Availability check control - how to include stock in transit (frm 351 mvmt)

We are trying to adjust the config on the availability check control settings to include intransit stock (settings in OVZ9 spro t-code). 
This is stock that we have processed into intransit in the receiving plant via movment 351. (MARC-TRAME).
Is there a way to change the availability check settings to include this stock?  I would like my sales orders to see this instranit stock as available.  I have tried using the StockIn Transfer flag (under Stocks category) and also tried using Incl.rel.order reqs falg (In/outward movments category). 
Appreciate any feedback.
Edited by: Peter Boese on Jan 14, 2009 10:37 PM

Hi,
Exclude the stock in transfer from availability check in tcode opjj.
Regards,
nandha

Similar Messages

  • Availability check controll

    dears gurus,
    in OPJJ we can set “receipts in the past” for “availability check controll”.
    how does it works?
    If I’m going to convert planned order in process order (COR8) for material A, composed from B and C, in which case it give me the message “Past receipts were taken into account”?
    Thanks in advance,
    Best Regards.
    Juan

    General Setting:
    "Blank" Include receipts from past and future
    This is the one most of the process will be using
    Option-A
    A     Include receipts from past and future, with messages
    In this case ...it will include both the receipts but you will get a message when the Availability check is done ..this is an information message.
    Option-B
    B     Include future receipts only
    In this case it only considers the future receipts..which means if we hvae any reciept element before the requirment date it will not be considered and this doens give any message
    Option-C
    C     Include future receipts only, with a message
    This performs the same activity of the Option B but with a information message
    Let us know if you are looking for more specific information...
    reg
    DsK

  • What is availability check concept  how it is used in SAP

    hi friends,
    i don't know what is availity check,how is it used and how it should be configured,please help me.

    Availability Check in Sales and Distribution Processing 
    There are three types of availability check:
    •     Check on the basis of the ATP quantities
    •     Check against product allocation
    •     Check against planning
    In Customizing, you determine whether an availability check is to be carried out against the ATP quanitity or against planning. The check against product allocations is controlled in the material master and elsewhere in the system.
    Check on the Basis of the ATP Quantities
    The ATP quantity (ATP = Available To Promise) is calculated from the warehouse stock, the planned inward movements of stock (production orders, purchase orders, planned orders) and the planned outward movements of stock (sales orders, deliveries, reservations). This type of check is performed dynamically for each transaction, taking into account the relevant stock and planned goods movements with or without replenishment lead time. Planned independent requirements are not taken into account here.
    Check against Product Allocation
    Product allocation facilitates period-based distribution of products for certain customers or regions. As of Release 3.0F, you can carry out an availability check against product allocation. This ensures, for example, that when production is low, the first customer does not get the full amount, resulting in following sales orders not being confirmed or being confirmed far too late.
    Check against planning
    The check against planning is performed against independent requirements which are usually created for an ‘anonymous’ market rather than being customer-specific (for example, in the strategy ‘Planning without assembly’, when production occurs only up to the stocking level). The planned independent requirements result from demand program planning and are used for planning expected sales quantities independent of orders
    Controlling the Availability Check in Sales and Distribution Processing 
    You control the availability check using general and SD-specific control features.
    General Control Features
    The following control elements need to be maintained in Customizing and in the material master record:
    •     Strategy group
    The allowed planning strategies (main strategy and further possible strategies) are combined in the strategy group. As of Release 3.0, the strategy group is specified in the material master record in the MRP 1 Screen. In Customizing, strategy groups are assigned, dependent on plant, to MRP groups. If the strategy group is missing in the material master record, it is determined on the basis of the MRP group, if it has been maintained.
    Up to Release 3.0, the strategy group is determined on the basis of the MRP group
    •     MRP group
    The MRP group combines materials from the point of view of material requirements planning. This enables you to control planning for these materials in a particular way using, for example, the strategy group, consumption mode and planning period. You enter the MRP group in the material master in the MRP 1 screen. The strategy group is determined from the MRP group.
    •     Planning Strategy
    The planning strategy specifies the requirements type for planning and customer requirements. This represents the decisive control feature for the interaction between Production Planning and Sales and Distribution.
    •     MRP type and item category
    If no requirements type is found using the planning strategy, the system tries to determine a corresponding requirements type on the basis of the MRP type and the item category.
    Until 3.0C, determination of the requirements type via planning strategy has taken priority. This is not always the best option, however, as the following example will show. A requirements type is determined for a material, which causes availability to be checked against planning. In consignment stock processing, however, availability should be checked against stock. Until 3.0C the availability check had to be deactivated in these cases. As of Release 3.0C, you can determine how the requirements type is to be determined for each transaction by maintaining the Source field in Determination of requirement types using transaction in Customizing.
    •     Requirements type
    The various requirements are identified by their requirements type. The requirements type refers to the requirements class and its control features.
    •     Requirements Class
    The requirements class contains all control features for planning such as relevance for planning, requirements planning strategy and requirements consumption strategy. In addition, it is specified at a global level whether an availability check is to take place for the material in the sales and distribution documents on the basis of the ATP quantity (ATP = available to promise) and whether requirements are to be passed on. A finer degree of control can be obtained for sales documents using the schedule line category.
    Control Features Specific to Sales and Distribution
    The following SD-specific control features need to be maintained in Customizing:
    •     Checking group
    The checking group controls whether the system is to create indivdual or collective requirements in sales and shipping processing. In addition, a material block for the availability check with transfer of requirements can be set here. The checking group can also be used to deactivate the availability check. This option was created especially for the assembly order so that when the bill of material is exploded in the assembly order, the individual components, if necessary, can be classified as non-critical parts as far as procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the availability check. It is proposed in the material master record on the basis of the material type and the plant, and copied into the sales and distribution documents.
    •     Checking Rule
    You use the checking rule to control the scope of the availability check for each transaction in sales and distribution. You also specify whether the check should be carried out including or excluding replenishment lead time. The individual checking rules define by transaction, which stock and inward and outward movement of goods should be taken into account for the availability check.
    •     Schedule line category
    You can control with the schedule line category whether an availability check and transfer of requirements should be carried out in the sales documents. The possible settings for this at schedule line level are dependent on the settings in the requirements class which is determined from the requirements type of the material.
    •     Delivery item category
    The delivery item category can be used to control whether an availability check takes place in deliveries.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    •     The control elements described above for the availability check must be maintained in Customizing for Sales and the relevant assignments made to the sales transactions
    •     The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    •     A requirements type must exist by which the requirements class can be found
    •     A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    •     A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Timing of the Availability Check in Sales and Distribution Processing 
    When you create an order, the system determines the required materail availability date on the basis of the customer’s requested delivery date. On this date, you must begin picking, packing, labeling, and loading the goods. Therefore, this is the date of significance for requirements planning on which the availability should be checked.
    The following data is required for determining this date:
    •     Route from the shipping point to the ship-to party location
    •     Shipping point from which the goods are issued
    •     Loading group from the material master record
    •     Weight group determined from the order using the order quantity
    Scheduling
    This data, which you have already entered in the system, means that scheduling can occur automatically. Since scheduling is carried out backwards from the requested delivery date, it is also called backward scheduling. If backward scheduling determines that the preparation for the shipping activities should have been started already to meet the customer's requested delivery date, the system then starts forward scheduling automatically from the current date.
    Scope of the Availability Check in Sales and Distribution Processing 
    The following elements can be included in the availability check:
    •     Stock
    o     safety stock
    o     stock in transfer
    o     quality inspection
    o     blocked stock
    •     Inward/Outward movement of goods
    o     purchase orders
    o     purchase requisitions
    o     planned orders
    o     production orders
    o     reservations
    o     dependent reservations
    o     dependent requirements
    o     sales requirements
    o     delivery requirements
    Requirements in sales and distribution (sales requirements and delivery requirements) result from all transactions which forward a requirement to Materials Management (MM) or to Production Planning (PP). For example, this could include sales orders or deliveries and quotations as well. Sales and distribution requirements reduce existing stock or inward movements of stock on the material availability date to ensure that other outward movement of stock elements cannot access the quantity reserved in this way.
    Requirements relevant for Sales and distribution are created in Sales and Distribution, whereas other elements in this list are created in Materials Management or in Production Planning.
    Defining the Elements to be Included in Check
    A checking rule is assigned to each transaction. This rule in combination with the checking group controls the scope of the availability check. You can use the checking rules in Customizing for Sales to specify for the various transactions which of the elements listed above should be included in the availability check.
    For trading goods it does not make sense to include planned or production orders, for example, in the availability check. However, for products manufactured by your company these orders should be included in the check.
    For transactions such as make-to-order production, consignment or returnable packaging processing that create special stock, the availability check is performed against special stock.
    If it is defined by the checking rules that both sales and delivery requirements are taken into account in the availability check in sales documents but only delivery requirements are taken into account in the availability check in deliveries, there is a danger that quantities reserved in the sales documents are considered to be available by the availability check in the deliveries. This can lead to sales documents becoming backlogged.
    Reactions to the Availability Check in Sales Documents 
    If the goods ordered by the customer are not available on the requested date, the system branches automatically during sales document processing to a further screen where delivery proposals are offered for selection. The system determines these proposals on the basis of the availability situation. This screen also provides you with information on the scope of the check, the current ATP quantity, and the availability situation across all plants.
    Availability Control
    On the Availability Control screen, you can choose between the following delivery proposals:
    •     One-time delivery on the requested delivery date
    In this section, the system checks whether the requested delivery date can be kept to. If stock of the material is available to make a delivery on the requested delivery date, the stock quantity is confirmed here. If there is no stock available, confirmed quantity zero is displayed.
    To copy this data into the sales document, select Edit One-time delivery.
    •     Complete delivery
    In this section, the system checks whether there will be sufficient stock for complete delivery at a later date:
    o     If there is sufficient stock available at a later date to cover the required quantity in the sales document, the system proposes the date here.
    o     If the system determines that complete delivery cannot be made at a later date, no date is proposed in this section.
    When availability is checked including replenishment lead time, the date which is proposed in this section is the date on which the replenishment lead time period ends if the stock before the end of replenishment lead time does not cover the order quantity.
    When availability is checked excluding replenishment lead time, the system bases its calculations on the stock and the planned inward movements of stock.
    To copy this data into the sales document, select Edit Complete delivery
    •     Delivery proposal
    In this section, the system checks whether and for which dates partial deliveries can be made. Partial deliveries are displayed for different dates. These dates are based on the planned inward and outward movements of stock.
    During an availability check which takes replenishment lead time into account, the date on which replenishment lead time ends is displayed if insufficient stock means that no partial deliveries can be made before replenishment lead time ends.
    During an availability check which does not take replenishment lead time into account, the system displays the dates on which partial deliveries can be made with the available stock.
    To copy this proposal into the sales document, select Edit Delivery proposal
    The dates displayed in the sections complete delivery and delivery proposal are determined from the material availability date using forward scheduling and represent actual delivery dates.
    Availability Across Plants
    You can display the availability situation in the various plants for which a material is maintained. To do this, proceed as follows:
    1.     Select Goto Other plants on the availability control screen.
    The dialog box Plant Selection appears. All plants for which the material is maintained are displayed.
    2.     Mark the plants in which you want to check availability and select Check plants.
    You reach the Availability Check: Overview screen. The requirements quantity and the quantity which could be confirmed as well as some additional information is displayed in a separate line for each plant you selected.
    3.     If you require detailed information on the availability check for a particular line, select the relevant line and select Edit Check availability.
    You reach the Date proposals dialog box where the detailed data is displayed.
    4.     You can select a plant with sufficient quantity for confirmation to be copied automatically into the Overview screen. Select the appropriate line and select Edit Copy plant.
    Using the user exit USEREXIT_PLANT_SELECTION in the Include LV03VFZZ you can make a preselection of the allowed plants. If you use this option, the Plant selection dialog box does not appear and the availability check is performed immediately for the allowed plants. If, on the basis of information resulting from the availability check, you want to deliver from a plant other than the one specified in the item, you must at present enter this plant manually in the item. In a later release, however, you will be able to select the plant directly from the list of plants.
    Displaying the ATP Quantities
    If you want to display the current ATP situation on the availability control screen, select Goto Availability overview.
    Displaying the Scope of the Check
    If you want to display the scope of the check (stock and inward/outward movements of goods taken into account during the availability check) from the availability control screen, select Goto Scope of check.
    Delivery Agreements in the Customer Master Record
    A customer may react in different ways to the fact that a complete delivery can not be provided for the required delivery date. You can define in the customer master record, the way a customer reacts to the inability to meet the requirements represented by the key data.
    •     The customer wants complete delivery of all items by the requested delivery date or at a later date.
    The complete delivery indicator is copied into the sales document from the customer master record. To find it, select Header Business data on an overview screen or a header screen. You find the indicator in the Shipping section.
    If the complete delivery indicator is set in the sales document, the individual items are automatically correlated when the document is saved if the schedule lines exist for various dates (that is, a delivery group is automatically created for the sales document items and the latest delivery date within this group becomes the group delivery date). For further information on delivery groups, see  Combining Sales Document Items for Delivery.
    •     The customer only allows a certain number of partial deliveries for each item.
    The partial delivery indicator and the number of partial deliveries are copied into the sales document item from the customer master record. To find the indicators:
    1.     Go to the Business Data screen for this item.
    2.     Select Edit Shipping details.
    The indicators are found in the Shipping section.
    Performing the Availability Check Again
    Usually, an availability check is only performed when a sales document is created. If quantities or dates are changed in the document and availability needs to be checked again, the check is performed again automatically . However, you can also initiate an availability check manually.
    Automatic Checks
    In the following situations, a new availability check is automatically carried out:
    •     Quantity change
    •     Date change (requested delivery date, material availability date)
    •     Change to the fixed data
    •     After new delivery scheduling (for example, the route or shipping point has been changed)
    •     Change of plant
    •     Change of storage location or batch
    •     Removal of blocks which affect requirements
    •     Removal of reasons for rejection
    Initiating a Check Manually
    In the sales document, you can initiate a new availability check manually. If you want to perform an availability check for all items in a sales document, select Sales document Check availability on the header screen. If you want to check availability for an individual item, select Edit Item availability.
    Fixing Quantities and Dates in Sales Documents 
    If the availability check for an item determines that the item cannot be delivered fully on the requested delivery date, and, as a result one or more schedule lines have to be created for later delivery dates, the customer can decide whether to accept these delivery dates and quantities.
    You can record the customer's decision either by setting an indicator in the Fixed date and qty field or by leaving this field blank. The field is displayed both on the schedule line overview screen and on the availability screen.
    Customer Accepts the Schedule Line Proposal
    If the customer accepts the schedule lines which are proposed by the system, mark the Fixed date and qty field. The system then transfers the requirements for the schedule lines to material requirements planning.
    Customer Requires Goods Earlier
    If the customer requires the goods earlier than the date that the system can confirm after the availability check, leave the Fixed date and qty field blank. The system then only passes on the requirements for the requested delivery date and does not take the quantities and dates confirmed by the system after the availability check into account. In this case, it is assumed that the requested delivery date can be kept to because, for example, additional production capacity may become free. The system only confirms the sales order once the entire order quantity can be delivered on the requested delivery date. In the subsequent delivery processing, the sales order is only considered to be completed when the entire order quantity has been delivered or when all partial delivery agreements have been fulfilled.
    A fixed item is considered to be completed once the entire confirmed quantity (which can be smaller than the originally requested order quantity)has been delivered. Therefore, it does not make sense to fix the confirmed quantity to 0 as the item is considered to be completed from the start.
    During rescheduling, the fixed quantities and dates are no longer taken into account.
    Blocking Confirmation of Quantities in Sales Documents 
    In Customizing, using Block transfer of requirements by delivery block, you can specify that certain delivery blocks in the sales document header also block the confirmation of order quantities.
    If you enter such a delivery block in a sales order header, the system confirms the available quantity to show you the delivery options. If you save the document, however, the confirmed quantities are not saved. Your company could block confirmation for a customer if this customer's credit worthiness was questionable. The sales order in this case is not only classed as unconfirmed, it is also blocked for delivery.
    Thus, no stock is reserved. The stock is still available for other customers. Although the order quantities are not confirmed, the system still transfers the requirements to material requirements planning. It is assumed that the delivery block will be removed at some point. The automatic transfer of requirements means that the order quantity can be confirmed at a later point in time
    Source: SAP Library
    Hope this is of some help.

  • How to exclude stock in transit from availability check?

    Hello,
    When we run availability checks, we would like to exclude stock in transit.
    How can this be done?
    Thx.
    Andy

    Hi,
    Exclude the stock in transfer from availability check in tcode opjj.
    Regards,
    nandha

  • Subcontracting availibility check on make to order stock

    Dear All,
    I have a material let's say  'X' which with a BOM/routing which includes a subcontracting step of material "Y" which is a also a make to stock item. When I create a sales order for material X and run a Plannings run I first produce material Y. Because it's a make to order item the stock it will be customer specific stock. The next step is to send material Y away to the subcontrator, in order to complete material X. However when a create a subcontracting PO and wants to delivery it via transaction ME2O I get the error message that there is no stock available. The reason for this is that teh availibilty check doesn't check the Make to order stock quantities.
    I have treid several option but i am Not able to let sap to check the make to order stock when creating a subcontracting delivery. What I am missing or is this not supported by standard SAP?
    Thanks in advance.

    Dear All,
    Thanks for your replies but it doesn't solve my problem because when creating a delivery SAP still uses the normal availability check (B) and not the client specific availability check (BE).
    Just for the clarification the underlying material is a client specific item (with special stock indicator E) that needs to be send to the subcontractor. However the administrative stock of this material is stored as client specific and won't be picked up when we make a subcontracting delivery because the standard process use availability check B instead of BE.
    Like I mentioned maybe it is not foreseen in the standard functionality.

  • Material availability check not consider the MMBE stock correctly

    Dear Experts,
    Thanks for your continuous support.
    I have one clarification ,at the time of process order raised COR1 - Click Material availability check after that massage had come in all material check available , but system wise some of the Bill of materials having not stock in MMBE ? What is the reason for the issue, with out stock material also given the status ok in ATP.
    At the time of confirmation i have put some loss qty , where is the way of display in loss qty after that confirmation.
    I need the report for one month process order confirmation list with order qty, confirm qty, delivered qty, &Loss qty ? Loss qty details only i am seeing kindly give the guidance if any t.code for display loss qty against the process order.
    Thanks,
    N.Umapathy

    Hi N.Umapathy,
    "Click Material availability check after that massage had come in all material check available , but system wise some of the Bill of materials having not stock in MMBE ? What is the reason for the issue, with out stock material also given the status ok in ATP."
    There can be an available quantity even if there is no stock in MMBE for that material.
    A simple example:
    Production order created with component X.
    Component X has a required quantity of 100.
    There is no stock in MMBE for material X.
    However, there is a planned receipt of stock (maybe in the form of a purchase document for example) of 100.
    In this case, it is possible that the availability check will confirm 100 is available even if it is not in MMBE.
    Another contributor on here, Jürgen L has written a very good blog on this here:
    Unrestricted use stock not equal to available stock
    Hope this helps.

  • ATP qty to include stock in transit

    Hi,
    How can we set-up that we include the stock-in-transit (transfers via STO - in transit) to be included in the availability check or ATP quantity? 
    Help.

    Hi,
    If u want to consider the stock in transits. in OVZ9 to be checked.
    the purpose of the indicator is whether during an availability check, the system takes into
    account any stock that is being transferred into the plant.
    Regards,
    Sasikanth.Ch

  • Stock in transit problem (351 Movement type)

     

    In standard system you have two options concerning stock transfer:
    - one step process
    - two step process
    Concerning mvt 351 scenario you can use only the two step process - please see SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/52/38f741a47dc517e10000000a155106/frameset.htm
    Standard SAP concept is that when posting GI the ownership of the stock changes. Of course in real life it is not (always) true because the ownership change of the goods doesn't depend (generally) on the fact the goods leave the WH or not. Ownership change is controlled by the agreement of the parties (contract, incoterms) - but sorrowfully SAP cannot manage this (maybe it would be very difficult to solve each and every case in ERP system).
    So, please check the link and choose a solution that suits your business requirement, else you have to choose a workaround or go to development.
    (E.g. you can define a "stock in transit" storage location for the supplying plant --> first you move the goods into this stock in transit storage location and when the goods arrive at receiving plant you can post them to receivng's plant storage location. Dummy solution...)
    Regards,
    Csaba

  • Availability check for sales order stock

    Hi,
    We use sales order stock in sales order which creates purchase requisition automatically.Movement types for GR 101E, for GI 601E. Material master data has on MRP2 view as GR processing time 2 days for example. I create sales order with requested delivery date today.After saving SO, PR is created and I create PO with delivery date today and post goods receipt document for today. System gives as confirmation date today + 2 days. although the material is in stock.
    We use also project stock in sales order which creates purchase requisition automatically.Movement types for GR 101Q, for GI 601Q.I run the same scenario for the same material. As soon as I create the purchase order system confirms the open quantity in sales order for today. (Scope of availability check is the same for both sales orders and includes PO)
    What can be the reason?
    Thanks

    Hi Murat,
    i guess the problem is with the 'Check without RLT' indicator' in Availability check control. For the MTO (checking rule AE) i guess this indicator is not set but for the Project systems (Checking rule PS) this indicator is set. This makes the difference. Do the changes as desired in transaction OVZ9.
    Please check and revert back if you are still facing the same problem.
    regards,
    Kathir

  • VL10A - Stock on hand Availability Check before creation of delivery

    Hi,
    I'm trying to figure out how to control the creation of delivery via VL10A to first check for actual receipted stock before allowing the delivery to be created.
    eg. Material X has inbound delivery date 01.07.2011.  Sales Order has delivery date of 01.07.2011, thus schedule line has confirmed date of 01.07.2011.
    On 01.07.2011, inbound delivery has not yet been GR'd into stock, VL10A runs with current date set and outbound delivery is created for Sales Order, despite the stock not being available to deliver.
    Where does this check (for available stock on hand) need to be performed?
    Is there a setting in the input parameters in VL10A? If so which specific parameter on what tab controls this?
    If not, does this need to be handled in the Availability Check & Transfer of Requirements configuration of the sales order, so that the schedule line is not confirmed until the goods are in stock?  If so, what specific config is required to achieve this.
    During my research I have found responses indicative of both areas however no specific examples are available. Thanks for your help
    Jodes

    Hi
    Please check OVZ9 . In availability check control you can control the in/outward movements.
    Hope it helps
    Karthik

  • Consingement Stock during the availibility check

    Dear All ,
    During the availibility check I want to consider  the customer consingment  .
    E.G   if the plant level stock is 300 and customer consingement  stock is 30  then the ATP quantity should be 330 wen i am performing the Availibility check ...
    Pls help me in this regard
    Thanks in advance
    Regards
    Satish

    hi,
    you cannot take into consideration the stock available at consignee for availability check. the consignment stock is treated as special stock unlike unrestricted.
    For transactions such as make-to-order production, consignment or returnable packaging processing that create special stock, the availability check is performed against special stock.
    The following elements can be included in the availability check:
    Stock
    safety stock
    stock in transfer
    quality inspection
    blocked stock
    regards
    sadhu kishore

  • How can a qm-lot be excluded from availability check?

    Hi experts,
    in oppj I can exclude "stock in quality inspection" from availability check, but the qm lots are still handled as fixed receipts. This is ok, because the qm lots are not a stock. But the availability check shows available quantity and this is, what I don't want!
    The question is: "How can qm-lots be excluded from availability check?"
    Thanks for your help!
    SAP Anwender

    Dear,
    when you talk about QM lot,
    QM lot is created during PO GR or Production order GR. Hence before the GR, MRP showes a recipt is expected and recipt element is either production order or PO.
    Now even after GR, system removes the PO/Production order and increase the stock.
    Hence in availability check if you decativate QM stock, this stock will not be considered, if to be con sidered, then active the QM stock.
    Pl come back if required

  • Availability check - sales order

    Hi experts,                              
    I've gone through the relevant info, but still hit the issue below. Pls help. Thx.                                                       
    Issue: How to include the created order (not delivered ) when running availability check?                                                       
    Example:                              
    Stock (storage location C) - 1pc                              
    sales order A - 1pc (confirmed in schedule line)                         
    sales order B - 2pcs (1pc confirmed, 1pc unconfirmed)                                                       
    Those two orders are created agaisnt storage location C. No other stocks against storage location C are available, such as on-order stock.                              
    In my understanding, order B cannot be confirmed as order A has been created firstly.                                    
    Background: As the customer just sells the purchased product, he places PO firstly, then sales order following. Thus, he requests new sales order creation to be based on the stock qty, created sales order qty, PO qty to be received & delivered sales order qty.                                                       
    For this sales scenario, availability check with ATP is activated, but not against product allocation. And the check boxes "incl.purchase orders", "include sales reqmts", "include deliveries" are checked in OVZ9 only.                              
    ps. "Check sales requirements" has been checked in Availability check control while "No storage location inspection" has not been checked.

    Dear Cathy
    Can you please reconfirm that the combination of availability check and checking rule in OVZ9 in which, you have selected the box "Include sales reqmts"  is the same value what you have maintained in material master MRP3 view for availability check ??
    If the availability check is same in both the cases, then try to create a fresh order and post the outcome.
    thanks
    G. Lakshmipathi

  • Availability check in the background

    Hi,
    Please can anybody advise whether there are any standard reports/transactions whereby the availability check for sales documents (including scheduling agreements) can be ran in the background? i.e. is there any way to do a mass availability check
    The requirement is to re-run the availability check and confirm the proposed quantities in the background without having to enter each sales order and manually re-run the availability check.
    Example - order is received for 100 however 0 is confirmed for the requested date due to the availability check, the 100 is confirmed on later scheduline line once the stock has become available. Stock of 50 then comes available and we would like to confirm the 50 for the required date and the remaining 50 for when stock will be available. How to do this without entering the sales document item and manually running ATP.
    I have tried using V_V2 rescheduling report however it cannot be restricted by sales document number and does not give us the required proposals.
    Many Thanks

    Hi Tubby ,
    i am looking at this one
    Indicator 'Unconfirmed documents required'; Rescheduling
    The option 'unconfirmed documents required', which is preset, only carries out rescheduling for materials for which at least one unconfirmed transaction already exists.
    If rescheduling should also be carried out for materials, for which all transactions are confirmed, deselect the indicator. However, you should note that if you make this selection the quantity of data to be processed will increase.
    regards
    Prabhu

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH