Basis - 2 System Landscape Possibility

We want to have only a 2 system landscape for our SAP deployment i.e. Within the development server, we shall have development client and quality client and then just have another production server.
Since we have confirmed that this is possible, please let me know the disadvantages in doing so and also if we need to anticipate for trouble shooting.
Thanks & regards,
Tommy.

Having QA "clients" is not possible because there are many things, that are cross client:
- ABAP (corrections)
- Data Dictionary
- Cross client customizing
Hence, you can't "test" those things, once you have an ABAP error in one client, you will the same in the other client too.
Markus

Similar Messages

  • ChaRM - Mainenance Cycle in two system landscape - possible?

    Hi Experts,
    we are trying to create a maintenace cycle with two systems.
    We have a system defined as "Evaluation System" and the second is defined as "Production System".
    Generally Question
    Is it possible to create a maintenace cycle for a two-system-scenario?
    Specific Question - Erorrs/Warnings
    While checking the project we got several errors/problems:
    1 Differences between BC Set SOLMAN40_CHARM_BASICFUNC_001 and database
    2 Differences between BC Set SOLMAN40_SDESK_BASICFUNC_000 and database
    3 No consolidation system found for EID-800 (project Z_CRM_T)
    4 No track for project Z_CRM_T with log. system EID/800
    5 Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for CBI-001
    CTS
    The transport system is configured correct - Check in STMS is OK
    Question:
    The comparison checks seem to be OK - is it necessary to reactivate the BC Sets?
    Kind regards
    Tom

    Hi,
    the system role for your client/systems in the logical component is very important:
      - The development system needs to be defined as a Source System.
      - If you don't have a QA, leave all target systems empty. If there are one or more consolidation/integration/regression systems, assign them to system role Target System.
      - Your production system uses system role Production System.
    The defined Development client needs a client dependent (TMS parameter CTC=1) consolidation track to the QA, or in a 2 Tier landscape to the production system. In a 3 Tier landscape you need a delivery track from QAS client to your production client. But as you wrote, TMS has been set up already. I just would like to mention all steps....
    Check that all RFC connections have been set up correctly. Especially the Trusted RFC. Don't forget the Trusted RFC to client 000 ot the TMs domain controller.
    In tab Systems ( transaction code SOLAR_PROJECT_ADMIN => System Landscape ):
    Make sure you see all clients of your logical component. If not hit button System Role Assignment and add your System role.
    Then still in the same tab: Hit button Shipment Routes and make sure, you see the complete transport track and only this track here!
    After correct setup of TMS, RFCs, logical components and assignment of LC to your project:
    First perform a Refresh and a Check in transaction code SOLAR_PROJECT_ADMIN => System Landscape => Change Requests. Then please recreate the maintenance cycle (and task list).
    Regards,
    Holger

  • CHaRM 2 system landscape possible??

    Hi Solman experts,
    I have a question. Is CHaRM possible in a 2 system landscape without creating extra clients? For example:
    BWDEV100 -
    >DWPRD100
    Thanks in advance.
    Regards,
    Ricky

    Hi Avinash,
    But in TMS do you create one delivery transport route from dev100 to prod100 or do you create a consolidation route to prod100. Usually in a three system landscap you create 2 consolidation routes to the test system one with a transport layer that you created and one with the sap transport layer and then one delivery route to the production system.
    Could you please explain what kind of transport route you create?
    Thanks in advance.

  • ChaRM: 4-System-Landscape possible?

    Hello,
    regarding our system landscape we have no clue how ChaRM will handle following situation
    DEV-System: Development-System were the developments should be done.
    QAS-System: Test-System were the tests should be done.
    FNC-System: nothing to do here, just for functional tests
    PRD-System: Production System
    Transport routes are DEV -> transport group which deliveres QAS and FNC, and from QAS -> PRD.
    What needs to be done to set this up correctly for ChaRM (e.g.: SMSY-logical components)?
    Thanks in advance.

    Hi
    You have two options:
    1) assign FNC to task list: you can start the import to this system in the task list manually
    2) or task list without FNC: you can schedule a job 'import all' at FNC or import manually via STMS
    Confiiguration:
    1) One log. component with D-Q-FNC-P (Q and FNC are of role target systems)
    2) One log. component with D-Q-P
    regards
    Andy

  • Is it possible to do portal content transports through System landscape?

    Hello,
    In order to transport content from portal A to portal B I am currently using transport packages: export the content from portal A, download it to the local PC and import it to portal B. The process is working OK but I still have a question:
    SAP are transferring all the control on their systems to the System landscape, for example Java developments. My question is if it is also possible to make these transports through the system landscape so no local PCs are involved in the process?

    Hi Roy,
    You are right in the point that development projects can be transported, using the NWDI, centrally managed through the system landscape.
    Nevertheless, the PCD transports (EPA) have to be touched manually anyhow. Theoretically, you can set up an SDA and put an EPA into it, see http://help.sap.com/saphelp_nw04/helpdata/en/a3/782240da03e569e10000000a155106/frameset.htm for details.
    But this only really makes sense if you want to transport your own application together with the portal configuration (iViews representing your application...).
    So in the end, PCD transports are designated to be transported as you are used to - manually via the export / import function of the portal.
    Hope it helps
    Detlev

  • SAP-Basis System: 1 possible network problems detected - check tracefile

    Dear Gurus,
    I am getting this error in syslog in MMC for ECC 6.0 on windows with db2.
    SAP-Basis System: > 1 possible network problems detected - check tracefile and adjust.
    Regards
    Rao.

    hi,
    can you look at this
    [http://sapbasisnotes.blogspot.com/2009/05/sap-startup-problems-in-windows.html]
    Regards,
    Muralidhar

  • ChaRM - possible to have 2 different system landscapes in one project?

    Hi,
    can anyone tell me if it is possible to have 2 different system landscapes in one project. One landscape for developing and testing the Change Requests and another one for developing and testing the Bugfixes.
    Thanks,
    Martin

    As Rick, mentions, there's no default way.
    Having said that, there's nothing stopping you from doing it yourself. You can add a kind of language selector to the layout and set that for every html5 output. With some JavaScript, you can have the user switch between your outputs. It would look like content categories, but you'll have build it yourself.

  • Doubts in System Landscape Directory

    Hello All,
    I got some basic doubts in SLD.
    Why do we need to store the information about the installed products and to be installed products in software catalog?
    And, what is this techncal system?
    After reading few help sites, what I understand is the following:
    For example SAP is a product and  CRM etc are the software components. We create the technical system for this product like for client 100 we create a technical system and for client 200 we create another technical system. And we give some logical names, called business sytems, to these technical systems.
    My second question is, why do we need to create all these information(the information in SLD)? Why cant we directly create messages types, message interfaces etc and configure them in Integration directory without using the information in SLD like business system?
    In Integration Directory, we say that the sender is one Business System and receiver is another business system. These business system are created based on some technical systems. These technical systems are based on some software components and product. This product and the software component might be a installed or non installed product. Then how do we can get the connection between the sender and the business system? Can you please explain me the idea behind considering the sender and reciever as business systems.
    Can anybody please clear the above doubts?
    Priya

    Hi Priya,
    <u><b>SLD:</b></u>
    The System Landscape Directory of SAP NetWeaver (SLD) serves as a central information repository for your system landscape. A system landscape consists of a number of hardware and software components that depend on each other with regard to installation, software updates, and demands on interfaces.
    - so talking about the working of an SLD, here if any information is required for the integration server regarding the systems(logical or physical) and the software (installed products) it refers to the SLD.
    - to tell you about the other features it has....it captures the dimensions of the system landscape like solution dimension, transport dimension and technical dimension.
    - putting it in short XI IS A CLIENT OF SLD
    Also go thru this link and understand more about SLD <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/31/f0ff69551e4f259fdad799a229363e/frameset.htm">System Landscape Directory</a>
    <u>
    <b>SOFTWARE CATALOG:</b></u>
    The SLD contains a Software Catalog of all installable SAP products and software components. The Software Catalog includes information about support packages and dependencies between the products and software components. This information is the basis for the description of the system landscape.
    Also go thru this link and understand more about Software Catalog <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/a2/2999ef97ea2b4790165f9ca5c05c41/content.htm">Software Catalog</a>
    <u><b>TECHNICAL SYSTEM, BUSINESS SYSTEMS, SOFTWARE PRODUCTS:</b></u>
    Technical system correlates the software to the physical host on which it is installed
    Or in other words Technical systems are application systems that are installed in your system landscape.
    - they are actually the basis for defining the business systems.
    - we assign a technical system to a business system to help the SLD make the appropriate association.
    - the software products used by the business system are got from the technical system definition.
    - to note 1 technical system can have more than one business system assigned to it....and as told the SLD make the appropriate association between them.
    Also go thru this link and understand more about each of it:
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/24/8fa93e08503614e10000000a114084/content.htm">Technical Systems</a>
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/42/c817d9d2296bb2e10000000a1553f6/content.htm">Business Systems</a>
    <a href="/people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation Preparation</a>
    Regards,
    Abhy

  • Setting Up the System Landscape for ESS

    Hello Experts,
    I am implementing ESS in portal.
    I am in step of defining systems in portal for ESS/MSS.
    Below is link I am following from help.sap.com
    [Link|http://help.sap.com/erp2005_ehp_04/helpdata/en/5b/76a6d7fd3a4e91bfb422405bf3e04d/frameset.htm]
    In above link it is mentioned that we have to define following systems :
    SAP_WebDynpro_XSS
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    SAP_ITS_XSS
    SAP_BSP_EREC
    Additionaly according to below Article in SDN :
    [Link|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/21eb036a-0a01-0010-25a3-b2224432640a?quicklink=index&overridelayout=true]
    Following additional systems must be created :
    SAP_ITS_EBU Looks similar to SAP_ITS_XSS above 
    SAP_R3_Financials
    Now the basis person in my project has handed over to me following systems :
    SAP_BSP_EREC
    SAP_ITS_FND Name mismatch as FND is used in place of XSS or EBU
    SAP_R3_Financials
    SAP_WebDynpro_ESS Name mismatch as ESS is used in place of XSS
    Now below two systems are altogether missing as per first link on help.sap.com
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    Please explain if it requires to be corrected or name mismatch and missing ststems would do.
    Thanking you in anticipation.

    All the above names that you are referring to are not necessarily separate systems.
    These are system aliases for a system object created in your portal via System Administration - System landscape.
    So, if you have HR and Finance on the same backend server, then you need only one system with the related system aliases.
    You will need SAP_BSP_EREC only if you are planning on using E-recruitment.
    Similarly, you will need SAP_ITS_XSS  only if you are planning on using any ITS applications.
    It is pretty straight forward to change/correct the names of your system aliases instead of changing the usage of these aliases every where else.
    SAP_ECC_HumanResources is absolutely necessary.
    SAP_ECC_Travel is required if you are planning on using travel and expense related applications.
    Also, note that SAP_WebDynpro_XSS should be the alias of the system where your webdynpro applications are deployed (typically the same portal server)
    - Shanti

  • Could not get system landscape directory client - NWDS 7.31 SP 09

    Hi Experts,
    We are unable to import development configurations from NWDI 7.4 to NWDS 7.31 for one of the developer's id. Other developers are able to import the
    configuration successfully in NWDS and are able to create projects without any issues. In fact, I am able to import the development configurations from his Id on my machine.
    The error message that is appearing is as follows: Could not get system landscape directory client.
    PFB the NWDS logs:
    null
    Error
    Tue Jan 06 12:48:58 IST 2015
    List Development Configurations failed      [Error: com.sap.ide.dii05.ui.internal.sld.SldContext  Thread[ModalContext,6,main]]
    com.sap.lcr.api.cimclient.LcrException: com.sap.lcr.api.cimclient.CIMClientException: HTTP response code: 407 (Proxy Authentication Required ( Forefront TMG requires authorization to fulfill the request. Access to the Web Proxy filter is denied.  ))
    at com.sap.lcr.api.cimclient.HttpRequestSender.newClientException(HttpRequestSender.java:719)
    at com.sap.lcr.api.cimclient.HttpRequestSender.processResponse(HttpRequestSender.java:608)
    at com.sap.lcr.api.cimclient.HttpRequestSender.send(HttpRequestSender.java:352)
    at com.sap.lcr.api.cimclient.CIMOMClient.sendImpl(CIMOMClient.java:205)
    at com.sap.lcr.api.cimclient.CIMOMClient.send(CIMOMClient.java:153)
    at com.sap.lcr.api.cimclient.CIMOMClient.enumerateInstancesImpl(CIMOMClient.java:450)
    at com.sap.lcr.api.cimclient.CIMOMClient.enumerateInstances(CIMOMClient.java:754)
    at com.sap.lcr.api.cimclient.CIMClient.enumerateInstances(CIMClient.java:989)
    at com.sap.lcr.api.sapmodel.JavaCIMObjectAccessor.enumerateInstances(JavaCIMObjectAccessor.java:213)
    at com.sap.lcr.api.sapmodel.SAP_DesignTimeConfigurationAccessor.enumerateInstances(SAP_DesignTimeConfigurationAccessor.java:164)
    at com.sap.ide.dii05.lib.internal.sld.SldBasicContext.listRemoteDevConfNames(SldBasicContext.java:197)
    at com.sap.ide.dii05.ui.internal.devconf.wizard.DevConfImportSldPage$6.run(DevConfImportSldPage.java:293)
    at org.eclipse.jface.operation.ModalContext$ModalContextThread.run(ModalContext.java:121)
    NWDS version: 7.31 SP 09
    Error Screenshot -
    Any pointers will be highly appreciated.
    BR,
    Anurag

    Hi,
    we had some issues recently with this, and the trace also mentions proxy issues. Could you please try direct connection in that preferences  (in other words do not use proxy settings in NWDS) ?
    Is it possible that there is some kind of web-filter application installed that is blocking the request?
    I'd suggest to google for this error:
    407 (Proxy Authentication Required ( Forefront TMG requires authorization to fulfill the request. Access to the Web Proxy filter is denied.  ))
    Perhaps the problem is not even sap related.
    Is Microsoft Forefront TMG (Threat Management Gateway after some googleing) perhaps configured in the way that it is not allowing this request ? Perhaps the IT guys of your company could look into this.
    Microsoft Forefront Threat Management Gateway - Wikipedia, the free encyclopedia
    12209 Forefront TMG requires authorization to fulfill the request. Access to the Web Proxy filter is denied.
    Cheers,
    Ervin

  • Warning: Problems occurred during synchronization of the system landscape

    Hello
    I have created systems in system landscape, TMS is working fine, all the configuration steps are completed successfully.
    am working in Solution Manager 4, in project change -SOLAR_PROJECT_ADMIN - Project Administration - in 'System Landscape' tab &#61664; Change request  and when I activate change request management I am getting following messages:
    1. Warning: Problems occurred during synchronization of the system landscape
    2. The project is not released. Hence cycle can not be created.
    Its bit urgent as I m in middle of this activity, please assist me on the same…
    Thanks
    Sharmishtha

    Hello Jason & Prakhar
    Thanks for your quick response. I am basis person, and configuring this change request management for one of the project.
    Jason:
    Will you please check with your basis person about these settings and let me know the same. I have set the settings as follows
    C= Development (source system)
    T = Quality
    P = Production
    Prakhar:
    I have checked with all RFC connections are working fine, authorizations are also properly given.
    I didn’t get your point No correctly defined maintenance project exists, I have already created project in project administration transaction, assigned the system landscape, I have activated project IMG in IMG Project and then going in change request tab to activate the change request management, where its giving me above error.
    More over, as you have mentioned I am getting following message in SLG1:
    “Project CHARM_GBW not found in the project administration table”
    This is asking me to do following things:
    Synchronize the project in Change Manager with the Solution Manager. Call the Solution Manager with the transaction SOLAR_PROJECT_ADMIN, and go to the 'System Landscape' tab, and then the 'Project Cycle' tab. Select the 'Change Request Management' field, and choose 'Refresh'. Project CHARM_GBW should then be available.
    Where do I have to make entry for this?  I can see the entry in /TMWFLOW/PROJMAP table too. I don’t know what more I need to do for this.
    Problem is I can’t see ‘Project Cycle’ tab in ‘System Landscape’.  Prakhar, frankly I am not able to find any step wise document on this part. So will you please help me with some documents on this? I am from technical side thus there is bit difficulty to understand this scenario from functional view.
    I will be grateful for your help,
    Thanks
    Sharmishtha

  • Client Roles in a Three System Landscape

    I initially post this Question in other forum:
    Hi all,
    We have a three system landscape. In the Development client, we have the Customizing Client, the Sandbox Cliet and a Training client. I have some questions about this configuration:
    Acording to System and Client Settings - System Administration Assistant (BC-RRR) - SAP Library, Training client must be in Quality Assurance System, and it must be created by client copy from client QTST (it gets the transports from Custimizing). In this Training System we must create users for all our key-users to training. We must not create any user for key-users in sandbox client (this client is for the DEV team). is that ok?
    What are the downsides of having out TRAINING client in the Development System?
    Now, a consultant is asking me to open some modifications in the TRAINING client: He needs to load Exchange rates (OB08) in that client, but he is getting "Client is not modifiable". They are asking me to create users for key-users in the sandbox client and the training client.
    I need to know if they are using the system in the right way. I dont want the system to become a mess.
    I been reading this notes: SAP Note 356483. I don´t know what this means: "Now the corresponding Customizing object is no longer subject to the transport connection and is excluded from the changeability check. The change is active in all clients of the system. You can also change the Customizing object in a locked client (independent of the client role). However, now it is also no longer possible to manually transport entries of the view or table."
    Aditional notes:
    SAP Note 78329,  sap kb 356483
    Thanks for your help!
    One person answere me this:
    Hi
    You should create your question in the appropriate area :
    Software Logistics
    The drawback of having training client in dev system is that it could be negatively impacted by ongoing changes performed in that system (custom program that are changed, not working...)
    Some specific customizing changes can be set as current setting and thus can be modified without needing to open customizing but only if the client is set as productive.
    There is also a way do deactivate modification recording of objects (aka deactivating the transport connection) but, if you apply this change for this activity/object, you won't be able any more to record change into transport orders
    Regards
    356483 - Customizing: Current settings in the test system
    77430 - Customizing: Current settings

    Hi Andres
    I do not really now the exact impact, it might prevent some business data from being mass processed or overwritten...
    I did had to deactivate the transport connection on specific objects/activities for some customers.
    It depends on the frequency of that activity. I don't like to open the client to modification as you can sometime forget to close it back, and sometime also it gave the opportunity to other consultants to make changes that would create inconsistency among envt in the whole landscape.
    At least activating the recording of changes could help in tracking the source of modifications
    RZ10 => rec/client=ALL
    STMS => RECCLIENT=ALL
    Regards

  • How to deal with customer motive in three system landscape?

    Hello,
    I am developing a portal application based on the Composition Environment 7.1 in a three system landscape. Now, I have created a customer motive on the development system.
    What is the proposed way to transport this motive from the development system to the quality aussurance and the production system?
    Is there some sort of transport mechanism or do I have to export / import the motive?
    Best regards
    Alexander

    Hello,
    Portal themes can be moved use the theme transport tool. From system admin -> portal display -> theme transport there is an option to store a theme as a zip file and then you can upload it to another portal.
    I know that this is possible. My question is, whether this is the preferred (or intended) way to do this.
    Best regards
    Alexander

  • How to configure in Charm in three system landscape

    Hi Experts
    I want to configure the charm in the three system landscape system. Please help me to configure
    Thanks & Regards

    It is same whether it is two or it is three system landscape, i guess you already must have gone through the following
    charm setup
    Re: Can Any one Provide Step by Step Config of CHARM??
    http://sap.ittoolbox.com/groups/technical-functional/sap-basis/charm-in-2tier-system-1231210

  • System Landscape on XI or SRM ?

    Hello to all,
    Actually I have to configure the system landscape for several systems, but I do not know which are the best practices that I must follow to form it.
    I have two servers one of the XI and other one of SRM 5.0, additional I have in another server of SSM 3.2.
    Would I like to know which is the best recommendation, if I must install and configuring SLD in the XI or SRM?. And if someone can indicate me where it he can access information that recounts me to this topic.
    I have never formed the SLD in Systems SAP, estimated to anybody who could orientate me.
    Best Regards,
    Desiree

    Hello Desiree,
    A good approach is to use the SLD for your Solution Manager 4.0, by using this SLD as primary one, you can release the resources for the others Application Servers and also use  this for change management reporting....
    Of course it depend how critical is your XI and if your system have sufficient resources.
    BTW, if you don't have a Solution Manager you must install one as soon as possible or at least use the SM Diagnostics as stand alone cause it's very important for root cause analysis on Java based product like your XI.
    Hope this helps.
    Yours,
    Luis

Maybe you are looking for

  • After updateing my iPad Air 2 to iOS 8.3, it no longer works

    After updating my iPad Air 2 to iOS 8.3, it no longer works.  It is a 64 GB model. The opening screen is the same as when I first starting using it, with "welcome" in various languages. I have gone through the operations requested, iCloud, etc. but a

  • Fire wire drive won't work with Mac Pro

    This is kind of crazy. I just bought a MacPro 2.8 Ghz 8-core. I hook up my OWC Neptune FW drive to it. Nothing. Didn't Apple invent Firewire? It boots just fine on the ten year old G4 running OS 10.4.11. I really am getting a little annoyed with Appl

  • Data Modeler: Super Type and Inheritance when engineered to Relational Mode

    PLEASE IGNORE THIS MESSAGE, I'VE SORTED IT. MY STUPIDITY HAS BEEN RECTIFIED BY READING THE MANUAL!! Hi I have a logical model that I'm playing with where I want to set a super type entity that contains common columns for all sub-type entities a la ja

  • How to display additional items from an LOV?

    Hi guys, This is bound to be a fairly common scenario, though I didn't see it in the Forum archives. The wizard-based LOV facility provides support for one display value and one return value. But how do you display a half-dozen items from the row fou

  • Cannot Uninstall Adobe Flash on iMac

    Hello, I'm trying to Uninstall Adobe Flash Player. I've gone to the Adobe website and clicked on the appropriate uninstall link. However, it didn't work. The link takes me to the right uninstallation, however after I download it and open it up, it fr