BW Save System Copy (Dev vs Quality)

Hi ,
I have one BW system (FWD) connected to ERP (FED).
I wanted to Connect FWD to ERP quality (FEQ) to load data.
I used transport Connection , SAVE FOR SYSTEM COPY and chose source system FED.
In menu Tools - Conversion of Logical System names, i have set Original Source as FED and Target Source System as FEQ.
After the object collected and imported within FWD, i got the new transfer structure and infopackages under FEQ.
I have completed the testing by running Process chains with source FEQ.
Today, i wanted to revert the above change. I wanted to  copy the infopackages back to SED source from SEQ.
I have changed the Tools - Conversion of Logical System names, Original Source as SEQ and Target Source System as SED.
In Transport Connection, SAVE FOR SYSTEM COPY and chose source system FEQ.
Objects collected and and transport imported within FWD.
Unfortunately, the earlier infopackages remains under SEQ, while new technical name infoPakages had been created under SED source. Can i know how the get back the same TECHNICAL name infopackages back to my SED source as the process chain holds it.
Appreciate advice from anyone whos familiar with this issue.
Thanks.
Regards
Maili

Hi Maili,
Have a look at below note,
886102 - System Landscape Copy for SAP NetWeaver BW
In this you will find out complete system copy scenarios which is matching yours, hope it will be useful.
Regards,
Mani

Similar Messages

  • Error while exporting/transporting the Business system from Dev to Quality

    Hi,
    We are getting the following error whil exporting/trsnporting the Business system from development(SLD) env to quality(SLD) environment. The error is
      404   Not Found
      The requested resource does not exist.
      Details:   Go to main page of this application!
    We have followed the following procedure to export :
    1. opened the business system.
    2. Clicked on export option
    3. tried to download
    then we got the above error message.
    Please provide your precious inputs to resove our problem.
    Thanks
    Ramesh

    Go through the following links for transporting XI objects.
    https://service.sap.com/~sapdownload/011000358700001684302005E/HowToSLDandXI.pdf
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/0fa2c490-0201-0010-61b4-df12869c4753
    ere's a good link for what you are looking.
    Re: Transport design and configuration objects
    Here are some blogs.
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    Pls reward if useful

  • Problem in sapscript form from dev to quality server - 333 to 555

    Moved to correct forum
    Hi,
    I am working on a script form in which i am performing the modifciations in the form but the problem is when i try to check it ,it says the form does not exist.
    Actually the (dev) 333 server contains no dat as it is simply for the new report code where as 555(Quallity) Server is the replica of the Prd server and the valid data is present in it.
    I had try to perform the cpoy form client ,but it is allowing me to it in the quality as the error msg comes:-
    Changes to Repository or cross-client Customizing are not permitted
    Choose 'Display object' or 'Cancel'.
    Plzz provide me guidelines how to solve this problem.
    Edited by: Matt on Mar 13, 2009 8:28 AM - fixed subject formatting, moved to correct forum

    From what I understand from your first post, I think 333 and 555 are two different systems like dev and quality and in this case you will not able to get the sapscript in 555 by doing SCC1.
    You will have to attach the script into a transport request (when you change and try to save it will ask for a TR , click create new and save it - you will have to assign a package which you can check in the attributes of the script and use the same ) , activate the script.
    Now go to SE09 , for your user name , display request and you will find the Transport request and task under it.If you feel the changes you made are complete, then release the Task and then release the TR.
    Now you need to request the basis team (or who ever is authorized ) to import this to the 555.
    Hope this helps.
    Mathews

  • Deactivate integraionmodel after system copy

    Hello
    We have done a system copy (Productiv to Quality-System)
    But we have forgot do deactivate the integrationmodel.
    So in Quality-System the integrationmodel is active. But how could i deactived the integrationmodel?
    With the CFM2 i get a fail
    "Information about the release vers. of system RSCM has not been maintained  "                                                   
    RSCM = Production System
    How could i deactived the integrationmodel hard?
    Thanks
    Sven

    hii ines,
    check the foll threads.
    /message/5830628#5830628 [original link is broken]
    System copy
    regards,
    raghu.
    Edited by: Raghu on Sep 26, 2008 2:46 PM

  • RFC users locked after system copy in production system

    Hi,
    BW_User,MDBTC(RFC users) system users were locked in our BI Production system at the same time system copy activity was running in the Quality system(production to quality) so as per our colleagues concern after system copy they started Quality system with out changing background work-process 0 so some jobs were triggered which were copied from production system.
    Is there any cause to lock RFC users in production system for system copy? If there is any other reason where we can check logs
    Thanks
    Jalandhar Reddy

    Hi,
    Well maybe i am wrong to analyze your problem .
    Anyway I faced this issue to in our system before and we found that one background job was running  in a system that has basically  prompting an RFC connection to another system. In the t.code SM59 and there was wrong password was put in.We just reset the password and it was worked fine.
    You can try for this..
    Regards
    Bhuban
    RKFL

  • After System copy all objects become modified state in Dev and Quality .

    Hello All.
    we have 5 source systems, recently we did system copy for 4 source systems but only one system alone not participated.
    so now all objects in  SS become modified state in development and quality.
    earlier in Sys copy i faced the same problem in quality i will do the transport form dev to quality. but now in development itself its in modified state how can activate it?
    Thank you!
    Regards,
    Ranga
    Edited by: Ranga123 on Jan 10, 2012 5:57 PM

    Hi,
    Looks like system copy is not performed correctly.
    But there are options like
    go to source system
    myself BW system right click actiuvate and replicate option
    similarly for SAP R/3 source system.Right click and activate
    then there are other transactions in case there are specific objects to be activated
    RSDG_CUBE_ACTIVATE
    RSDG_IOBJ_ACTIVATE
    SO ON
    Thanks

  • Organization unit ID is different in Dev and Quality Systems

    Hi Experts,
    We have downloaded the Organizational Structure from ECC in the Dev System, Sales organizations, Sales offices and sales groups were created with number range Assigned to Current Active Plan version. but the number for the Sales orgs started with 50000026 instead of starting with 50000001. And in the Quality again  we have downloaded the Org. structure from ECC, now the IDs were created starting from 50000007. this causing the inconsistencies in the Qualtiy System like, Pricing procedures are not getting determined.
    why the Ids were created from 50000026 instead of 50000001.
    What are best practices to have the same ID for Organizational Units in both the Systems?
    Thanks and Regards,
    S Reddy

    Hi Kiran,
    thanks for responses,
    Now we are planning to delete the Org. Structure in Quality and planning transport if from Development. What is best approach to save the Org. model in Transport request and move to Quality. I came to know about the report RHMOVE30, will it be used for transporting from Dev to Quality?
    One more thing, if we transfer the Org data to Quality will it take the same no. in Quality. I have doubt, If Dev Org Id were created from 50000026 and Quality it will start from 50000000.
    Kindly help me,
    thanks and Regards,
    S Reddy

  • Save as system copy - BW QA -- BQ QA

    Hello,
    I'm attempting to create a transport in Transport Organizer in system BI QA in the mode "save as system copy". My plan is then to re-import to the same system in order to change the source system assignement of all involved transfer rules (I have a new R/3 QA that I want to connect to BI).
    However, I get an error message saying that "Edit objects separately since they belong to different original systems".
    What can I do about this? Which original system should I enter for these objects? BI QA or BI dev? Do I need to change anything in the transport settings in order to be able to transport from the QA system (standard is dev --> QA --> prod).
    Thanks,
    F C

    Check note 1493850 and 1408161. The program RSDG_TRFN_ACTIVATE is developed for regenerating and re-activating transformations:
    The programm has the following parameters:
    Transformation ID (TRAN_ID)     Selection via ID of transformation,                                     optional.
    Object status (OBJSTAT)         default = 'INA', should not be changed
    Type of source                  optional
    Source name                    optional
    Type of target                  optional
    Target name                    optional
    In case of no input for field Transpormation ID, all transformation objects will be regenerated for specified Tape of Source/target or Target/source name. If the programm will be run without any selections, all objects of transformation type (table RSTRAN) will checked and re-generated. DTP's containing transformation of source - / target type 'InfoSource' also will be re-activated.
    In case you need to reactivate an already active transformation you need to put the parameter Object status (OBJSTAT) as 'ACT' for the that particular Transformation (TRAN_ID).

  • Is ST-PI and ST-A/PI needs to be installed in DEV and Quality Systems.

    Environment:
    ERP and BI 6.0 / Windows / SQLServer 2005
    Hi All,
    Is ST-PI and ST-A/PI needs to be applied to DEV and Quality Systems of ERP and BW.
    I understand that ST-PI and ST-A/PI are necessary for Production Environment.
    Is it recommended to install or upgrade the same in Dev and Quality Systems of ERP and BW.
    Because I believe it is always good practice to keep all systems Support Packages including ST-PI and ST-A/PI the same in the same Landscape. (But could not find any documents from SAP.)
    Thanks and Best Regards,
    Raghunahth L.

    Hi Raghu,
    you can get into the problems which I have said if you dont implement that,also many support packs do have their dependencies on ST-PI and ST-A/PI and seriously I havent heard people implementing this on prod and not dev and qa....I have worked on with many big clients but never heard this
    Also if you ignore whatever I have said,still it is still recommended that you never apply anything directly on Production,It is always better if you first implement on dev and qa and see if you are facing any issues while implementing...so its always better to implement on dev and then qa
    and It doesnt take too much of time,so that should not be an issue after all
    Always follow SAP best Practices
    Rohit

  • Acitivites  R/3 quality and BW qualilty in case of System copy(database )

    Hi,
    We have carried out system copy (database copy )  to refresh r/3 qualtiy server from r/3 production server.
    client no of r3/ qulaity is same (earlier it was 500 and and after system copy also it is ketp same ie 500).
    Now we want to know what are the acitivites that are required to be carried out in  R/3 quality and BW quality as we want to refesh data in  bw quality.
    we already have source system RQ1CLNT500  in BW under SAP node and on running check connection option it show message "source system connection RQ1CLNT500 OK.
    But still when we want to fetch data in PSA it shows following message
    "No transfer structure is available for InfoSource 0FS_PORTFOL_TEXT in the source system"
    can anybody guide us to solve the problem
    Thanks and Regards
    Deepak Deshpande
    LIC of India,

    Hi ,
    This is common issue comes due to upgrade /system copy .
          This is caused because table ROOSGEN does not contain an entry for the erroneous Datasource.
          The entries in ROOSGEN table are generated in $TMP (Temporary package) and sometimes after upgrade, they disappear.
          It happen if the extract structure of a DataSource gets a new timestamp we often enhance DataSources between different releases,upgrades .
         so the normal procedure should be to replicate the DataSources into BW in order to get the currently valid set of metadata. Solution:
    In case of 7.0 DataSources, you need to reactivate them by using the program RSZ_DATASOURCES_ACTIVATE_ALL and if the issue occurs for few datasources, they can be activated manually also.
    regards,
    Jaya Tiwari

  • System Copy abap+java PRD to DEV

    Hi,
    we want to do a Systemcopy from our productiv system to develop (abap+java / Maxdb / NW 7.0).
    Normaly this is my way.
    -Backup Maxdb
    -Export Java with sapinst
    -deinstall DEV system
    -install DEV system by choose the last Backup an the Java export
    This works fine !
    So is it possible to do this a little bit faster.
    For example only restore the last Backup from productiv system
    to develop an recreate/reinstall the Java by another way ?
    Thanks
    Steven

    Hi,
    You should not choose other way because that will not be supported. Since for Java most of things lies in the file system, so, you have to export As Java to do the system copy.
    Thanks
    Sunny

  • System copy of a DEV system on the same server

    Hi experts!
    In our company, we have a 2-systems landscape, DEV and PRD, and we are working on the system together with another organization of the same company. Now, they want me to "split" the systems, one for each organization, making a copy of the systems. In other words, they want to completely split the systems, running on the same server, development server will have 2 systems, DEV and DEV' and so on in production server.
    The doubt is in developments, as I don't know how to face the CTS and TMS setup to provide 2 different development environments, without losing the actual change requests for both systems. As you know, I have to change the SID, because the copy will be in the same server, so what happends with change requests?? Do I have to make a copy of DIR_TRANS and set up a new DIR_TRANS for the new system???
    Thank you in advance!
    Fran.

    Hi William,
    I guess I did not explain it properly.
    Now we have:
    1. System DEV in DEV server.
    2. System PRD in PRD server.
    Transport later ZDEV from DEV to PRD.
    And we will do:
    1. Homogeneous system copy from DEV to DEV' in DEV server, so we will have DEV and DEV' on the same server.
    2. Homogeneous system copy from PRD to PRD' in PRD server, so we will have PRD and PRD' on the same server.
    Sizing is good, servers are very powerful.
    The doubt is configuring the TMS, as we will have two different development environments on the same server. How do I have to set up the TMS properly???
    Thanks!!

  • Save for system Copy grouping how we can use

    Hi,
    In transporting objects for grouping the collected objects (necesaary,iefore,after and befroe ,after i am ok with those) i do not know waht is the use save for system Copy can anybody expalin what it is and how it is useful when collecting the objects.
    Thanks & Regards
    sathish

    Hi,
    Before transport the objects, you must set the source system connections, we won't trasport source systems, but I need to tell to my system if I release and Transport the request then where it shoud go and which source system/target system like this , you can check in RSA1>Tools>Assignements of source system.
    I'm not getting
    what is the difference between for coping and before after collecting please i want some clarification
    Thanks
    Reddy

  • After system copy DTP pointing to Prod Sourcesystem in Quality

    Hi,
    We have copied BWP system to BWQ.
    All the transformations are correctly pointing to R3Q system.
    But DTPs are still pointing to R3P system.
    How to convert this source system assignment for all the DTPs and InfoPackages?
    Regards
    SSS

    Hi,
    Collect the DTPs and then Transport the DTPs again.
    See the following  SAP Notes:
    SAP Note 886102 - System Landscape Copy for SAP NetWeaver BW
    SAP Note 325470 - Activities after client copy in BW source systems
    SAP Note 325525 - Copying and renaming systems in a BW environment
    SAP Note 1333302 - Special procedure for BW system copy
    SAP Note 996238 - Dump 'RFC connection error' after BW system copy
    Search for PDF in SDN
    How Tou2026System Copy in SAP Business Intelligence System Landscapes
    Thanks
    Reddy

  • About sap bw system Copy or backup ?(URGENT)

    Hi gurus:
         Hi friends,I saw many theads about this subject,and I found many documents,But STILL I can't find the way to solve my problem.
         It is: How to export the objects I created in develop system to a harddisk, then import it to the QA system . Dev to QA with harddisk NOT online?
         And can I backup the whole bw system in the harddisk,and restore the bw system in the qa system istead ? how to backup the bw system ?
    All useful reply will assign points
    thx
    chan

    Hi Zegion,
    I think the following may help you:
    Purpose: Preserves logical system dependent objects for restoration in case of a system copy issue when a logical source system is deleted or deactivated. BW will auto re-generate a lot, but not these objects.
    1.     Create on a development system like BWD, because the system is set as a development system in SCC4 and can create and export transports, and will include all objects. A dummy can be used for comparison if the system to be copied is production or test.
    a.     If creating on another system, like BW test (BWT) or production, you must first open the system in
       i.     SE06 – System Change option – modifiable /BIC and /BI0
       ii.     SCC4 – client settings – set like in BW Development system (BWD)
       iii.     STMS – in client 000 from BWD (domain controller)
                1.     Remove BWT from transport path
                2.     Setup new 2-system path BWT-BW? (BWS or virtual system). This creates a ZOUO transport layer, allowing creation of non-local/not $TMP package transports (see complex sample below)
    2.     Go to RSA1-Admin workbench, Transport Connection
        a.     Select Object Types
        b.     Set for Grouping-“Save for system copy”
        c.     Set for “Start manual” collection
        d.     Set for Display “List”
    3.     Drag and drop source system (select from “select objects” list and “transfer selection”) to collection window, example – SCEM, SC0CLNT575, DEVCLNT100, SAP_DEMO. I recommend only doing one source system at a time for maximum flexibility…and because the R3 sources are very large.
        a.     Then execute collection – “Gather dependent objects”
        b.     Select each category (mainly Transfer Rules, Transfer structure and InfoPackages…whatever is selected. On each header, right click and select “transfer all below”
        c.     Validate that there are no objects in the $TMP development package (DevClass). If it is, select the object and change package button to set to ZAWB. (Anything but $TMP (local))
        d.     NOTE- To reset transport connection, select anything on the left frame of the screen to refresh
    4.     You are now ready to transport…select the truck icon to create
        a.     Call it Save for System Copy and the source system name
        b.     Go to SE09/SE10 and release it and tasks to the OS level
    5.     Cleanup – reset STMS and distribute, reset SCC4 and SE06 on “BW0”/Source BW system
    6.     Verify RSA1- Tools – mapping of source system names on target BW system (i.e. BWU) for “source system” of transport (i.e. SC0CLNT575).
    7.     Verify RSA1- Modeling-Source system connection checks OK on target system
    8.     Manually import transport in STMS – Import Queue, extras, other requests, Add (to buffer). Import single with right click or partially loaded truck icon, select options as below:
    9.     LAST STEP – Validate import logs and activated objects. If there is an error, ensure the link to the new system is active, the RSA1-Tools-Mapping of source system names converts properly from say DEVCLNT100 to TSTCLNT200 (correct frame of reference) and reimport.
    if it helpful reward point are appreciated