Billing Plan and Promotions for Service Agreements

Hello Friends,
We have a requirement here, that we want to sell a 1 Yr Service Agreement (Price of $1200) on a promotion who ever buys this service agreement will not be billed till three months (for evaluation purpose) and say if they like it and want to continue with this agreement then on the begining of the Fourth month they will be billed for the remaining portion of the service agreement ( i.e. $900). in a way that means they will get a 25% discount on this service agreement and remember the bill will be only one time i.e. in the fourth month for an amount of $900 and also this promotion should last only till the end of this year.
Any thoughts on how we can configure for this, your help
will be greatly appreciated
Thanks

You will require two service contract document types. The first (say contract type SC) which uses milestone billing and the other (say ZC) which uses periodic billing.
The second one should be generated as a follow up action of the first at the end of the first year.
Ensure that the milestone billing allows you to bill 25% in the first installment. You can ofcourse block this one. The second one should allow you to bill 75%. This will not be blocked.
If the customer does not terminate the contract during the first quarter you bill the customer for the second billing item.
Once this contract has ended you can create another contract which will use the periodic billing which is simple quarterly billing which is what I think u require.
Next, the item category is an area you might have to think on. You may be able to create the same contract type if u can create the same material with a different item category so that in the same document type u can create first an item with milestone billing and the second with periodic.
Most probably this will meet your requirement. Please vet this with the FI/CO guys to check how it reflects their G/L accounts.
Let me know if u need any more tips.
thanx

Similar Messages

  • Billing plan and pricing proc

    Dear frnds,
                        I would like to know the link between Billing plan and pricing procedure...............I have prepared a milestone billing plan with a pricing procedure  which has price,  gym chrgs, maintenance chrgs etc..............but when i invoice for  the first line item in the billing plan it  calculates in a completely diff way( line item value - 51000  but invoice is billing for 1.50000......plss assit
    Regards
    Maddy

    Hi,
    This is because of two issues.
    1.Check the Billing value in the sales order.
    Goto VA03
    Enter the order number.
    Goto Item details-->Billing Plan.
    Check the field "Billing Plan" and "%" for the first item.
    The same will be flowed into billing if all the copycontrols are correctly maintained.
    2.Goto VTFA T.Code.
    Select your valid combination.
    Click on Item.Select your Item category.Details.
    Maintian "Copying requirements" as "023".
    Pricing type as "D".
    Pricing Exchange rate type as "A".
    Price source as "Blank(Order)".
    Save.
    Regards,
    Krishna.

  • Error Regarding Data loading in Planning and budgeting cloud service.

    Hi ,
    I was able to load data in planning and budgeting cloud service before 1 month.
    I loaded via Administration -> Import and Export -> Import data from File.
    Today i loaded the same file to the cloud instance for the same entity that i loaded after clearing the existing data.
    I am getting error while validating itself as
    \\Unrecognized column header value(s) were specified for the "Account" dimension: "Apr", "May", "Jun", "Jul", "Aug", "Sep", "Oct", "Nov", "Dec", "Jan", "Feb", "Mar", "Point-of-View", "Data Load Cube Name". (Check delimiter settings, also, column header values are case sensitive.)
    I checked the source file. Everything is correct. I actually loaded the same file before and i was able to load.
    Does anyone know the problem behind. Can anyone give me suggestion please
    Thanks in Advance
    Pragadeesh.J

    Thanks for your response John.
    I had Period and Year dimension in Columns
    I changed the layout of year dimension in period to POV and loaded the data file. I was able to load without any errors.
    I changed the layout again to the original form as before and loaded. I didn't get any errors again.
    It worked somehow.
    Thank you
    Cheers John

  • Open PR, PO and Contract for services.

    Dear All,
    I want to develop a report that gives the open PR, PO and Contract for services.
    When user will enter the service number report will give the open PR, PO and Contract.
    But for services quntity in item overview is always 1 AU.
    I want to compair the quantity in item details (ESLL - MENGE).
    Suppose PR is with 100 Hrs and 3 diffrent PO created for this with 25 Hrs each.
    How Can I compair this.
    Thanks and Regards.
    Prakash

    TNX

  • Id and password for service market place

    Hi all,
    I m certified consultant since 2004 ,I thinks I should have an Id and password for service market place, no?!!
    Thanks in Advance

    Hi,
    Check my Reply in this thread => How i will get my S-userid
    Thanks and Regards,
    Faisal

  • SAP BO Planning and Consolidation for Banking In Version 10

    Hello All.
    Is there a version of SAP BO Planning and Consolidation for Banking, for version 10?
    Thanks

    Hi There
    The current available version is SBOP PLANNING & CONSOLIDATION FOR BANKING 1.2, which is built on top of BPC 7.5
    BPC 10 has only recently gone GA, so at the current moment there is nothing for version 10, it should come soon hopefully.
    It should coincide with the release of the starter kits for version 10
    Hope this helps
    Kind Regards
    Daniel

  • Project related tables and link for services in Network Activity

    Dear Experts,
        My requirement is I need a table for services in Network activity before release of Network and link for services to another table(Project related before PR).
    Ex : Network             Activity           Service         
            XXX                     XX                   12345
          So I need Service  field, which is updating in ESLL was unable to link with another table to get the Project Number. So please help me .
    Regards,
    Srikanth.

    Dear sushrut sheth,
    thank for the reply
    I looked in AFVC before to post the Issue but in this table the Activity is only updating but not the individual service items
    I required the table which is updating the individual service line items

  • Was not informed of new policy when signing up for service and charged for services I did not knowingly agree to.

    I’m writing to contest a $29.99 monthly charge, which is contracted for 24 months amounting to $720 in total. The charge is for a data plan which I did not knowingly agree to, and verizon is unwilling to remove from the account even though the phone on the line does NOT use data.
    The backstory of the issue:
    On September 19, 2014 I waited in line at an Apple store to purchase a new iPhone on launch day.  I opened a new basic line of service for $9.99 a month on my account so I could purchase a discounted phone from Verizon. When purchasing the phone, the representative explained that he was going to have to put a basic data package on the line for $15 a month, but that it would be removed once I transferred the phone to an existing line on the account.  After the purchase was complete, we transferred the phone to an exisitng line, and the represented confirmed that the data package would not be charged to my account and therefore I would only have to pay $9.99 a month for the basic line of service for two years. A couple weeks pass and I receive my bill, I notice that the data plan is still listed on my account and has also increased to $29.99 a month!  I call Verizon to see what is going on, they tell me that they have just implemented a new policy that states if I purchased a smart phone on a basic account and then transfer the phone to a differnt line that I will have to pay $29.99 a month for data even if the new phone that is currently on the line does not use data! I told them I was not informed of this, and was actually told the complete opposite when signing up for service.  They refuse to remove the data package, and will not let me cancel the account without charging  me $350.  The representative on the phone said that the representative in the store was a sales person and most likely did not have the training to inform them of the new policy change, and that they could not honor what he told me.
    I should be able to rely on and trust what a Verizon wireless representative is telling me, I was not aware of the new policy and did not knowingly agree to this policy. And in that case, I would like to point out that I have been a loyal Verizon customer for over 15 years humbly request that you clear this $29.99 monthly charge from my account as a gesture of good faith.
    I have spent over 7 hours on the phone with verizon trying to get this resolved to no avail. I have also filed a complaint with the attorney generals office, and plan to persue this until it is fully resolved.

    Customer Agreement | Verizon Wireless
    This agreement and the documents it incorporates form the entire agreement between us. You can't rely on any other documents, or on what's said by any Sales or Customer Service Representatives, and you have no other rights regarding Service or this agreement.
    They gotcha! And that policy change was listed here and other places on the net.
    Its either pay that or the early termination fees.
    Verizon will not grant you a mistake forgiveness clause.
    If they do it for you they would have to do it for everyone.
    Good Luck

  • Plan Assessment and Allocation for Service Orders (CS)

    Hello,
    I'm trying to run plan assessment (KSUB) and plan allocation (KO9E) for a service order (created via IW31), but I'm not able to do it.
    I can do assessments (KSU5) and allocations (KO8G) with real values, but since I'm not able to do it in plan mode, I can't have comparative values between real and planned values (no value is flowing to allocation secondary cost elements).
    Can anyone let me know if this is some sort of limitation for Service Orders? Because I checked SPRO in transaction code KOAI and for this type of orders there is no Indicator for Integrated Planning, nor it's possible to assign a planning profile.
    Many thanks for any help you can provide!
    Regards,
    Cátia

    I created a SAP message and they confirmed that this is not possible.

  • BAPI for billing plan and billing order

    Hi Sap Guru, i need your help on bellow questions :
    Are there any BAPIs or MF standard used to read billing plan from the business partner (header and lines) ? Are there any that permit to create, simulate, modifify or cancel a billing plan ?
    Are there any BAPIs or MF standard used to obtain payment from a Busines Partner or Contract Account ? Are there any that allow to obtain views on the accounting records (header, extension, set of payments, discharges...)
    Thanks in advance for all reply.

    Check the BOR object  PAYSCHEME . You would find all the methods there

  • Billing plan and billing status

    Hello Friends,
    I would like to clarify if my understanding is correct before I configure a billing plan:
    1. Billing status is not seen in billing doc but in preceding doc like a DO.
    2. For a Billing Plan, there can be 1 billing plan at item level for a set of settlement dates.
    If the plan is defined at header level, only 1 billing plan is for all items.
    3. Contract is a sales doc type  and contract data is only at header level.
    Is this considered an Order-related billing when invoice is printed at each billing date?
    Is the contract considered as the reference doc for the billing doc sent to customer? I believe so. please confirm.
    4. There is no such thing as master billing plan that item level billing plans need to be linked to.
    5. date category : this is at billing date level and cannot be changed?
    regards
    Pascal

    Hello,
    Milestone billing means distributing the total amount to be billed over multiple billing
    dates in the billing plan.
    As each milestone is successfully reached, the customer is billed either a percentage of
    the entire project cost or simply a pre-defined amount.
    During sales order processing, the system determines from the item category whether a
    billing plan is required and, if so, which type of plan
    The type of billing plan that is determined at this point is set up in Customizing and
    cannot be changed in the sales document.
    Billing plans for periodic billing and milestone billing plans for project-related milestone
    billing have different overview screens so that you can enter data relevant to your
    processing.
    For example, for milestone billing, you must be able to enter data to identify the
    individual milestones.
    Thanks,
    venkataswamy.y
    IMG configuration requires :-
    1. Maintain billing plan types for milestone billing in OVBO.
    2. Define date description in SM30 - V_TVTB.
    3. Maintain Date Category for Billing Plan Type IN OVBJ.
    4. Allocate date category in SM30 - V_TFPLA_TY.
    5. Maintain date proposal for Billing Plan Type in OVBM.
    6. Assign Billing Plan Type to Sales Documents Type in OVBP.
    7. Assign Billing Plan Type to Item Categories in OVBR.
    8. Define rules for determining the date in OVBS.
    Milestone billing is typically used for billing projects, such as plant engineering and
    construction projects. Such projects often include a series of milestones that mark the
    completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones
    are also assigned to the billing dates in the billing plan.
    Each milestone-related billing date is blocked for processing until the Project System
    confirms that the milestone is completed.
    Delivery-relevant order items for which a milestone billing plan applies are billed on the
    basis of the requested delivery quantity and not on the total of the confirmed quantities.
    The connection between the project and the sales document item is made in the individual
    schedule lines of the item. Each schedule item can be assigned to a network in a project.
    To display the project-related data for a schedule line, proceed as follows:
    In one of the overview screens of the sales document, select
    1. Item -> Schedule lines.
    2. Mark the schedule line and select Procurement details.
    The following figure shows an example of milestone billing where only the Contract have
    been billed :
    Order Item Turbine 100,000
    Billing Plan
    Billing date Description % Value Billing Block Milestone Billing Status
    01-10-94 Contract 10 10,000 - x x
    01-03-95 Assembly 30 30,000 x x
    01-04-95 Maintenance 30 30,000 x x
    01-05-95 Acceptance 30 30,000 x x
    01-06-95 Final invoice .. .. x
    Network/Activities
    Milestone Estimate Actual
    Assembly 01-03-95 01-03-95
    Maintenance 01-04-95
    Acceptance 01-05-95
    For each billing date in a milestone billing plan, you can specify whether the billing
    date is:
    1. fixed
    2. always updated with the actual date of the milestone
    3. updated with the actual date of the milestone, if the date is earlier than the
    planned billing date for the date
    Comments
    the article was great it explained about billng milestone very well

  • Derivation rule for service agreement

    Dear Gurus,
    I have derivation rules between GL-commitment item and Cost center - Fund center. now when i create PR & standard PO for type "cost center" the system is working properly by derives fund center and commitment item automatically but when i create service agreement the system doesn't derive fund center and commitment item. If anyone have any suggestions, please let me know.

    Are there any conditions to the derivation rule?
    In my QA system, I was able to create a derivation rule GL=Committment item. It worked the first time I created a scheduling agreement using ME31L.
    Then I went into the "conditon" tab of the derivation rule and entered business transaction=RMBA and RMBE (purchase requisition and purchase order respectively) and the derivation rule did not work when i created another scheduling agreement.
    Other than some conditions exist or the target field attribute is needed to be set to overwrite. I am at a loss to what the problem could be.

  • Cracked TV, a UPS claim, and an unusable protection plan--and poor customer service

      Best Buy has some serious issues with customer service. I recently tried to exchange/return/fix a 46-inch smart TV my father purchased from BestBuy.com. It came damaged. Immediately upon walking in and asking to exchange our damaged TV, the three customer service team members took the television from us and whisked it off behind the scenes. They did not tell us what they were doing, nor did they tell us they had called in a supervisor. The supervisor (at least I presume she was the supervisor because she did not introduce herself or state why she was there) came over and said “So what’s your “story” behind the damage to the TV?” I stared blankly at her because it felt like she was accusing me of something, and she repeated, “Tell me what happened when you opened it?” I explained that because the TV arrived four days early, we didn’t have a place for it right away and we put it in an office where it would be safe. We opened it a few days later. Yes, we had assembled it, because we opened the TV with the screen away from us and assembled the base from behind. It was only when we turned the TV around that we saw the cracked screen and the shards of plastic on the floor. Then we dissembled it and put everything back in the box to take to Best Buy. Yes, we noticed some damage to the box, but it looked minor. The supervisor told me that it looked like the TV was damaged when it was installed. I told her we did not drop, kick, or otherwise damage the television. We were incredibly careful, because it was a gift and very expensive. She said the damage must have been done in transit then. Best Buy was not responsible. All they could do was put in a claim for UPS. I asked about the Geek Squad protection purchased with the TV and was told that only counted for software. I pointed out that Best Buy’s website clearly states that the stores accept returns from BestBuy.com and that Best Buy also accepts damaged returns. She didn’t reply to that, just said she was sorry and left. I work in customer service. I know people can be dishonest and are always trying to get as much as the can for very little. I also know that regardless whether the customer is right or wrong, he/she should always be treated respectfully. I do not feel I was treated with respect. I felt like a criminal from the moment the team took my TV from me. The supervisor practically accused me of lying and did not seem to listen to my explanation. She did not even stay to see the transaction through, but left (the store was fairly empty at this time) and I had to wait, twiddling my thumbs, while two other customer service members took another fifteen minutes to set up my claim with UPS. Neither one spoke or looked at me during this process. Now, I have a $500 television set with a large crack in the screen, a claim with UPS that may take weeks to resolve, a 5-year $100 protection plan on a TV I won’t ever be able to use, and a lingering bad taste about Best Buy. I have never walked out of a store feeling as small as this experience made me feel. The sad thing is that I had planned on purchasing more items from Best Buy over the next couple of months. Rest assured, they will be purchased elsewhere. The only person who smiled or wished me a good day upon exit was the guard at the door. I will not be returning to this or any Best Buy store.

    Hello eab64 –
    It is regrettable that you had such a poor experience when you brought your father’s TV into our store, and for that I am truly sorry. The way the customer service associates and supervisor treated you was unacceptable. We in no way want you to feel like a criminal, or feel like you’re being accused of wrong doing when all you’re trying to do is get your product fixed. It is also clear many of the actions taken in the store may not have been clearly communicated to you.
    It is standard procedure for damaged or defective TV’s brought in store to be taken in back where they can be setup and our customer service associates can perform an assessment. This should have been clearly communicated to you. Once any damage or defect was assessed, ideally the supervisor should have approached you with a solution, and not accusations.
    The store did offer you the correct solution in the end, regrettably this too sounds like it was not communicated as well as it should have been. Our Return and Exchange Promise does not allow the return of damaged products, and the Geek Squad Protection (GSP) plan for televisions does not cover damage to the panel beyond burnt our pixels and image burn in. Because this damage occurred during shipping, a claim with UPS is the correct course of action. UPS claims can usually take up to 8 business days, and I am sorry we are unable to offer you a more immediate solution.
    Please feel free to reach out to me if you have any additional questions or concerns.
    Sincerely,

  • How to change bill to and payer for an internet order

    Hello Gurus,
    I have an issue. I am trying to change the bill to and payer assigned to Internet order through the partner determination procedure.
    The scenario is when we create an internet order on the basis of sold to payer and bill to are selected. But the user has option to change the bill to and payer if there are many other maintained before saving the order.
    to do that i am calling the crm_order_maintain function module. I am preparing the partner tables and input fields
    In the input fields i am passing display type , kind_of_entry, no_type ,partner_no, partner_fct and relation partner.
    Apart from these fields I am passing the reference guid, ref_kind and objectname.
    t_field_names-ref_guid    = '4BB334EA8B0C24B6E10000000A02B02D'."wa_extension-ref_guid.
    t_field_names-ref_kind    = 'A'.
    t_field_names-objectname  = 'PARTNER'.
    t_field_names-logical_key = '0000000000031000000060      BPBP'.
    INSERT t_field_names INTO TABLE t_input_fields.
    With this I am not able to save the order with new bill to and payer. Am I missing something ?
    Regards
    Sohit

    Hi Sohit,
    I've the same requirement of picking one of the Bill-To from the dropdown on viewOrder.jsp
    Well for maintaining the Ship-To SAP has given a a standard Action class : MaintainShipToAction.
    and the method in the SalesDocument class to add new ShipTo but nothing for billTo.
    I'm looking for a different approach to handle this problem, incase you find any solution then please share it with us.
    Best regards
    Sandeep

  • Item Category Determination for Service Agreement

    Hi,
    Which Item Category can be used for the Determination of Service Agreement.
    Thanks & Regards,

    Hi,
    Thanks for your response,
    Infact i had problem with the certain fields which were not displayed.
    Regards,

Maybe you are looking for

  • Can I use a cell value to reference a table on another sheet?

    I'm not sure if this is possible and I have had no luck with searches, here is what I am attempting to do... On my first sheet I have a number of tables, each holding information on a service. Each table is named to match the service name. On another

  • How can i move to a new page in smartform?

    hi friends i hav a smartform with two pages. the fist page contains the Main window and 3 Secondary windows. in the 1st page i'm displaying some line items and in the main window i gave the command to go to Page 2. the 2nd page contains only one Seco

  • Windows to mac with a used ipod

    I had a 4th gen ipod on my mac but it was stolen. My friend gave me her old 2nd gen ipod that was synced to a pc and now i'm trying to restore it and sync it with my itunes. it will not show up in itunes but will show up in the finder. how do i reset

  • Invoice sequential number is skipped

    Dear All,                 My End user post a invoices daily minimum 10. But the particular once invoice number is skipped and it shows errror  "No Matching Record found A/R Invoice (ODBC- 2028)"                I can able to see the invoice number 287

  • Log4J not creating any output file