Error while exporting/transporting the Business system from Dev to Quality

Hi,
We are getting the following error whil exporting/trsnporting the Business system from development(SLD) env to quality(SLD) environment. The error is
  404   Not Found
  The requested resource does not exist.
  Details:   Go to main page of this application!
We have followed the following procedure to export :
1. opened the business system.
2. Clicked on export option
3. tried to download
then we got the above error message.
Please provide your precious inputs to resove our problem.
Thanks
Ramesh

Go through the following links for transporting XI objects.
https://service.sap.com/~sapdownload/011000358700001684302005E/HowToSLDandXI.pdf
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/0fa2c490-0201-0010-61b4-df12869c4753
ere's a good link for what you are looking.
Re: Transport design and configuration objects
Here are some blogs.
/people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
/people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
Pls reward if useful

Similar Messages

  • Error when reading the ID of the business system from the SLD

    Hi,
    I am working on a scenario JDBC - XI - BW (ABAP Proxies). I configured all the steps required to connect XI & BW systems. The SLDCHECK transaction is all green. I was able to connect to SLD from BW using SXMB_IFR tcode too. I was able to look at all the XI Repository interfaces from SPROXY tcode in BW. Created a new ABAP proxy (class interface and method) for the message interface in XI from BW (SPROXY Tcode). Created all required config in XI Directory. Got the message from JDBC adapter, mapping done successfully, and the message failed in the CALL Adapter Step.
    The error is "Error when reading the ID of the business system from the SLD for system BWS and client 100."
    What could have gone wrong. Thanks in advance.
    Srini

    Hi,
    :::::::One Should Have the Following Roles AS A XI Developer With Out Admin Rights ::::::
    1) SAP_XI_Developer_ABAP +
    2) SAP_XI_Developer_J2EE  +
    3) SAP_XI_MONITOR_ABAP   +
    4) SAP_XI_MONITOR_J2EE    +
    5) SAP_SLD_ADMINISTRATOR +
    6) SAP_XI_BPE_MONITOR_ABAP +
    7) SAP_XI_DEMOAPP
    8) SAP_XI_DISPLAY_USER_ABAP +
    9) SAP_XI_DISPLAY_USER_J2EE +
    Regards
    Sesh

  • The Business-System  from SLD canu00B4t read

    Hello,
    during export from an configuration object folloging exception occure:
    "The Business-System  from SLD can´t read"
    It seams all OK ...
    Thanks in advance,
    Frank

    Did you change the name of the Business System in the past? Then you need to keep the old Business System name in the SLD, as during exporting and importing of configuration objects the history of the objects is checked as well.
    Regards
    Stefan

  • Error while exporting transport requests

    Dears,
    In our PI 7.1 server,configured with CTS +,We are getting below error while exporting transport requests:
    Caused by: com.sap.tc.di.draft.ts.TsExecutionException: Error executing function (check stacktrace for details): EPS_OPEN_OUTPUT_FILE, (service=com.sap.tms)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.TmsJCoExceptions.throwTsServiceException(TmsJCoExceptions.java:74)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.EpsJCoAdapter.openFile(EpsJCoAdapter.java:98)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.AbapEpsOutputStream.open(AbapEpsOutputStream.java:83)
    ... 40 more
    Caused by: com.sap.conn.jco.AbapException: (126) OPEN_FAILED: OPEN_FAILED
    at com.sap.conn.jco.rt.MiddlewareJavaRfc$JavaRfcClient.execute(MiddlewareJavaRfc.java:1492)
    at com.sap.conn.jco.rt.ClientConnection.execute(ClientConnection.java:1065)
    at com.sap.conn.jco.rt.RfcDestination.execute(RfcDestination.java:987)
    at com.sap.conn.jco.rt.RfcDestination.execute(RfcDestination.java:977)
    at com.sap.conn.jco.rt.AbapFunction.execute(AbapFunction.java:300)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.JCoAdapter.executeFunction(JCoAdapter.java:103)
    at com.sap.tc.di.draft.cts.impl.adapters.jco.EpsJCoAdapter.openFile(EpsJCoAdapter.java:78)
    In SE01 it show tp 12 while releasing request.
    Please suggest.
    Shivam
    Edited by: Shivam Mittal on Mar 16, 2010 1:04 PM

    File Permission Issue.

  • Error occurred when determining the business system (NO_BUSINESS_SYSTEM)

    Hi ,
    I am working on a POC(ECC 6.0(proxy)>PI 7.1>(proxy)ECC 6.0).
    I have created
    1) IR objects.
    2)Proxy generation & report program to fill the proxy structure.
    3)ID objects. (reciever CC, RA, ID, RD)
    I am getting below short dump on Sender ECC side,
    An exception occurred which is explained in detail below.
    The exception, which is assigned to class 'CX_AI_SYSTEM_FAULT', was not caught
    and
    therefore caused a runtime error.
    The reason for the exception is:
    Error (id=GET_BUSINESS_SYSTEM_ERROR): An error occurred when determining the
    business system (NO_BUSINESS_SYSTEM)
    pls let me know, what might be wrong.
    santosh.

    Hello,
    You may need to create your business system and point it to the Integration Server on SLD.
    Generally it acuses an error on tcode SDLCHECK, for this please check note #1143810.
    Regards,
    Caio Cagnani

  • How to transport an LSMW object from dev to Quality and to Production?

    hi All,
             Could any one please specify how to transport the lSMW object from developmen to Quality and finally to Production?
    Thanks in Advance.
    Regards.
    Abhilash.

    Hi,
    The "cleaner" way is using normal transport procedure via "Extras->Generate Change Request".
    This will transport the entire project though, not possible to transport a single object this way.
    step by step
    1. Run Tcode LSMW in source system.
    2. in the menu bar choose Extras-->Export. Now give the filename and save in your desktop.
    3. Now login to destination system. again execute LSMW.
    4. Now goto Extras-->Import.Give your file which was downloaded earlier.
    5. Now tool bar click on import with diffrent name option and give your new project and subprojectname.
    6. Now execute all steps.
    Also refer the below link
    http://help.sap.com/saphelp_crm50/helpdata/en/da/a22506a3291b418b759524b278dcde/content.htm
    Please reward points if it helps
    Thanks
    Vikranth

  • Can we move the Organisation structure from DEV to Quality to Production?

    Hi Experts,
    Can we move the Organisation structure from DEV to Quality to Production?
    If yes, I believe that we have to change  backend details at some areas.
    Please any one provide procedure and precautions for doing this, In general how we have to proceed?
    Thanks
    Reshma

    Hello Reshma,
    See program documentation from PFAL transaction (ALE distribution of HR Master Data).
    You will need:
    - an evaluation path,
    - a distribution models for sender DEV > receiver QUAL and sender QUAL > receiver PROD for correct message type.
    Regards.
    Laurent.

  • How to transport the distribution model from devlopment to quality in idocs

    Hi ,
    I am developing settings for idocs for the basic idoc type 'MATMAS03'.
    By using SM59 , I gave the connections of two logical systems.
    I created the distribution model by using BD64. when I generate the partner profiles , automatically, port and partner profiles are created.
    How to transport from DEV to QUALITY of RFC connections, Distribution model and automatically generate partner profils and port ?
    Plz give me the answer in broad way
    Regards
    NTR

    hi,
    Refer to this link...
    how to transport distribution model

  • How to transport an existing infopackage from dev to quality?

    Can anyone pls give me the steps for transporting an existing infopackage from dev to qual?
    I am not finding any infopackage in RSA - TRANSPORT CONNECTION
    Points guranteed.

    Here is the steps:
    1. rsa1->transport connection
    2. left panel choose 'object type', middle panel choose 'infopackage' and 'select objects'. Do a search here with your IP technical name.
    3. then choose your IP and 'transfer'
    4. will go to right panel, choose collection mode 'manual' and grouping only 'necessary objects'
    5. after objects collection finished, create request. Repeat the same steps with grouping 'in dataflow before'
    6. If they are $TMP, then change the package.
    7. When you click the Save on the change package, it will prompt for transport. Here you can provide an existing open transport request number, or if you like here itself you can create a new one.
    8. You can check the request in SE09 to confirm.
    9. If everything is ok, release your request and ask your basis/security guy to move to QA.
    Also you can open your InfoPackage and click on the truck symbol directly from IP window.
    Hope it helps..

  • Getting error while try to open SAP system from GUI

    Hi All,
    When I try to open any SAP system from GUI I am getting below dump error message. Please suggest on this.
    Thanks  & Regards
    Surender

    Hi Surender,
    Is it a general user issue or are you the only user facing that issue ? Does the error occur right after you enter user/password ?
    From the GUI session status bar, I see " Memory Low. leave the transaction before taking a break".
    This looks like a improper memory configured system. I would suggest that you review your memory parameters as per the SAP note 146289.
    If you already have the memory parameters set to at least the values suggested by that note, please further increase the parameters below:
        abap/heap_area_total
        abap/heap_area_dia
    Hope that helps.
    Kind regards,
    Eric

  • Changing Business Systems from Dev to QA

    I am trying to transport Integration Directory (Configuration) objects from DEV to QA.  Is there a way that I can define my business systems (or something else) so that when I import my ID objects into QA I do not have to go into the Communication Channels to change the sender(s) and receiver(s) of the interface from DEV business systems to QA business systems?

    Hi Kirk,
    I have not noticed this much, so I am bit doubtful.
    It MAY be possible with below conditions
    1)  If you use CMS and have your transport groups enabled in SLD (for QA, Prod equivalent of Dev)
    2) you use the same name for the receiver & sender adapters (common names across scenarios & servers)
    3) you do the transport for the SECOND time
    what i mean as second time is, suppose there is a scenario to the same business system and you are using a RFC adapter, (which was already configured for someother scenario in your QA)
    with all these things, you may anyway have to ACTIVATE (but not configure) after the transports.
    Hope this helps.
    Regards
    Vishnu

  • Export views and business areas from dev to prod.

    Hi Gurus,
    I am using oracle database 10gR2 and Oracle BI Discoverer Administration 10gR2.
    I have an End User Layer disadmin1 with 10 business areas. This EUL also have folders for the views in its own schema. I used original import/export utility to export this EUL from Development to Production environment.I exported the schema disadmin1 form development and imported it into production into same shcema disadmin1 (This exported the views too) . It is absolutely working fine.
    Now I have to develop 5 more business areas in the same EUL as phase 2 development I am keeping the EUL disadmin1 for bug fixing for initial 10 BAs, and I have another EUL disadmin2 to develop new business areas. For these new business areas, I have to firrst create views and then create folders on these views in disadmin2. I will export the new business areas form discoverer utility 'Selected Business Areas' from disadmin2 and will import them into production in original EUL disadmin1. My problem is how can I export new views from development to production.
    Thanks for the help.

    With Discoverer, there is not necessarily one right way to do things. There is certainly nothing wrong with the process you are doing. I believe Oracle had a different process in mind with Oracle, but that does not mean your process is wrong. Did you install the seeded (Oracle term) business areas that come with Discoverer, and activated the business views for those Oracle business areas? Put those into Production and your users can develop workbooks on the fly in Production, rather than wait for something to go through a development-test-production process. Which can be good or bad depending on your individual situation. As for creating new views, I suggest talking to your Oracle technical team to see what process they have for approving new views in production and getting those views created. I would suggest getting those approved and created first before relying on using them for Discoverer development (just in case the creation is not approved), but that is just my opinion.
    John Dickey

  • Error while transferring Plants to TM system from ECC

    Hi Experts,
    I am getting below error message that Location (Plant) already exist in target system with Outbound queue blocked status while in target system plant does not exist physically in CFM2 Tcode.
    Please advise if any RFC settings are missing in both ECC, TM system.
    Regards,
    Shakti

    Hi Bimal,
    Thanks for the reply, I have 3022 shipping point available in TM transferred earlier, but system should consider the same number 3022 configured as plant for shipping point. I guess this is a standard behavior which need to be resolved using BADI.
    Kindly suggest if you know any BADIs for this issue.
    Thanks,
    Shakti

  • How to transport the modified Query from DEV to QA

    Hi BW users,
    I have made few changes for existing query and transported to QA and the changes are reflecting in QA .But did n't transported to Production .and Now I have to added one more InfoObject.
    Now Can I add that Info Object in QA  it self or Do I need to add the New Info Object in DEV and Transport it to QA again.
    Please let me know as it is very urgent to me.
    Thanks in Advance
    Sanjay M

    Hi Sanjay,
        Any changes you should to in DEV only. Do changes in DEV and move transport to Quality and subsequently to Production.

  • Error while reading ID of own business system from the SLD for system

    Dear all,
    We running on a SAP PI 7.1 enhancement pack 1.I know that there some threads about this subject, but unfortunately all suggestions found so far didn't solve my problem:
    - SLDCHECK reports no errors
    - SLAPICUST: pointing to the SLD
    - SXI_CACHE with full refresh: no result.
    Does anyone have a clue for me?
    Kind regards,
    John.

    I hope you are facing this prolem with one particular Business System.. Since you have checked all the points and still facing this issue then try below options..
    1. First try to clear full SLD cache and then test.
    2. If cache doesn't solve the issue then delete the Business System from SLD and Integration Directory first then re-create the BS in SLD and "Clear SLD Data Cache" from "Environment" menu in Integration Directory and then import the Business System and test your scenario.

Maybe you are looking for