CA03 tcode customization of workcenter, activity type

Hello Expert,
In CA03 Transaction Code, there are fields like Operating,workcenter, plant , control Key, Activity Type etc..
I just want to know where these all customization can be done want to check cost center and activity hours for one article.
where we assign operating, workcenter,plant, control key, Activity type ???
Thanks in Advance.
Sujeet

Dear Sujeet,
1.Work center and routing are also the master datas for PP Module.
2.Work center is the place at which the individual operations are carried out and its created using CR01.
3.Each work center will be linked to a cost center in the costing tab.
4.Before making this assignment, for a combination of cost center and activity type the activity per hour
rate will be maintained in KP26 for the periods.
5.If for the same activity type different rates are to be maintained means,then it can assigned to a
different cost center only.
6.One work center can be linked only to one cost center.
7.one cost centers can be linked to several work centers.
8.Cost centers will be created using KS01 and activity types using KL01.
9.While creating routing using CA01,for each operation a work center must be assigned.It means that
particular operation will be done in the mentioned work center.
10.Control key can be assigned either directly in the work center or else in the routing manually it can
be added or changed.
11.A control key tells the whether an operation is relevant to scheduling,costing,capacity
requirements,qualtity insepction characteristics.
12.Control key configuration can be made in OP67.
13.OP5A is for configuring the routing.
14.OPFA is for configuring the work center fields.
Regards
Mangalraj.S

Similar Messages

  • Maintenance activity type - PM order

    Hello,
    I have to configure the field "activity type" on PM order (tcode IW31).
    I want to make this field obrigatory and It can't come with default values. It must comes empty.
    In SPRO, when a take off the link between the Order type and the default value for activity type (table T350), occurs the error bellow, on tcode IW31:
    "No maintenance activity type could be determined"
    After that, occurs a runtime error, and I can't enter in the IW31 to create the PM order.
    Somebody knows how can I do what I need?
    Tks, Camila.

    Message 2 (second part):
    Source Code Extract                                                                               
    Line  SourceCde                                                                               
    1 FUNCTION t350_read.                                                     
        2 *"----
        3 ""Lokale Schnittstelle:                                               
        4 *"  IMPORTING                                                           
        5 *"     VALUE(AUART) LIKE  T350-AUART                                    
        6 *"     VALUE(LANGUAGE) LIKE  SY-LANGU DEFAULT SY-LANGU                  
        7 *"     VALUE(MTYPE) LIKE  SY-MSGTY DEFAULT ' '                          
        8 *"  EXPORTING                                                           
        9 *"     VALUE(ILART_TEXT) LIKE  T353I_T-ILATX                            
       10 *"     VALUE(T350_WA) LIKE  T350 STRUCTURE  T350                        
       11 *"  EXCEPTIONS                                                          
       12 *"      NO_T350_ENTRY                                                   
       13 *"----
       14                                                                         
       15                                                                         
       16 *--- Pufferung übergeben -
       17   t350_wa = t350.                                                       
       18   ilart_text = t353i_t-ilatx.                                           
       19 *--- nur weiter wenn noch nicht gelesen -
       20   CHECK t350-auart <> auart.                                            
       21                                                                         
       22 *--- Lesen Vorschlag ILA zur Auftragsart -
       23   SELECT SINGLE * FROM  t350                                            
       24          WHERE  auart       = auart.                                    
       25                                                                         
       26   IF sy-subrc <> 0.                                                     
       27     if mtype <> space.                                                  
            MESSAGE ID 'I0' TYPE mtype NUMBER '226'                          
       29           RAISING no_t350_entry.                                        
       30     endif.                                                              
       31   ELSE.                                                                 
       32 *--- Übergeben T350 Workarea -
       33     t350_wa = t350.                                                     
       34 *-> nur wenn nicht im Puffer und Sprache spezifiziert                   
       35     IF t353i_t-ilart <> t350-ilart and                                  
       36        not language is initial.                                         
       37 *--- lesen Text zur ILART -
       38       SELECT SINGLE * FROM  t353i_t                                     
       39              WHERE  spras       = language                              
       40              AND    ilart       = t350-ilart.                           
       41 *--- Übergeben Text zur ILART -
       42       ilart_text = t353i_t-ilatx.                                       
       43     ENDIF.                                                              
       44   ENDIF.                                                                
       45                                                                         
       46 ENDFUNCTION.
    Edited by: Camila Peralta on Jun 22, 2010 2:17 PM

  • Activity type in workcenter

    Hi PP experts,
    I have created the activity type and assigned it to work center. While saving it is showing the following error
    Error: "You are attempting to assign the activity type to the workcenter, However this activity type is not been set up in controlling area for the cost center"
    Please help me on this regard
    Samarth

    Dear Mr.Samarth,
    Try with this T codes.
    KS01,KS02 - Create & Change Cost centre Respectively.
    KL01,KL02 - Create & Change Activity Type.
    KP26 - Activity Output/Prices.
    In CR01 while creating a work centre,you will be assigning a cost centre and activity types defined & valid for that cost centre.
    Hope it will solve your issue.
    Regards,
    R.Brahmankar

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • How to set activity type for a cost center

    i was practicing the split valuation topic and for the that i was making a routing for a product so that i can have that product for inhouse production.
    while using ca01(to create routing), i am facing a problem with the activity type.
    when i am setting up the operation i am getting an error " activity type # is not set up for cost center 10004220 in year 2007"
    can you please tell me how should i come out of it.
    thankyou very much

    hi Nandha, i am sorry but i could not do it. i am new in this. let me make my problem more clear to you.
    i was creating a routing using ca01
    after puttig all the details i switched to operations tab and in operation tab i put workcenter as (1111 - lathe, may be i am wrong as i told you i am just practicing).
    i did not put anything on that screen and then when i pressed enter it took me to another screen with name Operation check.
    here is the layout of the problem on that screen
                          std val      unit     activity type     efficiency
    set up                            min        1422
    machine                         min        1421
    labor                              min        1420
    and then curser being on the std value i am getting this error "activity type 1422 is not set up for cost center 1000 4220 in the year 2007.when i am ignoring it it is switching to next std val coloumn and the same error.
    thankyou for your time

  • MASS activity type in router

    I'm hoping someone has any ideas if CA85N can really MASS change activity types. I have been testing the transaction in our test client and have entered the material, plant, work center in the selection criteria and then in the change tab I have entered the new activity type and click the copy button.
    However, the system keeps giving me errors that there isn't an activity type for standard value for setup. But I'm not changing setup, I'm trying to change labor.
    I also get another error "consistency check is not successful when changing operation 0004. But for this one material I'm not changing operation 0004. I'm changing operation 0030.

    Hi,
    Activity Type will for a Work Center and not for the Standard Value Key. Hence when you are trying to change the activity type system will try to modify for the standard values for Setup / Operation / Labour etc. In your case I think you have not entered any activity type for the Setup, hence it is showing that error.
    I suggest you to go tcode : CR02/CR03 and check in the costing tab whether you have maintained the activity type for Setup or not.
    Hopw this will help you.
    regards
    radhak mk

  • Activity type - actual cost automatic updation

    Hello Gurus
    I have done KL01 KP06 and  KP26  transactions. That is I ahve defined the activity and assignes a cost conter to it.
    i need some report , when i will  check  the     tcode    S_ALR_87013611 - Cost Centers: Actual/Plan/Variance
    Here  my actaul  cost want to update actumatically , is  it possiable 
    can Anybody  give me the solution
    Regards
    Sri

    Hi,
    What do you mean by 'automatic' update of actual costs? Whenever you will post a transaction on the activity type you have defined, you will create actual costs based on the tariffs you have provided.
    Regards,
    Eli

  • Activity type origin text doesn't have been showed on Cost analysis report

    I have defined three acitivities TMAQ, TMO, CIF. But  the origin text column of these acitivities is not showing in cost Analysis report(althoug the origin is showed), i.e. when we go to an order & navigate to "Cost Analysis".  TCODE:CO02 (Production order)
    Anyone knows how to show the origin text ?
    Thanks a lot for your comments.
    Vero

    Hi Veronica
    I think maybe it´s missing the description in language you are running the report.
    Check transaction KL03 to see if the activity type has the description in the language you are logged.
    If not go to KL02 and update the description and try to run it again.
    Regards
    Fred

  • Activity type and skf calculation

    Dear Forum,
    I would like to seek advice of the difference of both calculation. 
    1 skf - 1 big amount allocated to all cost center. if the skf measurement is number of employee, then the cycle will apportion the amount according to the number of employee. correct?
    2 activity type - if the measurement is hour, then base on amount per hour defined in kp26 to get the total amount. correct?
    3 kp26 only can be used by activity type. not applicable to skf. correct?
    please advise me.
    Thanks

    hi,
    1 . As long as you have the Variable portion type as SKF defined in your Allocation cycle you can distribute the cost according to the SKF defined for each cost center.  hence you are correct.
    2. yes based on the per unit price of the activity type defined in the KP26 the total amount of the activity is calculated.
    (FOR ACTUAL the tcode is  KBK6)
    3. absolutely its only for activity types.
    Hope this helps.
    regards
    sayeed

  • Activity type field in Maintenance Order

    Hi all
    My client requirement is that activity type (LARNT)should me mandatory in maintenance orders to capcture the cost with out fail.
    Could any body suggest me that when we need to do that?
    Regards
    Srinivas

    Hi
    Since the work center is mandatory you can make the activity type mandatory for workcenter master data record in OPFA IMG
    or check in OIOPL where you can make the activity type as mandatory ,but i think it will only work once you nagivate the operation tab
    or check whether user exit order at save will be useful
    regards
    thyagarajan

  • Assign the desired activity type to cost center 1102 within cost center acc

    Dear all,
    I am facing the problem mentioned as subject during entering the activity type.
    please guide me to overcome this problem.
    rgds,
    Vijay Mankar

    Hi Vijay,
    The problem is as expected by me it is due to assignment and acitivty price details missing. This needs to be created in KP26.
    Once you enter txn KP26 you need to type active version generally "0", then enter period 1 to 12, Fiscal Year "2007" and populate field "Cost Center" and "Activity type" now use "F5".
    In the overview screen populate the value "Fixed Price" and "Variable Price" and save the transaction. (We are entering price for individual period but same across all period)
    Now try creating Workcenter and assigning the Cost Center and Activity type. It should work.
    Reward your points,
    Regards,
    Prasobh

  • Block Activity types in Activity Scheduling Calendar

    Hi,
    We have a requirement in which only some of the Activity types needs to be synchronized to MSA calendar. I've maintained the customizations in CRM side (Trxn:SPRO) and now the activities are being blocked on Activity-->Calendar. But now the issue is that the blocked Activity types when created from Activity Scheduling is appearing over in the Activity Scheduling calendar. I've an analysis like if we can make the reference of the Calendar in Activity Scheduling to the same reference as that of the Activity calendar. Any pointers on this would be helpful
    Regards,
    Rashmi.

    This was resolved by adding a line of code in the Activity Scheduling Calendar

  • Activity type in additive costs

    Dear Experts,
    is there a way to add the activity type field in additive costs "tcode CK74N", its a customer need to allocate activity types manually on materials.
    and if there is a transaction to allocate activity types on a group of materials (like MASS creation)
    Appreciating your quick response and thanks in advance,

    Hi
    I am sure it is there. Either in resource field or some other field..
    If item catg E is there, then option to enter act type will also be there
    Br. Ajay M

  • ACTIVITY TYPE IN CO

    Hi sap gurus
    plz spare few minutues with this
    What is Activity type in CO
    how will u give link with cost center 
    plz look into this
    rgds
    prasad

    Hi
    Activity types describe the activity produced by a cost center and are measured in units of time or quantity.
    In activity type planning, control data determines whether the activity price for evaluation of the activity type is manually set or is derived iteratively through activity price calculation
    Activity type creation at TCode KL01 - Create
    Cost Centre creation at TCode KS01 - Create
    Activity type and cost centres are assinged to Workcentre at TCode CR01
    Cheers
    Srinivas

  • Making Activity Type Mandatory in Maintenance Plan

    Hi PM Gurus,
    Can someone please let me know how to make the field "Activity Type" and "Planner Group"  mandatory (Required Entry) in Maintenance Plan at screen level.
    Cheers
    Deepal

    Hi ,
          If you do not want to go for user exit then you can also get it using transcation variants via tcode SHD0 ... for IP41 /IP02/IP42/IP43 Tcodes ..
    Search this forum for steps as it was discussed many times ..
    regrds
    pushpa

Maybe you are looking for

  • Unable to view "Properties" for Spartan launch icon.

    Build 10049 ... minor nit ... glitch When I right-click on the pinned Spartan Quick Launch icon, I seen the normal three choices: Project Spartan Unpin this program Close this window. However, when I right-click on the top choice (Project Spartan), t

  • What tool can I use to load CD's made from a PC to my Mac for use with iMovie?

    I have digitized my old VCR home movies onto a CD, but did that on a PC before I got my iMac.  I am keen to transfer the material into iMovie for editing and ultimately producing a DVD, but my Mac doesn't recognize the CD when I insert it.  Is there

  • EA2 Connections are not saved

    When I migrate my connections from a previous version of SQL Developer these connections will not be saved. In the command window I get following messages: WARNING: Unknown directive: SetSkipJ2SDKCheck (this message is always displayed in the cmd win

  • RFC-SOAP (B2B)

    Hi....All, 1) I am doing RFC-SOAP Scenario (B2B), we r getting the response from target(soap) system to XI, from XI we want to send the response to sap system inbox.. how we will send the response from xi to sap inbox. pls suggest me..its very urgent

  • Move hana db from single tenant to multi tenant

    Hi experts, I have read that, for the moment, we cannot do an upgrade of a SAP system + conversion to a multi tenant Hana database in one shot. We have to deploy it on a single tenant and then move it to a multi tenant environment (where we can put a