PM order - Collective component availibility check

Hello,
Looking for a transaction code which would allows me to conduct collective component availibility check for PM order. Similar to COMAC for PP orders.
Any hints?
Thanks.
Christian

Christian,
Here's some useful info: Collective Material Availability Check for PM
PeteA

Similar Messages

  • Production order release Material Availability check

    Gurus,
    I have a production problem where the order can be released when the component for the order is in a restricted status.  This is not allowed by the batch search strategy.
    <u>Here's Problem Description:</u>
    When running on version 4.6C, I have a work order created. I release the work order successfully.  However there is a component that has an invalid material/batch according to the batch search strategy  The material availability check shows all components available. 
    However, I remove the batch and the batch can not be entered because it is not correct according to the batch search strategy.  I try and release and the material is added to the missing parts list.
    I change the component so that it can be used.  
    Put the batch number back in the order. 
    Save the order.  
    Change the component material/batch so that it is no longer valid.  
    The order will release and it shouldn't because the material/batch is not valid.
    <u>I've looked at the following transactions and master data:</u>
    OPL8 - Order Type - Dependent Parameters Overview for my plant and order type and the check batch box is checked.
    MM03 - Material Master MRP 2 view for the component to get the availability check
    OVZ2 - Availability check control
    OPJK - Order Control to get the checking rule for order release
    OPJJ - Availability check control details with availability check and the checking rule for order release - I did not see anything here that would influence the checking based on if the batch was entered or not.
    I did double check the batch search strategy for production order - COB3. Everything looks OK there.
    Does anyone have any other places to check? I must be missing something. I tried OSS - there weren't any notes that I could find.
    Thank you!
    Michelle

    Hi,
    Check in order control opjk for order type pp01
    Batch assignment /release material
    Release despite missing batches
    no release if batches are missing
    Regards,
    nandha

  • Component Availability Check for Subcontracting PO

    Hi,
    Is their any Setting to check the component availability and reservation of component material in stock after creating Subcontracting Purchase Order, As that is available in case of production order.
    Regards
    Siddharth

    Dear Mr. R Brahmankar
    This what we are doing in the current mapping, but the problem we are facing is that this activity is done by 2 different departments. Subcon PO is created by one department and Component material is sent to vendor by another department.
    So while I am creating PO I will check that all the components are avaibale by seeing it in MMBE or in MB52, If stock is available(or will be available in 1-2 days, as In-house produciton of components is there)  I create the  PO. But the transfer of stock to vendor might take a gap of 3-5 days after creating the PO. So after 5 days stock is might not available or available in shortage(as it is consume by Inhouse Producion or by some other PO).
    Can any soluiton is there to this problem ?
    Regards
    Siddhath

  • Component availability check problem

    Hi,
    I created a production order. It is having two components and these component having zero stock....when I check the material availability check system is showing message as all materials are available....now I went to materials list in the order and selected one component then clicked on  material availability then I am getting below message....
    i checked for the component material in material master in MRP 2 view for any special procurement is defined there nothing is defined and procurement type is F..then why the below problem is coming..can somebody help....
    Thanks
    Kumar

    Hi Srinivas,
    Thanks for your reply......I checked in BOM component details...no special procurement key is maintained....in OPPQ Direct procurement is maintained as follows....
    If this setting is the problem can u guide me what changes I need to do....
    Thanks
    Kumar

  • Component Availability check during MRP Heuristics

    Hi Experts,
    I am running MRP heurstics to create plannerdorders, during this time i would like to check component availability (planned order/production orders, stock etc).
    I don't want to create planned order if component is not available. I don't want to create new PR/Planned order for component.
    Component is produced in the same plant.
    Regards,
    Vipul

    Hi Vipul,
    Have  you tried in PPDS, single-level MRP heuristic SAP_MRP_001 ?
    This will run only at single level and not run heuristics for the components.
    Regards
    Data

  • MDVP - Plan order (NB type) Availability check problem

    Hello GUru's,
    I received one issue, the transaction MDVP does not select the plan orders for Availability check.
    DUring my analysis I found that, materials have procurement type is "F". Plan orders are generated by system,
    It has order type "NB" (generally our plan order type is LA - stock order).
    When user check the plan orders (NB type) in the transaction code MDVP or COMAC, system shows the message
    no plan order is available in the system but I checked in the MD12, plan order is available.
    What could be the reason, system is showing like this message and not selecting the plan order for coll. Avl check.?
    Procurement type is F and plan order type is NB this is the reason?
    Kindly help me.
    Thanks in advance.

    Dear,
    Yes collective availability check has only been implemented for in-house production only.
    Order type NB with F will be for the subcontracting. Also the collective availability check (Transaction CO28, MDVM) takes no subcontract orders or subcontracting purchase requisitions into account.
    If you want planned orders with special procurement subcontracting into account during the collective availability check then you need to activate the modification, set the variable MOD_SUBCON to 'X' in the include PPIOHF02 after the implementation.
    For more details refer the OSS  Note 198398 - Collect. availability check w/o subcontracting planned ords.
    Regards,
    R.Brahmankar

  • [PM] - Work order (shifted) capacity availability check

    Hi all,
    I've created a shifted capacity work center (1 person) and attributed to it a planning intervals:
    As you see, this person is available during the first shift on Sunday (07.08.2014)
    I've tried to see if SAP will check the availability of this work center in the IW31 menu by planifying a WO in a non availability time of this work center (interval 4PM - 8PM)
    But SAP mention that capacities are available
    Could SAP check the availablity of persons
    (sorry for my English)

    Hi Anand,
    That's why I'm talking about finite scheduling, the example that I've put in the start of this topic shows that:
    - The technician is available by default from 3PM to 11PM (capacity)
    - Specially, on the 07.09.14 (the last day of the inteval), the technician was declared available from 7AM to 3PM
    In the work order, i've requested a job from 4PM to 8PM (normally the technician will not be available in this interval)
    But as an output, SAP shows that the capacities are available (in this case, SAP refers to the default capacity and not the special interval..)
    So i wonder to know how SAP could deep analyse the availability interval of every capacity (taking on consideration intervals)
    @Kaushik: The 3rd screen capture shows "person responsible" that is different from the work center (MT-MED)..
    Waiting for your reply guys !
    Regards

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Availability Check in planned order

    Hi Everyone,
    What is differecnce between MDVP  collective ATP check and MD12 ATP.
    I am getting different result for the same planned order.
    could you plase tell me why this so.
    Thanks
    Siddhesh

    HI R.Brahmankar,
    Thanks for your quick replay.
    But I am getting different results for same materil in MDVP and MD12 Component Avail check.
    I am not getting  the logic why the system is giving this results.
    can you please tell me the same.
    Thanks a lot in Advance.
    Siddhesh

  • Changing Availability Checking Group in Sales Order.

    Hello Gurus:
    We changed the checking group in the material master.  The existing sales orders still shows the earlier checking group.  So how to change the checking group in existing sales order also (after it is changed in material master).  Also, once the checking group in sales order is changed, how to de-commit and re-commit material as per the new checking group.  Thanks.
    - Chetan

    Chetan,
    As you have changed Checking Group in MMR later on all ur availability check etc will be calculated as per previous MMR settings..
    Still go to OVZ9...See if your sales order has correct Check rule/Group..
    Then Go to sales order Carry out availability check again...See if Avalability Overview has changes as per your new Check Rule..
    Also Do Some R & D...
    Like test with change in quantity of line items...save and carry out avalability check gain..See if schedule line dates in Sales order Is there any change?
    See if any change is there...
    If not better create new  sales order...it will minimise your efforts and will be quicker way..
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • Error during availability check for order

    Hi PM experts,
    How can I make below warning message (W) to an error message (E)?
    Message no: CO820 (Error during availability check for order)
    Regards,
    Nizam
    PM Consultant

    Hi,
    you can cantrol not to release maint orders in case if parts are missing by OIOI transaction, here under Material Availability  against Release material you maintain option 3 No release if parts are missing. This way you can achieve this. If there are other components which has stock on Maint order then delete the un-available material from maint order then it will allow you to release the order.
    Hope availability check rule is maintained on material master.
    Hope it helps.
    Regards,
    N.Nagaraju

  • Disable Availability Check Based on Sales Order Type

    Hi All SD experts,
    Usually ( correct me if i'm wrong ) availability check is set via schedule lines item type. Is there any way that I can disable the availability check based solely on Sales Order Type ? Meaning no matter what item category or schedule lines assigned to materials, availability check will still be disable.
    Besides setting in schedule lines type, what are others config that might trigger availability check ? MRP settings ? Movement type ?
    Any valuable feedback will be great and much appreciated. A big thank you in advance.
    Warmest Regards,
    Edie

    HI EDIE
        In order for the availability check to happen,the following configuration settings are required.
    Availability check:
         a) you have to define requirement class & requirement type.
         b) you have to activate at scheduline category level
         c) in deleviry item.cat ,there is availability check off field,,,,, if  u dont mention any values here,then system checks for availability.if u mention 'x' here,then system dont check for availability.
        d) you define checking group and checking rule ,these determine how availability check is going to be performed
    MRP:
       MRP determines how material is planned,whether it is inhouse production or external procurement.MRP also determines the time taken for the material to become available for ready use.When ever an order is rised,the requirement is passed to MRP through  transfer of requirements(TOR), here MRP determines the inhouse production time or external procurement time.
    Movement Type: Movement type determines the type of material movement ,whether it is Goods Issue ,,, or ,, Goods Recipt,,,,, stock transfer between two plants etc.Movement type is determined in schedule line category level.
                      Award points if it is useful
                        Prasad.G

  • Disable Availability Check on Sales Order  But Activate on Outbound Delv

    Greetings all experts !
    Currently, there's a new request to create a new processes whereby during the sales order creation, no availability check will be in place but material will still be posted to production planning ( TOR ).
    Availability check instead should be activated  during the creation of outbound delivery.
    I have already configured in such a way that the relevant sch line item ( VOV6 ) - availability check is unchecked and TOR is checked.
    But during creation of sales order, availability check is still in place for material specified.
    I have check on the necessary requirement class and requirement type settings. Fyi, requirement class used - availability check is ticked. Could this be the reason even though i have disabled availability check on sch line ?
    I have tried to untick the availability check setting in requirement class  ( OVZG ), and while this can disable the availability check in Sales order, but that configuration will also disable availability check in outbound delivery.
    My queries :
    1 ) What are the configurations that I need to look into to cater to the above request. To disable availabilty in sales order but instead, run availability in outbound delivery ?
    2 ) Is there any way I can disable the availability check on based on sales order type using userexit or function module ?
    3 ) Is there any additional function module/bapi/userexit that i can implement to force outbound delivery to run availability check ?
    My apologies for such lenghty message here but really really need some valuable feedback here as I'm totally at lost with the new requirement for now.
    Many thanks in advance.
    Warmest Regards,
    Edie O

    In SPRO
    goto SD>Schedule line>Define schedule line categories
    here check if the schedule line category associated with your mentioned order has a flag ticked for Availability.
    Availability check for sales
    You must carry out an availability check for the following transaction.
    The indicator is determined as a proposal in conjunction with the respective requirements type. It can be changed in individual shipping transactions. However, only one restriction is effective.
    Example
    You do not set an indicator for maintaining the requirements type. In this case, no availability check is carried out. This is independent of the selection in the respective transaction.
    You set an indicator for maintaining the requirements type. In this case you can decide whether or not you require an availability check for the relevant transaction.
    reward points if it helps
    regards
    Biju

Maybe you are looking for

  • Updating tiger and mac os will not boot after download finished

    Hi all. I updated my mac tiger os on my mac book pro last friday. There were approximately 10 updates to do so i excepted them and all downloaded and i installed them all. I was then asked to restart so i did. On restart my mac is now stuck with a bl

  • PRODUCTION ORDERS - CREATION N CNFRMN

    1) When i am creating an production order in co01 i have entered total quantity and given the settlement rule as settle to cost center and scheduled, released , and when trying to save the order system is displaying the message as  :      ERROR WHILE

  • ALV GRID short dump issue

    could anybody advice, ALV GRID FM(field catalog issue)is getting short dump, but workig fine for ALV LIST. PERFORM create_field_catalog USING:     'TRAFFIC_LIGHT' ' ' 15 'Status'   'Status' ' ',     'VKORG'     ' ' 15 'Sales Org'    'Sales Org' ' ',

  • Need Help with Entourage and sbcglobal (att.yahoo)

    Hi, I just got sbcglobal DSL service. I have finally gotten Apple Mail to work, but I cannot get Entourage X to work. For Apple Mail, the settings are: Description: Doug Rice email Address: [email protected] Full Name: Doug Rice Incoming Mail Server:

  • Automate and Schedule the launch of an Application

    Greetings All, I was looking for some help in starting an application to automatically run on a scheduled basis (like once a month, or weekly for example), regardless of the user who is logged in. The laptops are setup as the following:  there is an