Budget by periods and availability check (AVC)?

HI ,
Can we have Budget by periods and with availability check (AVC)?
for ex: for
WBS element 1 for January -1000 USD for Feb 5000 USD. And so on...Total yearly budget is 15000USD.
And
WBS element2: January -1500 USD, Feb 2500 USD and so on ...total yearly budget is 25000USD.
If the budget Exceeds for the particular WBS element for the particular period then it should give message (error/warning/).
Can we implement this in Project system?
Thanks for your time

To give budget by period (Month ) is not possible in PS. Budget is annual / overall in PS. you requirement can be achieved by monthly you provide budget to WBS in the form of supplement.
This way indirectly you can achieve the same.
Please refer this post.
Project Budget by Month
Regards
Nitin
Edited by: Nitin  Patoliya on Feb 3, 2009 8:40 AM

Similar Messages

  • MRP and Availability check clarification

    while browsing the forum, many experts here mentioned in old threads that MRP and availability check are two different (independent) concepts. I am really confused on this one. let me put my understanding here and plz experts help me if I am wrong with a figurative explanation, so that will be easy for understanding.
    Assume this is the scenario as of today.
    Plant stock for material x u2013 100
    Reservations for material x u2013 70
    Incoming receipts for material x u2013 50
    So net stock = 100 + 50 -70 = 80
    sales order arrived for material x u2013 100 and availability check is done. Results of availability check says 80 can be confirmed and 20 can be confirmed on later date.Transfer of requirement for quantity 20 is done to MRP. Mrp runs and creates planned order for 20.
    In the availability check config  ovz9 if I say donu2019t consider reservations, then when availability check is done for 100 quantities..system will confirm 100 because available stock according to system will be 100+50 = 150. So transfer or requirements are not sent to mrp.
    So isnu2019t mrp run directly dependent on availability check?

    925,
    sales order arrived for material x u2013 100 and availability check is done. Results of availability check says 80 can be confirmed and 20 can be confirmed on later date. Transfer of requirement for quantity 20 is done to MRP
    No.  100 pcs requirements are passed to MRP.
    In the availability check config ovz9 if I say donu2019t consider reservations, then when availability check is done for 100 quantities..system will confirm 100 because available stock according to system will be 100+50 = 150. So transfer or requirements are not sent to MRP.
    No, 100 pieces requirement are passed to MRP.
    This behavior depends upon how your 'transfer of requirements' is configured, which is an SD setting.  Normally, unless the fix date qty field is set in the sales order, the entire 100 pc requirement is passed to MRP in all cases.  The assumption is that you have accepted the sales order and will 'some day' need to issue and sell the parts.  You need to begin planning for this event  now.
    When MRP subsequently runs, it will net out the supply elements (stock and inbound reservations) and will from this calculation determine how much needs to be built.  It then proposes a solution (planned order or purchase req).
    ATP check seldom has much impact on MRP.  You are correct in realizing that the ATP check must be consistent with MRP and with your chosen MRP strategies, in order to provide an end-to-end business process that is logical and meets all business requirements.  However, in SAP these two functions are separate.
    Best Regards,
    DB49

  • Blocked Goods and availability Check

    Hi,
    I have a scenario where certain quantity of a material say "a" was blocked.But after certain time due to increased demand the client asked to make the material "a" available.So how does the availability check will work now..
    Thanks

    Simple, you need to have stock for the material. You schedule line cat relevant for Availability Check in sales order will take care of it.
    If you have existing sales order for the material then use TCode V_R2 and V_V2 for running the availability check for unconfirmed items of the sales orders.
    Or you can use V_V1 used to create confirmed backorder.
    Regards
    JP

  • Third Party Drop ship and availability check against Product Allocations.

    Dear All -
    We are facing a situation where we need to create a third party drop ship Sales Order with an item category which still reaches out to APO and confirms against the product allocation quantities. This is not supported by standard SAP.
    Has anyone come across such a requirement and how has it been handled. I would really appreciate any suggestions.
    Regards
    Mandar

    Vladimir,
    I want the drop ship in which when you create SO, before selecting the vendor, system should perform availability check for plants. If material is not available in the plants ( nearest plant) then system should select the vendor who will ship the material to customer directly.
    _pat

  • MRP planning and Availability check

    Dear Friends ,
    We are updating  Availablity check in the MRP view for all materials in materials master , While running MRP system is considering ATP check as per SPRO settings defined for Availablity check group .
    Weare not conclude what is the relation for MRP run and availablity check , or  any seperate SPRO settings available for MRP on availablity.
    If we not assigned the Availablity check in MRP view what will happen if  during MRP run ?
    thanks & regards
    Suresh Babu.S

    Suresh,
    MRP does not look at what you have configured for Availability check. These two are independent from each other.
    As given in Help,
    In the planning run, the system carries out the following partial processes:
    1. The system checks the planning file entries. Here, the system checks to see whether a material has been changed in some way relevant to MRP and should therefore be included in the planning run (see Checking the Planning File Entries).
    2. The system carries out a net requirements calculation for every material. Here, the system checks to see whether the requirement quantity is covered by available warehouse stock and fixed receipts from Purchasing or production. If the requirement quantity is not covered, the system creates a procurement proposal (see Net Requirements Calculation).
    3. Then the system carries out the lot-sizing calculation. Here, the system takes the lot-sizing procedure and, if necessary, the rounding up or down values into account (see Lot-Sizing Calculation).
    The system carries out scheduling to calculate the start and finish dates of the procurement proposals (see Scheduling).
    4. The system determines the type of procurement proposals. Depending on the settings, the system creates either planned orders, purchase requisitions or schedule lines for a material (see Determining the Procurement Proposal). If you have maintained the necessary specifications for procurement quota arrangements, the system determines the source of supply which it assigns to the procurement proposal (see Quota Arrangements).
    5. The system recognizes critical situations which the planner has to processes manually in the planning results. For this purpose, the system creates exception messages and carries out a rescheduling check (see Creating Exception Messages and Rescheduling Check).
    Availability check is not a planning process, it is basically a CHECK, based on the Scope of check derived for that Particular transaction, system check the availability of a material and it can confirm or propose the possible availability date.
    In short if a material is defined with Check Group "KP", but with MRP type PD, still MRP would creates procurement proposals if the demand is more than the stock+recipets.
    Regards,
    Prasobh

  • Error in va01 for transfer of reeqirement and availability check

    hi every one when i have done TOR and availabilty check configuration it is not reflecting in va01 can any one help out with configuration step by step

    HI
    Kindly check the Google with Same text so you can find out so many documents which is related to Availability Check & TOR
    Coming to your Question , try to check the Schedule line Category (VOV6) , you need to TICK the Field *"Availability" * Requirement/Assembly"*
    and also kindly check the Below
    link [Availability Check (ATP) and Transfer of Requirement (TOR)|http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabilityCheck(ATP)andTransferofRequirement+(TOR)]
    [Available to Promise (ATP)|http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+(ATP)]
    Regards,
    Prasanna

  • Credit block and Availability Check

    Hi,
    As per standard behavior when there is credit block in sales order, system does not confirm the quantities when the sales order is saved even though receipt elements are available during availability check.
    Is there any way to confirm the quantities even though sales order is into credit block.
    Regards,
    RS

    Hello,
    In requirement like yours we can Confirm the Quantities & insert a Delivery Block. To do this follow as below:
    IMG - Sales and Distribution - Basic Functions - Availability Check and Transfer of Requirements - Transfer of Requirements - Block Quantity Confirmation In Delivery Blocks - Deliveries: Blocking Reasons/Criteria -
    Here for Delivery Block 01 - Credit LImit - There will be a tick mark in Confirmation block (Conf) Box. Remove this tick mark & then system will Confirm the Stock inspite of Credit Block.
    These block are defined here:
    IMG - Sales and Distribution - Basic Functions - Availability Check and Transfer of Requirements - Transfer of Requirements - Block Quantity Confirmation In Delivery Blocks - Reasons for and Scope of Deliv.Blocks: Transfer of Req.Block
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Schedule Line Category and Availability checks

    Hi Folks,
    A generic question.
    Wanted to know, how would availability check results influenced if only Item category and MRP type are maintained and not the scheduled line categories.
    Was trying to figure a strange Availability check behavior of non-confirmation for one item category and confirmation for another- item x location being same. The ATP checks settings are maintained and called from GATP. (not R/3 and R/3 customization is not imported too).
    Regards

    closing

  • Cross-Docking, Deliveries and availability check

    Friends & Gurus,
    From what I read, Cross Docking (ECC 6.0) works with deliveries. I can link an inbound to an outbound delivery so as soon as the goods are received they head straight to the outbound delivery.
    If I plan to use X-Docking for stockouts, how can I link the deliveries if the outbound cannot be created because of availabity check (no stock on hand).
    Question: Should I change the availability check of the outbound deliveries so I can create them without stock on hand in order to use X-Docking functionality?
    Thanks stranger!

    Hi
    If you are talking about blocked stock you can remove the check for blocked stock in OPJJ transaction. this will make availability check will not consider blocked delivery
    If useful reward points
    Regards
    Ranga

  • Schedule line and availibility check

    Hello,
    I have three questions ;
    Q1) my schedule line category is set to " no avalibility check".
    Q1A) How does the system confirms the stock in sales order or  in delivery if schedule line category is set to "no avalilibity check"
    Q1B) does the sales order and delivery appear in MD04 is schedule line category is set to "no availbility check".
    Q2)my schedule line category is set to " no materials planing ?
    Q2A) How does the system confirms the stock in sales order or  in delivery if schedule line category is set to "no materials planning"
    Q2B)does the sales order and delivery appear in MD04 is schedule line category is set to "no materials planning"
    Q3) what is the relationship between MD04 and MRP run. Does all the sales orders or deliveries appear in MD04 after MRP run ?
    request pls answer pointwise for clarity
    regards
    sachin

    hi Sonu,
    Q/3 ) relationship between MRP run & MD04
    >The function of MRP is to plan the requirement of a header material as well as for the dependent requirements.This is done with the transaction code MD02.All the requirements are pulled up and planned.the outcome of the run will be a report which will show the details of the planning like
    >Materials planned
    >Materials with new exceptions
    .MRP run is therefore static.
    >MD04 shows you the stock requirement list of the material.after you run the MRP for a particular material this screen will show you the requirement for header materials,
    dependent requirement,available stock,the reservations made.if the stock is less u can either generate PR for externally procured or create prodn order for internal mfred.
    this is dynamic i.e whenever u run this t code u get the latest update on the status of that material.
    u can't see deliveries in MDO4 only reservations
    SO are not seen directly but as a customer requirement and when u run MRP they are changed to planned order.this planned order can be seen in MD04 from where u can either create PR or production order
    Q/2B
    "no planning " is used for those items for which u don't want to run MRP.certain materials are such that the controller can manage w/o running MRP i.e the SO comes and the product is either delivered or produced w/o running MRP.
    hope this helps,
    regards.
    Edited by: vikas koul on Jun 26, 2008 1:27 PM

  • Complete Deliv and Mixed Item cat and Availability Check

    Hi Gurus,
    Not sure if this is problem is new, I have searched with no clues.
    A SO has 2 item categories. ZTAN, ZTAS. ZTAN is stock item, ZTAS is back to back item where a PO will be created. Same material. There is a GR processing time of 10 days.
    SO created on 12.05.2014.
    Item 1: MatA     First Date: 15.05.2014     Item Cat: ZTAN Qty: 500     Confirmed Date = 15.05.2014 (Stock Available)
    Item 2: MatA     First Date: 15.05.2014     Item Cat: ZTAS Qty: 1000     Confirmed Date = 29.05.2014 (Today + 10 GR Process)
    Then tick Complete Deliv. Indicator in SO overview screen.
    Item 1: MatA     First Date: 15.05.2014     Item Cat: ZTAN Qty: 500     Confirmed Date = 29.05.2014
    Item 2: MatA     First Date: 15.05.2014     Item Cat: ZTAS Qty: 1000     Confirmed Date = 29.05.2014
    Save SO.
    PO 1st AB line for SO item 2: Confirmed Date = 15.07.2014 results in Both SO item confirmed date = 15.07.2014
    PO 2nd AB line for SO item 2: Confirmed Date = 15.06.2014 results in Both SO Item confirmed date = 15.07.2014.
    You see the problem is after 2nd AB, confirmed date in SO does not change to earlier confirmed date. And even if we run the standard back order processing V_RA or V_V2, system still does not schedule earlier.
    Any solution?

    Then tick Complete Deliv. Indicator in SO overview screen.
    Item 1: MatA     First Date: 15.05.2014     Item Cat: ZTAN Qty: 500     Confirmed Date = 29.05.2014
    Item 2: MatA First Date: 15.05.2014 Item Cat: ZTAS Qty: 1000 Confirmed Date = 29.05.2014
    Save SO.
    PO 1st AB line for SO item 2: Confirmed Date = 15.07.2014 results in Both SO item confirmed date = 15.07.2014
    PO 2nd AB line for SO item 2: Confirmed Date = 15.06.2014 results in Both SO Item confirmed date = 15.07.2014.
    When you say system has confirmed in the first instance (29.05.2014), I am not sure where system is showing 15-06-2014 & 15-07-2014. 
    G. Lakshmipathi

  • TOR and Availability Check,

    Dear Friends,
    I have two questions:
    1.What should be the Ideal requirement to be used ...is this
        011-Delivery requirement
        041-Order/delivery requirement
    2.The MRP type i am using is Manual reorder point(V1).
    During "Determination Of Requirement Types Using Transaction" Iam not able to create new entry with V1...ie Item category and the MRP type are in display mode....
    TAN + V1  - 11(Delivery requirement)
    Thanks
    Sasi

    Dear Friends,
    I have two questions:
    1.What should be the Ideal requirement to be used ...is this
        011-Delivery requirement
        041-Order/delivery requirement
    2.The MRP type i am using is Manual reorder point(V1).
    During "Determination Of Requirement Types Using Transaction" Iam not able to create new entry with V1...ie Item category and the MRP type are in display mode....
    TAN + V1  - 11(Delivery requirement)
    Thanks
    Sasi

  • MRP  Availability check

    Hi All,
    I am running MRP for a Assembly which is to be assembled by a subcontractor. MRP run should create PR for child parts of Assembly(Finished Goods). MRP type is PD and Strategy is 10 and availability check for Assembly (Finished Goods) is KP and for child parts is 02.
    The Purpose of MRP run is simply creating PR for child parts (Raw Materials) as per Plan given in Demand Management table (MD61)
    PRs are getting created sucessfully after MRP run but I have issue with Assembly parts (Finished Goods).
    MRP requirement calculation should not consider stock of Assembly and it should also not consider subcontracting Purchase order of Assembly parts (Finished Goods)
    Currently it is considering both. How I can avoid this . MRP calculation should consider only Plan given in Demand Management table.
    Thanks
    Sanjay
    Pls. refer thread posted earlier
    Re: MRP  Availability check

    Hi,
      In the scope of check OPPJ for the assembly exclude the sloc stock by
      activating the indicator  No sloc stock inspn for assembly.
      For Subcontractor stock In OPPJ activate the indicator W/O subcontracting
      ie you need to define two scope of checks.
      You use the logic of Material Provision indicators.
    Regards,
    nandha

  • Componenet availability check / ATP

    Dear All,
    We have created a purchase Order for subcontractor who produce an assembly for our product. We have attached a Bill of material which has three to four material as an Alternate material. We have set the Alternate group , priority , strategy as 2 check for 100% availability as well as probability also based on the requirement.
    When we explode the BOM from the same Purchase order / Job work order to check the Requirement. System displays the entire list of component along with the Alternative materials alongwith the Requirement as per BOM.
    When we check the Component availability ( selecting from menu) , system shows the available Qty against One material and other alternate material requirement qty becomes zero.
    But the problem is when we check the stock of the component / Altenate material. through MMBE , it shows zero quantity in stocks, But there is Purchase order for the original  component alternater material  of more then required qty.
    Our requirement is that System should not consider the pending PO qty while doing ATP / component availabity check at the time of creating reservation for the material defined into Jobwork / Subcontractor Order.
    Pending PO qty which is not received  at plant, then how the same can be used allocated to Reservation.
    May tyou please let us know that what parameter we have to set into SAP system  so that system should not consider the pending po qty for availablity check.
    thanks
    harish

    I have run OPJJ but in this the checking rule "02" is defined for PP - " Production Order" while running MRP.
    We want to apply the checking rule for Purchase Order where we can exclude the same.
    We would like to know that how can we define the new checking rule for Purchase Order and assign the same to it.
    We have seen that checking rule which is showing in the ATP list of component is PP and availability check " 02".
    In Checking rule " PP " and 02 , Purchase Order is included. If we remove the same then while running MRP  , system will not consider the purchase order.
    let us know that how can we create new purchase rule for Purchase order.
    thanks
    harish

  • Sales order availability check considering the ROH stock/procurement time

    Hi Gurus,
    Our client's Production process requires  the availability check at order level to consider the procurement time required for the Rawmaterial (BOM component of the FERT, whose sales order is taken) in cases when this RM is not available in the plant, and Availability check should not consider this procurement time when this RM is available in the plant.
    ie in first case, it should consider the total time for in-house production as well as the time required to procure the rawmaterials, along with all other times that we use like Gr processing time, packing picking etc.
    In second case it should not consider the RM procurement time, but only the inhouse production time and other times as applicable.
    To my understanding, Availability check at order level will only check the time given in the MRP view of the FERT, and it does not check anything about RM stock or RM procurement time.
    Can you please give me some suggestions to meet this requirement of the client (client is into Food Product Manufacturing).
    Your quick response will be very helpful
    Thanks
    Jobi

    Jobi,
    Our client is not following Assemble to order or even make to order. The typical production process followed is neither make to order nor make to stock.
    Understood, although I am not sure why you are telling me what he has today; since your client has already told you his existing solution is unsatisfactory.  I have described a solution that seems to meet the short list of business requirements that you described in your first post.  I suggest you offer this solution to your client, unless he has already told you that ATO is not acceptable for some other reason not mentioned in your post.
    As already mentioned by the other experts Saurabh and Kiran and Mariano,  the requested functionality in general is not supported for MTS in standard ECC.  As always, anything is possible through enhancement or 'workaround', as long as the client has enough time and money, and you have sufficient skills to implement.
    If the client is willing to implement APO, which is the standard SAP advanced planning system, such a solution (multi-level availability checking with MTS) is possible as standard.  Within the Global Available To Promise Module of APO there are a couple of ways to get at this type of ATP solution.
    Best Regards,
    DB49

Maybe you are looking for

  • Problems with Boot Camp, OSX Lion Server 10.7.3, and Windows 7

    My new Mac Mini Server is running OSX Lion Server 10.7.3. I want to install Windows 7 as a dual boot. I start up Boot Camp and use an ISO image to create a USB boot disk. I don't seem to be able to use the DVD to install, so I use an ISO image on dis

  • Live Paint Bucket in CS5

    Using Illustrator on a Windows box running XP sp3 with an Intuos 2 I've been using Illustrator CS2 for awhile and have upgraded to CS5.  I need some help with a problem I'm experiencing with the Live Paint Bucket.    I select the illustration, go to

  • Video DVI splitter

    Hi, I was wondering if Mac has a video DVI splitter. I have DVI to Video Adapter for My Mac Mini, in a perfect world I would like to switch from my monitor to my TV with out having to disconnect any wires.

  • Yahoo Messenger WAP version

    Yahoo has Instant Messenger available as a WAP application: http://m.yahoo.com/p/messenger It seems to work "OK", here are the details: 1. You get access to your full existing messenger list after you sign in. 2. Since it's a WAP site, it's almost al

  • Changed Dept Dimension Hierarchy, erased all historical data!

    Yesterday I made a change to our Department dimension. I changed a base level member (034) to be a "child" to another base-level member (050). I changed the Parent property for 034 to 050 and didn't make any changes to the parent of 050, then saved a