PM Order - Change operations Work Center to Main Work Center

Hi Experts,
We have prepared a tool for client, which create Maintenance Plan and order in the background.
The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
Client has the requirement that work center maintained at operations should be same as the main work center.
We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
Has anyone worked on the similar requirement before?
I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
Please suggest any possible solution.
Thanks,
Ankur Sharma

Hi,
     The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
regards
pushpa

Similar Messages

  • Difference between PP work Centre and Main work centre in a floc ?

    Hi,
    Can someone tell me the difference between the PP work centre in the location tab of a functional location compared to the Main Work Centre listed in the Organizational tab ?
    Thanks

    Kent,
    The way I understand it, is that the main work centre (Field name: GEWRK) in the organizational tab refers to the actual group who are reponsible for carrying out the maintenance of the object.  Costing and capacity planning is carried out through this Work Centre.  However the PP Work Centre (Field name: ARBPL) in the location tab is a different work centre.  And I'm not sure what it controls (if anything).  I think it refers to the location of the unit, but other than that I don't know what it controls.

  • New operation for production order - change operation quantity not possible

    Hello all,
    we want to create a new operation for a production order.
    So we go to CO02 and to the operation order overview screen.
    But when we add a new operation, the system will not let us determine the operation quantity for the new operation, the system will just take the quantity from the operation before.
    How can I determine the qty by myself?
    Thanks
    Anne

    You can do another way also.   You change your routing with new operation quantity and save it in CA02.    NOw you go to CO02 and read master data in funtions,  then the new operation quantity will definetly come in to the production order.
    KrishnamurtyDSS

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Main  Work Centers

    Hi,
    Would like to know what exactly main work centers are ? How are they different from regular (operational) work centers ?
    Is any configuration different for creating main work centers as compared to work centers ?
    What is the hierarchy 'option' in the work center creation used for ? Is there a hierarchical relationship between Main work centers and work centers as far as comfiguration is concerned .
    Appreciate any help.
    Thanks,
    Kingfischer

    Dear King Fischer,
    There are types & cat if we need to sepatre work centres in the customerisation if it needed normally it does not need in PM.
    But in large detail planning etc. It may be used by business.
    Following are the extracts for difference as per SAP.
    The Main Work Center
    The main work center must be entered in the order header, whereupon its master data is copied into the order as a default.
    During internal processing, the main work center is also used as a default for the performing work center.
    In addition to the main work center, you can create a specific employee, who has been represented in the Human Resources (HR) component with their own master record, as Person responsible.
    The Performing Work Center
    In addition to the main work center, you can create a specific employee, who has been represented in the Human Resources (HR) component with their own master record, as Person responsible. You can also assign other employees to an operation in the Requirement assignment.
    The performing work center is managed in the operation data for the order. It is proposed as a performing work center for the operations in the order. Since capacities are assigned to the performing work center and costs assigned using the activity type, the performing work center is required primarily for capacity planning, scheduling and cost determination.
    It is also possible to create operations without entering a performing work center. A control key, which is not linked to a cost center or an activity type, must then be assigned to these operations. It may be that the operations are simply used for documentation purposes, for example, operations that only contain safety instructions or specifications for the production/resources tools to be used. Operations without a specified performing work center are also used in external processing.
    The Work Center as Production Machine
    The work center as production machine is managed in the location data for the technical object of an order. It is only entered if the technical object at which maintenance work should be executed is a machine in Production.
    Since machine capacities are assigned to the work center as production machines, the work center as production machine is required primarily for capacity planning of the machine, for example, non-operational periods for the machine must be planned as effectively as possible.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/d7/45f364b10811d2a5e30060087a7a74/frameset.htm
    Ramesh

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Replace Main work center for maintenance order

    hello
    I have to change the work center maintenance orders to 1000.
    Is there a standard transaction to make this change in mass?
    or I'll have to create a LSMW?
    thanks
    Paulo Picarra

    Hi Paulo
    though you have closed this thread I would like to tell you that In standard T- code IW38 there is a carry out mass change option available through which you can change many data including Main Work center. Pl check the following steps
    Select the orders through IW38 & click on order (at the top menu) & select carry out mass change (or CTRL+F11)
    you will get a popup screen for selection of fields to be changed.
    Pl check & give feedback
    Regards
    Shakti

  • How to change operation dates in Production Order /Capacity Leveling

    Dear Experts ,
    We are using ECC 5.0 .In production order , scheduling happing as Backward  based on the Sales Order Delivery Date .I am doing the following :
    1.Demand as Sales Order with Delievery date : 20.03.2010
    2.Running MRP with Lead Time Scheduling -2  in md02 and converting the Planned Order to Production Order .
    4.Production Order have following dates :
             Basic Finsish Date : 21.03.2010
             Basic Start : the day Pl.Or--Pr.Ord
             Schedule Start : 15.03.2010
             Schedule Finsish : 17.03.2010
            Schedule Release : 13.03.2010
    5.In schedueling margin key :  Float Before Production : 3    , FAP : 3 , Release Period : 2
    6.In material master : Work Scheduling View : Setup : 3 days , Processing : 4 ,Interoperation : 2 for one Base Qty 1
    7.In operation : Op1  : Start Date  : 15.03.2010    Finish Date: 15.03.2010
                             Op2 : Start Date : 16.03.2010      Finish Date : 17.03.2010
                             Op2 : Start Date : 17.03.2010      FD : 17.03.2010
    Question :
    1.How to change the Operation dates  in Production Order Operation over view screen ? Today,  operation over view screen , Start date and Finsih Date  of individual operation are not changable with in Production Basic Start /BF date  or beyond .It is only changing based on the Standard Value : Labor
    2.How to change/re-schedule operation dates d in CM21 (Graphical view -Work Center Capacity load as per   Production Order and Operation combination ) based on capacity availale in advance dates? I am using  Time Profile : SAPSFCZ002 -SFC Graph midterm-3 motnhs and Planning  ,
    How to solve this above issue in scheduling operation and capacity distribution .
    Regards
    JH

    Closing the thread

  • Not Required Main Work Centre on Order Header Maintenance Order

    Hi Experts,
    I want to know about main work center on order header maintenance order. Standart SAP is main work center required, and i want to set main work center on order header is not required. How Can i set Main Work center on order header is not required?
    Thank you experts for the answers,
    Best Regrads,
    Bernardus Jalu
    Edited by: bernardus jalu on Jan 17, 2012 8:46 AM

    Hi
    Main workcenter is the responsible workcenter in a order and is used as a reporting selection criteria in major reports(IW38/IW39/IW28/IW29/IW68/IW69 etc). From it also the responsible cost center gets derived. Also it gets copied to the Performing workcenter fields of each operations. So why you dont wants it to be used. It can be maintained as master data in technical objects & gets copied to notifications/orders while creation
    Shakti
    Edited by: SHAKTI BEHERA on Jan 17, 2012 3:41 AM

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Download notifications based on main work center and edit based on task level person responsible

    Hi Experts,
                   My requirement is to download notifications based on main work center.The downloaded notifications contains task level person responsible.If the notification contains four task assigned to different persons.Let suppose one task is assigned to the mobile user and other three task to another user.Now the first mobile user should able to edit the task  assigned to him ,but he should able to see all other task in disable mode that are assigned to other user.Iam using agentry work manager 5.3
    Please help me to achieve this requirement as soon as possible.Thanks in advance.
    Thanks & Regards,
    Sravanthi Polu
    Tags edited by: Michael Appleby

    Please refer my earlier posting for Work Order related requirement similar logic can be extended even to your Notification requirement.
    Also refer.
    Work Order and Notification Assignment Types Supported In Work Manager 5.3
    Thanks
    Manju

  • I recently did the iOS 7.0.2 update, now I'm unable to purchase apps. "App could not be purchased at this time. Please try again later. ". I have tried a few of the suggestions and nothing has worked. Reset,change auto lock time on main screen, now what??

    I recently did the iOS 7.0.2 update, now I'm unable to purchase apps. "App could not be purchased at this time. Please try again later. ". I have tried a few of the suggestions and nothing has worked. Reset,change auto lock time on main screen, change language setting. Now what???

    This sorted it for me:
    Backup your iPhone to iCloud (I believe backing up to iTunes will work too). Now go to "Settings --> General --> Reset --> Erase All Content and Settings" to completely restore your iPhone to factory settings. Assuming you've backed up to iCloud, you'll be asked when setting up your iPhone if you want to restore from an iCloud backup. Choose that option and once your iPhone has restored itself from your backup, this annoying problem will finally be gone! (was for me anyway).
    To restore from an iTunes backup, connect your iPhone to your computer, load iTunes. Click the File menu and select Devices > Restore from Back up.

  • User exit to populate profit center in production order change (CO02)

    Hello,
    The requirement is to populate the profit center in production order change (Tcode CO02). I know the user exit that can populate profitcenter in CO01 but it's not called in CO02. Ther other user exits that I found are for checking but not for changing
    Is there a user exit /BADI that can acheive this requirement?
    Thanks a lot for your advise.
    Joe

    Hi,
    Use the user exit PPCO0007 ,function module EXIT_SAPLCOZV_001
    HEADER_EXP-PRCTR
    Thanks,
    Shailaja Ainala.

Maybe you are looking for

  • Updated itunes 10.41 and iphone 4 to  ios 6, now itunes dose not recognise my iphone as says it needs to be upgraded to 10.4 already is HELP

    Iphone 4 has been upgraded to ios 6 and also have downloaded 10.4 on my mac. mac does not recognise iphone and tells me i need to upgrade phone through itunes. have done this with both items but does not recognise iphone . HELP

  • Table control

    Hi ALL, i have a table control with two columns col a and col b User enters the values into col a and col b my requirement that values of column shouldn't be same say user first enters 1     2 2     2  after this i hit enter ,after hitting enter it s

  • Process order - Confirmation - Closing

    Hi Friends, I have one typical requirement.  Whenever the user performs the Final confirmation of an order, It should get close.  Or Is there any way to close the orders in mass?  Or any standard report is available to see the final confirmation , no

  • How to load  a tables one partition of data in to OWB target table

    Hey , I want to load only one partition data from source (size in Tera bytes) in OWB tables. I used filter condition as per the partition done on a key value. But Its take so much time to load the data into the target table. I feel to configure the s

  • Problem with floating point precision

    Hello! I need to store in a variable a number like this 1234512345.123412345. But when I store it on a double or long double... it gets truncated to 1234512345.123412... only six decimals? What can I do?? Thanks!