Automatically create scheduling lines based on quantity and number of containers

Dear Gurus
Our business requires that when creating a sales order automatic scheduling lines should be created based on the quantity and number of containers.
i searched  and found of using VOV6 but i am a bit confused on how to set up this calculation logic.
Thanks and Regards

Dear Arun kumar
Our business requires that when creating a sales order automatic scheduling lines should be created based on the quantity and number of containers.
Generally shedulines  are confirmed Based On qty only ...Or Number of containers
Check OVLZ   Maintain Days
MMR--Maintain RLT  MRP 3 VIEW Or goods pressing time MRP2 VIEW
VOV8--Lead time in days
VOV6--Activate availability check, Req check box
OVZ9--Remove RLT Check box
SCAL--Factory Calendar also impact please check 
If customer Is maintain complete delivery ..Make it Complete check box in XD01 But while creating Sales order if he agrees Partial delivery also according to company activate check box  Fixed qnty/date in Schedul lines
And make it availability check in sales order level not in delivery level
Let me know your requirement is some thing different

Similar Messages

  • BADI / user-exit for MD02 while creating Schedule Lines

    Hi experts,
    I have a problem with implementation that I'm designing.
    Current situation:
    While MRP run (MD02 or background) new Schedule Lines are being created in reference to MM Scheduling Agreement.
    Example:
    04.08.2014
    SchLne
    5500000415/00010
    200
    04.08.2014
    IndReq
    VSFB
    200-
    05.08.2014
    SchLne
    5500000415/00010
    300
    05.08.2014
    IndReq
    VSFB
    300-
    2 Schedule Lines where created - for wuantity 200 and 300.
    Target:
    There is a need to create more than one Schedule Line per day during MRP run. According to example there should be for example 2 Schedule Lines in 04/08 and 3 Schedule Lines in 05/08 all for quantity = 100. There is possibility to change Schedule Lines in ME38, but there is a need to make a change during creatin while MRP run.
    04.08.2014
    IndReq
    VSFB
    200-
    04.08.2014
    SchLne
    5500000415/00010 *
    100
    04.08.2014
    SchLne
    5500000415/00010 *
    100
    05.08.2014
    IndReq
    VSFB
    300-
    06.08.2014
    SchLne
    5500000415/00010 *
    100
    06.08.2014
    SchLne
    5500000415/00010 *
    100
    06.08.2014
    SchLne
    5500000415/00010 *
    100
    So instead of creating only 2 Schedule Lines, MRP should create 5.
    I'm looking for a BADI/user-exit to edit Schedule Lines which are to be created by MRP and change it tn reference to the needs.
    I found only one BADI:
    BADI:    MD_CHANGE_MRP_DATA
    method: CHANGE_MDPSX_MDBS
    The priblem is that this method is only being executed when there are Schedule Lines which already exist.
    Maybe some of you have done some extension similar to mine? Please give me advice where I should put extension.
    Thanks in advance!

    Dear Saravaran,
    Thanks for the reply.
    This will not suits to us. The provided BADI will works upto Posting the material document in transaction MIGO and it will not considered for the FI level entries.
    Hope you could have understand mine requirement.
    The requirement of mine is:
    While doing the GR with ref to PO the material documnet will be posted and subsequently FI documnet  will be  generated in Background. While generating the FI document i need to manipulate the values for the G/L. So that the manipulated values will be flow into BKPF and BSEG tables.
    Thanks.
    Regards
    Swamy

  • Unable to create Schedule line(Maintain sch.agreement)

    Hi experts,
    After running MRP i got Planned order for a certain material and for that material procurement type maintained as "Both internal and external" in material master. After completing the process planned order to purchase requisition, i separately created schedule agreement . Now here i am facing one problem that if i create schedule line with reference to purchase requsition i am getting the error Requisition doc. type NB not allowed with doc.type LP.
    pls anybody suggest is there any prob made in the above process
    Regs,
    SR
    Edited by: SP Ramesh on Jan 1, 2010 8:22 AM

    go to tcode OLME> schedule agreement> select the line of document type LP and then slecte the folled item category and then selce each item category one by one and then click on the second folders link document type and there give source document type NB
    cause of the issue is : the source document type NB is not set with LP document type of schedule agreement

  • Link between Delivery schedule line counter from PO and the material docume

    Dear Gurus,
    I have one PO with single line item having delivery schedule -
    Material 1 -
    delivery schedule 01.01.2009     2000
                                                         01.03.2009    5000
    I have received quantity against this Po
    I want to know where I can find the link between Delivery schedule line counter from PO and the material document
    Best regards
    Sar

    There is no link from the MAterial document line item (Table Mseg) to the PO Schedule Line (EKET).
    If this is for Evaluating an on time delivery or GR, you may consider the following approach.
    PO details Po Date  QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   100
    GR Details
    GR1   01Jun2009   180
    GR2   07Jun2009   110
    GR3  09Jun2009      10
    Calculate a *** total qty for the PO Line.
    PO details Po Date  CUMUL QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   300
    Calculate a *** total qty for the ontime GR.
    PO details Po Date  CUMUL PO QTY  CUMUL GR on time
    Sch1   01Jun2009   200                180
    SCH2  08Jun2009   300                 290 (180+110)  the 3rd GR was too late
    Evaluate the PO SChedule Lines as follows:
    Po SCL qty + CUMUL GR QTY - CUMUL PO QTY = ADJ GR ON Time Qty
    SCH1 01Jun2009
    200 + 180 - 200 = 180 on time for 01Jun2009 date ( 90% fill rate)
    SCH2 08Jun2009
    100 + 290 - 300 = 90 on time for 08Jun2009 date (90 % fill rate) the first 20 of the GR on 07Jun2009 went to fill the late, early date.
    Best of luck !
    SCH2 100 +290 - 300 = 90 on time for 07Jun2009 date

  • Error in creating schedule line aggrement through BAPI

    Hi All ,
    I want to create schedule line aggrement (VA31) by using BAPI / FM .
    I am using " SD_SALESDOCUMENT_CREATE" FM  .
    Here i am getting error in output when i enter shchedle line data in input .
    Error is given below .
    E V1                   434 No schedule line category could be determined during quantity adjustment
    Error only come when i want to create new schedule line ....in Changing any schedule line aggrement there is no error .
    I am able to create schedule line aggrement manually .
    please help .

    Use BAPI_SAG_CREATE

  • Schedule lines with null quantity deleted from EKET

    Hi All, I would understand if there is a logic that deletes schedule lines with null quantity from EKET.
    Sometimes it happens and sometimes not and I can't find the reason. I thought that it could depend from the transaction used (ME38 or MD43) but it's not so.
    thanks
    L

    Hi,
    This functionality was implemented after OSS Note was applied with release 4.0B.
    191898 - ME38: Delivery schedules w/ scheduled quantity zero

  • Create RSA keys based on p and q

    Is there a way to create a KeyPair based on p and q (BigIntegers or byte[])
    The reason i need this is because i need to encrypt files that need to be decrypted in a c# program (and vice versa). The encryption needs to be RSA (so no DES or....) although i know that there is not really a need for asymetric encryption.
    The problem is I can generate a keypair in Java but then i cannot get the data for that keypair in c# (and vice versa).
    In c# i can create an equivalent of a keyPair based on p and q or on so if there would be a way to get the p and the q of a generated keypair that would also help (or all the other paramets, d, n, e, phi,....).
    Thanks

    You can generate a PKCS8 private key bytes and X509 public key byte using something like
                final KeyPairGenerator rsaKeyPairGenerator = KeyPairGenerator.getInstance("RSA");
                rsaKeyPairGenerator.initialize(2048); // or whatever size you want
                final KeyPair rseKeyPair = rsaKeyPairGenerator.generateKeyPair();
                // The private key as PKCS8 bytes
                final byte[] privateKeyAsBytes = rseKeyPair.getPrivate().getEncoded();
                // The public key as X509 bytes
                final byte[] publicKeyAsBytes = rseKeyPair.getPublic().getEncoded();then you can import the X509 into C# (C# must have a way of importing an X509).
    OR
    do a similar thing in C# and export the X509 public key and import it into Java.
    The private key should only be used by either the C# or Java application (not both) and I would expect whichever needs the private key should generate the key pair.

  • Create schedule line

    Any function module available for creating new schedule line specifying schedule line type along with other schedule line related entries

    HI,
    you can user FM : ME_CREATE_SCHEDULE_DOC to create schedule line agreements.
    Thansks,
    Nelson

  • MRP create more Schedule Lines than target quantity

    We already follow the OSS note 83343, we create a Schedule agreeement and validity date is the same as the Source List and Quota arrangement, also the Target Quanity is the same in the quota arrangement in the maximun quantity and Maximun release qty fields.
    After maintaining that data, we run the MRP as follow:
    Processing key          NETCH               Net change for total horizon
    Create purchase req.    2                   Purchase requisitions in opening period
    Delivery schedules      3                   Schedule lines
    Create MRP list         1                   MRP list
    Planning mode           1                   Adapt planning data (normal mode)
    Scheduling              1                   Basic dates will be determined for plann
    After that, still in teh schedule agreement was created more schedule lines that the quantoty is bigger that the target quantity in the sched Agreement.
    What else we miss??

    Thanks for your not help.
    That I can investigate is the quota arrenagement is incorrect but for some reason the QA is not working.

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • Scheduling agreement - automatic delivery schedule line generation

    Hi,
    we assign our scheduling agreements in source lists with MRP indicator on 2 (Record relevant to MRP. Sched. lines generated automatically). As we don't know what the future demand pattern for the product will be, a longer validity date of the source list item is entered, in comparison with the actual validity period. However, all new schedule lines which are generated within this validity period are assigned to the scheduling agreement, even if the quantity of the scheduling agreement has been reached (even outside of tolerances). Can this behavior be changed ?
    Thanks for any valuable input.
    Kristof.

    Hi,
    thanks for your reply,
    Generally when we create an SA, user will give the schedule line dates instead of that  the system has to propose the delivery dates.
    My requirement is:
    On the scheduling agreements we need to automatically propose delivery dates based on criteria like every Monday, etc. These dates need to get calculated automatically from the header and then get calculated to each JIT tab at the line item.
    Is there any document which will hlep in getting the Delivery dates automatically,
    am looking into Lz, LZJ but bit confused with these two document types.
    Can you please explain more the functionality of these two.
    Regards
    Nath.

  • Sales Order Credit Status Block with Schedule Line ATP Confirmed Quantity

    I would like to keep the Credit Status Block on a Sales Order when it is created and over the credit limit and at the same time be able to Confirm the Order Quantity (if inventory is available) on the Schedule Line.  Has anyone done this?  I'm using ECC 5.0
    In the IMG --> Sales and Distribution --> Basis Functions --> Credit Management/Risk Management --> Credit Management --> Define Automatic Credit Control --> If I remove the Status/Block indicator the schedule line does confirm the sales order quantity but the sales order is not blocked and a delivery can be created.
    Thanks.
    Donna

    Hello Donna,
    I think I solved your problem.
    There are two ways to block the sales order - one is to not confirm the Schedule line i.e. block delivery... block further action that can be taken. The second is to not let the person save the sales order.
    Another option is to get Just a warning message, that the credit limit has been exceeded, but able to save the sales order with a confirmed schedule line.
    The setting will be in OVA8.
    For the Document Value you make the setting C or A. and make sure the block is not set.
    Don't worry about the Open order or open delivery unless you want the system to perform a credit check considering the orders that are already existent. Same with open delivery. It will take into account all the cost of the orders that are open for delivery.
    Now here some options:
    Either consider a 'warning' by the system good enough and still be able to confirm the schedule line.
    (ii) Put in a Delivery Block in the Sales Document Types, in the Shipping tab. That way, you will be able to save the sales doc. but not be able to deliver it.
    (iii) Put a Billing Block in the Sales Doc type, in the Billing tab. You will be able to deliver but not bill.
    (iv) Create a new routine (with the help of an ABAP guy) and place it in the auto credit check, 'Reaction' field where it will place a Delivery Block.
    Do let me know what your thoughts are and what you decided to do.
    Thanks
    Noel

  • Automatic Delivery schedule line proposal on scheduling agreements

    Hi Experts,
    I have a requirements where client wants to have automatic schedule lines in outline agreement i.e. scheduling agreements.
    Is there any standard functionality available for configuring this type functionality or we have to customize?
    If standard functionality available please suggest which document type we have to use, and  what are all the other settings we have to make to work this functionality.
    Thanks
    Nath

    Dear Jagnnath,
    The best solution is to create a source list. You can create source list directly from the outline agreemnt main screen (Menu Bar -> Environment) or else use t code ME01. In source list maintain the validity, Pur Org, outline agreement , MRP=2. Here you may set the check box 'FIX', by doing this always scheduling lines will generate with this vendor if there is any requirement of that material.
    Hope this may help you.
    Vaibhav Mishra

  • BAPI FOR Deleting a Schedule Line Item from EKES and EKET tables

    Dear All,
    I would like to for deleting one of the line item from EKES (Po Confirmation ) and the respective line item from the EKET(PO Schedule Line Item Table).
    Assume that am allowing the user to select the lineitem from zprogram screen and collecting the PO and Its LIne Item details in an internal table.
    Can i Use
    <b>BAPI_PO_Change</b> , if so , can anybody tell me the steps to follow to use this bapi for deleting the PO lineItems, since i m going to try BAPI for First time.
    pls help me out
    Message was edited by: Raja K.P

    Hi raja ,
    loop at iekko1.
        w_index = sy-tabix.
        item-po_item   = itemx-po_item   = iekko1-ebelp.
        item-quantity  = iekko1-mng01.
        itemx-quantity = iekko1-mng01.
        if iekko1-wamng = iekko1-wemng.
        itemx-no_more_gr = item-no_more_gr = 'X'.
        else.
        itemx-no_more_gr = item-no_more_gr = ''.
        endif.
        append item.
        append itemx.
          clear return[].
          call function 'BAPI_PO_CHANGE'
               exporting
                    purchaseorder = iekko1-ebeln
               tables
                    return        = return
                    poitem        = item
                    poitemx       = itemx.
          if return[] is initial.
          commit work and wait.
          call function 'DEQUEUE_ALL'.
    search for deletion fields which u have to mark 'X'.
    before calling  this BAPi u have to lock the PO by using ENQUEUE.
    <b>
    FU BAPI_PO_CHANGE
    Text
    Change purchase order
    Functionality
    Function module BAPI_PO_CHANGE enables you to change purchase orders. The Change method uses the technology behind the online transaction ME22N.
    Alternatively, the IDoc type PORDCH1 is available. The data from this IDoc populates the interface parameters of the function module BAPI_PO_CHANGE.
    Functionality in Detail
    Authorization
    When you create (activity 02) an Enjoy purchase order, the following authorization objects are checked:
    M_BEST_BSA (document type in PO)
    M_BEST_EKG (purchasing group in PO)
    M_BEST_EKO (purchasing organization in PO)
    M_BEST_WRK (plant in PO)
    Controlling adoption of field values via X bar
    For most tables, you can use your own parameters in the associated X bar (e.g. PoItemX) to determine whether fields are to be set initial, values inserted via the interface, or default values adopted from Customizing or master records, etc. (for example, it is not mandatory to adopt the material group from an underlying requisition - you can change it with the BAPI).
    Transfer
    Purchase order number
    The PurchaseOrder field uniquely identifies a purchase order. This field must be populated in order to carry out the Change method.
    Header data
    The header data of the Enjoy purchase order is transferred in table PoHeader.
    Item data
    The item data of the Enjoy purchase order is stored in the tables PoItem (general item data). Changes regarding quantity and delivery date are to be made in the table PoSchedule.
    Use the table PoAccount to change the account assignment information.
    Services and limits
    Changes to existing items cannot be carried out with the Change method. It is only possible to create new items.
    Conditions
    Conditions are transferred in the table PoCond; header conditions in the table PoCondHeader. A new price determination process can be initiated via the parameter CALCTYPE in the table PoItem.
    Vendor and delivery address
    The vendor address in the table PoAddrVendor and the delivery address in the table PoAddrDelivery can only be replaced by another address number that already exists in the system (table ADRC). Changes to address details can only be made using the method BAPI_ADDRESSORG_CHANGE.
    Partner roles
    You can change all partners except the partner role "vendor" via the table PoPartner.
    Export/import data
    Export/import data can be specified per item in the table PoExpImpItem. Foreign trade data can only be transferred as default data for new items. Changes to the export/import data of existing items are not possible.
    Texts
    Header and item texts can be transferred in the tables PoTextHeader and PoTextItem. Texts for services are imported in the table PoServicesText. Texts can only be replaced completely.
    Version Management
    You can make use of the Version Management facility via the table AllVersions.
    Return
    If the PO was changed successfully, the header and item tables are populated with the information from the PO.
    Return messages
    Messages are returned in the parameter Return. This also contains information as to whether interface data has been wrongly or probably wrongly (heuristical interface check) populated. If a PO has been successfully created, the PO number is also placed in the return table with the appropriate message.
    Restrictions
    With this function module, it is not possible to:
    Create subcontracting components (you can only use existing ones)
    Create configurations (you can only use existing ones)
    Change message records (table NAST) and additional message data (this data can only be determined via the message determination facility (Customizing))
    Attach documents to the purchase order
    Change foreign trade data
    Change service data
    Change or reexplode BOMs
    A firewall prevents the manipulation of data that is not changeable in Purchasing according to the business logic of the purchase order (e.g. PO number, vendor, etc.).
    PO items with an invoicing plan cannot be created or changed using the BAPIs
    In this connection, please refer to current information in Note 197958.
    To change addresses with numbers from Business Address Services (cantral address management), please use the function module BAPI_ADDRESSORG_CHANGE.
    To change variant configurations, please use the function module BAPI_UI_CHANGE. More information is available in the BAPI Explorer under the Logistics General node.
    In the case of changes that are to be made via the BAPI_PO_CHANGE, a firewall first checks whether the relevant fields are changeable. This approach follows that of the online transaction. Here it is not possible to change the vendor or the document type, for example.
    Example
    Example of changes made to a purchase order with:
    1. Change in header data
    2. Change in item
    3. Change in delivery schedule
    4. Change in account assignment
    5. Change in conditions
    6. Change in partners
    Parameter: PURCHASEORDER 4500049596
    Parameter: POHEADER
    PMNTTRMS = 0002
    PUR_GROUP = 002
    Parameter: POHEADERX
    PMNTTRMS = X
    PUR_GROUP = X
    Parameter: POITEM
    PO_ITEM = 00001
    CONF_CTRL = 0001
    Parameter: POITEMX
    PO_ITEM = 00001
    PO_ITEMX = X
    CONF_CTRL =  X
    Parameter: POSCHEDULE
    PO_ITEM = 00001
    SCHED_LINE = 0001
    QUANTITY = 10.000
    PO_ITEM = 00001
    SCHED_LINE = 0003
    DELETE_IND =  X
    Parameter: POSCHEDULEX
    PO_ITEM =  00001
    SCHED_LINE =  0001
    PO_ITEMX =  X
    SCHED_LINEX =  X
    QUANTITY =  X
    PO_ITEM =  00001
    SCHED_LINE =  0003
    PO_ITEMX =  X
    SCHED_LINEX =  X
    DELETE_IND = X
    Parameter: POACCOUNT
    PO_ITEM = 00001
    SERIAL_NO = 01
    GL_ACCOUNT = 0000400020
    Parameter: POACCOUNTX
    PO_ITEM = 00001
    SERIAL_NO = 01
    PO_ITEMX = X
    SERIAL_NOX = X
    GL_ACCOUNT = X
    Parameter: POCOND
    ITM_NUMBER = 000001
    COND_TYPE = RA02
    COND_VALUE = 2.110000000
    CURRENCY = %
    CHANGE_ID = U
    Parameter: POCONDX
    ITM_NUMBER = 000001
    COND_ST_NO = 001
    ITM_NUMBERX = X
    COND_ST_NOX = X
    COND_TYPE = X
    COND_VALUE = X
    CURRENCY = X
    CHANGE_ID = X
    Parameter: POPARTNER
    PARTNERDESC =  GS
    LANGU =  EN
    BUSPARTNO = 0000001000
    Help in the Case of Problems
    1. Note 197958 lists answers to frequently asked questions (FAQs). (Note 499626 contains answers to FAQs relating to External Services Management.)
    2. If you have detected an error in the function of a BAPI, kindly create a reproducible example in the test data directory in the Function Builder (transaction code SE37). Note 375886 tells you how to do this.
    3. If the problem persists, please create a Customer Problem Message for the componente MM-PUR-PO-BAPI, and document the reproducible example where necessary.
    Customer Enhancements
    The following user exits (function modules) are available for the BAPI BAPI_PO_CREATE1:
    EXIT_SAPL2012_001 (at start of BAPI)
    EXIT_SAPL2012_003 (at end of BAPI)
    The following user exits (function modules) are available for the BAPI BAPI BAPI_PO_CHANGE:
    EXIT_SAPL2012_002 (at start of BAPI)
    EXIT_SAPL2012_004 (at end of BAPI)
    These exits belong to the enhancement SAPL2012 (see also transaction codes SMOD and CMOD).
    There is also the option of populating customer-specific fields for header, item, or account assignment data via the parameter EXTENSIONIN.
    Further Information
    1. Note 197958 contains up-to-date information on the purchase order BAPIs.
    2. If you test the BAPIs BAPI_PO_CREATE1 or BAPI_PO_CHANGE in the Function Builder (transaction code SE37), no database updates will be carried out. If you need this function, please take a look at Note 420646.
    3. The BAPI BAPI_PO_GETDETAIL serves to read the details of a purchase order. The BAPI cannot read all details (e.g. conditions). However, you can use the BAPI BAPI_PO_CHANGE for this purpose if only the document number is populated and the initiator has change authorizations for purchase orders.
    4. Frequently used BAPIs for purchase orders are BAPI_PO_CREATE, BAPI_PO_CREATE1, BAPI_PO_CHANGE, BAPI_PO_GETDETAIL, BAPI_PO_GETITEMS, BAPI_PO_GETITEMSREL, and BAPI_PO_GETRELINFO.
    5. For more information on purchase orders, refer to the SAP library (under MM Purchasing -> Purchase Orders) or the Help for the Enjoy Purchase Order, or choose the path Tools -> ABAP Workbench -> Overview -> BAPI Explorer from the SAP menu.
    Parameters
    PURCHASEORDER
    POHEADER
    POHEADERX
    POADDRVENDOR
    TESTRUN
    MEMORY_UNCOMPLETE
    MEMORY_COMPLETE
    POEXPIMPHEADER
    POEXPIMPHEADERX
    VERSIONS
    NO_MESSAGING
    NO_MESSAGE_REQ
    NO_AUTHORITY
    NO_PRICE_FROM_PO
    EXPHEADER
    EXPPOEXPIMPHEADER
    RETURN
    POITEM
    POITEMX
    POADDRDELIVERY
    POSCHEDULE
    POSCHEDULEX
    POACCOUNT
    POACCOUNTPROFITSEGMENT
    POACCOUNTX
    POCONDHEADER
    POCONDHEADERX
    POCOND
    POCONDX
    POLIMITS
    POCONTRACTLIMITS
    POSERVICES
    POSRVACCESSVALUES
    POSERVICESTEXT
    EXTENSIONIN
    EXTENSIONOUT
    POEXPIMPITEM
    POEXPIMPITEMX
    POTEXTHEADER
    POTEXTITEM
    ALLVERSIONS
    POPARTNER
    Exceptions
    Function Group
    2012
    </b>
    regards
    prabhu
    Message was edited by: Prabhu Peram

  • MRP in third party scenario. System not creating schedule lines

    HI
    I am using third party subcontracting scenario. As i am purchasing material but i am not taking material in under my company. I am paying to my vendor but the delivery is going to my subcontractor.
    Here i am able to create planned order or purchase requisition. But MRP is not generating schedule lines for that vendor.
    Regards,
    Anand.

    Hello,
    Check the following settings.
    1. Source list active in Material master.
    2. Valididy of the source list.
    3. Any quota arrangement
    4. Purchase infor record.
    Note: all are OK, but still PR's only created, then check for the requirement date, if the requirement date lies before the validity of the source list then also system will create only purchase requisitions.
    for this calculation you have to check the lead time for procurement cycle you have to check. Based on this no. of days only system will try to create the procurement proposals.
    If the lead time is very high and this is going beyond the sourcelist validity, then also PR's only created.
    So there are so many possibilities. check for the above said things and revert back.
    regards,
    <Manick>

Maybe you are looking for

  • XP pro file sharing and guest password - how to enable guest password?

    Hi, I want to share files between two Windows XP pro computers. I would also like that these shares can only be accessed with a password. Here's a description of my setup: I have two laptops: over 1 yo Fujitsu-Siemens (FS) running on Windows XP pro (

  • Photoshop CC 2014 not responding and cannot uninstall

    PS CC 2014 installed on Mac.  Recent update stopped at 74% days ago.  Tried to stop update and now it says "finishing" for the last 2 days.  PS CC 2014 won't open at all.  Tried to uninstall it and Adobe Creative Cloud but I keep getting a message th

  • "System Exec" Output to same window that called it

    Hi, I have a complicated program, but let me break it down to what matters. My labVIEW application (exe) is called by the command prompt. Does some calculations based on arguments I passed to it. The thing I can't quite seem to figure out, is how to

  • Best way to update a load of clobs

    Hello I have a procedure that needs to insert into a table containing a CLOB column using bulk binds/forall. The problem I have is that the value for the clob column is being passed in as a collection of varchar2s. For too many reasons to list, I can

  • VC003 Error in the UK

    I've seen a few mentions of this error, but the only guidance offered by BT is that the VC003 error message will appear if an attempt is made to watch BT Sport outside the United Kingdom.  Well, I'm sitting in the UK and I get this error message no m