BAPI_FUNCLOC_CREATE : Main work center and plant associated

Hi,
  I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
Thanks:
Gaurav

Hi,
  Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
    Awarding you points for your help.
Thanks buddy!!!

Similar Messages

  • Selection of technical objects by work center and plant

    Hi there,
    I want to select functional locations and equipments that are diretly linked to a workcenter which you can see in the location tab in the standard-transactions.
    How can I select this data the way from work center (and plant) to the technical objects? Which tables I have to use??
    Kind regards
    Jens

    Try using Function Module ITOB_FUNCLOC_READ_SINGLE.

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Download notifications based on main work center and edit based on task level person responsible

    Hi Experts,
                   My requirement is to download notifications based on main work center.The downloaded notifications contains task level person responsible.If the notification contains four task assigned to different persons.Let suppose one task is assigned to the mobile user and other three task to another user.Now the first mobile user should able to edit the task  assigned to him ,but he should able to see all other task in disable mode that are assigned to other user.Iam using agentry work manager 5.3
    Please help me to achieve this requirement as soon as possible.Thanks in advance.
    Thanks & Regards,
    Sravanthi Polu
    Tags edited by: Michael Appleby

    Please refer my earlier posting for Work Order related requirement similar logic can be extended even to your Notification requirement.
    Also refer.
    Work Order and Notification Assignment Types Supported In Work Manager 5.3
    Thanks
    Manju

  • IW51-52 - Updating fields Main work center and Maintenance plant

    Hello Experts.
    I Have a task which includes recieving a file and using the data to create new notifications. I need to update the fields above (Data elements GEWRK & SWERK ) but i can't find the right BAPI or Function which will do this work for me.
    Thanks for your help.
    Motty Gal.

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Could U Please Tell me the Link B/W  Work Center and Plant ?

    Urgent Issue ...

    Hi,
    The org structure is as follows-
    1 st - Company code
    2 nd - Plant
    3 rd - Work center
    First co code is created (by FICO) then Plant is created (by MM) then come s the creation of work center.
    When we create a Work center it will ask about the plant in which the WC is to be created. The work center is directly linked to the plant.
    Please revert with further details of your question if this answer is not satisfactory.
    Award points if satisfied.
    Thanks,
    Hemant

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Control Key in Work Center and Routing

    Hi Gurus,
    Can anybody tell me what is the difference between Control Key we are providing in second tab of work center and the control key we input in routing.
    can i use same control keys at both the places.
    Regards,
    Anand.

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • I have a .mac family account, a personal .mac account and separate iTunes id I use for my work iPhone and the associated apps.  How do I keep them separate in the iCloud change?

    I have a .mac family account, a personal .mac account and separate iTunes id I use for my work iPhone and the associated apps.  How do I keep them separate in the iCloud change?

    Welcome to the Apple community.
    Could you tell us a little more about what you want to do. Bear in mind that iTunes has nothing to do with your iCloud account.

  • How to write a validaton rule for Cost Center and plant in PO

    Hi,
    I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    Thanks
    Sunil

    >
    Sunil Pal Raj wrote:
    > Hi,
    >
    > I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    >
    > But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    >
    > Thanks
    > Sunil
    Check OKC7
    Regards,
    Indranil

  • Cost center and plant in asset master creation compulsory entry config

    where we configure that cost center and plant entry is complusory while creation of asset master.
    is it   asset accounting
                   master data
                           Define screen layout for asset master
                                     Define Screen Layout for Asset Master Data
    as in our system in config    cost center and plant is optional        but while creation of asset master it becomes compulsory field

    Hi,
    Yes, it's defined in the layouts for assets master data.
    Regards,
    Eli

Maybe you are looking for

  • Error Creating a System in IIR Admin Config

    Hello, We are setting up a new instance on Red Hat Enterprise Linux 5 kernel level 2.6.18- 53el5 (32-bit), We have installed IIR with below version: SSA-NAME3 v2.8.07 (FixL106) SSA-NAME3 Extensions v2.8.07 FixL106 Informatica Identity Resolution v2.8

  • Get rid of the Bluetooth icon

    I migrated my account from my powerbook to mini, trouble is i don't have bluetooth installed on my mini and the bluetooth icon on the top right corner is also 'migrated'. so the icon would show as grey and read 'not available'. if i try to open bluet

  • How to re-init a delta upload?

    Hi experts I have done a delta initialization, and delta updates; but after occurs some troubles and then I must do a full update. Now when i want do new deltas uploads, the system tell me that can't find the last "mark". Im try to do an "initializat

  • Sharing iTunes Libraries - does the library location matter?

    (Reposting to correct section...) I have iTunes installed on several (Windows) machines on my local network and have enabled sharing for each of them. One of them (the one with the main library, alas) doesn't appear and doesn't see the others. It see

  • SQL for Top 10 Products Sold

    Hi Everyone. I want to report on my top 10 products sold by Volume not Invoiced amount. Any ideas? SELECT TOP 10 T1.[ItemCode], MAX (T1.[Dscription]), SUM (T1.LineTotal) FROM OINV T0  INNER JOIN INV1 T1 ON T0.DocEntry = T1.DocEntry WHERE T0.[DocDate]