the appropriate Mvt (eg 321)
    This will cause to have the GR number to the PCN, which is compared with the GR no in the quant existing, while creating the TO wrt PCN.
    For eg: Material           Qty              Stk catgry                Bin                      GRno
                     A                  20                    Q                      B001                  5000000102
                     A                  40                    Q                      B003                  5000000140
    Now, when transfering the stock category form Quality to unrestricted, for 20 qty, a PCN will be created bforethat a pop-up screen flows in which u'll b giving the GR no as 5000000140.
    So u have the PCN for Qty 20, with GR no 5000000140.
    When u create a TO wrt PCN, system will pick the stock from the bin B003.
    I don't know how far this may light u.
    Reg
    Prasanna

  • CRM Availability Check not working for certain Item Category

    Hi there,
    I have a situation where for certain order type/item category combinations, the availability check on the same material is not working.
    The check is set up to happen in SAP ECC.
    I have checked the config. under SPRO->CRM->Basic Functions->Availability Check->Availability Check using SAP ECC
    as per many SDN posts on this, and everything looks fine.
    The new item category, which was a copy of an existing one, works (i.e. gives availability) for certain order types, but not others.
    If I create the same order directly in ECC, it works correctly every time.
    I searched the code (from consultants who set it up originally) and can see nothing specific to the order type/ item category.
    I also put a breakpoint on AVAILABILTY_CHECK function module in SAP ECC - it is not being hit, in the case where check is not successful.
    Breakpoints in MV45AFZZ (Sales Order userexit) also not being hit, but they are hit for the Order/item category combination when it works successfully.
    Any suggestions on where else this could be configured would be appreciated!
    thanks,
    David

    Hi David,
    One 'simple' reason for this could be that the copied item category does not have the
    ATP Profile set up in the item category in the IMG. Make sure you have an ATP profile assigned in the area 'ATP Profile' in the item category.
    Please see as well the SCN Wiki link:
    Availability Check CRM-BTX-BF-ATP - CRM - SCN Wiki
    Best regards
    Christophe

  • Automatic TO creation for Mvt 311

    Hi,
    I am facing issue while doing Stock transfer between 2 Sloc. TO is not automatically getting created once i do stock transfer in MB1B for mvt 311.
    I checked Tcode OMKX,OMKY,OMKZ, in all of them "A" is maintained in Automatic TO field.
    Kindly let me know if i have missed any configuration.
    I want to create TO automatically once i do Stock transfer in MB1B.
    Please help.
    Regards
    Utsav
    Edited by: Csaba Szommer on Jul 12, 2011 11:25 AM

    Hi
    Kindly cjheck the move type details.
    LE-WM-ACTIVITY-TRASFERS-DEFINE MOV TYPES-SELECT 311 - CHECK THE TR REQ INDICATORS.
    Laxman

Maybe you are looking for

  • Everytime I insert a blank CD into my iMac, it spits it out. How can I fix this so I can burn CDs?

    Everytime I insert a blank CD into my iMac, it spits it out. How can I fix this so I can burn CDs?

  • Sending Material for Final packaging.

    Dear Experts, Greetings of the day! Scenario: At times we have some finished products, which we need to send to a vendor for making promotion packs- In simple terms, suppose we have finished material - A, B and C, and we want to get all together shri

  • Will not keep home page

    after setting the home page by dragging it to the home button, it won't keep it that way. Next time I open it it goes to searchu not yahoo that I set as the home page.

  • Fireworks CS3 Program Switching Issue

    In the office we have 3 machines using Fireworks CS3 (part of Studio CS3). All the machines are experiencing the issue I am about to describe. Each machine is an Intel Core 2 Duo with 4GB ram. All 3 machines are using Windows Vista. We all had the ol

  • Virtual PC on intel based mac

    Hello there, i would like to know if anyone tried virtual pc on intel based mac, i know it was designed for G4 processor. if you tried virtual pc on intel based mac thne please let know how it performed. thanks in advance