BAPI to create a production order CO07

Hi guys,
Need a help....i need to create a production order with the following data...
1.final date...2.routing group 3.components screen with all the materials needed
there will be multiple components added..as co-products and as a main material
BAPI_PRODORD_CREATE...can we use this to add multiple materials...and will it fulfill the tcode CO07...
any queries or any sort of info..plz share..
Regards,
Ashok

Thanks for the reply.
In these BAPIs..or FMs...we can add one material or a component...
I want to add a main material...as a first one..
then a component of it....so it goes on..
say i have a main material and 10 components needed and created in a single production order...
any info???

Similar Messages

  • GR for create the production order without material(co07)

    Hi all,
               I am creating the  production order without  material (T-Code :co07), After creating this order i want to get the Material from W/H and after dismantling how to do GR for this Prod.order, What is the Movement type to be used?Please advice me

    Dear Kumar,
    CO07 specially meant for Rework order (Production order
    without material) or for dismantalling the Customer returns or
    Inhouse rejected,for the components which re good to reuse
    again,their quantity will be entered in -ve and so 531 movement
    takes place.
    On the other hand,if you want to use for rework purpose and
    want to consume some components,using MB1A T code ,the
    materials required are issued.
    Already our Forum member(Krishnamohan) has given clearly in his first reply.
    Regards
    Mangalraj.S

  • BAPI to create SNP planned order based on start date

    Hi,
    I am looking for a BAPI to create SNP planned order based on the order start date. There is BAPI BAPI_MOSRVAPS_CREATESNPORDER which can be used to create SNP planned order based on the end date but not based on the start date.
    Also would be great if some one can share how do they create SNP Planned orders using BAPI BAPI_MOSRVAPS_CREATESNPORDER in case if GR processing time is defined in the product master and workdays for GR to be respected according to the calendar.
    Regards,
    Venkat

    Hello Mr.Venkat,
    Hope you recognize me.
    Please check out the BAdi below.
    BAdi - APO_BAPI_BUS10503 (this is the BAdi for ManufactOrderAPS  BAPI which contains the SNPorder BAPI)
    Method - CHANGE_SAVEMULTIPLE2
    In this method parameter IT_ORDER_HEAD contains Order start date input option.
    For GR time please check this (not sure if it will help).
    Same BAdi/ same method
    Parameter IV_PLANNING_MODE_USAGE contains field PLANNING_MODE.
    Value 1 for PLANNING_MODE corresponds to "Observance of parameters from the product master".
    This may make it respect the GR time in product master
    Good luck with the above
    Regards,
    Ashok

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • BAPI  to confirm the production order

    Hi friends,
    Can anybody tell me whats the BAPI to confirm the production order? If BAPI is not available how to create a BAPI for that?
    Please help me out.
    Thanks & Regards
    Sireesha.

    Here are the list of BAPI's pertaining to confirmations
    BAPI_PRODORDCONF_CREATE_ACT    Enter Activity Confirmation                                              
    BAPI_PRODORDCONF_CREATE_HDR    Enter Order Confirmations                                                
    BAPI_PRODORDCONF_CREATE_TE     Enter Time Event Confirmation                                            
    BAPI_PRODORDCONF_CREATE_TT     Enter Time Ticket Confirmation                                           
    BAPI_PRODORDCONF_EXIST_CHK     Existence Check for Confirming Production Order                          
    BAPI_PRODORDCONF_GETDETAIL     Detailed Data for Production Order Confirmation                          
    BAPI_PRODORDCONF_GETLIST       Confirmations List                                        
    Regards,
    Ravi
    note - Please mark all the helpful answers

  • Create a Production order for rework

    Hi,
    I would like to create a Production order for rework.
    But I don't want to do it in the master PO with trigger point.
    I would like to create a new PO for rework and asign to account to the old or master PO.
    I've tried to do it but I want to know if it's correct.
    CO07, maintained the qty, in the settlement rule maintained (category= order,settlement reciever= master PO number) released the order and by confirmation where can I maintain the qty? (as Yield or as rework qty)
    Thanks

    Hi,
    Use T code CO07- creation of PO w/o material, settelment rule as u mentioned and the quantity has to be maintained in rework.
    When u confirmed the order and settel it, it will be settel againts the main order.
    Regards
    JDB

  • Co- Product Error while creating a production order

    Hi,
    While performing the Co-Products Approtionment at the time of creation of Production order..
    we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
    kindly help me out.
    the error msg is
    Debit with cost element 9460404 cannot be settled.
    Message no. KD549
    Diagnosis
    Costs/revenues exist for cost/revenue element 9460404.  This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters).  However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
    Note:
    Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
    Procedure
    Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%.  Change the settlement profile for the sender as necessary.
    Change settlement profile
    Note:
    Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.

    Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
    I will explain the step by step process that i have done.
    I am attaching the Screen shots of the issue.
    1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
    2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
    3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
    4. When I was settling the production order the same error was getting displayed.
    I have tried various methods to resolve it.
    1. I have created a periodic settlement rule and tried to settle but it didnt work
    2. I have assigned the source structure in the settlement profile this also didnt work.

  • Error while creating a production order

    Dear PP gurus
    I am trying to create a production order of a material  through CO01 , I am getting a error   05.05.2016 date comes after end of valid factory calendar. (Please correct
    Although  for all other  material , no error is coming.
    My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
    please help me how to correct it?
    Thanks in advance
    Regards

    Dear Aadi,
    When your in operations screen
    Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
    it should show you the days for ur base qty
    then click on scheduling results then click on update material master & save
    then Go to CA96
    input plant
    then mark a tick for ur material & click on update material master icon
    then check in material master work scheduling view
    Regards
    Madhu

  • Serial number error while creating the production order

    Hello frds,
    I am getting the following error while creating the production order.
    "Item 000000 requires exactly 100 serial numbers for the asset".
    If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
    I have tried using the new serial number profile also, but it is giving same error.
    Kindly guide.
    Regards,
    Narendra Bora

    Dear Narendra
    Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
    Procd Procedure description Ser.Usage
    PPRL PP order release 02
    since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
    Regards
    Soundar

  • BAPI for Creating a PM order(iw34) with reference to a Notification

    Hi All,
    Could anyone help to find the BAPI for creating a PM order with reference to a notification Number.
    I will explain my requirement :
    I want to create a notification from an external Application where i got the BAPI BAPI_ALM_NOTIF_CREATE and keeping this created notification number as Referece or for this notification number  i need a create a PM order.Usually this process in done transaction IW34 in R/3.
    But with the BAPI BAPI_ALM_ORDER_MAINTAIN i can create a PM order but this BAPI doesn't have a input parameter "Notification number ".So i can't use this BAPI.
    Could any suggest for a BAPI where i can create a PM order with reference to a Notification Number.
    Regards,
    Sid

    Hi,
    I have tried with the FM CO_IH_ORDER_GENER_2 but when i executes it gives a error message
    "<i>Service/maintenance order type PM02 not completely maintained in plant
    Message no. IW216
    Diagnosis
    For the selected order type and plant, no check control is maintained in Plant Maintenance/Service in 'Availability Check for Materials, PRTs and Capacities'.
    Procedure
    A check control must be maintained for this combination of order type and plant</i>"".
    And even have a doubt what to enter in this input parameter "GEWRK_OBJTYP"  .
    Kindly help me to solve this issue.
    Regards,
    Sid

  • Need a Bapi to Create a purchase order

    Hi experts,
    Is there a Bapi, to create a 'Purchase Order' from an existing Purchasing document no. marked for deletion.
    Thanks in advance ,
    Hrashit Rungta

    Hi Experts,
    I have used BAPI_PO_CREATE1 to create a purchase order .
    I have successfully created a purchase order when i use this BAPI directly through SE37 ,
    supplying the required inputs.
    But now i am calling  this BAPI inside a program,
    Supplying the same inputs as earlier.
    Buit i am not able to generate a PO.
    I am getting the messages in the Return Table as :|Please enter items first
                                                                                    No instance of object type PurchaseOrder has been created. External referen
                                                                                    Document contains no items
    Can someone suggest What input am i missing ?
    Thanks in advance,
    Harshit Rungta

  • Reserve batch number at creating of production order

    Hi,
    I would like to know if there is a way to reserve batch numbers when creating a production order. And when the production order is released and create the receipt, the receipt to use that batch number reserved at the moment of the creation of the PO.
    How could I do this using the SDK?
    Best regards,
    Irina

    Hi,
    Thank you for your answer.
    But, if I "reserve" the batches in a UDF in the production order, it might be that by the time the receipt from production is added those batch numbers to be used already.
    Any other ideas?
    Thank you,
    Edited by: Rui Pereira on Dec 23, 2008 4:18 PM

  • Bapi to complete the Production Order completely

    Hi All,
    I am using the above Bapi to complete the Production Order completely. Now my requirement is to complete technically. I don't want to write BDC. Can anybody please let me if there is any FM to meet this requirement.
    Thanks n Regards

    used BDC

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Error "Cost" by creating a production order

    Hi,
    I' ve create a production order CO01. before I saved I get this error in log "No cost element segment exists for 89000 on 27.02.2009".
    With KL01 I've create a activity type and with KP26 I've planed this activity per cost center.
    What can I do
    Thanks
    Dede

    Hi,
    Run the T-Code KA03, Key in the controlling area and the given cost element.
    If it doesn't exists, contact your CO guy to create that.
    It will solve the problem.
    Regards,
    Rohit.

Maybe you are looking for

  • Issue using spry regions in spry tabbed content

    I am having a slight issue with making a slideshow in a spry tabbed panel set. I have tested my XML used for the slideshow in a basic blank page, where I created the spry source and detail regions, and it loads fine. When you click on the thumbnail,

  • Why do my headphones only play out of right ear when they're perfectly fine?

    my headphones were working fine last night but this morning when I went to listen to music they would only work out of right ear. If anyone knows the solution to this please let me know

  • Sync Outlook Calendar

    This is for my Dad - he has an iPad2 with the latest iOS version and the latest iTunes on his machine.  He is trying to sync his calendar to the iPad - it was working, but something got messed up and now he's getting an error message when he tries to

  • Can't read Dowloaded Ibook

    Hi there, I downloaded the Mac INtegration Basics 10.7 Ibook from Itunes. The book shows as an E-pub in my library and it can't be read. It shows that it is locked and only comes as garbled text. Any assistance would be greatly appreciated. IKE

  • Make separate pages in Number '09

    I am creating a Table of Contents; would like each letter of the alphabet to be a new page. How do I create 26 separate pages without adding/deleting rows? I will be adding new entries constantly so adding/deleting rows would be too cumbersome.