We have a one to one ratio of component (B) to Finished Goods (A)  ratio for our BOM quantity.  PO is for 15 ea of  Material A. 
There is only 12 ea of Material B at the vendor.  System allows me to Post Goods Receipt all 15 Material A without any error message. 
Is there any availability check of subcontract components during GR?  I was hoping the system would suggest that I only need to receive 12 ea.
Thanks.

Hi,
As you have told that there is one to one ratio b/w component (B) and FG (A). It means if you create a PO for 15 qty of A then system will automatically copy 15 qty of B in "Components" tab of PO from BOM.
And you will transfer 15 qty of B to Subcontractor. (MB1B - 541 mvmt)
So at the time of GR, system will propose 15 qty of A as well as B.
But, if you will change the qty of A or B after clciking on "BOM Explostion" button then it will allow to change you the qty of A and B and will not give you any message since it is the facility provided by SAP. In case if your FG got manufactured in less qty then you have that faclility to change the qty of components in MIGO.
If you want system to change the component (B) qty on the basis of receipt qty of FG (A)as per the BOM then first change Qty. in Unit of Entry for FG (A) at "Item Details" level and then click on "Explode BOM" button at "Item Overview" level. It will propose qty of B as per BOM.

Similar Messages

  • Mass availability check in subcontracting PO's

    Hi,
    is there a way to mass availability check in subcontracting PO's?
    Thanks,
    Sebastian

    Hi,
    ME2O just compares subcontractors stock and it's demand, not carin about dates.
    But I need a full availability check based on my checking rules.
    I have this feature in a particular PO, but our byers need a tool to check multiple PO's at one time.
    Regards

  • Component Availability Check for Subcontracting PO

    Hi,
    Is their any Setting to check the component availability and reservation of component material in stock after creating Subcontracting Purchase Order, As that is available in case of production order.
    Regards
    Siddharth

    Dear Mr. R Brahmankar
    This what we are doing in the current mapping, but the problem we are facing is that this activity is done by 2 different departments. Subcon PO is created by one department and Component material is sent to vendor by another department.
    So while I am creating PO I will check that all the components are avaibale by seeing it in MMBE or in MB52, If stock is available(or will be available in 1-2 days, as In-house produciton of components is there)  I create the  PO. But the transfer of stock to vendor might take a gap of 3-5 days after creating the PO. So after 5 days stock is might not available or available in shortage(as it is consume by Inhouse Producion or by some other PO).
    Can any soluiton is there to this problem ?
    Regards
    Siddhath

  • Avail. check in subcontracting orders

    Hi guys,
    I have recently faced an issue that must be a well-known problem. Unless I am doing something wrong.
    When you place a subcontracting PO, its components are reserved in stock. The problem is that the availability check is not started automatically when the order is placed, but must be explicitly triggered by the user on the component screen.
    This creates two problems:
    - There's no warning about unavailability of components
    - The reservations are not confirmed (committed), which means that the other orders (prod. orders, sales orders) competing on the same stock don't see them and reserve the stock for themselves.
    I wonder if there's a way in standard SAP (either customising or a user exit) to force availability check of the components.
    TIA
    Raf

    Hi,
    Thanks for the input. I have found the answer - it is impossible.
    If you like, check the OSS note 323991 why.
    In short, SAP doesn't want to reserve the stock and doesn't recommend doing this manually since the following stock movement (541) doesn't consume this reservation, as this is the case in e.g. SD and PP. The functionality is simply not there.
    For our purposes however, it is enough to cancel the reservation when the the subcontracting PO is recieved and closed (thus effectively cancelling the reservation). But SAP doesn't have provision for this case. We will have to continue running the avail. check manually...
    BR
    Raf

  • *Availability check for Subcontracting*

    Dear All,
    I am using subcontracting Scenario for semifinished product. For this i am making purchase order for this material But How to check availability of Bom component which is used in P.O. for subcontractor. Because it very hectic to check every material for bom in MMBE. If any solution pls revert back with Proper Solution. Thanks in advance.
    Regards
    Atul

    Dear ZOD,
    You can check the availability of BOM Material through the Pur.Order.
    Just do the following steps-:.
    Open pur.order - Item details (at bottom) -click on material data Tab page,select Component,next screen select the row & click F2,at bottom of that screen there is one button for Availability check click on that,at next click on ATP Availability & then overview stock.
    You will find out the result what you want.
    Hope it will clear you.
    Regards,
    Mukesh

  • Availability check in subcontracting P.O

    Hi Experts,
    I have a scenerio, Finished material - A, component - B & C. two Boms for fini material A. Bom 1 with component B and Bom2 with component C.
    When creating purchase order system should check the availability of Bom 1, if stock is available system picks the Bom 1 otherwise system should pick Bom2.
    Regards
    Senthil

    HI,
    Select the sub material line item in the screen,then click on the lens on the left hand side then click on check availabilty icon.The system will give input whether material is available.
    Edited by: Murugan mgl on Aug 10, 2009 12:53 PM

  • Subcontracting availibility check on make to order stock

    Dear All,
    I have a material let's say  'X' which with a BOM/routing which includes a subcontracting step of material "Y" which is a also a make to stock item. When I create a sales order for material X and run a Plannings run I first produce material Y. Because it's a make to order item the stock it will be customer specific stock. The next step is to send material Y away to the subcontrator, in order to complete material X. However when a create a subcontracting PO and wants to delivery it via transaction ME2O I get the error message that there is no stock available. The reason for this is that teh availibilty check doesn't check the Make to order stock quantities.
    I have treid several option but i am Not able to let sap to check the make to order stock when creating a subcontracting delivery. What I am missing or is this not supported by standard SAP?
    Thanks in advance.

    Dear All,
    Thanks for your replies but it doesn't solve my problem because when creating a delivery SAP still uses the normal availability check (B) and not the client specific availability check (BE).
    Just for the clarification the underlying material is a client specific item (with special stock indicator E) that needs to be send to the subcontractor. However the administrative stock of this material is stored as client specific and won't be picked up when we make a subcontracting delivery because the standard process use availability check B instead of BE.
    Like I mentioned maybe it is not foreseen in the standard functionality.

  • Component availability check problem

    Hi,
    I created a production order. It is having two components and these component having zero stock....when I check the material availability check system is showing message as all materials are available....now I went to materials list in the order and selected one component then clicked on  material availability then I am getting below message....
    i checked for the component material in material master in MRP 2 view for any special procurement is defined there nothing is defined and procurement type is F..then why the below problem is coming..can somebody help....
    Thanks
    Kumar

    Hi Srinivas,
    Thanks for your reply......I checked in BOM component details...no special procurement key is maintained....in OPPQ Direct procurement is maintained as follows....
    If this setting is the problem can u guide me what changes I need to do....
    Thanks
    Kumar

  • How to get committed date for each component after availability check

    Hi,
    When I use CO02 to check material availability, I can see committed date in missing part list and missing part overview for each component in production order. I save it and use CO03 to read missing part list again. The committed date is blank?! How to get the committed date for each missing part in production order?
    Another question, committed date can be displayed in CO24(missing parts info system)? Thanks in advance!!

    Rita,
    Please check that the PP avail. check has replensh lead time turned on. If RLT is turned off & there is no sufficient stock of material, then system can only committ date of 12/31/9999.
    Once you turn on RLT, it will give you some date based on your configured avail check ( that looks at stock or purchase order or production order). That way if there is no sufficient stock of material to satisfy your order system will committ the worst case date which is the RLT.
    On CO24 unfortunately there is no field for Committ date. Hence is it not possible to view commit date. You can only view Committ quantity.
    i am sure this will help you. Else please come back.
    thanks,
    Ram

  • PM order - Collective component availibility check

    Hello,
    Looking for a transaction code which would allows me to conduct collective component availibility check for PM order. Similar to COMAC for PP orders.
    Any hints?
    Thanks.
    Christian

    Christian,
    Here's some useful info: Collective Material Availability Check for PM
    PeteA

  • Availability Check required without "Safety Stock"

    Hi,
    I have a fert material "FG' whose prodn order i am creating.
    This FG has a child Component "RM"
    Available Stock for RM = 20
    Safety Stock for RM =     20
    No Receipts / No Reservations exists for RM.
    I want the production order not to consider SAFETY STOCK. Hence in OPJJ i removed the Tick "Include Safety Stock".
    When i create production order, as per the above setting, it should show " Material Avaliable", but instead it is showing Material Shortage.
    Plz guide.
    Thanks in advance,
    Harris

    Hi,
    Here is my Availability settings.
    Availability Check = Z2
    Stocks     
    Include Safety Stock     
    Stockin Transfer     X
    Incl. Quality Stock     X
    Incl. Blocked Stock     
    Incl. Restricted - Use Stock     
    W/o Subcontracting     
    Replineshment Lead Time     
    Check without RLT     X
    Storage Location Insp.     
    No stor. Locn inspecn.     
    Missing parts processing     
    Checking period: GR     0
    Receipts in past     
    In/Outward Movements     
    Incl. purchase orders     
    Incl. purchase req.     
    Incl. dep. Reqt.     X
    Incl. reservations     X
    Incl. sales reqt     X
    Incl. deliveries     X
    Incl shipping notifcn     
    Incl depe. Reservations     X
    Incl. rel. ord reqs     
    Incl. Planned orders     
    Incl. Production orders     
    This Availability, Z2 is maintained in MRP3 view also.
    Regards,
    Harris
    Edited by: Harris Panchal on Nov 17, 2010 2:27 PM

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Availability check Problem in sales order according MRP sterategy

    hi,
    We are using strategy 56 for configurable final product and strategy 65
    for its variants.Requirement type is "ELV V". According this requirement type,
    it is not possible to confirm availability check and then deliver the
    sales order. We tried to mark availability check for requirement type ELV V in OVZG Tcode, but the
    following error came up: "Check against plan material can only be carried
    out w/o avail.check". Is there any setting to handle this problem to work
    with strategies 56 and 65? Is it some configuration that we forgot?
    Thanks,

    Yes, We have maintained planned del. time. and other fields also,
    My problem is that, To make assembly of material A we have two component material B and C.
    in the sales order of material A, system should check availability of component material B and C.
    please help
    vikas

  • Availability check problem in sales order

    Hi All,
    We have one material which is assembled by using two components (BOM).
    During avaiability check in sales order system should check components stock available in Stores.
    · If there is sufficient stock of the component materials is available, the availability check should report a fixed number of days to make assembly,
    · If there is insufficient stock of the component materials,  the availability check should report the longest lead time for the material which is short + fixed number of days to assembly.
    Please help
    Vikas

    Yes, We have maintained planned del. time. and other fields also,
    My problem is that, To make assembly of material A we have two component material B and C.
    in the sales order of material A, system should check availability of component material B and C.
    please help
    vikas

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH